This document is a submittal register for a construction contract to perform minor renovations at Building 204, Room 105. It lists over 30 submittal items required from the contractor organized by specification section and paragraph number. Submittals include accident prevention plans, safety checklists, waste management plans, demolition plans, notices, training certifications, warranties, and operation and maintenance manuals. It specifies submittal dates for approval along with required material delivery dates and includes columns to track review actions and status. The related federal contract opportunity is a multiple award construction contract issued by the Naval Sea Systems Command for indefinite delivery/indefinite quantity construction services.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A
PRB-90
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED
BY
A C
T I
O N
C O
D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T
I O N
C O D
E
DATE OF
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 14 00 SD-01 Preconstruction Submittals
List of Contact Personnel 1.4.1.1
01 20 00 SD-01 Preconstruction Submittals
Schedule of Values 1.3 G
01 30 00 SD-01 Preconstruction Submittals
View Location Map 1.3
Progress and Completion 1.4
Pictures
01 33 00 SD-01 Preconstruction Submittals
Submittal Register 1.8 G
01 35 26 SD-01 Preconstruction Submittals
Accident Prevention Plan (APP) 1.8
SD-06 Test Reports
Monthly Exposure Reports 1.4
Notifications and Reports 1.13
Accident Reports 1.13.2
SD-07 Certificates
Contractor Safety Self-Evaluation 1.5
Checklist
Standard Lift Plan 1.8.3.2
Naval Architecture Analysis 1.8.3.4
Activity Hazard Analysis (AHA) 1.9
Confined Space Entry Permit 1.10.1
Hot Work Permit 1.10.1
Certificate of Compliance 1.13.4
01 45 00 SD-01 Preconstruction Submittals
QC Plan 1.6 G
01 50 00 SD-01 Preconstruction Submittals
Construction Site Plan 1.3
Traffic Control Plan 3.3.1
Haul Road Plan
Contractor Computer 1.5.1.4
Cybersecurity Compliance
Statements
Contractor Temporary Network 1.5.6
Cybersecurity Compliance
Statements
01 50 00 SD-07 Certificates
Backflow Tester
Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
Preconstruction Survey 1.6.1
Solid Waste Management Permit 1.10
Regulatory Notifications 1.6.2
Environmental Protection Plan 1.7
Dirt and Dust Control Plan 1.7.6.1
Employee Training Records 1.6.5
SD-06 Test Reports
Solid Waste Disposal Report
SD-07 Certificates
Employee Training Records 1.6.5
ECATTS Certificate Of
Completion
SD-11 Closeout Submittals
Waste Determination 3.4.1
Documentation
Disposal Documentation for 3.4.3.4
Hazardous and Regulated Waste
Assembled Employee Training 1.6.5
Records
Solid Waste Management Permit 1.10
Project Solid Waste Disposal 3.4.2.1
Documentation Report
01 57 19 Contractor Hazardous Material 3.5.1
Inventory Log
Hazardous Waste/Debris 3.4.3.1
Management
Regulatory Notifications 1.6.2
Sales Documentation 3.4.2.1
01 58 00 SD-02 Shop Drawings
Preliminary Drawing Indicating 1.4.1
Layout And Text Content
01 57 19 Contractor Hazardous Material 3.5.1
Inventory Log
Hazardous Waste/Debris 3.4.3.1
Regulatory Notifications 1.6.2
Sales Documentation 3.4.2.1
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION
BUILDING 204 ROOM 105 MINOR RENOVATION
CONTRACTOR
A C T
I V I T
Y
N O
T R
A N
S M
I T
T A
L
N O
S P E C
S E C T
DESCRIPTION ITEM SUBMITTED
P A R A
G # R
A P H
G O V
C T
L
A O
S R S
I A
F /
I E
C
A R
T E
I V
O W
N R
CONTRACTOR: SCHEDULE
DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FRM APPR
AUTH
REMARKS
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED
BY
A C
T I
O N
C O
D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T
I O N
C O D
E
DATE OF
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 74 19 SD-01 Preconstruction Submittals
Construction Waste Management 1.7
Plan
SD-11 Closeout Submittals
Final Construction Waste 1.9
Diversion Report
01 78 00 SD-03 Product Data
Warranty Management Plan 1.6.1
Warranty Tags 1.6.4
Final Cleaning 3.4
Spare Parts Data 1.5
SD-08 Manufacturer’s Instructions
Instructions 1.6.1
01 78 00 SD-10 Operation and Maintenance
Data
Operation and Maintenance 3.3
Manuals
SD-11 Closeout Submittals
As-Built Drawings 3.1
Record Drawings 3.2
As-Built Record of Equipment 1.6.1 and Materials
Certification of EPA Designated
Items
Certification Of USDA Designated 2.1
Items
Interim DD FORM 1354 3.5.1
Checklist for DD FORM 1354 3.5.2
01 78 23 SD-10 Operation and Maintenance
Data
O&M Database
Training Plan 3.1.1
Training Outline 3.1.3
Training Content 3.1.2
SD-11 Closeout Submittals
Validation of Training Completion 3.1.6
02 41 00 SD-01 Preconstruction Submittals
Demolition Plan 3.3 G
Existing Conditions 1.10
02 41 00 SD-07 Certificates
Notification 1.6
SD-11 Closeout Submittals
Receipts
02 84 16 SD-07 Certificates
Qualifications of CIH 1.8.1 G
Training Certification 1.8.1 G
PCB and Lamp Removal Work 1.8.2 G
Plan
PCB and Lamp Disposal Plan 1.8.3 G
SD-11 Closeout Submittals
Transporter Certification 3.5.2 G
Certification of Decontamination 3.2.4
Certificate of Disposal and/or 3.5.3 recycling
Testing Results
02 84 33 SD-07 Certificates
Training certification 1.7.1
Qualifications of CIH 1.7.2
PCB Removal Work Plan 1.7.3
PCB Disposal Plan 1.7.4
Notification 1.7.5
Transporter Certification 3.8
Certification of Decontamination 3.5.4
Certificate of Disposal 3.8.1
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION
BUILDING 204 ROOM 105 MINOR RENOVATION
CONTRACTOR
A C T
I V I T
Y
N O
T R
A N
S M
I T
T A
L
N O
S P E C
S E C T
DESCRIPTION ITEM SUBMITTED
P A R A
G # R
A P H
G O V
C T
L
A O
S R S
I A
F /
I E
C
A R
T E
I V
O W
N R
CONTRACTOR: SCHEDULE
DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
MAILED TO
CONTR/
DATE RCD
FRM APPR
AUTH
REMARKS
File details come from the government source that posted it. Updated .