B08_140P1221R0013_Att_C1_STO_Cover_Sheet.docx
DOCX document 21 KB Posted
- Attached to
- LW MABO SABER IDIQ
- Solicitation number
- 140P1221R0013
About this file
This document is a notice of proposed task order for the replacement of a diesel storage tank at Colorado National Monument. The project includes removing the existing tank and installing a new tank, shutoff systems, pump, dispenser, hoses, nozzle, card reader and monitoring systems. A site visit is scheduled for March 16th, 2022 at 10am at the maintenance building, where contractors will be given a park map and directions to the project site. Proposals are due in accordance with solicitation 140P1221R0013 issued by the National Park Service Intermountain Region. The project magnitude is between $100,000 and $250,000 and must be completed within 60 days of notice to proceed. Contractors must submit an acceptable safety plan, insurance, and proposal pricing using the attached RS Means estimate format. The anticipated award date is not provided.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE OF PROPOSED TASK ORDER
REQUEST FOR PROPOSAL SEED TASK ORDER
REFERENCE NO: 140P1221R0013
DATE: February 25, 2022
PROJECT TITLE AND NUMBER: 40561716 – Colorado National Monument Replacement of Saddlehorn Area Fuel Storage Tank
- Page 1 of 1
PROJECT SUMMARY:
The primary work of this project includes, but is not limited to, removal and replacement of the diesel storage tank, shutoff systems, including the pump, dispenser, hoses, nozzle, card reader system and monitoring system. Work includes transportation and disposal of the existing tank.
SITE VISIT SCHEDULED FOR: 10 am MT, March 16, 2022. Meet at Maintenance Building from where we will drive to the East and West Entrance Stations.
Directions to the Maintenance Building - enter Colorado National Monument from the Fruita Entrance and drive about 4 miles, just before the Visitor Center take a right turn into the administrative area and the Maintenance Compound will be the first buildings on the road.
Park map may be found at: www.nps.gov/colm
COVID-19 specific requirements for the site visit: All contractors attending the site visit will be required to wear a mask if entering a federal building. Most discussion will occur outside
INCLUDED CURRENT WAGE RATES: See Attachment D for Mesa County
SPECIAL REQUIREMENTS:
Acceptable site-specific and project-specific safety plan must be submitted before work begins.
OTHER ATTACHMENTS:
Additional and Revised Clauses and Provisions:
PERFORMANCE PERIOD: 60 days from Notice to Proceed
SUBMISSION OF PROPOSAL:
Submit Proposal to: Per instructions in RFP 140P1221R0013
MAGNITUDE OF CONSTRUCTION PROJECT:
(a) Less than $25,000.
(b) Between $25,000 and $100,000.
| x |
| (c) Between $100,000 and $250,000. |
(d) Between $250,000 and $500,000.
(e) Between $500,000 and $1,000,000.
(f) Between $1,000,000 and $5,000,000. (Contractor has option to opt out if >$1M)
PERFORMANCE & PAYMENT BONDS: In accordance with Contract Clause 52.228-15, any amount awarded over $30,000 requires submission of a Payment Bond, and a Performance Bond is required for awards in excess of $150,000. In addition, a bid bond is required for this seed task order project.
INSURANCE: See Clause I.6, 1452.228-70, Liability Insurance
LIQUIDATED DAMAGES: ( ) YES or (X ) NO
EACH DAY DELAY:
ONE TIME CHARGE
AWARD OF CONTRACT: The price must be determined fair and reasonable.
CONTRACTOR MUST COMPLETE THE FOLLOWING:
PROPOSAL PRICING: Attached RS Means Estimate
CONTRACTOR INCLUDED ATTACHMENTS:
CONTRACT ANTICIPATED AWARD DATE: ___________
ACKNOWLEDGEMENT OF AMENDMENTS(S):
I/we _________________________________have received and considered the following Amendment(s) in the submitted proposal for this project. (SABER contractor shall fill in signature above using same person as signing the Proposal Form below and shall initial each applicable Amendment space below.)
None(______) #1(______) #2(______) #3(______) #4(______) #5(______)
COMPANY NAME:
CONTRACTORS SIGNATURE & DATE:
NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or Print)
File details come from the government source that posted it. Updated .