Attachment L Requirement Drawings.pdf
PDF 25 MB Posted
- Solicitation number
- 36C24822R0002
About this file
This document provides details for a federal contract solicitation seeking bids to replace variable air volume assemblies at the West Palm Beach Veterans Affairs Medical Center. The Department of Veterans Affairs Network Contracting Office 8 is soliciting bids to replace 1,184 variable air volume boxes in the main hospital and 119 boxes in the community living center. Bids are due by December 2, 2021. The contractor will be responsible for providing all labor, materials, tools and equipment to replace the air terminal units, reheat coils, control valves, and associated direct digital controls and thermostats. The solicitation number is 36C24822R0002 and the project drawings provide additional details. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses. The award is anticipated to be a firm-fixed-price contract between $10-20 million. The solicitation will be issued on October 28, 2021 and all information will be posted on sam.gov.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
N
F
A
D
I
ET
D S T
N U
E
TM
AP
R
E NT O
S
A
T SE FO
REM
ACI
N
VE RATE
A
FAI R
F
S VA Medical Center West Palm Beach
7305 N. Military Trail West Palm Beach, Florida 33410
STATE OF FLORIDA
N.T.S.
N
WEST PALM BEACH
KEY WEST
MIAMI
TAMPA
ORLANDO
PENSACOLA
TALLAHASSEE
GAINESVILLE VAMC
JACKSONVILLE
OCALA CBOC
VILLAGES CBOC
VALDOSTA CBOC
WEST
PALM
BEACH
BUILDING 1
BUILDING 3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
group mes
Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700
COA # 8304
DALE A. BACIK, P.E.
FULLY SPRINKLERED
8/
/2
:2 5:
A
M
REPLACE VAV BOXES AND
UPGRADE TO DIRECT DIGITAL
CONTROLS
LOCATION, SITE PLAN, AND SHEET
INDEX
WEST PALM BEACH, FLORIDA
08/20/2018 REM/DAB REM
548-16-612
01, 03
GI001
EP400 ENLARGED ELECTRICAL PLANS
EP401 ENLARGED ELECTRICAL PLANS
EP402 ENLARGED ELECTRICAL PLANS
EP403 ENLARGED ELECTRICAL PLANS
EP501 ELECTRICAL DETAILS
EP601 ELECTRICAL SCHEDULES
EP602 ELECTRICAL SCHEDULES
EP603 ELECTRICAL SCHEDULES
EP604 ELECTRICAL SCHEDULES
EP605 ELECTRICAL SCHEDULES
EP606 ELECTRICAL SCHEDULES
EP607 ELECTRICAL SCHEDULES
INDEX OF DRAWINGS
DRAWING
NUMBER DRAWING TITLE
E001 ELECTRICAL LEGEND, NOTES AND ABBREVIATIONS
EP110 BUILDING 1 BASEMENT OVERALL PLAN
EP110i-1-R BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - EAST - POWER EP110i-2-R BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER EP110i-3-R BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - WEST - POWER
EP111 BUILDING 1 FIRST FLOOR OVERALL PLAN
EP111-4-R BUILDING 1 FIRST FLOOR RENOVATION PLAN - CHAPEL - POWER
EP111i-1-R BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER EP111i-2-R BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER EP111i-3-R BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - WEST - POWER
EP112 BUILDING 1 SECOND FLOOR OVERALL PLAN
EP112i-1-R BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER EP112i-2-R BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER EP112i-3-R BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - WEST - POWER
EP113 BUILDING 1 THIRD FLOOR OVERALL PLAN
EP113i-1-R BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER EP113i-2-R BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER EP113i-3-R BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - WEST - POWER
EP114 BUILDING 1 FOURTH FLOOR OVERALL PLAN
EP114i-1-R BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER EP114i-2-R BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER EP114i-3-R BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - WEST - POWER
EP115 BUILDING 1 FIFTH FLOOR OVERALL PLAN
EP115i-1-R BUILDING 1 FIFTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER EP115i-2-R BUILDING 1 FIFTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER
EP116 BUILDING 1 SIXTH FLOOR OVERALL PLAN
EP116i-1-R BUILDING 1 SIXTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER EP116i-2-R BUILDING 1 SIXTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER
EP117 BUILDING 1 SEVENTH FLOOR OVERALL PLAN
EP117i-1-R BUILDING 1 SEVENTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER EP117i-2-R BUILDING 1 SEVENTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER
EP118 BUILDING 1 EIGHTH FLOOR OVERALL PLAN
EP118i-1-R BUILDING 1 EIGHTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER
EP119 BUILDING 1 NINTH FLOOR OVERALL PLAN
EP119i-1-R BUILDING 1 NINTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - POWER EP119i-2-R BUILDING 1 NINTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - POWER
EP131-J-J BUILDING 3 RENOVATION FLOOR PLAN - AREA J - POWER
EP131-J-K BUILDING 3 RENOVATION FLOOR PLAN - AREA K - POWER
EP131-J-L BUILDING 3 RENOVATION FLOOR PLAN - AREA L - POWER
INDEX OF DRAWINGS
DRAWING
NUMBER DRAWING TITLE
MH114-2-R BUILDING 1 FOURTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH114-3-R BUILDING 1 FOURTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - WEST - HVAC MH114i-1-D BUILDING 1 FOURTH FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH114i-1-R BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH114i-1-R-P BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH114i-2-D BUILDING 1 FOURTH FLOOR INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH114i-2-R BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - HVAC MH114i-2-R-P BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING MH114i-3-D BUILDING 1 FOURTH FLOOR INTERSTITIAL DEMOLITION PLAN - WEST - HVAC MH114i-3-R BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - WEST - HVAC MH114i-3-R-P BUILDING 1 FOURTH FLOOR INTERSTITIAL RENOVATION PLAN - WEST - PIPING MH115-1-R BUILDING 1 FIFTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH115-2-R BUILDING 1 FIFTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH115i-1-D BUILDING 1 FIFTH FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH115i-1-R BUILDING 1 FIFTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH115i-1-R-P BUILDING 1 FIFTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH115i-2-D BUILDING 1 FIFTH FLOOR INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH115i-2-R BUILDING 1 FIFTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - HVAC MH115i-2-R-P BUILDING 1 FIFTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING MH116-1-R BUILDING 1 SIXTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH116-2-R BUILDING 1 SIXTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH116i-1-D BUILDING 1 SIXTH FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH116i-1-R BUILDING 1 SIXTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH116i-1-R-P BUILDING 1 SIXTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH116i-2-D BUILDING 1 SIXTH FLOOR INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH116i-2-R BUILDING 1 SIXTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL- HVAC MH116i-2-R-P BUILDING 1 SIXTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING MH117-1-R BUILDING 1 SEVENTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH117-2-R BUILDING 1 SEVENTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH117i-1-D BUILDING 1 SEVENTH FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH117i-1-R BUILDING 1 SEVENTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH117i-1-R-P BUILDING 1 SEVENTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH117i-2-D BUILDING 1 SEVENTH FLOOR INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH117i-2-R BUILDING 1 SEVENTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - HVAC MH117i-2-R-P BUILDING 1 SEVENTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING MH118-1-R BUILDING 1 EIGHTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH118i-1-D BUILDING 1 EIGHTH FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH118i-1-R BUILDING 1 EIGHTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH118i-1-R-P BUILDING 1 EIGHTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH119-1-R BUILDING 1 NINTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH119-2-R BUILDING 1 NINTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH119i-1-D BUILDING 1 NINTH FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH119i-1-R BUILDING 1 NINTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH119i-1-R-P BUILDING 1 NINTH FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH119i-2-D BUILDING 1 NINTH FLOOR INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH119i-2-R BUILDING 1 NINTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - HVAC MH119i-2-R-P BUILDING 1 NINTH FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING
MH131-1-D BUILDING 3 FIRST FLOOR DEMOLITION PLAN - AREA J - HVAC
MH131-1-R BUILDING 3 FIRST FLOOR RENOVATION PLAN - AREA J - HVAC
MH131-1-R-P BUILDING 3 FIRST FLOOR RENOVATION PLAN - AREA J - PIPING
MH131-2-D BUILDING 3 FIRST FLOOR DEMOLITION PLAN - AREA K - HVAC
MH131-2-R BUILDING 3 FIRST FLOOR RENOVATION PLAN - AREA K - HVAC
MH131-2-R-P BUILDING 3 FIRST FLOOR RENOVATION PLAN - AREA K - PIPING
MH131-3-D BUILDING 3 FIRST FLOOR DEMOLITION PLAN - AREA L - HVAC
MH131-3-R BUILDING 3 FIRST FLOOR RENOVATION PLAN - AREA L - HVAC
MH131-3-R-P BUILDING 3 FIRST FLOOR RENOVATION PLAN - AREA L - PIPING
MH501 DETAILS - HVAC
MH502 DETAILS - HVAC
MH503 DETAILS - HVAC
MH601 CONTROLS - HVAC
INDEX OF DRAWINGS
DRAWING
NUMBER DRAWING TITLE
GI001 LOCATION, SITE PLAN, AND SHEET INDEX
MH001 NOTES & LEGEND - HVAC
MH002 SCHEDULES - HVAC
MH003 SCHEDULES - HVAC
MH004 SCHEDULES - HVAC
MH005 SCHEDULES - HVAC
MH006 SCHEDULES - HVAC
MH007 SCHEDULES - HVAC
MH110-1-R BUILDING 1 BASEMENT FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH110-2-R BUILDING 1 BASEMENT FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH110-3-R BUILDING 1 BASEMENT FLOOR RENOVATION - AIR DISTRIBUTION PLAN - WEST - HVAC MH110i-1-D BUILDING 1 BASEMENT INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH110i-1-R BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH110i-1-R-P BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH110i-2-D BUILDING 1 BASEMENT INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH110i-2-R BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - CENTRAL - HVAC MH110i-2-R-P BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING MH110i-3-D BUILDING 1 BASEMENT INTERSTITIAL DEMOLITION PLAN - WEST - HVAC MH110i-3-R BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - WEST - HVAC MH110i-3-R-P BUILDING 1 BASEMENT INTERSTITIAL RENOVATION PLAN - WEST - PIPING MH111-1-R BUILDING 1 FIRST FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH111-2-R BUILDING 1 FIRST FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH111-3-R BUILDING 1 FIRST FLOOR RENOVATION - AIR DISTRIBUTION PLAN - WEST - HVAC
MH111-4-D BUILDING 1 FIRST FLOOR DEMOLITION PLAN - CHAPEL - HVAC
MH111-4-R BUILDING 1 FIRST FLOOR RENOVATION PLAN - CHAPEL - HVAC
MH111i-1-D BUILDING 1 FIRST FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH111i-1-R BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH111i-1-R-P BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH111i-2-D BUILDING 1 FIRST FLOOR INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH111i-2-R BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - HVAC MH111i-2-R-P BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING MH111i-3-D BUILDING 1 FIRST FLOOR INTERSTITIAL DEMOLITION PLAN - WEST - HVAC MH111i-3-R BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - WEST - HVAC MH111i-3-R-P BUILDING 1 FIRST FLOOR INTERSTITIAL RENOVATION PLAN - WEST - PIPING MH112-1-R BUILDING 1 SECOND FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH112-2-R BUILDING 1 SECOND FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH112-3-R BUILDING 1 SECOND FLOOR RENOVATION - AIR DISTRIBUTION PLAN - WEST - HVAC MH112i-1-D BUILDING 1 SECOND FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH112i-1-R BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH112i-1-R-P BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH112i-2-D BUILDING 1 SECOND FLOOR INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH112i-2-R BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - HVAC MH112i-2-R-P BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING MH112i-3-D BUILDING 1 SECOND FLOOR INTERSTITIAL DEMOLITION PLAN - WEST - HVAC MH112i-3-R BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - WEST - HVAC MH112i-3-R-P BUILDING 1 SECOND FLOOR INTERSTITIAL RENOVATION PLAN - WEST - PIPING MH113-1-R BUILDING 1 THIRD FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC MH113-2-R BUILDING 1 THIRD FLOOR RENOVATION - AIR DISTRIBUTION PLAN - CENTRAL - HVAC MH113-3-R BUILDING 1 THIRD FLOOR RENOVATION - AIR DISTRIBUTION PLAN - WEST - HVAC MH113i-1-D BUILDING 1 THIRD FLOOR INTERSTITIAL DEMOLITION PLAN - EAST - HVAC MH113i-1-R BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - EAST - HVAC MH113i-1-R-P BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - EAST - PIPING MH113i-2-D BUILDING 1 THIRD FLOOR INTERSTITIAL DEMOLITION PLAN - CENTRAL - HVAC MH113i-2-R BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - HVAC MH113i-2-R-P BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - CENTRAL - PIPING MH113i-3-D BUILDING 1 THIRD FLOOR INTERSTITIAL DEMOLITION PLAN - WEST - HVAC MH113i-3-R BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - WEST - HVAC MH113i-3-R-P BUILDING 1 THIRD FLOOR INTERSTITIAL RENOVATION PLAN - WEST - PIPING MH114-1-R BUILDING 1 FOURTH FLOOR RENOVATION - AIR DISTRIBUTION PLAN - EAST - HVAC
Revisions: Date
REVISION 1: UPDATED BY WEST PALM BEACH VAMC 10/01/2021
• THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND INSTALLED) UNDER THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO FIELD VERIFY SPACE ALLOCATED PRIOR TO ORDERING EQUIPMENT.
• PERFORM ALL WORK IN COMPLIANCE WITH ALL VA STANDARDS, GUIDELINES AND SPECIFICATIONS, AND WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE ENGINEERING DOCUMENTS AND CODES, THE MOST
STRINGENT REQUIREMENTS SHALL GOVERN.
• ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:
• FLORIDA BUILDING CODE (FBC) 2014
• FLORIDA EXISTING BUILDING CODE 2014
• FBC MECHANICAL 2014
• FBC PLUMBING 2014
• FBC ENERGY CONSERVATION 2014
• FLORIDA FIRE PREVENTION CODE 2014
• NFPA 1-2015, THE UNIFORM FIRE CODE
• NFPA 101-2015, THE LIFE SAFETY CODE
• NFPA 51B-2014, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK
• NFPA 70-2017, NATIONAL ELECTRICAL CODE
• NFPA 90A-2015, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.
• NFPA 99-2015, STANDARD FOR HEALTH CARE FACILITIES
• NFPA 241-2013, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.
• THE CONTRACTOR SHALL EXAMINE THE EXISTING CONDITIONS UNDER WHICH HE SHALL OPERATE AND VERIFY THE
EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.
• CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.
• MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS
TO MAINTAIN THE ASSEMBLY RATING.
• CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
• THE CONTRACTOR SHALL SUBMIT 5 COPIES OF SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT. THE CONTRACTOR SHALL PROVIDE A COMPLETE SUBMITTAL REGISTER SPREADSHEET PRIOR IDENTIFYING ALL REQUIRED SUBMITTALS PRIOR TO START OF WORK. PROJECT MANAGEMENT SOFTWARE MUST BE APPROVED BY THE COR AND WILL BE CONSIDERED ON A CASE BY CASE BASIS. ALL REQUIREMENTS IN
SPECIFICATIONS SECTION 01 33 23 SHALL BE STRICTLY ADHERED TO.
• THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE
AN INDEX AND ASSOCIATED DIVIDERS.
• THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON SITE TO MARK UP AS-BUILT CONDITIONS RED LINE DRAWINGS SHALL BE SCANNED INTO PDF AND PROVIDED TO THE VA AT CLOSEOUT. THE CONSTRUCTION DRAWINGS WILL ALSO BE USED TO IDENTIFY EXISTING CRUSHED/DAMAGED DUCTWORK. PRIOR TO STARTING WORK, EACH AREA IS TO BE INSPECTED BY THE SUPERINTENDENT, VERIFIED BY THE COR AND ANNOTATED ON THE
CONSTRUCTION DRAWINGS.
• ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.
• THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY.
ANY CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
• CLOSE OUT DOCUMENTS: CONTRACTOR SHALL MAINTAIN A SET OF AS-BUILT DRAWINGS AND KEEP CURRENT DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ENGINEER AFTER
CONSTRUCTION COMPLETION.
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
• CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF FIELD CONDITIONS PRIOR TO BEGINNING WORK AND ORDERING EQUIPMENT, AND COORDINATING NEW EQUIPMENT DIMENSIONS AND MEANS AND METHODS FOR
INSTALLATION WITH FIELD CONDITIONS.
• CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH SUBMITTED EQUIPMENT TO ENSURE ALL INLET/OUTLET CONNECTIONS COORDINATE WITH FIELD INSTALLED DUCTWORK AND MAKE ANY NECESSARY DUCT MODIFICATIONS
TO ENSURE PROPER OPERATION OF MECHANICAL EQUIPMENT.
• SUBMITTALS SHALL MEET SCHEDULED DESIGN CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO CFMS, EAT(DB/WB), ESP, CAPACITIES, VOLTAGES/PHASES, MCA/MOCP, SONES, ETC.
• ALL DUCT CONSTRUCTION, INSTALLATION, AND SUPPORTS ARE TO COMPLY WITH LATEST EDITION OF SMACNA'S
HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE DUCT. SEE SPECIFICATIONS.
• INSULATE DUCTWORK PER SPECIFICATIONS.
• ALL WALL-MOUNTED THERMOSTATS AND/OR TEMPERATURE SENSORS SHALL BE INSTALLED AT AN ELEVATION OF 48" ABOVE FINISHED FLOOR TO THE TOP UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF WALL-MOUNTED THERMOSTATS SHALL BE COORDINATED WITH OTHER TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTATS SHALL BE COORDINATED WITH AND APPROVED BY THE COR. REPAIR WALL AREA AS NEEDED AFTER
EXISTING THERMOSTAT IS REMOVED AND NEW THERMOSTAT INSTALLED.
• DIFFUSERS/GRILLES SHALL NEVER BE INSTALLED ON SURFACE OF ACOUSTICAL LAY-IN TILE. ALL DIFFUSERS/GRILLES IN LAY-IN CEILINGS SHALL BE LAY-IN PANEL MOUNT. REFER TO SCHEDULE. GYPSUM BOARD
SURFACE MOUNT DIFFUSERS SHALL NOT BE BEVEL MOUNT.
• CONTRACTOR SHALL PROVIDE A COPY OF THE TEST AND BALANCE REPORT BY AN AABC OR NEBB CERTIFIED AGENCY. THIS REPORT MUST BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR TO THE FINAL INSPECTION.
THE CONTRACTOR MUST ALSO PROVIDE ALL REPORTS REQUIRED BY SPECIFICATIONS. SUPPLY AIR AT UNIT DISCHARGE (DB/WB & CFM); RETURN AIR (DB/WB & CFM); DIFFUSER/GRILLE (CFM); EQUIPMENT (EAT/LAT);
EQUIPMENT (GPM); EQUIPMENT (PRESSURES).
• ALL DUCTWORK MUST BE INSTALLED 6" AWAY FROM ANY FIRE RATED WALL TO FACILITATE INSPECTION.
• THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TRADES INSTALLATION SCHEDULES.
• PROVIDE A FIRE DAMPER AT EVERY DUCT PENETRATION OF A FIRE-RATED WALL OR CEILING, WHETHER SHOWN ON
DRAWINGS OR NOT.
• INTENT OF MECHANICAL NOTES ON DRAWINGS IS TO CLARIFY THE SCOPE OF WORK AND ALERT CONTRACTOR OF EXISTING CONDITIONS. CONTRACTOR IS TO VISIT THE SITE AND VERIFY ALL CLEARANCES BEFORE ORDERING EQUIPMENT OR FABRICATION OF DUCTWORK, AND PROVIDE ADDITIONAL OFFSET AND/OR CHANGES IN SIZES TO MEET FIELD CONDITIONS, AND TO COORDINATE WITH ALL TRADES, BEFORE ANY CONSTRUCTION WORK.
• FLEXIBLE AND RIGID ROUND DUCT TAKE-OFFS FOR DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER NECK.
MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 5'-0".
• CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND/SUPPORT MECHANICAL
EQUIPMENT AND MATERIALS.
• IT IS THE RESPONSIBILITY OF THE MECHANICAL INSTALLER TO PATCH AND REPAIR ANY DUCT OPENINGS WHICH RESULT FROM THE RELOCATION OR ELIMINATION OF ANY EXISTING DEVICES. THE PATCH IS TO BE OF A SIMILAR MATERIAL TO THE REPAIRED DUCT AND TO BE SEALED IN ACCORDANCE WITH SMACNA STANDARDS.
• EQUIPMENT WARRANTIES SHALL BE EQUAL TO OR EXCEED WARRANTY OF SCHEDULED EQUIPMENT, UNLESS NOTED
OTHERWISE.
• PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18" OF EACH FIRE RATED
WALL. DUCTWORK OR PIPING SHALL NOT BE SUPPORTED FROM ANY FIRE RATED WALL.
• PROVIDE TURNING VANES IN ALL RECTANGULAR SUPPLY AIR DUCT ELBOWS WITH ANGLES FROM 45 DEGREES TO 90 DEGREES PER FIGURES 2-3, 2-4, 2-5 OF THE 1995 SMACNA DUCT CONSTRUCTION STANDARDS. PROVIDE SINGLE WALL VANE CONSTRUCTION FOR DUCTS UP TO 48" WIDE, AND DOUBLE WALL VANE CONSTRUCTION FOR LARGER
DIMENSIONS.
• DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS (FREE AREA).
• ALL HVAC EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS UNLESS INDICATED OTHERWISE. ALL HVAC CONTROL WIRING SHALL BE INSTALLED IN 3/4" EMT (BLUE COLOR); DEVIATIONS MUST
BE APPROVED BY THE COR.
• CONTRACTOR SHALL PROVIDE A PERMANENT/PROFESSIONAL LABEL FOR EACH PIECE OF EQUIPMENT, ASSOCIATED THERMOSTAT(S) AND/OR SENSOR(S). THE CONTRACTOR SHALL ALSO MAINTAIN A SPREADSHEET CONTAINING ALL VAV BOX IDENTIFIERS, LOCATION, MANUFACTURER, SERIAL #, DATE PLACED IN SERVICE, COMMISSIONING DATE AND VA ASSIGNED EQUIPMENT IDENTIFICATION NUMBER (EE#). COORDINATE WITH COR FOR ADDITIONAL INFORMATION.
• DUCTWORK, DIFFUSERS, REGISTERS, GRILLES, AND OTHER MECHANICAL SYSTEM COMPONENTS SHALL NOT BE
SUPPORTED BY THE CEILING OR CEILING SUSPENSION SYSTEM.
• PROVIDE COMMISSIONING FOR ALL MECHANICAL EQUIPMENT ACCORDING TO MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS OF FLORIDA ENERGY CODE 2014 SECTION C408, INCLUDING
BUT NOT LIMITED TO:
a. A COMMISSIONING PLAN IN COMPLIANCE WITH SECTION C408.2.1, FBC-EC-2014.
b. TESTING, ADJUSTING, AND BALANCING OF AIR DISTRIBUTION SYSTEMS ACCORDING TO C408.2.2, FBC-EC-2014.
c. CONDUCT FUNCTIONAL PERFORMANCE TESTING ACCORDING TO C408.2.3, FBC-EC-2014.
d. PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS PER C408.2.4, FBC-EC-2014.
e. PRIOR TO FINAL INSPECTION, PROVIDE RECORD DRAWINGS, OPERATING AND MAINTENANCE MANUALS, SYSTEM
BALANCING REPORT, AND FINAL COMMISSIONING REPORT TO THE OWNER ACCORDING TO C408.2.5, FBC-EC-2014.
MECHANICAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
ABBREVIATIONS
(E) EXISTING
AH AIR HANDLING UNIT
ATU AIR TERMINAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
CAV CONSTANT AIR VOLUME
CD CEILING SUPPLY AIR DIFFUSER
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
COR CONTRACTING OFFICER'S REPRESENTATIVE
DCP DIRECT DIGITAL CONTROL PANEL
EA EXHAUST AIR
ECC ENGINEERING CONTROL CENTER
EF EXHAUST FAN
FBC FLORIDA BUILDING CODE
FPM FEET PER MINUTE
GPM GALLONS PER MINUTE
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
IBC INTERNATIONAL BUILDING CODE
IN INCH
NC NOISE CRITERIA
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
RA RETURN AIR
RG RETURN AIR GRILLE
SA SUPPLY AIR
SD SMOKE DAMPER
SF SQUARE FEET
TAB TEST AND BALANCE
VAV VARIABLE AIR VOLUME
WG WATER GAUGE
MECHANICAL LEGEND
DUCTWORK SYMBOLS
LIMIT OF DEMOLITION
(WALL TYPE)
(WALL TYPE)
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
SQUARE CEILING DIFFUSER
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
10ø
FLEXIBLE CONNECTION, EQUIPMENT,
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW ROUND DUCT (INSIDE DIMENSIONS: DIAMETER)
EXISTING DUCT TO REMAIN
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
VIBRATION SUPPLY
RETURN45°
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
45°
AIR TERMINAL SYMBOLS
AIR TERMINAL UNIT
WITH REHEAT COIL
PIPING SYMBOLS
HOT WATER HEATING SUPPLY
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
HOT WATER HEATING RETURN
HHWS
HHWR
CHWR
CHWS
D
X EXISTING PIPE TO BE REMOVED
GENERAL PIPING SYMBOLS
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
PIPE UP
PIPE DOWN
VALVE SYMBOLS
DUCTWORK SYMBOLS
MOTORIZED CONTROL DAMPER
M
EQUIPMENT ANNOTATIONS
1-ATU27-1
BUILDING NO. WHERE EQUIPMENT IS LOCATED
ITEM (AIR TERMINAL UNIT SHOWN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
SERVED BY AIR HANDLING UNIT NO. 27
10x8 NEW RECTANGULAR DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
10x8ø NEW OVAL DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
GATE VALVE
FLEXIBLE CONNECTION
THREE-WAY CONTROL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
WYE STRAINER (WITH BALL VALVE & HOSE
CONNECTION)
AUTOMATIC FLOW CONTROL VALVE
CALIBRATED BALANCING VALVE
GLOBE VALVE
(E)10ø EXISTING ROUND DUCT (INSIDE DIMENSIONS: DIAMETER)
(E)10x8 EXISTING RECTANGULAR DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
(E)10x8ø EXISTING OVAL DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
AIR TERMINAL UNIT
WITHOUT REHEAT COIL
CONTROLS DEVICE SYMBOLS
SPACE THERMOSTAT - WALL MOUNTT
SPACE TEMPERATURE SENSOR - WALL MOUNTT
SPACE HUMIDITY SENSOR - WALL MOUNTH
SPACE PRESSURE CONTROLLER & DISPLAY - WALL MOUNT
SPACE PRESSURE SENSOR - WALL MOUNTPS
PC
DRAWING SYMBOLS
DRAWING MATCHLINE
HVAC DESIGN DATA
DESIGN CONDITIONS
SUMMER WINTER
TEMPERATURE RELATIVE
HUMIDITY TEMP RELATIVE
HUMIDITY
°Fdb °Fwb % °Fdb %
OUTDOOR DESIGN
CONDITIONS 92 78 54 41 NA
OUTDOOR
DEHUMIDIFICATION
DESIGN CONDITION
87 80 72 41 NA
INDOOR AREA TEMPERATURE/HUMIDITY SETPOINTS
EXAM ROOMS 75 63 50 70 30
LABORATORIES 75 63 50 70 30
OPERATING ROOMS 66 56 55 75 30
PATIENT ROOMS 75 63 50 70 30
PROCEDURE ROOMS 75 63 50 70 30
SPECIAL PROCEDURE
ROOMS 73 61 50 68 30
CLASSROOMS /
CONFERENCE ROOMS 75 63 50 70 30
CORRIDORS 75 63 50 70 30
COMMUNICATION
ROOMS 77 64 50 - -
LOUNGES 75 63 50 70 30
ELECTRICAL ROOMS 86 66 50 - -
OFFICES 75 63 50 70 30
TOILETS 77 64 50 70 30
WAITING AREAS 75 63 50 70 30
ALL OTHER SPACES 75 63 50 70 30
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
group mes
Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700
COA # 8304
DALE A. BACIK, P.E.
FULLY SPRINKLERED
8/
/2
8:
:0
AM
REPLACE VAV BOXES AND
UPGRADE TO DIRECT DIGITAL
CONTROLS
NOTES & LEGEND - HVAC
WEST PALM BEACH, FLORIDA
08/20/2018 CJF/REM REM
548-16-612
01, 03
MH001
AIR DEVICE SCHEDULE (SUPPLY)
MARK TYPE
AIRFLOW PANEL SIZE
(IN.)
NECK SIZE
(IN.) NOTES
MIN. MAX.
CD-21 PERFORATED FACE 30 CFM 160 CFM 24x24 6ø 1,2,3 CD-22 PERFORATED FACE 90 CFM 240 CFM 24x24 8ø 1,2,3 CD-24 PERFORATED FACE 330 CFM 400 CFM 24x24 12ø 1,2,3 CD-25 PERFORATED FACE 410 CFM 640 CFM 24x24 14ø 1,2,3
NOTES:
1. RUNOUT BRANCH DUCT SHALL BE SAME SIZE AS INDICATED NECK SIZE.
2. PROVIDE VOLUME DAMPER INSTALLED IN BRANCH DUCT SERVING EACH DIFFUSER.
3. PROVIDE ALL REQUIRED ACCESSORIES FOR A COMPLETE INSTALLATION.
Revisions: Date
CONTRACTOR SHALL KEEP A RECORD (IN THE FORM OF A SPREADSHEET) OF ALL VAV LOCATIONS, VAV #, MANUFACTURER, MODEL NUMBER, SERIAL NUMBER, INSTALLATION DATE, COMMISSIONING DATE, WARRANTY DATE
AND VA PROVIDED EE#.
•14.
REVISION 1: UPDATED BY WEST PALM BEACH VAMC 10/01/2021
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
group mes
Office of Construction and Facilities Management on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550 North Reo Street Suite 203 Tampa, FL 33609 813.289.4700
COA # 8304
DALE A. BACIK, P.E.
FULLY SPRINKLERED
8/
/2
8:
:1
AM
REPLACE VAV BOXES AND
UPGRADE TO DIRECT DIGITAL
CONTROLS
SCHEDULES - HVAC
WEST PALM BEACH, FLORIDA
08/20/2018 CJF/REM NPS
548-16-612
MH002
• BASIS OF DESIGN EQUIPMENT WITH REQUIRED PERFORMANCE CHARACTERISTICS IS SCHEDULED. OTHER MANUFACTURERS ARE ACCEPTABLE; HOWEVER EQUIPMENT NOT MEETING EQUIVALENT PERFORMANCE CRITERIA
CANNOT BE CONSIDERED.
• HOT WATER REHEAT COIL SHALL HAVE A MAXIMUM WATER PRESSURE DROP OF 3.0 FT. WG.
• UNIT SERVES CRITICAL AREA.
• PROVIDE TERMINAL UNIT WITH PRE-PROGRAMMED CONTROLS AND SENSORS, AND PREASSEMBLED PIPING ACCESSORIES. REMOVAL OF EXISTING AND INSTALLATION OF NEW TERMINAL UNIT, CONTROLLER AND
COMPONENTS SHALL BE COMPLETED AND RUNNING 100% WITH SHORTEST DOWNTIME POSSIBLE.
• UNIT SERVES NON-CRITICAL AREA.
• CONTRACTOR'S OPTION TO PROVIDE TERMINAL UNIT WITH PREASSEMBLED OR FIELD-INSTALLED COMPONENTS
FOR NON-CRITICAL ZONE.
• PROVIDE SPACE PRESSURE CONTROLLER AND DISPLAY, PRESSURE DIFFERENTIAL SENSORS, AND INTERLOCKS
TO MAINTAIN REQUIRED SPACE PRESSURE DIFFERENTIAL. SEE CONTROLS, SHEET MH601.
AIR TERMINAL UNIT SCHEDULE NOTES
AIR TERMINAL UNIT SCHEDULE - LEVEL 0 - 1-AH2 (21)
MARK NOMINAL
SIZE
AIRFLOW
MAX. TOTAL
UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER MODEL
NUMBER
1-ATU2-1 10 740 CFM 740 CFM 0.35 in-wg 35 740 CFM 56.5 °F 180 °F 160 °F 1.5 GPM 14,900 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-2 10 740 CFM 740 CFM 0.35 in-wg 35 740 CFM 56.5 °F 180 °F 160 °F 1.5 GPM 14,900 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-3 6 270 CFM 270 CFM 0.20 in-wg 35 270 CFM 56.5 °F 180 °F 160 °F 1.0 GPM 5,700 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU2-4 8 570 CFM 570 CFM 0.35 in-wg 35 570 CFM 56.5 °F 180 °F 160 °F 1.5 GPM 11,400 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-08 1,2,3,4 1-ATU2-5 7 325 CFM 325 CFM 0.25 in-wg 35 325 CFM 56.5 °F 180 °F 160 °F 1.0 GPM 6,500 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-07 1,2,3,4 1-ATU2-6 6 150 CFM 150 CFM 0.20 in-wg 35 150 CFM 56.5 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU2-7 8 600 CFM 600 CFM 0.25 in-wg 35 600 CFM 56.5 °F 180 °F 160 °F 1.5 GPM 12,000 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-08 1,2,3,4 1-ATU2-8 10 740 CFM 740 CFM 0.35 in-wg 35 740 CFM 56.5 °F 180 °F 160 °F 1.5 GPM 14,900 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-9 10 800 CFM 800 CFM 0.25 in-wg 35 800 CFM 56.5 °F 180 °F 160 °F 2.0 GPM 16,100 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4
1-ATU2-10 8 500 CFM 500 CFM 0.20 in-wg 35 500 CFM 56.5 °F 180 °F 160 °F 1.0 GPM 10,000 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-08 1,2,3,4 1-ATU2-11 10 800 CFM 800 CFM 0.35 in-wg 35 800 CFM 56.5 °F 180 °F 160 °F 2.0 GPM 16,100 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-12 10 900 CFM 900 CFM 0.25 in-wg 35 900 CFM 56.5 °F 180 °F 160 °F 2.0 GPM 18,100 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-13 10 1200 CFM 1200 CFM 0.30 in-wg 35 1200 CFM 56.5 °F 180 °F 160 °F 3.0 GPM 24,100 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-14 10 680 CFM 680 CFM 0.30 in-wg 35 680 CFM 56.5 °F 180 °F 160 °F 2.0 GPM 17,500 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-15 10 900 CFM 900 CFM 0.25 in-wg 35 900 CFM 56.5 °F 180 °F 160 °F 2.0 GPM 18,100 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-16 10 900 CFM 900 CFM 0.25 in-wg 35 900 CFM 56.5 °F 180 °F 160 °F 2.0 GPM 18,100 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-17 8 500 CFM 500 CFM 0.20 in-wg 35 500 CFM 56.5 °F 180 °F 160 °F 1.0 GPM 10,000 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-08 1,2,3,4 1-ATU2-18 7 490 CFM 490 CFM 0.20 in-wg 35 490 CFM 56.5 °F 180 °F 160 °F 1.0 GPM 9,800 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-07 1,2,3,4 1-ATU2-19 7 460 CFM 460 CFM 0.20 in-wg 35 460 CFM 56.5 °F 180 °F 160 °F 1.0 GPM 9,200 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-07 1,2,3,4 1-ATU2-20 10 920 CFM 920 CFM 0.30 in-wg 35 920 CFM 56.5 °F 180 °F 160 °F 2.0 GPM 18,500 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU2-21 10 920 CFM 920 CFM 0.30 in-wg 35 920 CFM 56.5 °F 180 °F 160 °F 2.0 GPM 18,500 Btu/h 3/4" CAV PRICE INDUSTRIES SDV-10 1,2,3,4
AIR TERMINAL UNIT SCHEDULE - LEVEL 0 - 1-AH3 (27)
MARK NOMINAL
SIZE
AIRFLOW
MAX. TOTAL
UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER MODEL
NUMBER
1-ATU3-1 7 390 CFM 195 CFM 0.15 in-wg 35 290 CFM 50.1 °F 180 °F 160 °F 1.5 GPM 12,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU3-2 8 700 CFM 350 CFM 0.30 in-wg 35 350 CFM 50.1 °F 180 °F 160 °F 2.0 GPM 15,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-3 6 330 CFM 165 CFM 0.20 in-wg 35 230 CFM 50.1 °F 180 °F 160 °F 1.0 GPM 10,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-4 6 320 CFM 160 CFM 0.20 in-wg 35 220 CFM 50.1 °F 180 °F 160 °F 1.0 GPM 9,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-5 8 470 CFM 235 CFM 0.20 in-wg 35 350 CFM 50.1 °F 180 °F 160 °F 2.0 GPM 15,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-6 6 300 CFM 150 CFM 0.20 in-wg 35 150 CFM 50.1 °F 180 °F 160 °F 1.0 GPM 6,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-7 10 840 CFM 420 CFM 0.25 in-wg 35 460 CFM 50.1 °F 180 °F 160 °F 2.0 GPM 20,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,5,6 1-ATU3-8 6 260 CFM 130 CFM 0.15 in-wg 35 130 CFM 50.1 °F 180 °F 160 °F 0.5 GPM 5,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-9 8 450 CFM 225 CFM 0.20 in-wg 35 225 CFM 50.1 °F 180 °F 160 °F 1.0 GPM 9,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-10 6 330 CFM 165 CFM 0.25 in-wg 35 165 CFM 50.1 °F 180 °F 160 °F 1.0 GPM 7,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-11 6 290 CFM 145 CFM 0.20 in-wg 35 145 CFM 50.1 °F 180 °F 160 °F 1.0 GPM 6,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-12 8 470 CFM 235 CFM 0.20 in-wg 35 235 CFM 50.1 °F 180 °F 160 °F 1.5 GPM 10,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-13 5 180 CFM 90 CFM 0.15 in-wg 35 90 CFM 50.1 °F 180 °F 160 °F 0.5 GPM 3,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-05 1,2,5,6 1-ATU3-14 6 230 CFM 115 CFM 0.15 in-wg 35 115 CFM 50.1 °F 180 °F 160 °F 0.5 GPM 4,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-15 8 580 CFM 290 CFM 0.25 in-wg 35 320 CFM 50.1 °F 180 °F 160 °F 1.5 GPM 13,900 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-16 6 180 CFM 90 CFM 0.15 in-wg 35 90 CFM 50.1 °F 180 °F 160 °F 0.5 GPM 3,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-17 6 240 CFM 120 CFM 0.15 in-wg 35 140 CFM 50.1 °F 180 °F 160 °F 1.0 GPM 6,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-18 8 690 CFM 345 CFM 0.30 in-wg 35 500 CFM 50.1 °F 180 °F 160 °F 3.0 GPM 21,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-19 8 580 CFM 290 CFM 0.20 in-wg 35 350 CFM 50.1 °F 180 °F 160 °F 2.0 GPM 15,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-20 8 540 CFM 270 CFM 0.25 in-wg 35 380 CFM 50.1 °F 180 °F 160 °F 2.0 GPM 16,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-21 8 520 CFM 260 CFM 0.20 in-wg 35 410 CFM 50.1 °F 180 °F 160 °F 2.0 GPM 17,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-22 6 180 CFM 90 CFM 0.10 in-wg 35 90 CFM 50.1 °F 180 °F 160 °F 0.5 GPM 3,900 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-23 6 240 CFM 120 CFM 0.15 in-wg 35 120 CFM 50.1 °F 180 °F 160 °F 0.5 GPM 5,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-24 6 170 CFM 85 CFM 0.10 in-wg 35 85 CFM 50.1 °F 180 °F 160 °F 0.5 GPM 3,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-25 8 490 CFM 245 CFM 0.20 in-wg 35 245 CFM 50.1 °F 180 °F 160 °F 1.5 GPM 10,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU3-26 6 240 CFM 120 CFM 0.15 in-wg 35 120 CFM 50.1 °F 180 °F 160 °F 0.5 GPM 4,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU3-27 8 480 CFM 240 CFM 0.15 in-wg 35 260 CFM 50.1 °F 180 °F 160 °F 1.5 GPM 11,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6
AIR TERMINAL UNIT SCHEDULE - LEVEL 0 - 1-AH5 (16)
MARK NOMINAL
SIZE
AIRFLOW
MAX. TOTAL
UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER MODEL
NUMBER
1-ATU5-1 6 320 CFM 160 CFM 0.20 in-wg 35 175 CFM 56.7 °F 180 °F 160 °F 1.0 GPM 6,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-2 6 280 CFM 140 CFM 0.15 in-wg 35 140 CFM 56.7 °F 180 °F 160 °F 0.5 GPM 3,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-3 7 390 CFM 200 CFM 0.15 in-wg 35 200 CFM 56.7 °F 180 °F 160 °F 0.5 GPM 5,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,3,4 1-ATU5-4 8 570 CFM 290 CFM 0.30 in-wg 35 290 CFM 56.7 °F 180 °F 160 °F 1.0 GPM 7,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,3,4 1-ATU5-5 7 430 CFM 220 CFM 0.20 in-wg 35 220 CFM 56.7 °F 180 °F 160 °F 1.0 GPM 6,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,3,4 1-ATU5-6 6 280 CFM 140 CFM 0.20 in-wg 35 140 CFM 56.7 °F 180 °F 160 °F 0.5 GPM 4,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-7 6 240 CFM 120 CFM 0.15 in-wg 35 120 CFM 56.7 °F 180 °F 160 °F 0.5 GPM 3,400 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-8 6 230 CFM 120 CFM 0.15 in-wg 35 120 CFM 56.7 °F 180 °F 160 °F 0.5 GPM 3,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-9 6 280 CFM 140 CFM 0.20 in-wg 35 0 CFM 0.0 °F 180 °F 160 °F 0.0 GPM 0 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-10 5 90 CFM 50 CFM 0.10 in-wg 35 50 CFM 56.7 °F 180 °F 160 °F 0.5 GPM 2,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-05 1,2,3,4 1-ATU5-11 10 810 CFM 410 CFM 0.25 in-wg 35 0 CFM 0.0 °F 180 °F 160 °F 0.0 GPM 0 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU5-12 10 720 CFM 360 CFM 0.30 in-wg 35 720 CFM 56.7 °F 180 °F 160 °F 3.0 GPM 28,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU5-13 8 450 CFM 225 CFM 0.20 in-wg 35 225 CFM 56.7 °F 180 °F 160 °F 1.0 GPM 8,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,3,4 1-ATU5-14 6 240 CFM 125 CFM 0.15 in-wg 35 125 CFM 56.7 °F 180 °F 0.5 GPM 4,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-15 6 310 CFM 160 CFM 0.20 in-wg 35 160 CFM 56.7 °F 180 °F 1.0 GPM 5,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-16 8 690 CFM 350 CFM 0.30 in-wg 35 350 CFM 56.7 °F 180 °F 1.0 GPM 8,800 Btu/h 3/4" VAV-HD PRICE INDUSTRIES SDV-08 1,2,3,4 1-ATU5-17 6 300 CFM 150 CFM 0.20 in-wg 35 150 CFM 56.7 °F 180 °F 160 °F 0.5 GPM 4,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU5-18 5 160 CFM 80 CFM 0.10 in-wg 35 80 CFM 56.7 °F 180 °F 160 °F 0.5 GPM 2,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-05 1,2,3,4 1-ATU5-19 6 300 CFM 150 CFM 0.20 in-wg 35 150 CFM 56.7 °F 180 °F 160 °F 1.0 GPM 5,400 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4
AIR TERMINAL UNIT SCHEDULE - LEVEL 0 - 1-AH6 (18)
MARK NOMINAL
SIZE
AIRFLOW
MAX. TOTAL
UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER MODEL
NUMBER
1-ATU6-1 8 530 CFM 265 CFM 0.15 in-wg 35 360 CFM 63.9 °F 180 °F 160 °F 1.5 GPM 10,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-2 8 750 CFM 375 CFM 0.35 in-wg 35 375 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 6,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-3 8 750 CFM 375 CFM 0.35 in-wg 35 375 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 6,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-4 6 380 CFM 190 CFM 0.30 in-wg 35 190 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 3,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU6-5 8 640 CFM 320 CFM 0.25 in-wg 35 320 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 6,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-6 6 280 CFM 140 CFM 0.20 in-wg 35 140 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 3,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU6-7 8 740 CFM 370 CFM 0.35 in-wg 35 370 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 6,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-8 8 740 CFM 370 CFM 0.35 in-wg 35 370 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 6,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-9 8 740 CFM 370 CFM 0.35 in-wg 35 370 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 6,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-10 8 420 CFM 210 CFM 0.15 in-wg 35 210 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 3,900 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-11 7 390 CFM 195 CFM 0.15 in-wg 35 195 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 2,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU6-12 8 750 CFM 375 CFM 0.35 in-wg 35 375 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 4,900 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-13 8 760 CFM 380 CFM 0.35 in-wg 35 380 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 5,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-14 6 380 CFM 190 CFM 0.30 in-wg 35 190 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 2,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU6-15 8 460 CFM 230 CFM 0.20 in-wg 35 230 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 4,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU6-16 6 250 CFM 125 CFM 0.15 in-wg 35 200 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 5,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU6-17 7 410 CFM 205 CFM 0.15 in-wg 35 300 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 8,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU6-18 6 200 CFM 200 CFM 0.10 in-wg 35 200 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 3,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6
AIR TERMINAL UNIT SCHEDULE - LEVEL 0 - 1-AH7 (21)
MARK NOMINAL
SIZE
AIRFLOW
MAX. TOTAL
UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER MODEL
NUMBER
1-ATU7-1 8 520 CFM 260 CFM 0.20 in-wg 35 310 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 8,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU7-2 7 410 CFM 205 CFM 0.15 in-wg 35 300 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 8,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU7-3 6 380 CFM 190 CFM 0.30 in-wg 35 270 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 7,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-4 7 440 CFM 220 CFM 0.20 in-wg 35 220 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 6,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU7-5 8 610 CFM 305 CFM 0.20 in-wg 35 305 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 6,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU7-6 6 260 CFM 130 CFM 0.10 in-wg 35 130 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 2,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-7 7 490 CFM 245 CFM 0.20 in-wg 35 245 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 5,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU7-8 8 520 CFM 260 CFM 0.20 in-wg 35 260 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 5,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU7-9 8 660 CFM 330 CFM 0.30 in-wg 35 330 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 9,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU7-10 6 370 CFM 185 CFM 0.20 in-wg 35 185 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 4,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-11 6 340 CFM 170 CFM 0.25 in-wg 35 170 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 3,900 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-12 7 470 CFM 235 CFM 0.20 in-wg 35 235 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 5,900 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU7-13 6 290 CFM 145 CFM 0.20 in-wg 35 145 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 2,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-14 8 480 CFM 240 CFM 0.30 in-wg 35 250 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 7,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU7-15 7 460 CFM 230 CFM 0.20 in-wg 35 230 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 5,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU7-16 10 740 CFM 370 CFM 0.25 in-wg 35 460 CFM 63.9 °F 180 °F 160 °F 1.5 GPM 13,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,5,6 1-ATU7-17 6 320 CFM 160 CFM 0.20 in-wg 35 200 CFM 63.9 °F 180 °F 160 °F 1.0 GPM 5,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-18 6 360 CFM 180 CFM 0.30 in-wg 35 180 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 4,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-19 6 310 CFM 155 CFM 0.20 in-wg 35 155 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 3,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-20 6 290 CFM 145 CFM 0.20 in-wg 35 145 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 3,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU7-21 6 360 CFM 180 CFM 0.30 in-wg 35 180 CFM 63.9 °F 180 °F 160 °F 0.5 GPM 5,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6
AIR TERMINAL UNIT SCHEDULE - LEVEL 0 - 1-AH8 (23)
MARK NOMINAL
SIZE
AIRFLOW
MAX. TOTAL
UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER MODEL
NUMBER
1-ATU8-1 7 580 CFM 290 CFM 0.25 in-wg 35 360 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 12,900 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU8-2 7 520 CFM 260 CFM 0.20 in-wg 35 350 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 12,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU8-3 10 760 CFM 380 CFM 0.35 in-wg 35 480 CFM 57.0 °F 180 °F 160 °F 2.0 GPM 17,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,5,6 1-ATU8-4 7 370 CFM 185 CFM 0.15 in-wg 35 210 CFM 57.0 °F 180 °F 160 °F 1.0 GPM 7,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU8-5 5 130 CFM 65 CFM 0.10 in-wg 35 100 CFM 57.0 °F 180 °F 160 °F 0.5 GPM 3,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-05 1,2,5,6 1-ATU8-6 10 750 CFM 375 CFM 0.25 in-wg 35 420 CFM 57.0 °F 180 °F 160 °F 2.0 GPM 15,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,5,6 1-ATU8-7 6 280 CFM 140 CFM 0.15 in-wg 35 150 CFM 57.0 °F 180 °F 160 °F 0.5 GPM 5,400 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU8-8 8 560 CFM 280 CFM 0.20 in-wg 35 320 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 11,500 Btu/h 3/4" VAV-HD PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-9 8 560 CFM 280 CFM 0.20 in-wg 35 320 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 11,500 Btu/h 3/4" VAV-HD PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-10 6 340 CFM 170 CFM 0.25 in-wg 35 200 CFM 57.0 °F 180 °F 160 °F 1.0 GPM 7,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU8-11 6 280 CFM 140 CFM 0.20 in-wg 35 170 CFM 57.0 °F 180 °F 160 °F 1.0 GPM 6,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU8-12 8 560 CFM 280 CFM 0.20 in-wg 35 340 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 12,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-13 8 560 CFM 280 CFM 0.20 in-wg 35 340 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 12,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-14 7 370 CFM 185 CFM 0.15 in-wg 35 210 CFM 57.0 °F 180 °F 160 °F 1.0 GPM 7,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6 1-ATU8-15 10 840 CFM 420 CFM 0.25 in-wg 35 420 CFM 57.0 °F 180 °F 160 °F 2.0 GPM 15,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,5,6 1-ATU8-16 8 550 CFM 275 CFM 0.20 in-wg 35 275 CFM 57.0 °F 180 °F 160 °F 1.0 GPM 9,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-17 8 750 CFM 375 CFM 0.30 in-wg 35 380 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 13,600 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-18 8 690 CFM 345 CFM 0.20 in-wg 35 345 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 12,400 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-19 10 750 CFM 375 CFM 0.25 in-wg 35 420 CFM 57.0 °F 180 °F 160 °F 2.0 GPM 15,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,5,6 1-ATU8-20 6 370 CFM 185 CFM 0.25 in-wg 35 210 CFM 57.0 °F 180 °F 160 °F 1.0 GPM 7,500 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,5,6 1-ATU8-21 8 560 CFM 280 CFM 0.20 in-wg 35 330 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 11,800 Btu/h 3/4" VAV-HD PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-22 8 560 CFM 280 CFM 0.20 in-wg 35 330 CFM 57.0 °F 180 °F 160 °F 1.5 GPM 11,800 Btu/h 3/4" VAV-HD PRICE INDUSTRIES SDV-08 1,2,5,6 1-ATU8-23 7 400 CFM 200 CFM 0.15 in-wg 35 270 CFM 57.0 °F 180 °F 160 °F 1.0 GPM 9,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,5,6
AIR TERMINAL UNIT SCHEDULE - LEVEL 1 - 1-AH9 (9)
MARK NOMINAL
SIZE
AIRFLOW
MAX. TOTAL
UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER MODEL
NUMBER
1-ATU9-4 10 940 CFM 470 CFM 0.25 in-wg 35 470 CFM 56.1 °F 180 °F 160 °F 2.0 GPM 17,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-10 1,2,3,4 1-ATU9-6 6 310 CFM 155 CFM 0.20 in-wg 35 155 CFM 56.1 °F 180 °F 160 °F 1.0 GPM 5,700 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU9-7 6 230 CFM 115 CFM 0.10 in-wg 35 115 CFM 56.1 °F 180 °F 160 °F 0.5 GPM 4,200 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU9-8 6 170 CFM 85 CFM 0.20 in-wg 35 85 CFM 56.1 °F 180 °F 160 °F 0.5 GPM 3,100 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU9-9 7 340 CFM 170 CFM 0.20 in-wg 35 170 CFM 56.1 °F 180 °F 160 °F 1.0 GPM 6,300 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-07 1,2,3,4 1-ATU9-20 6 380 CFM 190 CFM 0.30 in-wg 35 190 CFM 56.1 °F 180 °F 160 °F 1.0 GPM 7,000 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU9-26 6 200 CFM 100 CFM 0.10 in-wg 35 130 CFM 56.1 °F 180 °F 160 °F 0.5 GPM 4,800 Btu/h 3/4" VAV PRICE INDUSTRIES SDV-06 1,2,3,4 1-ATU9-28 8 0 CFM 440 CFM 0.25 in-wg 35 610 CFM 61.6 °F 180 °F 160 °F 1.3 GPM 12,093 Btu/h 3/4" PRICE INDUSTRIES SDV-08 1,2,3,4 1-ATU9-29 8 0 CFM 440 CFM 0.25 in-wg 35 610 CFM 61.6 °F 180 °F 160 °F 1.2 GPM 12,093 Btu/h 3/4" PRICE INDUSTRIES SDV-08 1,2,3,4
AIR TERMINAL UNIT SCHEDULE - LEVEL 1 - 1-AH10 (25)
MARK NOMINAL
SIZE
AIRFLOW
MAX. TOTAL
UNIT
PRESSURE
DROP
SPACE
NOISE
CRITERIA
(NC)
HOT WATER HEATING COIL
CONTROL
TYPE
BASIS OF DESIGN
NOTES
MAXIMUM MINIMUM HEATING
AIRFLOW
ENTERING
AIR TEMP.
ENTERING
WATER
TEMP.
LEAVING
WATER
TEMP.
HEATING
WATER
FLOW
COIL
CAPACITY
HOT
WATER
PIPING
RUNOUT
SIZE
MANUFACTURER MODEL
NUMBER
1-ATU10-1 10 840 CFM 420 CFM 0.25 in-wg 35 420 CFM 59.8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .