Attch C_598-18-107 100 Pct Drawings.pdf

PDF 24 MB Posted

Attached to
Y1DB--CON | Construct Inpatient Dialysis | PR 598-23-1-8739-0001
Solicitation number
36C25622R0140
Issued by

About this file

This solicitation is for the construction of an approximately 2,600 gross square foot interior space for a new satellite inpatient dialysis unit at the North Little Rock Veterans Affairs Medical Center in North Little Rock, Arkansas. Offerors are to provide pricing for the construction using the price breakdown format included in the solicitation. The work includes divisions for general requirements, existing conditions, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. The closing date for proposals was not provided.

View the file

Other files

File Type Posted
A0005_App E_ACM Survey Report_2.pdf PDF
A0005_084113.pdf PDF
A0005_36C25622R0140 - RFIs_Additional Responses 03.07.23.pdf PDF
36C25622R0140 0005.pdf PDF
A0005_AE503 AMEND 0003.pdf PDF
A0005_App D_ACM Survey Report_1.pdf PDF
A0004 Contractor Rules of Behavior.pdf PDF
36C25622R0140 0004.docx DOCX document
A0004 36C25622R0140 - RFIs_ 021823 (003).pdf PDF
A0004 Sample Form 014500.pdf PDF
36C25622R0140 0003.docx DOCX document
signed Site Visit Attendance Sheet 01.17.23.pdf PDF
A0002 EP102 - FIRST FLOOR PLAN - SPECIAL SYSTEMS.pdf PDF
A0002 PK101 - PLUMBING SCHEDULES.pdf PDF
A0002 PJ102 - PLUMBING RISERS.pdf PDF
A0002 ADD. 2 NARRATIVE_Redacted.pdf PDF
A0002 PL102 - FIRST FLOOR PLAN - SANITARY SEWER.pdf PDF
A0002 EL101 - FIRST FLOOR PLAN - LIGHTING.pdf PDF
A0002 36C25622R0140 01272023.pdf PDF
A0002 EP101 - FIRST FLOOR PLAN - POWER.pdf PDF
A0002 EJ102 - ELECTRICAL DETAILS.pdf PDF
Amendment 36C25622R0140 0001 01.20.23.pdf PDF
Instructions to Offerors 01.20.23.pdf PDF
Attch F_EMR Form.pdf PDF
Attch A_ Final SOW for Construct Inpatient Dialysis.pdf PDF
Attch D_Subcontractor Information and Consent.pdf PDF
36C25622R0140_1.docx DOCX document
EXHIBIT A_PERFORMANCE RELEVANCY SURVEY.pdf PDF
Attch B_598-18-107 100 Pct Specifications.pdf PDF
Attch E_ Wage Determination.pdf PDF
EXHIBIT B_Past and Present Performance Questionnaire.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT INFORMATION

PROJECT INFORMATION

BUILDING SUMMARY

CONSTRUCTION TYPE: IIA [NON-COMBUSTABLE MATERIALAS, PROTECTED]

OCCUPANCY TYPE: I-2 [INSTITUTIONAL, HOSPITAL]

WALL & CEILING FINISHES: CLASS B - FLAME SPREAD INDEX 26-75;

SMOKE DEVELOPED INDEX 0-45

BUILDING SUMMARY:

GROSS AREA: 2,583 SQ. FT.

PRIMARY OCCUPANCY: HEALTHCARE

CLASSIFICATION: HEALTHCARE

FUNCTION: AMBULATORY HEALTHCARE

MAIN USE: HEALTHCARE

SECONDARY USES: N/A

PROJECT INFORMATION

CONSTRUCT INPATIENT DIALYSIS FOR NLR

VISN 16: SOUTH CENTRAL VA HEALTHCARE NETWORK

CENTRAL ARKANSAS VETERANS HEALTHCARE SYSTEM [CAVHS]

NORTH LITTLE ROCK, AR

N

N

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

NOT TO SCALE CAMPUS MAP

NOT TO SCALE VICINITY MAP

/2

/2

:4

:0

A

M C

U s e rs

\a m o rr is \R e v it L o c a l\

-1

-1

B

-1

D ia ly s is

A rc h

A d d e n d u m a la n a

.m o rr is

.r v t

COVER SHEET CONSTRUCTION

DOCUMENTS

CONSTRUCT INPATIENT DIALYSIS

FOR NLR

EJT HEALTHCARE CENTER, NLR, AR

2020.02.12 JDM AM

598-18-107

GI001

JDA PROJECT #: D-18-03

CONSTRUCT INPATIENT DIALYSIS FOR NLR

PROJECT No: 598-18-107

EUGENE J. TOWBIN HEALTHCARE CENTER

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

ADDENDUM 1 - CONSTRUCTION

DOCUMENTS

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

INSIGHT ENGINEERING, PLLC

201 S. CHESTER, SUITE B

LITTLE ROCK, AR 72201

SHEET INDEX

SHEET # SHEET NAME

35%

SCHEMATIC

DESIGN

2019.03.22

65% DESIGN

DEVELOPMENT

2019.10.01

95%

CONSTRUCTION

DOCUMENTS

2019.12.13

CONSTRUCTION

DOCUMENTS

2020.02.12

GENERAL

GI001 COVER SHEET X X X X

GI002 SYMBOLS, LEGENDS, & GENERAL NOTES X X X

GI003 GENERAL INFORMATION X X X

GI004 DEPARTMENTAL USE PLAN X X X X

GI005 LIFE SAFETY PLAN X X X X

GC100 ICRA CLASSIFICATION MATRIX X

GC101 ICRA PLAN X

HAZARDOUS MATERIALS

HA101 ABATEMENT PLAN X X X

ARCHITECTURAL

AD101 DEMOLITION FLOOR PLAN X X X

AD111 DEMOLITION REFLECTED CEILING PLAN X X X

AD201 DEMOLITION EXTERIOR ELEVATIONS X X X

AE101 RENOVATION PLAN X X X X

AE102 DIMENSION PLAN X X X

AE111 NEW CONSTRUCTION REFLECTED CEILING PLAN X X X

AE201 NEW CONSTRUCTION EXTERIOR ELEVATIONS X X X

AE401 INTERIOR ELEVATIONS-FA2 X X X

AE402 INTERIOR ELEVATIONS-FA3 X X X

AE403 INTERIOR ELEVATIONS-FA4 X X X

AE501 INTERIOR DETAILS X X X

AE502 CASEWORK DETAILS X X

AE503 WINDOW DETAILS X X

AE504 DETAILS - TYPICAL PARTITION X X X

AE601 SCHEDULES X X X

AG101 SIGNAGE PLAN X X X

EQUIPMENT

QH101 EQUIPMENT PLAN X X X X

INTERIOR

IN101 FINISH FLOOR PLAN X X X

FIRE PROTECTION

FA001 FIRE ALARM NOTES & DETAILS X X X X

FA101 FIRE ALARM PLAN X X X

FS101 FIRE SPRINKLER PLAN X X X

PLUMBING

PD101 FIRST FLOOR PLAN - PLUMBING DEMOLITION X X X

PL100 PLUMBING GENERAL NOTES AND LEGEND X X X

PL101 FIRST FLOOR PLAN - DOMESTIC WATER X X X

PL102 FIRST FLOOR PLAN - SANITARY SEWER X X X

PJ101 PLUMBING DETAILS X X X

PJ102 PLUMBING RISERS X X X

PK101 PLUMBING SCHEDULES X X X

MECHANICAL

MD101 FIRST FLOOR PLAN - HVAC DEMOLITION X X X

MH100 MECHANICAL GENERAL NOTES AND LEGEND X X X

MH101 FIRST FLOOR PLAN - HVAC X X X

MH102 FIRST FLOOR PLAN - HVAC PIPING X X X

MI101 MECHANICAL CONTROLS X X X

MJ101 MECHANICAL DETAILS X X X

MJ102 MECHANICAL SPACE PRESSURE MAP X X X

MK101 MECHANICAL SCHEDULES X X X

ELECTRICAL

ED101 FIRST FLOOR PLAN - LIGHTING DEMOLITION X X X

ED102 FIRST FLOOR PLAN - POWER AND SYSTEMS DEMOLITION X X X

EL101 FIRST FLOOR PLAN - LIGHTING X X X

EP101 FRIST FLOOR PLAN - POWER AND SYSTEMS X X X

EP102 FIRST FLOOR PLAN - SPECIAL SYSTEMS X X

EJ101 ELECTRICAL DETAILS X X X

EK101 ELECTRICAL GENERAL NOTES AND LEGEND X X X

EK102 ELECTRICAL SCHEDULES X

PROJECT

SITE

MAINTENANCE OF EMERGENCY EXITS AND COMMUNICATION DURING CONSTRUCTION:

CONTRACTORS AND STAFF SHALL COMPLY WITH NFPA 241 “STANDARD FOR

SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS” 2019

EDITION. CONTRACTORS SHALL COORDINATE PROPOSED CONSTRUCTION ACTIVITIES

REGULARLY AND IN ADVANCE OF ANY CHANGES THAT MAY IMPACT OCCUPANT

EGRESS, TRAVEL PATHS, EMERGENCY ACCESS, OR OTHER DAILY BUSINESS

OPERATIONS. PROPOSED ACTIVITIES SHALL BE COMMUNICATED TO STAFF AT LEAST

ONE WEEK IN ADVANCE. STAFF SHALL COMMUNICATE WITH ALL DEPARTEMENTS OF

THE PROPOSED ACTIVITIES. EMERGENCY ACTION PLANS SHALL BE EVALUATED AND

ADAPTED AS NECESSARY TO ACCOUNT FOR CLOSED EXIT PATHS, DETOURS FOR

IMPACTED AREAS, AND RELOCATION OF OCCUPANTS AROUND AFFECTED

AREAS. TEMPORARY DIRECTIONAL SIGNS SHALL BE UTALIZED TO CLEARLY

COMMUNICATE CHANGES IN DETOURS, IMPACTED EXITS, AND IMPACATED TRAVEL

PATHS. IMPAIRMENTS TO FIRE PROTECTION SYSTEMS SHALL BE REVIEWED AND

DOCUMENTED IN ACCORDANCE WITH NFPA 25 (SUPPRESSION SYSTEMS) AND NFPA 72

(FIRE ALARM SYSTEMS). EVACUATION AND RELOCATION PLANS SHALL BE REVIEWED

AND MODIFIED AS APPROPRIATE IN ACCORDANCE WITH NFPA 101,

19.7.1. PROCEDURES IN CASE OF FIRE SHALL BE REVIEWED AND MODIFIED AS

APPROPRIATE IN ACCORDANCE WITH NFPA 101, 19.7.2. HOSPITAL STAFF SHALL BE

UPDATED ON CONSTRUCTION PROGRESS AND SHALL ADAPT THEIR RESPONSE

APPROPRIATELY IN ACCORDANCE WITH NFPA 101, 19.7.2.3. CONTRACTOR SHALL

ENSURE ACTIVITIES THAT WILL IMPACT FIRE DEPARTMENT ACCESSS TO THE

BUILDING, OR RESPONSE TO AN EMERGENCY ARE COMMUNICATED WITH THE FIRE

DEPARTMENT PRIOR TO STARTING SUCH ACTIVITIES.

1 ADDENDUM 1 2021.08.2

A

1F157B

D2 / AE512

AE501

AE201

AE201

AE211

20' - 6"

FIRST FLOOR

P-01

SCOPE INDICATORS

DRAWING TITLE

DETAIL CALLOUT

DETAIL INDICATOR FOR SMALL CONDITIONS

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR,

INTERIOR, MULTIPLE

VIEW

BUILDING SECTION INDICATOR

SPACE IDENTIFICATION

OPENING INDICATOR

WINDOW INDICATOR

EQUIPMENT INDICATOR

SHEET NOTES

PARTITION TYPE INDICATOR

NORTH ARROW

INDICATES PROJECT NORTH

INDICATES TRUE NORTH

EXISTING

INDICATES

COLUMN LINE

DESIGNATION

COLUMN LINE INDICATORS

DRAWING REVISION INDICATOR

EXISTING CONSTRUCTION TO

REMAIN

EXISTING CONSTRUCTION TO BE

REMOVED

NEW CONSTRUCTION

VV ITEM - GOVERNMENT FURNISHED /

GOVERNMENT INSTALLED

VC ITEM - GOVERNMENT

FURNISHED / CONTRACTOR

INSTALLED

ELEVATION INDICATOR

WALL FINISH INDICATOR

CC ITEM - CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

N

1 1/8" = 1'-0"

View Name

A_4a

BA3034

CASEWORK TAG

LETTER PAIR INDICATES CASEWORK FAMILY:

RE: AE511-514 FOR DETAILS

FIRST PAIR OF NUMBERS INDICATES UNIT

WIDTH (I.E. 30")

SECOND PAIR INDICATES COUNTERTOP

HEIGHT (I.E. 34")

TOILET ACCESSORY TAG

XXXX

JSN

A

NEW

INDICATES

COLUMN LINE

DESIGNATION

CEILING HEIGHT INDICATOR

Room name 1A105

9' - 0"

SIMPLE PARTITIONS: VA BIM STANDARDS

A_4a

INDICATES PARTITION TYPE

INDICATES FIRE/SMOKE RATING (0-4 HRS); _ INDICATES 0 HOURS

INDICATES VARIATION CODE(S)

INDICATES NOMINAL CORE SIZE

FIRE RATINGS:

0 NON-RATED

1 1-HR RATING

2 2-HR RATING

3 3-HR RATING

4 4- HR RATING

VARIATION CODES

a ACOUSTICAL INSULATION: ACOUSTICAL BLANKET INSUL

FULL HT OF PARTITION, PLUS ACOUSTICAL SEALANT

BEADS AROUND FULL PERIMETER OF PARTITION. STC

RATING OF 40 MINIMUM.

b

SMOKE RESISTANT ASSEMBLY; EXTEND ASSEMBLY TO

DECK ABOVE; REF LIFE SAFETY PLANS

P A

R T

IT

IO

N S

P

A N

E L S

B O

T H

S

ID

E S

A B C

MTL STUDS

SINGLE BD,

BOTH SIDES

BOTTOM OF DECK

CEILING LINE

RE: RCP FOR TYPE(S)

CMU

UL U905

(2 HR)

DOUBLE BD

UL U415-B

(2 HR)

J K L

MTL STUDS

SINGLE BD,

BOTH SIDES

( PARTIAL HT )

D

SHAFT WALL

UL U415A

(1 HR)

F U

R R

IN

G

S

P

A R

T

IT

IO

N

S

P A

N E

L

O

N E

S

ID

E

FURRING / STUDS

SINGLE BD

NOTES 1 & 4

PARTITION TYPE NOTES

1. WHERE NO FIRE/SMOKE RATING AND NO ACOUSTIC INSULATION INDICATED, TERMINATE STUDS 4” ABOVE HIGHEST ADJACENT CEILING AND BRACE TOP TRACK AT INTERVALS OF 4’-0” OC (MAX) TO STRUCTURE ABOVE OR ADJACENT.

2. SEE FLOOR PLANS AND INTERIOR ELEVATIONS FOR HEIGHT OF PARTIAL HEIGHT PARTITION ABOVE FINISH FLOOR.

3. BRACE PARTIAL HEIGHT ONE-SIDED PARTITIONS TO ADJACENT PARTITIONS. EXCEPTION: WHEN OVERLAYING RATED

WALLS, BRACE NEW STUDS TO STRUCTURE ONLY.

4. OFFSET FURRING / STUD 1" FROM ADJACENT PARALLEL SURFACE / STRUCTURE, UNLESS NOTED OTHERWISE.

BOTTOM OF DECK

CEILING LINE

RE: RCP FOR TYPE(S)

COMPOSITE PARTITIONS:

DOUBLE LETTERS INDICATE COMPOSITE PARTITION MADE UP OF OTHER

PARTITION TYPES. FOR EXAMPLE KK_4A INDICATES A NON-RATED

PARTITION CONSTRUCTED OF TWO (TYPE 'K') SINGLE-SIDED

PARTITIONS WITH ACOUSTICAL INSULATION AND A SINGLE LAYER OF

GWB ON OUTSIDE FACES

CMU

CORE SIZES:

0 7/8" FURRING

1 1-5/8" STUD

2 2-1/2" STUD

4 3-5/8" STUD / CMU

6 5-1/2" STUD / 5-5/8" CMU

8 7-5/8" CMU

E

SINGLE BD

BOTH SIDES

UL U419

(1 HR)

M

FURRING / STUDS

SINGLE BD

(PARTIAL HT)

c

CEMENTICIOUS BACKER BOARD ON WET WALL / SIDE OF

STUD.

d

MOISTURE RESISTENT GYP BD ON HEADWALL SIDE OF

PARTITION

NOTES 1, 2,

3, & 4

NOTES 1, 2,

3, & 4

NOTE 1

e

ACOUSTICAL INSULATION: ACOUSTICAL BLANKET INSUL

FULL HT OF PARTITION, PLUS ACOUSTICAL SEALANT

BEADS AROUND FULL PERIMETER OF PARTITION. STC

RATING OF 45 MINIMUM

N

O T

U S

E D

N

O T

U S

E D

N

O T

U S

E D

- 1

"a" + "c" = ACOUSTICAL/SMOKE RESISTANTt

"a" + "e" = ACOUSTICAL/MOISTURE RESISTANTw

A.D.A.

WALL MOUNTED

MIRROR

(A1067)

WALL MOUNTED

GRAB BAR

(SIDE)

(A5109.2)

WALL MOUNTED

GRAB BAR

(REAR)

(A5109.1)

TOILET PAPER

DISPENSER

(A5200)

WALL MOUNTED PAPER TOWEL

DISPENSER (WITH OR WITHOUT

INTEGRAL TRASH RECEPTICLE)

(A5080/A5082)

FIRE

EXTINGUISHER

CABINET, FULLY-

RECESSED

WALL MOUNTED

TELEPHONE

(A1012/A1014)

MOP BRACKET WALL MOUNTED

LAVATORY

COUNTER

MOUNTED

LAVATORY

WALL MOUNTED

ROBE HOOK PAIR

(A5145)

DIALYSIS BOX,

RECESSED,

SINGLE VALVE

(P8705)

WALL MOUNTED

SOAP DISPENSER

HAND SANITIZER DISPENSER

(A5075/A5077)

MIRROR TO

BE

18"x36" U.N.O.

CENTER

MIRROR

OVER

SINK U.N.O.

T

R

E F

L E

C T

IN

G

S U

R F

A C

E

P L U

M B

IN

G

W A

L L

12" 42"

6" 36"

T O

IL

E

T S

ID

E

W A

L L

P L U

M B

IN

G

W

A L L

7"

IF A DOUBLE ROLL

DISPENSER IS

PROVIDED,

DIMENSION IS TO ROLL

CLOSEST TO TOILET

T O

F R

O N

T T

O P

E D

G E

F D

E C

K L

IP

W

H E

N L O

W E

R E

D

"4

T O

H A

N D

L E

T O

T O

P

T O

O P

E R

A T

IO

N

C O

U N

T E

R H

E

IG

H T

S

ID

E W

A L L

1'-3"

S

ID

E W

A L L

1'-3"

T O

O P

E R

A T

IO

N

FEC

BCS-1

WASTE DISPOSAL UNIT,

SHARPS WITH GLOVE

DISPENSER

(A5106/A5107)

SWING UP GRAB

BAR

RE: 12/A515 FOR

SUPPORTS

S

ID

E W

A L L T

O

IL

E T

C .L

18"

TOILET

MOUNTING

LOCATION

T O

IL

E

T S

ID

E

W A

L L

18"

OFFSET DRAIN

INSULATE HW

& DRAIN

OFFSET DRAIN

INSULATE HW

& DRAIN-

N O

T U

S E

D

N

O T

U S

E D

DISPOSAL, SANITARY

NAPKIN, SS, SURFACE

MOUNTED

(A5090)

SHELF; FOLD DOWN;

STAINLESS STEEL

(A5160)

CLOCK, ATOMIC,

BATTERY OPERATED

(F3200)

TELEVISION, FLAT

SCREEN

(M0506)

WHITEBOARD,

DRY ERASE 48"X24"

(F3050/F3065)

U .N

.O

TELEVISION, COLOR,

BEDSIDE, W/ GRAVITY

FREE SUPPORT ARM

(M0505)

TELEVISION HDTV

(M0512)

V A

R

IE

S

N

O T

U S

E D

N

O T

U S

E D

N

O T

U S

E D

N

O T

U S

E D

/4

/4

NEW UNRATED PARTITION

NEW / EXISTING 2-HOUR BARRIER

EXISTING PARTITION, TO BE

REMOVED

EXISTING PARTITION, TO REMAIN

INDICATES AREA NOT IN

CONTRACT; U.N.O.

NEW / EXISTING 1-HOUR BARRIER

NEW UNRATED PARTITION

NEW / EXISTING 1-HR FIRE AND SMOKE BARRIER

EXISTING PARTITION, TO BE REMOVED

EXISTING PARTITION, TO REMAIN

INDICATES AREA NOT IN CONTRACT

NEW / EXISTING 1-HR FIRE BARRIER

NEW / EXISTING 2-HR FIRE BARRIER

FIRE EXTINGUISHER CABINETFEC

LIFE SAFETY TRAVEL DISTANCE

EXIT LIGHT

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

/2

/2

:4

:0

A

M C

U s e rs

\a m o rr is \R e v it L o c a l\

-1

-1

B

-1

D ia ly s is

A rc h

A d d e n d u m a la n a

.m o rr is

.r v t

SYMBOLS, LEGENDS, & GENERAL

NOTES

CONSTRUCTION

DOCUMENTS

CONSTRUCT INPATIENT DIALYSIS

FOR NLR

EJT HEALTHCARE CENTER, NLR, AR

2020.02.12 JDM JAC

598-18-107

GI002

JDA PROJECT #: D-18-03

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

INSIGHT ENGINEERING, PLLC

201 S. CHESTER, SUITE B

LITTLE ROCK, AR 72201

DRAFTING SYMBOLS PARTITION TYPES TYPICAL PARTION NOTES

EQUIPMENT MOUNTING LEGEND GRAPHIC LEGEND

1 TESTING AGENCIES FOR THE FIRE ASSEMBLIES IDENTIFIED ON THE PARTITION SCHEDULE ARE:

UL – UNDERWRITERS LABORATORY DESIGN NUMBER

GA – GYPSUM ASSOCIATION DESIGN NUMBER

2 PLAN DIMENSIONS ARE TYPICALLY TO GRID LINE, FACE OF STUD, OR FACE OF CONCRETE OR CMU UNLESS NOTED OR INDICATED OTHERWISE. DOORS NOT LOCATED BY PLAN DIMENSIONS ARE LOCATED BY JAMB DETAILS REFERENCED FROM DOOR SCHEDULE.

CRITICAL CLEARANCES ARE DESIGNATED ‘CLR’.

3 THE PARTITION TYPE NOTED BY A SYMBOL CONTINUES BETWEEN CORNERS AND BETWEEN INTERSECTING PARTITIONS. AT OPENINGS, PROVIDE THE SAME PARTITION TYPE ABOVE AND BELOW SUCH OPENING AS THAT ON EITHER SIDE OF THE OPENING. AT PARTITIONS SCHEDULED TO EXTEND TO STRUCTURE ABOVE, EXTEND THE PARTITION AROUND AND ABOVE DUCTS, BEAMS, AND OTHER OBSTRUCTIONS. ALIGN DIFFERENT PARTITION THICKNESSES SO THAT THE FINISHED WALL PLANES CONTINUE UNBROKEN WITHIN EACH ROOM OR CORRIDOR, UNLESS NOTED OTHERWISE. WHERE FACE OF COLUMN FURRING IS SHOWN AS ALIGNING WITH FACE OF PARTITION, CONTINUE PARTITION FACE UNBROKEN PAST THE COLUMN. STANDARD COLUMN FURRING DETAILS LOCATE PARTITION FACE.

4 WHERE GYPSUM BOARD IS NOT SCHEDULED TO EXTEND TO BOTTOM OF STRUCTURE, BOARD MAY TERMINATE 4” ABOVE ABUTTED CEILING ON EACH SIDE. IF NO CEILING IS SCHEDULED, BOARD IN THAT ROOM MUST EXTEND FULL HEIGHT.

5 WHERE PARTITIONS ARE INDICATED AS BEING FIRE-RATED, CONTINUE PARTITIONS UNBROKEN TO BOTTOM OF DECK ABOVE AND ALONG THE ENTIRE PERIMETER OF THE SPACES BEING SEPARATED BY THE FIRE-RATED PARTITIONS. CONTINUE FIRE-RATED PARTITION

SEPARATIONS WITHOUT INTERRUPTION WHERE THEY INTERSECT NON-RATED PARTITIONS.

6 WHERE COLUMNS, MECHANICAL CHASES, PIPING, AND OTHER ELEMENTS ARE LOCATED WITHIN A FIRE-RATED PARTITION, CONTINUE THE GYPSUM BOARD AROUND BOTH SIDES OF THE OBSTRUCTION TO MAINTAIN THE RATED ASSEMBLY. FOR DUCT, PIPE, CONDUIT, AND OTHER PENETRATIONS PASSING THROUGH A FIRE-RATED PARTITION, PROVIDE TIGHT FITTING FIRE-RATED STOPPING ASSEMBLIES EQUAL TO

ASSEMBLY RATING.

7 WHERE SMOKE AND FIRE-RATED PARTITIONS TERMINATE AT EXTERIOR WALLS, FILL VOIDS WITH FIRE-RATED ASSEMBLIES, OR EXTEND TO RATED PARTITIONS TO THE OUTER FACE OF EXTERIOR WALL CONSTRUCTIONS. ENSURE THAT NO FLANKING PATHWAYS EXIST THAT

MIGHT PERMIT SMOKE OR FIRE TO FLOW FROM ONE SIDE OF THE PARTITION TO THE OTHER.

8 PROVIDE CONTINUOUS STANDARD BLOCKING AS DETAILED FOR WALL MOUNTED ELEMENTS AT TOP AND BOTTOM ATTACHMENT POINTS AND AT INTERMEDIATE ATTACHMENT POINTS AS REQUIRED BY THE ELEMENT, INCLUDING, BUT NOT LIMITED TO; ACCESSORIES, RAILINGS, FLOOR-MOUNTED CASEWORK, CURTAIN RODS, WALL PROTECTION, CORNER GUARDS, AND EQUIPMENT WEIGHING LESS THAN 50 POUNDS.

9 PROVIDE HEAVY DUTY BLOCKING AS DETAILED FOR SUPPORT OF HEAVY ELEMENTS, INCLUDING, BUT NOT LIMITED TO; WALL MOUNTED SHELVING AND CABINETRY, HAND RAILS, GRAB BARS, BABY-CHANGING TABLES, LAVATORIES, COUNTER TOPS, MOUNTS FOR TELEVISIONS AND COMPUTER MONITORS, DOOR STOPS, AND EQUIPMENT WEIGHING IN EXCESS OF 50 POUNDS.

10 WHERE ACOUSTICAL INSULATION IS INDICATED FOR PARTITIONS, SEAL TOP, BOTTOM AND SIDES OF EACH FACE AND EDGE OF GYPSUM

BOARD WITH ACOUSTICAL SEALANT WHERE THE BOARD CONTACTS OTHER MATERIALS.

11 BACK-TO-BACK ELECTRICAL BOXES ARE NOT PERMITTED UNLESS BOTH BOXES ARE WRAPPED WITH ADHESIVE WRAPPED INTUMESCENT PUTTY PADS. WHERE JUNCTION, OUTLET, AND SWITCH BOXES OCCUR ON OPPOSITE SIDES OF A PARTITION, EITHER PROVIDE PUTTY PADS FOR BOTH BOXES, OR OFFSET THE BOXES A MINIMUM OF ONE STUD SPACE AND PROVIDE ACOUSTICAL INSULATION BEHIND AND

BETWEEN THEM.

12 IN FIRE-RATED PARTITIONS WITH TOTAL “BLACK BOX” PENETRATIONS IN EXCESS OF 100 SQ. IN. IN 100 SQ. FT., ADDITIONALLY PROTECT BACK OF BOXES WITH RATED ASSEMBLIES APPROVED BY THE AUTHORITY HAVING JURISDICTION.

13 PROVIDE ACOUSTICAL SEALANT AROUND ALL PENETRATIONS THROUGH THE MEMBRANES OF ACOUSTICAL PARTITIONS. PROVIDE FIRE-RATED SEALANT IN LIEU OF ACOUSTICAL SEALANT WHERE REQUIRED TO MAINTAIN FIRE RATING OF ACOUSTIC PARTITIONS.

14 IN SHOWER STALLS AND WALLS BEHIND PLUMBING FIXTURES, PROVIDE TILE BACKER BOARD IN LIEU OF GYPSUM BOARD AT WALLS INDICATED TO RECEIVE CERAMIC TILE. BACKER BOARD TO MATCH GYPSUM BOARD IN TERMS OF THICKNESS AND FIRE-RATING CAPABILITY.

PROVIDE MOISTURE RESISTANT (MR) GYPSUM BOARD IN LIEU OF STANDARD GYPSUM BOARD AT THE FOLLOWING LOCATIONS:

DIRECTLY BEHIND PLUMBING FIXTURES WHERE FINISH IS NOT CERAMIC TILE, AND CEILINGS ABOVE SHOWER STALLS.

15 AT NON-FIRE RATED, NON-ACOUSTIC PARTITIONS THAT DO NOT EXTEND TO STRUCTURE ABOVE, CONTRACTOR HAS OPTION OF EXTENDING STUDS TO STRUCTURE ABOVE OR TERMINATING STUDS 4” ABOVE HIGHEST ADJACENT CEILING AND BRACING TOP TRACK AT

INTERVALS OF 4’-0” OC (MAX) TO STRUCTURE ABOVE.

16 WHERE STUDS EXTEND MORE THAN 3’-0” ABOVE THE GYPSUM BOARD, PROVIDE HORIZONTAL BRACING MIDWAY BETWEEN TOP OF

GYPSUM BOARD AND TOP OF STUDS.

17 AT FURRING PARTITIONS (GYPSUM BOARD ONE SIDE ONLY) PROVIDE HORIZONTAL STUD BRACING OR 18 GA ANGLE CLIPS SECURED TO

STRUCTURAL SUBSTRATE AT 4’-0” OC (MAX). SIMILAR REQUIREMENT AT COLUMN FURRING.

18 MAGNITUDE OF POTENTIAL STRUCTURAL LIVE LOAD DEFLECTION IMPACTING PARTITIONS FOR THIS PROJECT IS 1/2” IN COMPRESSION AND 0” IN EXTENSION, FOR A TOTAL MOVEMENT OF 1/2”. FOR RATED PARTITIONS, THE HEAD-OF-WALL FIRE RESISTIVE ASSEMBLY PROVIDED MUST BE RATED FOR THIS DEGREE OF MOVEMENT. PROVIDE A FIRE-RESISTIVE VARIATION FOR EACH CONDITION (BEAMS, DUCTS, CORNERS, ETC.) ENCOUNTERED AT THE RATED PARTITION HEADS. FOR NON RATED PARTITIONS, SECURE THE TOP TRACK IN A

MANNER THAT ACCOMMODATES DEFLECTION OF THE STRUCTURE ABOVE OR BELOW.

19 FOR DOORS, RELITES, DUCT, AND OTHER OPENINGS WITH ROUGH OPENING DIMENSIONS OF 4’-0” OR WIDER, PROVIDE HEAVY GAUGE KING

STUDS AND A “BOX BEAM” HEADER AS DETAILED IN STANDARD OPENING HEADER DETAILS.

LIFE SAFETY LEGEND

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

/2

/2

:4

:0

A

M C

U s e rs

\a m o rr is \R e v it L o c a l\

-1

-1

B

-1

D ia ly s is

A rc h

A d d e n d u m a la n a

.m o rr is

.r v t

GENERAL INFORMATION CONSTRUCTION

DOCUMENTS

CONSTRUCT INPATIENT DIALYSIS

FOR NLR

EJT HEALTHCARE CENTER, NLR, AR

2020.02.12 JDM JAC

598-18-107

GI003

JDA PROJECT #: D-18-03

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

INSIGHT ENGINEERING, PLLC

201 S. CHESTER, SUITE B

LITTLE ROCK, AR 72201

SJ SCORED JOINT

SJI STEEL JOIST SLIDING WINDOW

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SMS SHEET METAL SCREW

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL

UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE

SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION

CLASSIFICATION

STIF STIFFENER

STL STEEL

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUB

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT

STL

STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPENDED

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SNTHETIC

SYS SYSTEM

T

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL,

TEMPERATURE CONTROL PANEL,

OR TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TLT TOILET

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ______

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TYP TYPICAL

U

U.N.O. UNLESS NOTED OTHERWISE

U.O.N. UNLESS OTHERWISE NOTED

V

VC VA FURNISHED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE OR

VITRIFIED CLAY TILE

VENT VENTILATION

VERT VERTICAL

VV VA FURNISHED / VA INSTALLED

W

W/ WITH

WD WOOD

WP WALL PROTECTION

QRY QUARRY

QT QUARRY TILE OR QUART

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R

R RADIUS OR RISER

RA RETURN AIR

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER

BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

OR REFRIGERATION

REFRACTORY

REG REGISTER

REINF REINFORCE, REINFORCED, OR

REINFORCING

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

S

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID

CORE

SCH SCHOOL

SCHED SCHEDULE, SCHEDULED

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAP DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL

FLASH

SHEET METAL (FLASHING)

SHTHG SHEATHING

SIM SIMILAR

SJ SCORED JOINT

NRC NOICE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O

O OXYGEN

O/H OVER HEAD

O/O OUT TO OUT

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OR OUTSIDE

DIMENSION

OFD OVERFLOW DRAIN

OFF OFFICE

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSIE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE

RADIUS

ORD ORDNANCE OR OVERFLOW ROOF

DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

OUT OUTLET

OZ OUNCE

P

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR

PORTLAND CEMENT

PCA PORTLAND CEMENT

ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTYLINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

OR PURCHASE ORDER POST

OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMAIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING

CONCRETE

LYR LAYER

M

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTAIN, MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM O MEDIUM

MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMBO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S

RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MIN MINIMUM MINUTE OR MINUTE

MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR

OPERATED

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

H

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGAR

HM HOLLOW METAL OR

HECTOMETER

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR

HORSEPOWER

HQ HEADQUARTERS

HR HOUR

HRS HOURS

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATION, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I

I INTERSTATE (HIGHWAY) OR

MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATED, INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE

ASSEMBLY

IWH INSTANANEOUS WATER HEATER

J

J-BOX JUNCTION BOX

JAN JANITOR

K

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE OR LATENT

HEAT RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FH FLAT HEAD OR FLAT HEAD

SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCEN FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF

CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF CURB

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR

FIREPROOF OR FLAT PANEL

DOOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER

OR FIBERGLASS REINFORCED

PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUT

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON, GALLONS

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED

GFRG GLASS-FIBER-REINFORCED

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CTLINDER LOCK

D

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM OR

DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM,

OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC, ELECTRICAL

ELEC DR

OP

ELECTRIC DOOR OPENER

ELEV ELEVATOR

ELEVS ELEVATIONS

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C

C CELSIUS CHANNEL OR CHANNEL

CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

C/C CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

C/VA CONTRACTOR FURNISHED/

GOVERNMENT INSTALLED

CAB CABINET

CAC CEILING ATENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT, CEMENTITIOUS

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR

CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULATING, CIRCULAR

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LIINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CM CONSTRUCTION MANAGEMENT

cm2 SQUARE CENTIMETER cm3 CUBIC CENTIMETER

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,

CLEAN OUT, OR COMPANY

co2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINAION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECTION

CONSTR CONSTRUCTION

CONT CONTINUOUS, CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

COR COORDINATION OFFICER

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

A

A LABEL CLASS A DOOR

A/C AIR CONDITIONING

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABA ARCHITECTURAL BARRIERS ACT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR

ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ACT

ADB AUTOMATIC DOOR BOTTOM

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION,

ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE, ALTERNATIVE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLAYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE, APPROXIMATELY

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT, ARCHITECTURAL

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO-VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL

WOODWORKING INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'S

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKG BLOCKING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

UP

H

H

G

G

J

J

VESTIBULE

STAIRS

OUTSIDE

139 SF

EQUIPMENT

PROCESSING,

SOILED

RECEIVING

1C-165D

126 SF

EQUIPMENT

PROCESSING,

CLEAN PREP

1C-165B

112 SF

BARIATRIC BED

STATION

1C-167D

100 SF

BED COMPATIBLE

STATION

1C-167C

95 SF

BARIATRIC CHAIR

STATION

1C-167B

96 SF

BARIATRIC CHAIR

STATION

1C-167A

90 SF

EQUIPMENT

PROCESSING,

CLEAN STORAGE

1C-165A

168 SF

NURSE STATION

1C-167E

128 SF

MULTI-USE ROOM

1C-172

141 SF

EQUIPMENT

PROCESSING,

REPAIR SHOP

1C-165C

96 SF

UTILITY ROOM,

SOILED

1C-170

67 SF

STAFF TOILET

1C-171

139 SF

CORRIDOR

98 SF

STORAGE, CLEAN

SUPPLY & CLEAN

LINEN

1C-168

97 SF

CORRIDOR

1C-167

COURTYARD

109 SF

MEDICATION

PREP ROOM

1C-166

60 SF

PATIENT TOILET

1C-169

102 SF

STAFF LOUNGE

1C-173

O U

T S

ID

E

DEPARTMENTAL LEGEND

PATIENT

STAFF

UTILITY, CLEAN/STERILE

UTILITY, SOILED

CIRCULATION

EQUIPMENT, SOILED

EQUIPMENT, CLEAN/STERILE

EQUIPMENT, UTILITY

104 SF

STORAGE,

STERILE SUPPLY

1C-168A

C O

U R

T Y

A R

D

EXISTING CORRIDOR

EXISTING

COPIER/FAX

EXISTING

RESTROOM EXISTING

OFFICE

EXISTING

CORRIDOR

D

D

11.211.2

25' - 0"25' - 0"25' - 0"

25' - 0"25' - 0"25' - 0"

EXISTING

PHARMACY

SATELLITE

75' - 0"

75' - 0"

8 SF

NURSE CALL

CLOSET

1C-172A

NEW UNRATED PARTITION

NEW / EXISTING 2-HOUR BARRIER

EXISTING PARTITION, TO BE

REMOVED

EXISTING PARTITION, TO REMAIN

INDICATES AREA NOT IN

CONTRACT; U.N.O.

NEW / EXISTING 1-HOUR BARRIER

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

/2

/2

:4

:1

A

M C

U s e rs

\a m o rr is \R e v it L o c a l\

-1

-1

B

-1

D ia ly s is

A rc h

A d d e n d u m a la n a

.m o rr is

.r v t

DEPARTMENTAL USE PLAN CONSTRUCTION

DOCUMENTS

CONSTRUCT INPATIENT DIALYSIS

FOR NLR

EJT HEALTHCARE CENTER, NLR, AR

2020.02.12 JDM JAC

598-18-107

GI004

JDA PROJECT #: D-18-03

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

N

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

INSIGHT ENGINEERING, PLLC

201 S. CHESTER, SUITE B

LITTLE ROCK, AR 72201

FIRST FLOOR SLAB ELEVATION = 303.0'

N

KEY PLAN

PLAN

NORTH

A

B C

DE

G

M

N

HJ

K L

M

SCALE: 1/4" = 1'-0"

0 2' 4' 8' 1/4" = 1'-0"

F3

DEPARTMENTAL USE PLAN

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

GRAPHIC LEGEND

SPACE DESIGN MATRIX

NUMBER NAME

TIL ROOM

CODE

TIL MIN

AREA

PROVIDED

AREA */- TIL

FIRST FLOOR

1C-165A EQUIPMENT PROCESSING, CLEAN STORAGE CSIA1 200 SF 90 SF -110

1C-165B EQUIPMENT PROCESSING, CLEAN PREP CSSS1 200 SF 126 SF -74

1C-165C EQUIPMENT PROCESSING, REPAIR SHOP BMER1 150 SF 141 SF -9

1C-165D EQUIPMENT PROCESSING, SOILED RECEIVING CSDE1 150 SF 139 SF -11

1C-166 MEDICATION PREP ROOM MEDP1 110 SF 109 SF -1

1C-167A BARIATRIC CHAIR STATION XXYYC 80 SF 96 SF 16

1C-167B BARIATRIC CHAIR STATION XXYYC 80 SF 95 SF 15

1C-167C BED COMPATIBLE STATION XXYYC 100 SF 100 SF 0

1C-167D BARIATRIC BED STATION XXYYC 100 SF 112 SF 12

1C-167E NURSE STATION NSTA1 110 SF 168 SF 58

1C-168 STORAGE, CLEAN SUPPLY & CLEAN LINEN SRSE1 80 SF 98 SF 18

1C-168A STORAGE, STERILE SUPPLY LCCL1 112 SF 104 SF -8

1C-169 PATIENT TOILET TPG01 60 SF 60 SF 0

1C-170 UTILITY ROOM, SOILED USCL1 80 SF 96 SF 16

1C-171 STAFF TOILET TLTU1 60 SF 67 SF 7

1C-172 MULTI-USE ROOM RDC01 100 SF 128 SF 28

1C-172A NURSE CALL CLOSET COMC1 8 SF

1C-173 STAFF LOUNGE SL001 80 SF 102 SF 22

VESTIBULE

STAIRS

EQUIPMENT

PROCESSING,

SOILED

RECEIVING

1C-165D

EQUIPMENT

PROCESSING,

CLEAN PREP

1C-165B

BARIATRIC BED

STATION

1C-167D

BED COMPATIBLE

STATION

1C-167C

BARIATRIC CHAIR

STATION

1C-167B

BARIATRIC CHAIR

STATION

1C-167A

EQUIPMENT

PROCESSING,

CLEAN STORAGE

1C-165A

NURSE STATION

1C-167E

MULTI-USE ROOM

1C-172

EQUIPMENT

PROCESSING,

REPAIR SHOP

1C-165C

UTILITY ROOM,

SOILED

1C-170

STAFF TOILET

1C-171

C O

R R

ID

O

R

STORAGE,

STERILE SUPPLY

1C-168A

STORAGE, CLEAN

SUPPLY & CLEAN

LINEN

1C-168

M E

D

IC

A T

IO

N

P R

E P

R O

O M

C

-1

PATIENT TOILET

1C-169

STAFF LOUNGE

1C-173

COPIER/FAX

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

CHASE

RESTROOM

ASSISTANT DIRECTOR

CHIEF OF STAFF

C H

A S

E

RESTROOM

RESTROOM

ASSOCIATE DIRECTOR

DIRECTOR

RESTROOM

OFFICE

CHASE

AGENT

CASHIERS

RESTROOM

PATIENT

FUNDS

WORK

ROOM

CLERICAL

CHASE

STORAGE

OFFICE

C H

A S

E

CORRIDOR

BATHROOM RESTROOM

SOILED

LINEN

ELECTRICAL

RESTROOM BATHROOM

CHASE CHASE

RESTROOM

BATHROOM

C H

A S

E

STAIR

BEDROOM HELP DESKBEDROOMBEDROOMBEDROOM

OFFICE

CLERICALELIGIBILITY CTR

109-170 107-170

110-170

112-170

116-170

111-170

113-170

115-170

117-170

119-170

121-170

116A-170

118-170

143-170

141-170 124-170 122-170

133-170 129-170

129A-170

137-170

126-170 128-170

134-170

136-170

140-170

138-170 140A-170

142-170

144-170

146-170 148-170

150-170 152-170

154-170

156-170

158-170

S14-170

BEDROOM

161-170

BEDROOM

159-170

BEDROOM

153-170

BEDROOM

149-170

CHASE

C H

A S

E

RESTROOM

157-170

RESTROOM

155-170

RESTROOM

163-170

LINEN

ROOM

147-170

BATHROOM

151-170

NOUR.

KITCHEN

145-170

CLEAN

UTILITY

127-170

TELEPHONE

125-170

TELEPHONE

123-170

CORRIDOR

CORRIDOR VESTIBULE

175-170

STAIR

PHARMACY SATELLITE

107-170

STORAGE

107A-170

STAIR

ELEV.

ELEV.

WAITING AREA

131-170

CHASE

STAIR

GENERATOR

ROOM

173-170

CORRIDOR

ELECTRICAL

111-170

SOCIAL

WORKER

112-170

CLINICAL

DIETICIAN

113-170

ELEV.

SPD

STORAGE

118-170

TELEPHONE

116-170

SERVICE

CHUTES

115-170

WOMEN'S

RESTROOM

105-170

MEN'S

RESTROOM

104-170

CHIEF NURSING

SVCS.

106-170

CHASE

HVAC

119-170

COURTYARD

LOBBY

CORRIDOR

COURTYARD

CHASE

NURSE CALL

CLOSET

1C-172A

LIFE SAFETY PARTITION LEGEND

NEW UNRATED PARTITION

NEW / EXISTING 1-HR FIRE AND SMOKE BARRIER

EXISTING PARTITION, TO BE REMOVED

EXISTING PARTITION, TO REMAIN

INDICATES AREA NOT IN CONTRACT

NEW / EXISTING 1-HR FIRE BARRIER

NEW / EXISTING 2-HR FIRE BARRIER

FIRE EXTINGUISHER CABINETFEC

LIFE SAFETY TRAVEL DISTANCE

EXIT LIGHT

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

/2

/2

:4

:2

A

M C

U s e rs

\a m o rr is \R e v it L o c a l\

-1

-1

B

-1

D ia ly s is

A rc h

A d d e n d u m a la n a

.m o rr is

.r v t

LIFE SAFETY PLAN CONSTRUCTION

DOCUMENTS

CONSTRUCT INPATIENT DIALYSIS

FOR NLR

EJT HEALTHCARE CENTER, NLR, AR

2020.02.12 JDM JAC

598-18-107

GI005

JDA PROJECT #: D-18-03

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

INSIGHT ENGINEERING, PLLC

201 S. CHESTER, SUITE B

LITTLE ROCK, AR 72201

1/8" = 1'-0" F1

LIFE SAFETY PLAN

N

N

KEY PLAN

PLAN

NORTH

A

B C

DE

G

M

N

HJ

K L

M

SCALE: 1/8" = 1'-0"

0 8' 16' 32'

FIRST FLOOR SLAB ELEVATION = 303.0'

IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE

AREA CLASS DESIGNATION

TYPE OF CONTRUCTION/PROJECT ACTIVITY TABLE

GROUP 1-LOW RISK

● OFFICE AREAS (NON-

CLINICAL)

PATIENT RISK GROUP TABLE

GROUP 2-MEDIUM RISK

GROUP 3-HIGH RISK GROUP 4-HIGHEST RISK

INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK

PATIENT RISK GROUP TYPE A

I I I

III

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION

ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES

ARE NECESSARY.LOW RISK GROUP 1

MEDIUM RISK GROUP 2

HIGH RISK GROUP 3

HIGHEST RISK GROUP 4

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION

OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AN EXIT OF WORK AREA.

REPLACE USED MATS IN ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS.

7. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.

2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR

FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT

BEFORE CONSTRUCTION BEGINS.

3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

4. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR

IMPLEMENT CONTROL CUBE METHOD.

5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-

EQUIPPED AIR FILTRATION UNITS.

6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

7. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERS.

8. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING

WORK AREAS.

9. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

1. WIPE SURFACES TO REMOVE DUST.

1. WIPE WORK SURFACES WITH

DISINFECTANT.

2. CONTAIN CONSTRUCTION

WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM

WORK AREA WITH HEPA

FILTERED VACUUM BEFORE

LEAVING WORK AREAS.

4. REMOVE ISOLATION OF HVAC

SYSTEM IN AREAS WHERE

WORK WAS BEING PERFORMED.

1. REMOVE BARRIER MATERIALS

CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION

WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED

CONTAINERS.

3. COVER TRANSPORT

RECEPTACLES OR CARTS. TAPE

COVERING.

4. VACUUM WORK WITH HEPA-

FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC

SYSTEM IN AREAS WHERE

WORK WAS BEING PERFORMED.

1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III.

2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR

FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT

BEFORE CONSTRUCTION BEGINS.

3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD

BEFORE CONSTRUCTION BEGINS.

5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-

EQUIPPED AIR FILTRATION UNITS.

6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS-THROUGH

THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER

BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER

COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.

7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE

COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS

THE WORK AREA.

8. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA WITH

ANTEROOM. REPLACE PER MANUFACTURER'S RECOMMENDATIONS.

9. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED EACH BY THE HOSPITAL SAFETY OFFICER, FACILITIES

MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT AND

THOROUGHLY CLEANED BY THE HOSPITAL ENVIRONMENTAL SERVICES

DEPARTMENT OR THEIR CONTRACTED ENVIRONMENTAL SERVICES COMPANY.

10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

11. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERING.

12. VACUUM WITH HEPA FILTERED VACUUM. WET MOP WITH DISINFECTANT

AFTER BARRIERS ARE REMOVED.

13. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

1. REMOVE BARRIER MATERIALS

CAREFULLY TO MINIMIZE

SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH

CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE

BEFORE TRANSPORT IN TIGHTLY

COVERED CONTAINERS.

3. COVER TRANSPORT

RECEPTACLES OR CARTS. TAPE

COVERING.

4. VACUUM WORK WITH HEPA-

FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT

AFTER BARRIERS ARE REMOVED.

6. REMOVE ISOLATION OF HVAC

SYSTEM IN AREAS WHERE WORK

WAS BEING PERFORMED.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

CLASS I

CLASS II

CLASS III

CLASS IV

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES BUT IS NOT LIMITED TO:

● REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1

TILE IN 50 SQUARE FEET

● PAINTING (BUT NOT SANDING), WALL COVERING

● ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT

DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR

ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION

TYPE A

SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST

INCLUDES BUT IS NOT LIMITED TO:

● INSTALLATION OF TELEPHONE AND COMPUTER CABLING

● ACCESS TO CHASE SPACES

● CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE

CONTROLLED

TYPE B

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES

INCLUDES BUT IS NOT LIMITED TO:

● SANDING OF WALLS FOR PAINTING OR WALL COVERING

● REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK

● NEW WALL CONSTRUCTION

● MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS

● MAJOR CABLING ACTIVITIES

● ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE

WORK SHIFT

TYPE C

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES BUT IS NOT LIMITED TO:

● ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS

● REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CEILING SYSTEM

● NEW CONSTRUCTION

TYPE D

● CARDIOLOGY

● ECHOCARDIOLOGY

● ENDOSCOPY-GI

● PHYSICAL THERAPY

● RADIOLOGY/MRI

● NUCLEAR MEDICINE

● RESPIRATORY CARE (EXCEPT

BRONCHOSCOPY AREA)

● CAFETERIA

● OUTPATIENT AREAS-CLINICS AND

OFFICES (EXCEPTION: TRANSPLANT AND

ONCOLOGY)

● EMERGENCY ROOM

● POST ANESTHESIA

● CARE UNITS

● LABOR AND DELIVERY

● PEDIATRICS

ADMISSION/DISCHARG

E AREA

● LABORATORIES

● PHARMACY

● INPATIENT UNITS (NOT

OTHERWISE

SPECIFIED)

● ALL OPERATING ROOMS INCLUDING LABOR

AND DELIVERY

● ANESTHESIA AND PUMP AREAS

● CENTRAL EQUIPMENT/STERILE

SUPPLY

● CARDIAC CATHETERIZATION AND

ANGIOGRAPHY AREAS

● INTERVENTIONAL RADIOLOGY

● RADIATION ONCOLOGY

● ALL INTENSIVE CARE UNITS

● NEWBORN NURSERIES, INCLUDING NICU

● DIALYSIS UNIT

● ONCOLOGY-INPATIENT AND OUTPATIENT

● TRANSPLANT-INPATIENT AND OUTPATIENT

● PHARMACY ADMIXTURE

● NEGATIVE PRESSURE ISOLATION

ROOMS/AREAS (INCLUDING

BRONCHOSCOPY AREA)

TYPE B

II

II

III

III / IV

TYPE C

II

III

III / IV

III / IV

TYPE D

III / IV

IV

IV

IV

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

4/ 9/

:4

5:

A M

Z:

\J

D a

D es ig n\

_A ct iv e\ D

-1 8-

_5

-1

8-

7_ B-

D ia ly si s\

_B

IM

\jd m

.0

IC

R A

Pl an r1 9.

rv t

ICRA CLASSIFICATION MATRIX CONSTRUCTION

DOCUMENTS

CONSTRUCT INPATIENT DIALYSIS

FOR NLR

EJT HEALTHCARE CENTER, NLR, AR

2020.02.12 Checker Author

598-18-107

GC100

JDA PROJECT #: D-18-03

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

INSIGHT ENGINEERING, PLLC

201 S. CHESTER, SUITE B

LITTLE ROCK, AR 72201

K Y

LI

G H T

C

F

IR

E

EXIT

E X

IT

E X

IT

E X

IT

E X

IT

E X

IT

EXIT

EXIT

EXIT

EXIT

EXIT

E X

IT

E X

IT

C

C

C

C

C

C

C

C

F

IR

E

F

IR

E

F

IR

E

F

IR

E

F

IR

E 1212

H

H

G

G

J

J

D

D

11.211.2

EXIT

FI

R

E

EX

IT

EXIT

EX

IT

EX

IT

EX

IT

GAS GAS

CFI

R

E

EX

IT

EXIT

LINE OF 1B125-170

TELEPHONE ABOVE

GB113-170

ELECTRICAL

GB112-170

TELEPHONE

CGB4-170

CORRIDOR

CGB5-170

CORRIDOR

LINE OF B AND C

WINGS ABOVE

COURTYARD ABOVE

PRIMARY WORK LIMITS AT FIRST

FLOOR ABOVE

REFER TO SHEET FA101

FOR NEW FIRE ALARM

WORK IN THIS VICINITY

UNEXCAVATED SPACE

CONTRACTOR TO REVIEW EXISTING

CONDITION'S IMPACT ON REQUIRED

WORK IN THIS AREA PRIOR TO

BIDDING

REFER TO SHEET PL102 FOR

NEW PLUMBING WORK IN

UNEXCAVATED SPACE

UNEXCAVATED SPACE

CONTRACTOR TO REVIEW EXISTING

CONDITION'S IMPACT ON REQUIRED

WORK IN THIS AREA PRIOR TO

BIDDING

ICRA CLASS LEGEND

CLASS 2

CLASS 3

1B125-170

TELEPHONE

142-170

ELECTRICAL

ICRA CLASS LEGEND

CLASS 2

CLASS 4

IN AREAS OF EXTERIOR WORK,

ENCAPSULATE WORK AREA TO

ENSURE EXISTING AIR INTAKES AND

OPERABLE WINDOWS ARE

ISOLATED FROM GENERATED

CONSTRUCTION DUST AND DEBRIS

REFER TO SHEET FA101

FOR NEW FIRE ALARM

WORK IN THIS VICINITY

C 1B

3-

C

O R

R

ID

O R

1B124-170

NURSE

C1C1-170

CORRIDOR

PRIMARY WORK LIMITS

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

4/ 9/

:4

6:

A M

Z:

\J

D a

D es ig n\

_A ct iv e\ D

-1 8-

_5

-1

8-

7_ B-

D ia ly si s\

_B

IM

\jd m

.0

IC

R A

Pl an r1 9.

rv t

ICRA PLANS CONSTRUCTION

DOCUMENTS

CONSTRUCT INPATIENT DIALYSIS

FOR NLR

EJT HEALTHCARE CENTER, NLR, AR

2020.02.12 Checker Author

598-18-107

GC101

JDA PROJECT #: D-18-03

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .