Attch C_598-18-107 100 Pct Drawings.pdf
PDF 24 MB Posted
- Solicitation number
- 36C25622R0140
About this file
This solicitation is for the construction of an approximately 2,600 gross square foot interior space for a new satellite inpatient dialysis unit at the North Little Rock Veterans Affairs Medical Center in North Little Rock, Arkansas. Offerors are to provide pricing for the construction using the price breakdown format included in the solicitation. The work includes divisions for general requirements, existing conditions, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. The closing date for proposals was not provided.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT INFORMATION
PROJECT INFORMATION
BUILDING SUMMARY
CONSTRUCTION TYPE: IIA [NON-COMBUSTABLE MATERIALAS, PROTECTED]
OCCUPANCY TYPE: I-2 [INSTITUTIONAL, HOSPITAL]
WALL & CEILING FINISHES: CLASS B - FLAME SPREAD INDEX 26-75;
SMOKE DEVELOPED INDEX 0-45
BUILDING SUMMARY:
GROSS AREA: 2,583 SQ. FT.
PRIMARY OCCUPANCY: HEALTHCARE
CLASSIFICATION: HEALTHCARE
FUNCTION: AMBULATORY HEALTHCARE
MAIN USE: HEALTHCARE
SECONDARY USES: N/A
PROJECT INFORMATION
CONSTRUCT INPATIENT DIALYSIS FOR NLR
VISN 16: SOUTH CENTRAL VA HEALTHCARE NETWORK
CENTRAL ARKANSAS VETERANS HEALTHCARE SYSTEM [CAVHS]
NORTH LITTLE ROCK, AR
N
N
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
NOT TO SCALE CAMPUS MAP
NOT TO SCALE VICINITY MAP
/2
/2
:4
:0
A
M C
U s e rs
\a m o rr is \R e v it L o c a l\
-1
-1
B
-1
D ia ly s is
A rc h
A d d e n d u m a la n a
.m o rr is
.r v t
COVER SHEET CONSTRUCTION
DOCUMENTS
CONSTRUCT INPATIENT DIALYSIS
FOR NLR
EJT HEALTHCARE CENTER, NLR, AR
2020.02.12 JDM AM
598-18-107
GI001
JDA PROJECT #: D-18-03
CONSTRUCT INPATIENT DIALYSIS FOR NLR
PROJECT No: 598-18-107
EUGENE J. TOWBIN HEALTHCARE CENTER
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
ADDENDUM 1 - CONSTRUCTION
DOCUMENTS
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
SHEET INDEX
SHEET # SHEET NAME
35%
SCHEMATIC
DESIGN
2019.03.22
65% DESIGN
DEVELOPMENT
2019.10.01
95%
CONSTRUCTION
DOCUMENTS
2019.12.13
CONSTRUCTION
DOCUMENTS
2020.02.12
GENERAL
GI001 COVER SHEET X X X X
GI002 SYMBOLS, LEGENDS, & GENERAL NOTES X X X
GI003 GENERAL INFORMATION X X X
GI004 DEPARTMENTAL USE PLAN X X X X
GI005 LIFE SAFETY PLAN X X X X
GC100 ICRA CLASSIFICATION MATRIX X
GC101 ICRA PLAN X
HAZARDOUS MATERIALS
HA101 ABATEMENT PLAN X X X
ARCHITECTURAL
AD101 DEMOLITION FLOOR PLAN X X X
AD111 DEMOLITION REFLECTED CEILING PLAN X X X
AD201 DEMOLITION EXTERIOR ELEVATIONS X X X
AE101 RENOVATION PLAN X X X X
AE102 DIMENSION PLAN X X X
AE111 NEW CONSTRUCTION REFLECTED CEILING PLAN X X X
AE201 NEW CONSTRUCTION EXTERIOR ELEVATIONS X X X
AE401 INTERIOR ELEVATIONS-FA2 X X X
AE402 INTERIOR ELEVATIONS-FA3 X X X
AE403 INTERIOR ELEVATIONS-FA4 X X X
AE501 INTERIOR DETAILS X X X
AE502 CASEWORK DETAILS X X
AE503 WINDOW DETAILS X X
AE504 DETAILS - TYPICAL PARTITION X X X
AE601 SCHEDULES X X X
AG101 SIGNAGE PLAN X X X
EQUIPMENT
QH101 EQUIPMENT PLAN X X X X
INTERIOR
IN101 FINISH FLOOR PLAN X X X
FIRE PROTECTION
FA001 FIRE ALARM NOTES & DETAILS X X X X
FA101 FIRE ALARM PLAN X X X
FS101 FIRE SPRINKLER PLAN X X X
PLUMBING
PD101 FIRST FLOOR PLAN - PLUMBING DEMOLITION X X X
PL100 PLUMBING GENERAL NOTES AND LEGEND X X X
PL101 FIRST FLOOR PLAN - DOMESTIC WATER X X X
PL102 FIRST FLOOR PLAN - SANITARY SEWER X X X
PJ101 PLUMBING DETAILS X X X
PJ102 PLUMBING RISERS X X X
PK101 PLUMBING SCHEDULES X X X
MECHANICAL
MD101 FIRST FLOOR PLAN - HVAC DEMOLITION X X X
MH100 MECHANICAL GENERAL NOTES AND LEGEND X X X
MH101 FIRST FLOOR PLAN - HVAC X X X
MH102 FIRST FLOOR PLAN - HVAC PIPING X X X
MI101 MECHANICAL CONTROLS X X X
MJ101 MECHANICAL DETAILS X X X
MJ102 MECHANICAL SPACE PRESSURE MAP X X X
MK101 MECHANICAL SCHEDULES X X X
ELECTRICAL
ED101 FIRST FLOOR PLAN - LIGHTING DEMOLITION X X X
ED102 FIRST FLOOR PLAN - POWER AND SYSTEMS DEMOLITION X X X
EL101 FIRST FLOOR PLAN - LIGHTING X X X
EP101 FRIST FLOOR PLAN - POWER AND SYSTEMS X X X
EP102 FIRST FLOOR PLAN - SPECIAL SYSTEMS X X
EJ101 ELECTRICAL DETAILS X X X
EK101 ELECTRICAL GENERAL NOTES AND LEGEND X X X
EK102 ELECTRICAL SCHEDULES X
PROJECT
SITE
MAINTENANCE OF EMERGENCY EXITS AND COMMUNICATION DURING CONSTRUCTION:
CONTRACTORS AND STAFF SHALL COMPLY WITH NFPA 241 “STANDARD FOR
SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS” 2019
EDITION. CONTRACTORS SHALL COORDINATE PROPOSED CONSTRUCTION ACTIVITIES
REGULARLY AND IN ADVANCE OF ANY CHANGES THAT MAY IMPACT OCCUPANT
EGRESS, TRAVEL PATHS, EMERGENCY ACCESS, OR OTHER DAILY BUSINESS
OPERATIONS. PROPOSED ACTIVITIES SHALL BE COMMUNICATED TO STAFF AT LEAST
ONE WEEK IN ADVANCE. STAFF SHALL COMMUNICATE WITH ALL DEPARTEMENTS OF
THE PROPOSED ACTIVITIES. EMERGENCY ACTION PLANS SHALL BE EVALUATED AND
ADAPTED AS NECESSARY TO ACCOUNT FOR CLOSED EXIT PATHS, DETOURS FOR
IMPACTED AREAS, AND RELOCATION OF OCCUPANTS AROUND AFFECTED
AREAS. TEMPORARY DIRECTIONAL SIGNS SHALL BE UTALIZED TO CLEARLY
COMMUNICATE CHANGES IN DETOURS, IMPACTED EXITS, AND IMPACATED TRAVEL
PATHS. IMPAIRMENTS TO FIRE PROTECTION SYSTEMS SHALL BE REVIEWED AND
DOCUMENTED IN ACCORDANCE WITH NFPA 25 (SUPPRESSION SYSTEMS) AND NFPA 72
(FIRE ALARM SYSTEMS). EVACUATION AND RELOCATION PLANS SHALL BE REVIEWED
AND MODIFIED AS APPROPRIATE IN ACCORDANCE WITH NFPA 101,
19.7.1. PROCEDURES IN CASE OF FIRE SHALL BE REVIEWED AND MODIFIED AS
APPROPRIATE IN ACCORDANCE WITH NFPA 101, 19.7.2. HOSPITAL STAFF SHALL BE
UPDATED ON CONSTRUCTION PROGRESS AND SHALL ADAPT THEIR RESPONSE
APPROPRIATELY IN ACCORDANCE WITH NFPA 101, 19.7.2.3. CONTRACTOR SHALL
ENSURE ACTIVITIES THAT WILL IMPACT FIRE DEPARTMENT ACCESSS TO THE
BUILDING, OR RESPONSE TO AN EMERGENCY ARE COMMUNICATED WITH THE FIRE
DEPARTMENT PRIOR TO STARTING SUCH ACTIVITIES.
1 ADDENDUM 1 2021.08.2
A
1F157B
D2 / AE512
AE501
AE201
AE201
AE211
20' - 6"
FIRST FLOOR
P-01
SCOPE INDICATORS
DRAWING TITLE
DETAIL CALLOUT
DETAIL INDICATOR FOR SMALL CONDITIONS
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR,
INTERIOR, MULTIPLE
VIEW
BUILDING SECTION INDICATOR
SPACE IDENTIFICATION
OPENING INDICATOR
WINDOW INDICATOR
EQUIPMENT INDICATOR
SHEET NOTES
PARTITION TYPE INDICATOR
NORTH ARROW
INDICATES PROJECT NORTH
INDICATES TRUE NORTH
EXISTING
INDICATES
COLUMN LINE
DESIGNATION
COLUMN LINE INDICATORS
DRAWING REVISION INDICATOR
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO BE
REMOVED
NEW CONSTRUCTION
VV ITEM - GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
VC ITEM - GOVERNMENT
FURNISHED / CONTRACTOR
INSTALLED
ELEVATION INDICATOR
WALL FINISH INDICATOR
CC ITEM - CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
N
1 1/8" = 1'-0"
View Name
A_4a
BA3034
CASEWORK TAG
LETTER PAIR INDICATES CASEWORK FAMILY:
RE: AE511-514 FOR DETAILS
FIRST PAIR OF NUMBERS INDICATES UNIT
WIDTH (I.E. 30")
SECOND PAIR INDICATES COUNTERTOP
HEIGHT (I.E. 34")
TOILET ACCESSORY TAG
XXXX
JSN
A
NEW
INDICATES
COLUMN LINE
DESIGNATION
CEILING HEIGHT INDICATOR
Room name 1A105
9' - 0"
SIMPLE PARTITIONS: VA BIM STANDARDS
A_4a
INDICATES PARTITION TYPE
INDICATES FIRE/SMOKE RATING (0-4 HRS); _ INDICATES 0 HOURS
INDICATES VARIATION CODE(S)
INDICATES NOMINAL CORE SIZE
FIRE RATINGS:
0 NON-RATED
1 1-HR RATING
2 2-HR RATING
3 3-HR RATING
4 4- HR RATING
VARIATION CODES
a ACOUSTICAL INSULATION: ACOUSTICAL BLANKET INSUL
FULL HT OF PARTITION, PLUS ACOUSTICAL SEALANT
BEADS AROUND FULL PERIMETER OF PARTITION. STC
RATING OF 40 MINIMUM.
b
SMOKE RESISTANT ASSEMBLY; EXTEND ASSEMBLY TO
DECK ABOVE; REF LIFE SAFETY PLANS
P A
R T
IT
IO
N S
P
A N
E L S
B O
T H
S
ID
E S
A B C
MTL STUDS
SINGLE BD,
BOTH SIDES
BOTTOM OF DECK
CEILING LINE
RE: RCP FOR TYPE(S)
CMU
UL U905
(2 HR)
DOUBLE BD
UL U415-B
(2 HR)
J K L
MTL STUDS
SINGLE BD,
BOTH SIDES
( PARTIAL HT )
D
SHAFT WALL
UL U415A
(1 HR)
F U
R R
IN
G
S
P
A R
T
IT
IO
N
S
P A
N E
L
O
N E
S
ID
E
FURRING / STUDS
SINGLE BD
NOTES 1 & 4
PARTITION TYPE NOTES
1. WHERE NO FIRE/SMOKE RATING AND NO ACOUSTIC INSULATION INDICATED, TERMINATE STUDS 4” ABOVE HIGHEST ADJACENT CEILING AND BRACE TOP TRACK AT INTERVALS OF 4’-0” OC (MAX) TO STRUCTURE ABOVE OR ADJACENT.
2. SEE FLOOR PLANS AND INTERIOR ELEVATIONS FOR HEIGHT OF PARTIAL HEIGHT PARTITION ABOVE FINISH FLOOR.
3. BRACE PARTIAL HEIGHT ONE-SIDED PARTITIONS TO ADJACENT PARTITIONS. EXCEPTION: WHEN OVERLAYING RATED
WALLS, BRACE NEW STUDS TO STRUCTURE ONLY.
4. OFFSET FURRING / STUD 1" FROM ADJACENT PARALLEL SURFACE / STRUCTURE, UNLESS NOTED OTHERWISE.
BOTTOM OF DECK
CEILING LINE
RE: RCP FOR TYPE(S)
COMPOSITE PARTITIONS:
DOUBLE LETTERS INDICATE COMPOSITE PARTITION MADE UP OF OTHER
PARTITION TYPES. FOR EXAMPLE KK_4A INDICATES A NON-RATED
PARTITION CONSTRUCTED OF TWO (TYPE 'K') SINGLE-SIDED
PARTITIONS WITH ACOUSTICAL INSULATION AND A SINGLE LAYER OF
GWB ON OUTSIDE FACES
CMU
CORE SIZES:
0 7/8" FURRING
1 1-5/8" STUD
2 2-1/2" STUD
4 3-5/8" STUD / CMU
6 5-1/2" STUD / 5-5/8" CMU
8 7-5/8" CMU
E
SINGLE BD
BOTH SIDES
UL U419
(1 HR)
M
FURRING / STUDS
SINGLE BD
(PARTIAL HT)
c
CEMENTICIOUS BACKER BOARD ON WET WALL / SIDE OF
STUD.
d
MOISTURE RESISTENT GYP BD ON HEADWALL SIDE OF
PARTITION
NOTES 1, 2,
3, & 4
NOTES 1, 2,
3, & 4
NOTE 1
e
ACOUSTICAL INSULATION: ACOUSTICAL BLANKET INSUL
FULL HT OF PARTITION, PLUS ACOUSTICAL SEALANT
BEADS AROUND FULL PERIMETER OF PARTITION. STC
RATING OF 45 MINIMUM
N
O T
U S
E D
N
O T
U S
E D
N
O T
U S
E D
- 1
"a" + "c" = ACOUSTICAL/SMOKE RESISTANTt
"a" + "e" = ACOUSTICAL/MOISTURE RESISTANTw
A.D.A.
WALL MOUNTED
MIRROR
(A1067)
WALL MOUNTED
GRAB BAR
(SIDE)
(A5109.2)
WALL MOUNTED
GRAB BAR
(REAR)
(A5109.1)
TOILET PAPER
DISPENSER
(A5200)
WALL MOUNTED PAPER TOWEL
DISPENSER (WITH OR WITHOUT
INTEGRAL TRASH RECEPTICLE)
(A5080/A5082)
FIRE
EXTINGUISHER
CABINET, FULLY-
RECESSED
WALL MOUNTED
TELEPHONE
(A1012/A1014)
MOP BRACKET WALL MOUNTED
LAVATORY
COUNTER
MOUNTED
LAVATORY
WALL MOUNTED
ROBE HOOK PAIR
(A5145)
DIALYSIS BOX,
RECESSED,
SINGLE VALVE
(P8705)
WALL MOUNTED
SOAP DISPENSER
HAND SANITIZER DISPENSER
(A5075/A5077)
MIRROR TO
BE
18"x36" U.N.O.
CENTER
MIRROR
OVER
SINK U.N.O.
T
R
E F
L E
C T
IN
G
S U
R F
A C
E
P L U
M B
IN
G
W A
L L
12" 42"
6" 36"
T O
IL
E
T S
ID
E
W A
L L
P L U
M B
IN
G
W
A L L
7"
IF A DOUBLE ROLL
DISPENSER IS
PROVIDED,
DIMENSION IS TO ROLL
CLOSEST TO TOILET
T O
F R
O N
T T
O P
E D
G E
F D
E C
K L
IP
W
H E
N L O
W E
R E
D
"4
T O
H A
N D
L E
T O
T O
P
T O
O P
E R
A T
IO
N
C O
U N
T E
R H
E
IG
H T
S
ID
E W
A L L
1'-3"
S
ID
E W
A L L
1'-3"
T O
O P
E R
A T
IO
N
FEC
BCS-1
WASTE DISPOSAL UNIT,
SHARPS WITH GLOVE
DISPENSER
(A5106/A5107)
SWING UP GRAB
BAR
RE: 12/A515 FOR
SUPPORTS
S
ID
E W
A L L T
O
IL
E T
C .L
18"
TOILET
MOUNTING
LOCATION
T O
IL
E
T S
ID
E
W A
L L
18"
OFFSET DRAIN
INSULATE HW
& DRAIN
OFFSET DRAIN
INSULATE HW
& DRAIN-
N O
T U
S E
D
N
O T
U S
E D
DISPOSAL, SANITARY
NAPKIN, SS, SURFACE
MOUNTED
(A5090)
SHELF; FOLD DOWN;
STAINLESS STEEL
(A5160)
CLOCK, ATOMIC,
BATTERY OPERATED
(F3200)
TELEVISION, FLAT
SCREEN
(M0506)
WHITEBOARD,
DRY ERASE 48"X24"
(F3050/F3065)
U .N
.O
TELEVISION, COLOR,
BEDSIDE, W/ GRAVITY
FREE SUPPORT ARM
(M0505)
TELEVISION HDTV
(M0512)
V A
R
IE
S
N
O T
U S
E D
N
O T
U S
E D
N
O T
U S
E D
N
O T
U S
E D
/4
/4
NEW UNRATED PARTITION
NEW / EXISTING 2-HOUR BARRIER
EXISTING PARTITION, TO BE
REMOVED
EXISTING PARTITION, TO REMAIN
INDICATES AREA NOT IN
CONTRACT; U.N.O.
NEW / EXISTING 1-HOUR BARRIER
NEW UNRATED PARTITION
NEW / EXISTING 1-HR FIRE AND SMOKE BARRIER
EXISTING PARTITION, TO BE REMOVED
EXISTING PARTITION, TO REMAIN
INDICATES AREA NOT IN CONTRACT
NEW / EXISTING 1-HR FIRE BARRIER
NEW / EXISTING 2-HR FIRE BARRIER
FIRE EXTINGUISHER CABINETFEC
LIFE SAFETY TRAVEL DISTANCE
EXIT LIGHT
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/2
/2
:4
:0
A
M C
U s e rs
\a m o rr is \R e v it L o c a l\
-1
-1
B
-1
D ia ly s is
A rc h
A d d e n d u m a la n a
.m o rr is
.r v t
SYMBOLS, LEGENDS, & GENERAL
NOTES
CONSTRUCTION
DOCUMENTS
CONSTRUCT INPATIENT DIALYSIS
FOR NLR
EJT HEALTHCARE CENTER, NLR, AR
2020.02.12 JDM JAC
598-18-107
GI002
JDA PROJECT #: D-18-03
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
DRAFTING SYMBOLS PARTITION TYPES TYPICAL PARTION NOTES
EQUIPMENT MOUNTING LEGEND GRAPHIC LEGEND
1 TESTING AGENCIES FOR THE FIRE ASSEMBLIES IDENTIFIED ON THE PARTITION SCHEDULE ARE:
UL – UNDERWRITERS LABORATORY DESIGN NUMBER
GA – GYPSUM ASSOCIATION DESIGN NUMBER
2 PLAN DIMENSIONS ARE TYPICALLY TO GRID LINE, FACE OF STUD, OR FACE OF CONCRETE OR CMU UNLESS NOTED OR INDICATED OTHERWISE. DOORS NOT LOCATED BY PLAN DIMENSIONS ARE LOCATED BY JAMB DETAILS REFERENCED FROM DOOR SCHEDULE.
CRITICAL CLEARANCES ARE DESIGNATED ‘CLR’.
3 THE PARTITION TYPE NOTED BY A SYMBOL CONTINUES BETWEEN CORNERS AND BETWEEN INTERSECTING PARTITIONS. AT OPENINGS, PROVIDE THE SAME PARTITION TYPE ABOVE AND BELOW SUCH OPENING AS THAT ON EITHER SIDE OF THE OPENING. AT PARTITIONS SCHEDULED TO EXTEND TO STRUCTURE ABOVE, EXTEND THE PARTITION AROUND AND ABOVE DUCTS, BEAMS, AND OTHER OBSTRUCTIONS. ALIGN DIFFERENT PARTITION THICKNESSES SO THAT THE FINISHED WALL PLANES CONTINUE UNBROKEN WITHIN EACH ROOM OR CORRIDOR, UNLESS NOTED OTHERWISE. WHERE FACE OF COLUMN FURRING IS SHOWN AS ALIGNING WITH FACE OF PARTITION, CONTINUE PARTITION FACE UNBROKEN PAST THE COLUMN. STANDARD COLUMN FURRING DETAILS LOCATE PARTITION FACE.
4 WHERE GYPSUM BOARD IS NOT SCHEDULED TO EXTEND TO BOTTOM OF STRUCTURE, BOARD MAY TERMINATE 4” ABOVE ABUTTED CEILING ON EACH SIDE. IF NO CEILING IS SCHEDULED, BOARD IN THAT ROOM MUST EXTEND FULL HEIGHT.
5 WHERE PARTITIONS ARE INDICATED AS BEING FIRE-RATED, CONTINUE PARTITIONS UNBROKEN TO BOTTOM OF DECK ABOVE AND ALONG THE ENTIRE PERIMETER OF THE SPACES BEING SEPARATED BY THE FIRE-RATED PARTITIONS. CONTINUE FIRE-RATED PARTITION
SEPARATIONS WITHOUT INTERRUPTION WHERE THEY INTERSECT NON-RATED PARTITIONS.
6 WHERE COLUMNS, MECHANICAL CHASES, PIPING, AND OTHER ELEMENTS ARE LOCATED WITHIN A FIRE-RATED PARTITION, CONTINUE THE GYPSUM BOARD AROUND BOTH SIDES OF THE OBSTRUCTION TO MAINTAIN THE RATED ASSEMBLY. FOR DUCT, PIPE, CONDUIT, AND OTHER PENETRATIONS PASSING THROUGH A FIRE-RATED PARTITION, PROVIDE TIGHT FITTING FIRE-RATED STOPPING ASSEMBLIES EQUAL TO
ASSEMBLY RATING.
7 WHERE SMOKE AND FIRE-RATED PARTITIONS TERMINATE AT EXTERIOR WALLS, FILL VOIDS WITH FIRE-RATED ASSEMBLIES, OR EXTEND TO RATED PARTITIONS TO THE OUTER FACE OF EXTERIOR WALL CONSTRUCTIONS. ENSURE THAT NO FLANKING PATHWAYS EXIST THAT
MIGHT PERMIT SMOKE OR FIRE TO FLOW FROM ONE SIDE OF THE PARTITION TO THE OTHER.
8 PROVIDE CONTINUOUS STANDARD BLOCKING AS DETAILED FOR WALL MOUNTED ELEMENTS AT TOP AND BOTTOM ATTACHMENT POINTS AND AT INTERMEDIATE ATTACHMENT POINTS AS REQUIRED BY THE ELEMENT, INCLUDING, BUT NOT LIMITED TO; ACCESSORIES, RAILINGS, FLOOR-MOUNTED CASEWORK, CURTAIN RODS, WALL PROTECTION, CORNER GUARDS, AND EQUIPMENT WEIGHING LESS THAN 50 POUNDS.
9 PROVIDE HEAVY DUTY BLOCKING AS DETAILED FOR SUPPORT OF HEAVY ELEMENTS, INCLUDING, BUT NOT LIMITED TO; WALL MOUNTED SHELVING AND CABINETRY, HAND RAILS, GRAB BARS, BABY-CHANGING TABLES, LAVATORIES, COUNTER TOPS, MOUNTS FOR TELEVISIONS AND COMPUTER MONITORS, DOOR STOPS, AND EQUIPMENT WEIGHING IN EXCESS OF 50 POUNDS.
10 WHERE ACOUSTICAL INSULATION IS INDICATED FOR PARTITIONS, SEAL TOP, BOTTOM AND SIDES OF EACH FACE AND EDGE OF GYPSUM
BOARD WITH ACOUSTICAL SEALANT WHERE THE BOARD CONTACTS OTHER MATERIALS.
11 BACK-TO-BACK ELECTRICAL BOXES ARE NOT PERMITTED UNLESS BOTH BOXES ARE WRAPPED WITH ADHESIVE WRAPPED INTUMESCENT PUTTY PADS. WHERE JUNCTION, OUTLET, AND SWITCH BOXES OCCUR ON OPPOSITE SIDES OF A PARTITION, EITHER PROVIDE PUTTY PADS FOR BOTH BOXES, OR OFFSET THE BOXES A MINIMUM OF ONE STUD SPACE AND PROVIDE ACOUSTICAL INSULATION BEHIND AND
BETWEEN THEM.
12 IN FIRE-RATED PARTITIONS WITH TOTAL “BLACK BOX” PENETRATIONS IN EXCESS OF 100 SQ. IN. IN 100 SQ. FT., ADDITIONALLY PROTECT BACK OF BOXES WITH RATED ASSEMBLIES APPROVED BY THE AUTHORITY HAVING JURISDICTION.
13 PROVIDE ACOUSTICAL SEALANT AROUND ALL PENETRATIONS THROUGH THE MEMBRANES OF ACOUSTICAL PARTITIONS. PROVIDE FIRE-RATED SEALANT IN LIEU OF ACOUSTICAL SEALANT WHERE REQUIRED TO MAINTAIN FIRE RATING OF ACOUSTIC PARTITIONS.
14 IN SHOWER STALLS AND WALLS BEHIND PLUMBING FIXTURES, PROVIDE TILE BACKER BOARD IN LIEU OF GYPSUM BOARD AT WALLS INDICATED TO RECEIVE CERAMIC TILE. BACKER BOARD TO MATCH GYPSUM BOARD IN TERMS OF THICKNESS AND FIRE-RATING CAPABILITY.
PROVIDE MOISTURE RESISTANT (MR) GYPSUM BOARD IN LIEU OF STANDARD GYPSUM BOARD AT THE FOLLOWING LOCATIONS:
DIRECTLY BEHIND PLUMBING FIXTURES WHERE FINISH IS NOT CERAMIC TILE, AND CEILINGS ABOVE SHOWER STALLS.
15 AT NON-FIRE RATED, NON-ACOUSTIC PARTITIONS THAT DO NOT EXTEND TO STRUCTURE ABOVE, CONTRACTOR HAS OPTION OF EXTENDING STUDS TO STRUCTURE ABOVE OR TERMINATING STUDS 4” ABOVE HIGHEST ADJACENT CEILING AND BRACING TOP TRACK AT
INTERVALS OF 4’-0” OC (MAX) TO STRUCTURE ABOVE.
16 WHERE STUDS EXTEND MORE THAN 3’-0” ABOVE THE GYPSUM BOARD, PROVIDE HORIZONTAL BRACING MIDWAY BETWEEN TOP OF
GYPSUM BOARD AND TOP OF STUDS.
17 AT FURRING PARTITIONS (GYPSUM BOARD ONE SIDE ONLY) PROVIDE HORIZONTAL STUD BRACING OR 18 GA ANGLE CLIPS SECURED TO
STRUCTURAL SUBSTRATE AT 4’-0” OC (MAX). SIMILAR REQUIREMENT AT COLUMN FURRING.
18 MAGNITUDE OF POTENTIAL STRUCTURAL LIVE LOAD DEFLECTION IMPACTING PARTITIONS FOR THIS PROJECT IS 1/2” IN COMPRESSION AND 0” IN EXTENSION, FOR A TOTAL MOVEMENT OF 1/2”. FOR RATED PARTITIONS, THE HEAD-OF-WALL FIRE RESISTIVE ASSEMBLY PROVIDED MUST BE RATED FOR THIS DEGREE OF MOVEMENT. PROVIDE A FIRE-RESISTIVE VARIATION FOR EACH CONDITION (BEAMS, DUCTS, CORNERS, ETC.) ENCOUNTERED AT THE RATED PARTITION HEADS. FOR NON RATED PARTITIONS, SECURE THE TOP TRACK IN A
MANNER THAT ACCOMMODATES DEFLECTION OF THE STRUCTURE ABOVE OR BELOW.
19 FOR DOORS, RELITES, DUCT, AND OTHER OPENINGS WITH ROUGH OPENING DIMENSIONS OF 4’-0” OR WIDER, PROVIDE HEAVY GAUGE KING
STUDS AND A “BOX BEAM” HEADER AS DETAILED IN STANDARD OPENING HEADER DETAILS.
LIFE SAFETY LEGEND
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/2
/2
:4
:0
A
M C
U s e rs
\a m o rr is \R e v it L o c a l\
-1
-1
B
-1
D ia ly s is
A rc h
A d d e n d u m a la n a
.m o rr is
.r v t
GENERAL INFORMATION CONSTRUCTION
DOCUMENTS
CONSTRUCT INPATIENT DIALYSIS
FOR NLR
EJT HEALTHCARE CENTER, NLR, AR
2020.02.12 JDM JAC
598-18-107
GI003
JDA PROJECT #: D-18-03
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
SJ SCORED JOINT
SJI STEEL JOIST SLIDING WINDOW
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SMS SHEET METAL SCREW
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL
UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE
SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION
CLASSIFICATION
STIF STIFFENER
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUB
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT
STL
STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SNTHETIC
SYS SYSTEM
T
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL,
TEMPERATURE CONTROL PANEL,
OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TLT TOILET
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ______
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TYP TYPICAL
U
U.N.O. UNLESS NOTED OTHERWISE
U.O.N. UNLESS OTHERWISE NOTED
V
VC VA FURNISHED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE OR
VITRIFIED CLAY TILE
VENT VENTILATION
VERT VERTICAL
VV VA FURNISHED / VA INSTALLED
W
W/ WITH
WD WOOD
WP WALL PROTECTION
QRY QUARRY
QT QUARRY TILE OR QUART
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R
R RADIUS OR RISER
RA RETURN AIR
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER
BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE, REINFORCED, OR
REINFORCING
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
S
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE
CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID
CORE
SCH SCHOOL
SCHED SCHEDULE, SCHEDULED
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE
DETECTOR, OR SOAP DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL
FLASH
SHEET METAL (FLASHING)
SHTHG SHEATHING
SIM SIMILAR
SJ SCORED JOINT
NRC NOICE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING
CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O
O OXYGEN
O/H OVER HEAD
O/O OUT TO OUT
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE
DIMENSION
OFD OVERFLOW DRAIN
OFF OFFICE
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSIE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE
RADIUS
ORD ORDNANCE OR OVERFLOW ROOF
DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
OUT OUTLET
OZ OUNCE
P
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR
PORTLAND CEMENT
PCA PORTLAND CEMENT
ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTYLINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE ORDER
OR PURCHASE ORDER POST
OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMAIC TUBE, OR
PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING
CONCRETE
LYR LAYER
M
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTAIN, MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM O MEDIUM
MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMBO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MIN MINIMUM MINUTE OR MINUTE
MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
H
H HIGH
H PLAM HIGH PRESSURE PLASTIC
LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE
AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGAR
HM HOLLOW METAL OR
HECTOMETER
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND
FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR
HORSEPOWER
HQ HEADQUARTERS
HR HOUR
HRS HOURS
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATION, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I
I INTERSTATE (HIGHWAY) OR
MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATED, INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE
ASSEMBLY
IWH INSTANANEOUS WATER HEATER
J
J-BOX JUNCTION BOX
JAN JANITOR
K
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LATENT
HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND
EQUIPMENT
FH FLAT HEAD OR FLAT HEAD
SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCEN FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF
CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF CURB
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR
FIREPROOF OR FLAT PANEL
DOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT,
OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER
OR FIBERGLASS REINFORCED
PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUT
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON, GALLONS
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED
GFRG GLASS-FIBER-REINFORCED
GFRP GLASS-FIBER-REINFORCED
PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CTLINDER LOCK
D
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR
DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM,
OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC, ELECTRICAL
ELEC DR
OP
ELECTRIC DOOR OPENER
ELEV ELEVATOR
ELEVS ELEVATIONS
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE
BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
F
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C
C CELSIUS CHANNEL OR CHANNEL
CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
C/C CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
C/VA CONTRACTOR FURNISHED/
GOVERNMENT INSTALLED
CAB CABINET
CAC CEILING ATENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT, CEMENTITIOUS
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR
CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULATING, CIRCULAR
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LIINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CM CONSTRUCTION MANAGEMENT
cm2 SQUARE CENTIMETER cm3 CUBIC CENTIMETER
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE,
CERTIFICATE OF OCCUPANCY,
CLEAN OUT, OR COMPANY
co2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINAION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS, CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR COORDINATION OFFICER
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
A
A LABEL CLASS A DOOR
A/C AIR CONDITIONING
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR
ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ACT
ADB AUTOMATIC DOOR BOTTOM
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION,
ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE, ALTERNATIVE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLAYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE, APPROXIMATELY
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT, ARCHITECTURAL
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO-VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL
WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'S
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
UP
H
H
G
G
J
J
VESTIBULE
STAIRS
OUTSIDE
139 SF
EQUIPMENT
PROCESSING,
SOILED
RECEIVING
1C-165D
126 SF
EQUIPMENT
PROCESSING,
CLEAN PREP
1C-165B
112 SF
BARIATRIC BED
STATION
1C-167D
100 SF
BED COMPATIBLE
STATION
1C-167C
95 SF
BARIATRIC CHAIR
STATION
1C-167B
96 SF
BARIATRIC CHAIR
STATION
1C-167A
90 SF
EQUIPMENT
PROCESSING,
CLEAN STORAGE
1C-165A
168 SF
NURSE STATION
1C-167E
128 SF
MULTI-USE ROOM
1C-172
141 SF
EQUIPMENT
PROCESSING,
REPAIR SHOP
1C-165C
96 SF
UTILITY ROOM,
SOILED
1C-170
67 SF
STAFF TOILET
1C-171
139 SF
CORRIDOR
98 SF
STORAGE, CLEAN
SUPPLY & CLEAN
LINEN
1C-168
97 SF
CORRIDOR
1C-167
COURTYARD
109 SF
MEDICATION
PREP ROOM
1C-166
60 SF
PATIENT TOILET
1C-169
102 SF
STAFF LOUNGE
1C-173
O U
T S
ID
E
DEPARTMENTAL LEGEND
PATIENT
STAFF
UTILITY, CLEAN/STERILE
UTILITY, SOILED
CIRCULATION
EQUIPMENT, SOILED
EQUIPMENT, CLEAN/STERILE
EQUIPMENT, UTILITY
104 SF
STORAGE,
STERILE SUPPLY
1C-168A
C O
U R
T Y
A R
D
EXISTING CORRIDOR
EXISTING
COPIER/FAX
EXISTING
RESTROOM EXISTING
OFFICE
EXISTING
CORRIDOR
D
D
11.211.2
25' - 0"25' - 0"25' - 0"
25' - 0"25' - 0"25' - 0"
EXISTING
PHARMACY
SATELLITE
75' - 0"
75' - 0"
8 SF
NURSE CALL
CLOSET
1C-172A
NEW UNRATED PARTITION
NEW / EXISTING 2-HOUR BARRIER
EXISTING PARTITION, TO BE
REMOVED
EXISTING PARTITION, TO REMAIN
INDICATES AREA NOT IN
CONTRACT; U.N.O.
NEW / EXISTING 1-HOUR BARRIER
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/2
/2
:4
:1
A
M C
U s e rs
\a m o rr is \R e v it L o c a l\
-1
-1
B
-1
D ia ly s is
A rc h
A d d e n d u m a la n a
.m o rr is
.r v t
DEPARTMENTAL USE PLAN CONSTRUCTION
DOCUMENTS
CONSTRUCT INPATIENT DIALYSIS
FOR NLR
EJT HEALTHCARE CENTER, NLR, AR
2020.02.12 JDM JAC
598-18-107
GI004
JDA PROJECT #: D-18-03
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
N
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
FIRST FLOOR SLAB ELEVATION = 303.0'
N
KEY PLAN
PLAN
NORTH
A
B C
DE
G
M
N
HJ
K L
M
SCALE: 1/4" = 1'-0"
0 2' 4' 8' 1/4" = 1'-0"
F3
DEPARTMENTAL USE PLAN
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
GRAPHIC LEGEND
SPACE DESIGN MATRIX
NUMBER NAME
TIL ROOM
CODE
TIL MIN
AREA
PROVIDED
AREA */- TIL
FIRST FLOOR
1C-165A EQUIPMENT PROCESSING, CLEAN STORAGE CSIA1 200 SF 90 SF -110
1C-165B EQUIPMENT PROCESSING, CLEAN PREP CSSS1 200 SF 126 SF -74
1C-165C EQUIPMENT PROCESSING, REPAIR SHOP BMER1 150 SF 141 SF -9
1C-165D EQUIPMENT PROCESSING, SOILED RECEIVING CSDE1 150 SF 139 SF -11
1C-166 MEDICATION PREP ROOM MEDP1 110 SF 109 SF -1
1C-167A BARIATRIC CHAIR STATION XXYYC 80 SF 96 SF 16
1C-167B BARIATRIC CHAIR STATION XXYYC 80 SF 95 SF 15
1C-167C BED COMPATIBLE STATION XXYYC 100 SF 100 SF 0
1C-167D BARIATRIC BED STATION XXYYC 100 SF 112 SF 12
1C-167E NURSE STATION NSTA1 110 SF 168 SF 58
1C-168 STORAGE, CLEAN SUPPLY & CLEAN LINEN SRSE1 80 SF 98 SF 18
1C-168A STORAGE, STERILE SUPPLY LCCL1 112 SF 104 SF -8
1C-169 PATIENT TOILET TPG01 60 SF 60 SF 0
1C-170 UTILITY ROOM, SOILED USCL1 80 SF 96 SF 16
1C-171 STAFF TOILET TLTU1 60 SF 67 SF 7
1C-172 MULTI-USE ROOM RDC01 100 SF 128 SF 28
1C-172A NURSE CALL CLOSET COMC1 8 SF
1C-173 STAFF LOUNGE SL001 80 SF 102 SF 22
VESTIBULE
STAIRS
EQUIPMENT
PROCESSING,
SOILED
RECEIVING
1C-165D
EQUIPMENT
PROCESSING,
CLEAN PREP
1C-165B
BARIATRIC BED
STATION
1C-167D
BED COMPATIBLE
STATION
1C-167C
BARIATRIC CHAIR
STATION
1C-167B
BARIATRIC CHAIR
STATION
1C-167A
EQUIPMENT
PROCESSING,
CLEAN STORAGE
1C-165A
NURSE STATION
1C-167E
MULTI-USE ROOM
1C-172
EQUIPMENT
PROCESSING,
REPAIR SHOP
1C-165C
UTILITY ROOM,
SOILED
1C-170
STAFF TOILET
1C-171
C O
R R
ID
O
R
STORAGE,
STERILE SUPPLY
1C-168A
STORAGE, CLEAN
SUPPLY & CLEAN
LINEN
1C-168
M E
D
IC
A T
IO
N
P R
E P
R O
O M
C
-1
PATIENT TOILET
1C-169
STAFF LOUNGE
1C-173
COPIER/FAX
CONFERENCE
ROOM
OFFICE
OFFICE
OFFICE
CHASE
RESTROOM
ASSISTANT DIRECTOR
CHIEF OF STAFF
C H
A S
E
RESTROOM
RESTROOM
ASSOCIATE DIRECTOR
DIRECTOR
RESTROOM
OFFICE
CHASE
AGENT
CASHIERS
RESTROOM
PATIENT
FUNDS
WORK
ROOM
CLERICAL
CHASE
STORAGE
OFFICE
C H
A S
E
CORRIDOR
BATHROOM RESTROOM
SOILED
LINEN
ELECTRICAL
RESTROOM BATHROOM
CHASE CHASE
RESTROOM
BATHROOM
C H
A S
E
STAIR
BEDROOM HELP DESKBEDROOMBEDROOMBEDROOM
OFFICE
CLERICALELIGIBILITY CTR
109-170 107-170
110-170
112-170
116-170
111-170
113-170
115-170
117-170
119-170
121-170
116A-170
118-170
143-170
141-170 124-170 122-170
133-170 129-170
129A-170
137-170
126-170 128-170
134-170
136-170
140-170
138-170 140A-170
142-170
144-170
146-170 148-170
150-170 152-170
154-170
156-170
158-170
S14-170
BEDROOM
161-170
BEDROOM
159-170
BEDROOM
153-170
BEDROOM
149-170
CHASE
C H
A S
E
RESTROOM
157-170
RESTROOM
155-170
RESTROOM
163-170
LINEN
ROOM
147-170
BATHROOM
151-170
NOUR.
KITCHEN
145-170
CLEAN
UTILITY
127-170
TELEPHONE
125-170
TELEPHONE
123-170
CORRIDOR
CORRIDOR VESTIBULE
175-170
STAIR
PHARMACY SATELLITE
107-170
STORAGE
107A-170
STAIR
ELEV.
ELEV.
WAITING AREA
131-170
CHASE
STAIR
GENERATOR
ROOM
173-170
CORRIDOR
ELECTRICAL
111-170
SOCIAL
WORKER
112-170
CLINICAL
DIETICIAN
113-170
ELEV.
SPD
STORAGE
118-170
TELEPHONE
116-170
SERVICE
CHUTES
115-170
WOMEN'S
RESTROOM
105-170
MEN'S
RESTROOM
104-170
CHIEF NURSING
SVCS.
106-170
CHASE
HVAC
119-170
COURTYARD
LOBBY
CORRIDOR
COURTYARD
CHASE
NURSE CALL
CLOSET
1C-172A
LIFE SAFETY PARTITION LEGEND
NEW UNRATED PARTITION
NEW / EXISTING 1-HR FIRE AND SMOKE BARRIER
EXISTING PARTITION, TO BE REMOVED
EXISTING PARTITION, TO REMAIN
INDICATES AREA NOT IN CONTRACT
NEW / EXISTING 1-HR FIRE BARRIER
NEW / EXISTING 2-HR FIRE BARRIER
FIRE EXTINGUISHER CABINETFEC
LIFE SAFETY TRAVEL DISTANCE
EXIT LIGHT
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
/2
/2
:4
:2
A
M C
U s e rs
\a m o rr is \R e v it L o c a l\
-1
-1
B
-1
D ia ly s is
A rc h
A d d e n d u m a la n a
.m o rr is
.r v t
LIFE SAFETY PLAN CONSTRUCTION
DOCUMENTS
CONSTRUCT INPATIENT DIALYSIS
FOR NLR
EJT HEALTHCARE CENTER, NLR, AR
2020.02.12 JDM JAC
598-18-107
GI005
JDA PROJECT #: D-18-03
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
1/8" = 1'-0" F1
LIFE SAFETY PLAN
N
N
KEY PLAN
PLAN
NORTH
A
B C
DE
G
M
N
HJ
K L
M
SCALE: 1/8" = 1'-0"
0 8' 16' 32'
FIRST FLOOR SLAB ELEVATION = 303.0'
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE
AREA CLASS DESIGNATION
TYPE OF CONTRUCTION/PROJECT ACTIVITY TABLE
GROUP 1-LOW RISK
● OFFICE AREAS (NON-
CLINICAL)
PATIENT RISK GROUP TABLE
GROUP 2-MEDIUM RISK
GROUP 3-HIGH RISK GROUP 4-HIGHEST RISK
INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP TYPE A
I I I
III
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION
ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES
ARE NECESSARY.LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REPLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AN EXIT OF WORK AREA.
REPLACE USED MATS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR
FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT
BEFORE CONSTRUCTION BEGINS.
3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR
IMPLEMENT CONTROL CUBE METHOD.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
7. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERS.
8. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING
WORK AREAS.
9. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
1. WIPE SURFACES TO REMOVE DUST.
1. WIPE WORK SURFACES WITH
DISINFECTANT.
2. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND/OR VACUUM
WORK AREA WITH HEPA
FILTERED VACUUM BEFORE
LEAVING WORK AREAS.
4. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE
WORK WAS BEING PERFORMED.
1. REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION
WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE
COVERING.
4. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE
WORK WAS BEING PERFORMED.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III.
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR
FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT
BEFORE CONSTRUCTION BEGINS.
3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD
BEFORE CONSTRUCTION BEGINS.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-
EQUIPPED AIR FILTRATION UNITS.
6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS-THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
8. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA WITH
ANTEROOM. REPLACE PER MANUFACTURER'S RECOMMENDATIONS.
9. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED EACH BY THE HOSPITAL SAFETY OFFICER, FACILITIES
MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT AND
THOROUGHLY CLEANED BY THE HOSPITAL ENVIRONMENTAL SERVICES
DEPARTMENT OR THEIR CONTRACTED ENVIRONMENTAL SERVICES COMPANY.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
11. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERING.
12. VACUUM WITH HEPA FILTERED VACUUM. WET MOP WITH DISINFECTANT
AFTER BARRIERS ARE REMOVED.
13. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
1. REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE
BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
3. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE
COVERING.
4. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT
AFTER BARRIERS ARE REMOVED.
6. REMOVE ISOLATION OF HVAC
SYSTEM IN AREAS WHERE WORK
WAS BEING PERFORMED.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
CLASS I
CLASS II
CLASS III
CLASS IV
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES BUT IS NOT LIMITED TO:
● REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TILE IN 50 SQUARE FEET
● PAINTING (BUT NOT SANDING), WALL COVERING
● ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT
DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR
ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST
INCLUDES BUT IS NOT LIMITED TO:
● INSTALLATION OF TELEPHONE AND COMPUTER CABLING
● ACCESS TO CHASE SPACES
● CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED
TYPE B
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
INCLUDES BUT IS NOT LIMITED TO:
● SANDING OF WALLS FOR PAINTING OR WALL COVERING
● REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
● NEW WALL CONSTRUCTION
● MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
● MAJOR CABLING ACTIVITIES
● ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE
WORK SHIFT
TYPE C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT IS NOT LIMITED TO:
● ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS
● REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM
● NEW CONSTRUCTION
TYPE D
● CARDIOLOGY
● ECHOCARDIOLOGY
● ENDOSCOPY-GI
● PHYSICAL THERAPY
● RADIOLOGY/MRI
● NUCLEAR MEDICINE
● RESPIRATORY CARE (EXCEPT
BRONCHOSCOPY AREA)
● CAFETERIA
● OUTPATIENT AREAS-CLINICS AND
OFFICES (EXCEPTION: TRANSPLANT AND
ONCOLOGY)
● EMERGENCY ROOM
● POST ANESTHESIA
● CARE UNITS
● LABOR AND DELIVERY
● PEDIATRICS
ADMISSION/DISCHARG
E AREA
● LABORATORIES
● PHARMACY
● INPATIENT UNITS (NOT
OTHERWISE
SPECIFIED)
● ALL OPERATING ROOMS INCLUDING LABOR
AND DELIVERY
● ANESTHESIA AND PUMP AREAS
● CENTRAL EQUIPMENT/STERILE
SUPPLY
● CARDIAC CATHETERIZATION AND
ANGIOGRAPHY AREAS
● INTERVENTIONAL RADIOLOGY
● RADIATION ONCOLOGY
● ALL INTENSIVE CARE UNITS
● NEWBORN NURSERIES, INCLUDING NICU
● DIALYSIS UNIT
● ONCOLOGY-INPATIENT AND OUTPATIENT
● TRANSPLANT-INPATIENT AND OUTPATIENT
● PHARMACY ADMIXTURE
● NEGATIVE PRESSURE ISOLATION
ROOMS/AREAS (INCLUDING
BRONCHOSCOPY AREA)
TYPE B
II
II
III
III / IV
TYPE C
II
III
III / IV
III / IV
TYPE D
III / IV
IV
IV
IV
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
4/ 9/
:4
5:
A M
Z:
\J
D a
D es ig n\
_A ct iv e\ D
-1 8-
_5
-1
8-
7_ B-
D ia ly si s\
_B
IM
\jd m
.0
IC
R A
Pl an r1 9.
rv t
ICRA CLASSIFICATION MATRIX CONSTRUCTION
DOCUMENTS
CONSTRUCT INPATIENT DIALYSIS
FOR NLR
EJT HEALTHCARE CENTER, NLR, AR
2020.02.12 Checker Author
598-18-107
GC100
JDA PROJECT #: D-18-03
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING, LLC
P.O. BOX 723
GREENBRIER AR 72058
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
K Y
LI
G H T
C
F
IR
E
EXIT
E X
IT
E X
IT
E X
IT
E X
IT
E X
IT
EXIT
EXIT
EXIT
EXIT
EXIT
E X
IT
E X
IT
C
C
C
C
C
C
C
C
F
IR
E
F
IR
E
F
IR
E
F
IR
E
F
IR
E 1212
H
H
G
G
J
J
D
D
11.211.2
EXIT
FI
R
E
EX
IT
EXIT
EX
IT
EX
IT
EX
IT
GAS GAS
CFI
R
E
EX
IT
EXIT
LINE OF 1B125-170
TELEPHONE ABOVE
GB113-170
ELECTRICAL
GB112-170
TELEPHONE
CGB4-170
CORRIDOR
CGB5-170
CORRIDOR
LINE OF B AND C
WINGS ABOVE
COURTYARD ABOVE
PRIMARY WORK LIMITS AT FIRST
FLOOR ABOVE
REFER TO SHEET FA101
FOR NEW FIRE ALARM
WORK IN THIS VICINITY
UNEXCAVATED SPACE
CONTRACTOR TO REVIEW EXISTING
CONDITION'S IMPACT ON REQUIRED
WORK IN THIS AREA PRIOR TO
BIDDING
REFER TO SHEET PL102 FOR
NEW PLUMBING WORK IN
UNEXCAVATED SPACE
UNEXCAVATED SPACE
CONTRACTOR TO REVIEW EXISTING
CONDITION'S IMPACT ON REQUIRED
WORK IN THIS AREA PRIOR TO
BIDDING
ICRA CLASS LEGEND
CLASS 2
CLASS 3
1B125-170
TELEPHONE
142-170
ELECTRICAL
ICRA CLASS LEGEND
CLASS 2
CLASS 4
IN AREAS OF EXTERIOR WORK,
ENCAPSULATE WORK AREA TO
ENSURE EXISTING AIR INTAKES AND
OPERABLE WINDOWS ARE
ISOLATED FROM GENERATED
CONSTRUCTION DUST AND DEBRIS
REFER TO SHEET FA101
FOR NEW FIRE ALARM
WORK IN THIS VICINITY
C 1B
3-
C
O R
R
ID
O R
1B124-170
NURSE
C1C1-170
CORRIDOR
PRIMARY WORK LIMITS
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
4/ 9/
:4
6:
A M
Z:
\J
D a
D es ig n\
_A ct iv e\ D
-1 8-
_5
-1
8-
7_ B-
D ia ly si s\
_B
IM
\jd m
.0
IC
R A
Pl an r1 9.
rv t
ICRA PLANS CONSTRUCTION
DOCUMENTS
CONSTRUCT INPATIENT DIALYSIS
FOR NLR
EJT HEALTHCARE CENTER, NLR, AR
2020.02.12 Checker Author
598-18-107
GC101
JDA PROJECT #: D-18-03
A/E
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
FIRE PROTECTION
LACEY FIRE PROTECTION
ENGINEERING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .