A0002 PL102 - FIRST FLOOR PLAN - SANITARY SEWER.pdf

PDF 561 KB Posted

Attached to
Y1DB--CON | Construct Inpatient Dialysis | PR 598-23-1-8739-0001
Solicitation number
36C25622R0140
Issued by

About this file

This document is a solicitation from the Department of Veterans Affairs for construction services to build an approximately 2,600 square foot interior space for a new satellite inpatient dialysis unit at the North Little Rock Veterans Medical Center in Arkansas. The contractor will be responsible for constructing the new interior space in accordance with the attached statement of work, specifications and drawings. The solicitation includes a price breakdown template to be completed by offerors dividing the total proposed price into material, labor, equipment and general requirement costs for each construction division. Proposals are due by January 20, 2023 and the contractor will be responsible for general liability insurance and overhead and profit in addition to the base construction costs. The awarded contract will have a not to exceed price inclusive of all costs.

View the file

Other files

File Type Posted
A0005_App E_ACM Survey Report_2.pdf PDF
A0005_084113.pdf PDF
A0005_36C25622R0140 - RFIs_Additional Responses 03.07.23.pdf PDF
36C25622R0140 0005.pdf PDF
A0005_AE503 AMEND 0003.pdf PDF
A0005_App D_ACM Survey Report_1.pdf PDF
A0004 Contractor Rules of Behavior.pdf PDF
36C25622R0140 0004.docx DOCX document
A0004 36C25622R0140 - RFIs_ 021823 (003).pdf PDF
A0004 Sample Form 014500.pdf PDF
36C25622R0140 0003.docx DOCX document
signed Site Visit Attendance Sheet 01.17.23.pdf PDF
A0002 EP102 - FIRST FLOOR PLAN - SPECIAL SYSTEMS.pdf PDF
A0002 PK101 - PLUMBING SCHEDULES.pdf PDF
A0002 PJ102 - PLUMBING RISERS.pdf PDF
A0002 ADD. 2 NARRATIVE_Redacted.pdf PDF
A0002 EL101 - FIRST FLOOR PLAN - LIGHTING.pdf PDF
A0002 36C25622R0140 01272023.pdf PDF
A0002 EP101 - FIRST FLOOR PLAN - POWER.pdf PDF
A0002 EJ102 - ELECTRICAL DETAILS.pdf PDF
Amendment 36C25622R0140 0001 01.20.23.pdf PDF
Instructions to Offerors 01.20.23.pdf PDF
Attch F_EMR Form.pdf PDF
Attch A_ Final SOW for Construct Inpatient Dialysis.pdf PDF
Attch D_Subcontractor Information and Consent.pdf PDF
36C25622R0140_1.docx DOCX document
Attch C_598-18-107 100 Pct Drawings.pdf PDF
EXHIBIT A_PERFORMANCE RELEVANCY SURVEY.pdf PDF
Attch B_598-18-107 100 Pct Specifications.pdf PDF
Attch E_ Wage Determination.pdf PDF
EXHIBIT B_Past and Present Performance Questionnaire.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

G

J D

11.2

WC-1

WC-1

EW-1

LAV-1

S-3

FD-1

S-4

LAV-1

LAV-1

LAV-1

S-5

FD-1

FD-1

F D

-1

FD-1

FD-1

PJ102

F1

MULTIMULTIMULTIMULTI----USE ROOMUSE ROOMUSE ROOMUSE ROOM

1C-172

STAFF TOILETSTAFF TOILETSTAFF TOILETSTAFF TOILET

1C-171

BARIATRIC BEDBARIATRIC BEDBARIATRIC BEDBARIATRIC BED

STATIONSTATIONSTATIONSTATION

1C-167D

BED COMPATIBLEBED COMPATIBLEBED COMPATIBLEBED COMPATIBLE

STATIONSTATIONSTATIONSTATION

1C-167C

PATIENT TOILETPATIENT TOILETPATIENT TOILETPATIENT TOILET

1C-169

BARIATRIC CHAIRBARIATRIC CHAIRBARIATRIC CHAIRBARIATRIC CHAIR

STATIONSTATIONSTATIONSTATION

1C-167B

BARIATRIC CHAIRBARIATRIC CHAIRBARIATRIC CHAIRBARIATRIC CHAIR

STATIONSTATIONSTATIONSTATION

1C-167A

CORRIDORCORRIDORCORRIDORCORRIDOR

1C-167

EQUIPMENTEQUIPMENTEQUIPMENTEQUIPMENT

PROCESSING,PROCESSING,PROCESSING,PROCESSING,

SOILED RECEIVINGSOILED RECEIVINGSOILED RECEIVINGSOILED RECEIVING

1C-165D

EQUIPMENTEQUIPMENTEQUIPMENTEQUIPMENT

PROCESSING,PROCESSING,PROCESSING,PROCESSING,

CLEAN PREPCLEAN PREPCLEAN PREPCLEAN PREP

1C-165B

EQUIPMENTEQUIPMENTEQUIPMENTEQUIPMENT

PROCESSING,PROCESSING,PROCESSING,PROCESSING,

CLEAN STORAGECLEAN STORAGECLEAN STORAGECLEAN STORAGE

1C-165A

EQUIPMENTEQUIPMENTEQUIPMENTEQUIPMENT

PROCESSING,PROCESSING,PROCESSING,PROCESSING,

REPAIR SHOPREPAIR SHOPREPAIR SHOPREPAIR SHOP

1C-165C

MEDICATION PREPMEDICATION PREPMEDICATION PREPMEDICATION PREP

ROOMROOMROOMROOM

1C-166

NURSE STATIONNURSE STATIONNURSE STATIONNURSE STATION

STORAGE, CLEANSTORAGE, CLEANSTORAGE, CLEANSTORAGE, CLEAN

SUPPLY & CLEANSUPPLY & CLEANSUPPLY & CLEANSUPPLY & CLEAN

LINENLINENLINENLINEN

1C-168A

STORAGE, STERILESTORAGE, STERILESTORAGE, STERILESTORAGE, STERILE

SUPPLYSUPPLYSUPPLYSUPPLY

1C-168

UTILITY ROOM,UTILITY ROOM,UTILITY ROOM,UTILITY ROOM,

SOILEDSOILEDSOILEDSOILED

1C-170

CORRIDORCORRIDORCORRIDORCORRIDOR

STAFF LOUNGESTAFF LOUNGESTAFF LOUNGESTAFF LOUNGE

1C-173

FCO

FD-1

FD-1

FD-1

FD-1

FD-1

FD-1

S-2

EW-2 S-1

WF-1

S-1

WF-1 FS-1

WB-1

WB-1

WB-1

WB-1

WB-1

EW-1

FCO

FCO

EW-2

SYMBOLSYMBOLSYMBOLSYMBOL

PPPP----1111

CHECK VALVECHECK VALVECHECK VALVECHECK VALVE

GATE VALVEGATE VALVEGATE VALVEGATE VALVE

BALL VALVEBALL VALVEBALL VALVEBALL VALVE

HOT WATER (HW)HOT WATER (HW)HOT WATER (HW)HOT WATER (HW)

COLD WATER (CW)COLD WATER (CW)COLD WATER (CW)COLD WATER (CW)

NEW EQUIPMENTNEW EQUIPMENTNEW EQUIPMENTNEW EQUIPMENT

DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION

PLUMBING LEGEND

PLUMBING FIXTURE DESIGNATIONPLUMBING FIXTURE DESIGNATIONPLUMBING FIXTURE DESIGNATIONPLUMBING FIXTURE DESIGNATION

HOT WATER RETURN (HWR)HOT WATER RETURN (HWR)HOT WATER RETURN (HWR)HOT WATER RETURN (HWR)

SANITARY SEWERSANITARY SEWERSANITARY SEWERSANITARY SEWER

VENTVENTVENTVENT

EXISTING EQUIPMENT TO REMAINEXISTING EQUIPMENT TO REMAINEXISTING EQUIPMENT TO REMAINEXISTING EQUIPMENT TO REMAIN

EXISTING EQUIPMENT TO BE EXISTING EQUIPMENT TO BE EXISTING EQUIPMENT TO BE EXISTING EQUIPMENT TO BE

DEMOLISHEDDEMOLISHEDDEMOLISHEDDEMOLISHED

PIPING TO BE DEMOLISHEDPIPING TO BE DEMOLISHEDPIPING TO BE DEMOLISHEDPIPING TO BE DEMOLISHED

VVVV

SSSSSSSS

FCOFCOFCOFCO FLOOR CLEANOUTFLOOR CLEANOUTFLOOR CLEANOUTFLOOR CLEANOUT

WCOWCOWCOWCO WALL CLEANOUTWALL CLEANOUTWALL CLEANOUTWALL CLEANOUT

FDFDFDFD FLOOR DRAINFLOOR DRAINFLOOR DRAINFLOOR DRAIN

EWEWEWEW EYE WASHEYE WASHEYE WASHEYE WASH

U.S. Department of Veterans Affairs

CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

Drawing Title

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Building Number

Drawing Number

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

Revisions: Date:

VA FORM 08 - 6231

FULLY SPRINKLERED

MISSION CRITICAL

CONSTRUCTION DOCUMENTS

KCK CJC

/2

/2

:5

:5

P

M B

IM

/1

-0

C o n s tr u c t In p a ti e n t

D ia ly s is

/1

-0

I n p a ti e n t D ia ly s is

I n s ig h t C e n tr a l M o d e l

R v t

.r v t

FIRST FLOOR PLAN - SANITARY

SEWER

CONSTRUCTION

DOCUMENTS

CONSTRUCT INPATIENT DIALYSIS

FOR NLR

EJT HEALTHCARE CENTER, NLR, AR

2020.02.12

598-18-107

PL102

JDA PROJECT #: D-18-03

A/E

2200 N. RODNEY PARHAM ROAD

SUITE 210

LITTLE ROCK, AR 72212

501-404-4811 jda@JohnsonDanforth.com

JohnsonDanforth & Associates

FIRE PROTECTION

LACEY FIRE PROTECTION

ENGINEERING, LLC

P.O. BOX 723

GREENBRIER AR 72058

MEP ENGINEER

INSIGHT ENGINEERING, PLLC

900 S. SHACKLEFORD, SUITE 300

LITTLE ROCK, AR 72211

FIRST FLOOR SLAB ELEVATION = 303.0'

1/4" = 1'-0"

F4

FIRST FLOOR PLAN - SANITARY SEWER

SANITARY SEWER KEYED NOTES:

1. EXISTING 6" SANITARY LINE IS LOCATED IN CRAWL SPACE

AND EXITS BUILDING IN THE DIRECTION OF PLAN NORTH.

CONNECT NEW SANITARY LINES TO EXISTING. CONNECTION

LOCATION IS ESTIMATED.

N

KEY PLAN

PLAN

NORTH

A

B C

DE

G

M

N

HJ

K L

M

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

N

AN

SKR A

A S

C E R T

IF

IC

AT

EO

FAUTHOR

IZ

AT

IO

N

INSIGHT

ENGINEERING, PLLC

No. 3523

NO. 12022

ARKANSAS

ENGINEER

PROFESSIONAL

REGISTERED

OFETAS T

K

IM

B

ERLY CLA I

R

K O C H

2020.02.122020.02.122020.02.122020.02.12

1 ADDENDUM 2 01-20-23

Sheets
PL102 - FIRST FLOOR PLAN - SANITARY SEWER

File details come from the government source that posted it. Updated .