This is a quarterly preventive maintenance service report for a plumbing vacuum system under IFB No. OP143876, documenting repair and maintenance services provided at Union Station in Los Angeles, California (800 N Alameda St, Los Angeles, CA 90012). The report, dated December 9, 2025, was completed by technicians Darren Young and Clayton Damon, who performed a comprehensive inspection and maintenance of the vacuum center system between 7:00 AM and 1:00 PM PST. The facility houses a vacuum center Model AV04469 (Unit Serial Number AV-100S-2.15-LR-E3-480-7-9-FS) with a system run time of 79,300 hours since its startup on December 23, 2019. The maintenance included inspections and servicing of two vacuum pumps (Pump 1 with 39,909.9 runtime hours and Pump 2 with 39,390.1 runtime hours), two storage tanks (Tank 1 with 71,794 discharge hours and Tank 2 with 92,336 discharge hours), grinder components, and extraction systems serving men's and women's restrooms.
The preventive maintenance scope encompassed cleaning and flushing of pump filters, radiators, water jackets, and heat exchangers; inspection of swing check valves, storage tank drain modes, and make-up water filters; testing of pump capacity and vacuum pressure retention; verification of electrical panel voltage readings and motor amperage on all three phases; and functional testing of extraction valves, controllers, photo eyes, push buttons, accumulators, and vacuum lift piping. During the service, technicians identified several maintenance issues requiring corrective action: two flooded X-valves in the women's restroom (zones 2, lifts 8 and 9) that were replaced by ABM, push button replacement needed in the men's restroom (zones 4, lifts 5 and 6) being handled by ABM, and debris removal required from the floats in tanks 1 and 2 along with interior tank washdowns. The overall system was assessed as being in good condition with recommendations for implementing weekly checks to minimize future operational issues. Service manager David Ortega, Chief Engineer, verified the completion of this preventive maintenance work.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F
QUARTERLY REPORT SAMPLE
PLUMBING VACUUM SYSTEM
IFB NO. OP143876
(PLEASE SEE THE NEXT PAGE FOR ATTACHMENT)
DuranL Text Box
REPAIR AND MAINTENANCE SERVICE
duranl Text Box
SERVICES
Facility #
Union Station- LA Q4
Address
800 N Alameda St Los Angeles, CA 90012 United States
City
Los Angeles
State
CA
Zip Code
90012
Technician # 1 Name
Darren Young
Technician # 2 Name
Clayton Damon
Time In:
7:00am PST
Time Out:
1:00pm PST
Client Name hecoxs Text Box hecoxs
System Application
Condensate Grey-Water Blackwater Greasewaste
Vacuum Center Model #
AV04469
Unit Serial Number
AV-100S-2.15-LR-E3-480-7-9-FS
System Start Up Date
12/23/2019
VC, OIT, VC to ZCP and ZCP to VC Program Versions
VC 7.73, OIT 7.70, VC to ZCP 6.30
System Run Time Hours
79,300 Hrs
Panel Voltage Readings - (Phase to Phase) (A-B, A-C and B-C)
A-B 490, A-C 490, B-C 488
System Information https://img.companycam.com/Ux-iOZ2CRXukqz23AHP4lmhqeWYcvDXtb6ivxfnn68Y/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS8yMmU0/NWIzMy0zYzRmLTRl/ZDEtYmRjNy0xODUx/YWM4MGRlYWQuanBn.jpg
Panel Voltage Readings ( L1 to Ground, L2 to Ground and L3 to Ground)
L1,L2,L3- 288
Motor Running Amperage (Pump 1, Phase A, B, C)
P1- 17.7,17.2,18.5
Motor Running Amperage (Pump 2, Phase A, B, C)
P2-17.3,16.3,16.9
Motor Running Amperage (Pump #3 Phase A, B, C) if applicable
N/A
Motor Running Amperage (Pump #4 Phase A,B, C) if applicable
N/A
Confirm that voltage on panel placard is the same voltage installed for the Vacuum Center
Yes No N/A
Vacuum Pump Operation History (Pump # 1 Runtime hours)
39,909.9 Hrs
Vacuum Pump Operation History (Pump #2 Runtime hours)
39,390.1 Hrs
Vacuum Pump Operation History (Pump #3 Runtime hours) if applicable
N/A
Vacuum Pump Operation History (Pump #4 Runtime hours) if applicable
N/A
Storage Tank Discharge History (Storage Tank #1)
71,794 Hrs
Storage Tank Discharge History (Storage Tank #2)
92,336 Hrs
Storage Tank Discharge History (Storage Tank #3) if applicable
N/A
Storage Tank Discharge History (Storage Tank #4) if applicable
N/A https://img.companycam.com/N-nVMmWauWXUhmDsI8JEzVK0CjXpoNEQ86u0hIM6-4s/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9hODM1/NzI2OS0yODRmLTRk/ZWEtOTY5My1iMjYx/NzgxZWU4YjIuanBn.jpg https://img.companycam.com/eLUJ2lcM2gbxDnBf6E8gZiZehy7vc4unxxo_pSWTOgQ/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS80ZTAx/ZjYxZi1lNDY2LTQz/OTEtOGU0Zi0xNDI0/NDNmNTQ3MmYuanBn.jpg https://img.companycam.com/1l-KIVQsfKXhZBA9Rm4FKDweFAgWybE1tNOAFxZp3Ok/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9jN2Jm/NTE5Ny1hMzY0LTRm/M2QtYjljMy1jZmFm/ZmQ1ODE3MDcuanBn.jpg https://img.companycam.com/UhE7txD9BHV27GR6Inhzzslo_VDpB8pugKq0MKyCPWY/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS83YWRj/NTNlNC05MzY4LTQw/OGYtYjUxMS03NjA1/YjI1MDQ5MDUuanBn.jpg https://img.companycam.com/Vmk0bMyxSv8_RDwnB2XU5sxxpOJ2AAqf0o-pVLpmpEU/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9mZTY0/OGUyOS1kYTMxLTQy/ZDUtYWUyNC00MzI2/ZTVkY2UxMWMuanBn.jpg https://img.companycam.com/AxsBaeLkOFtf5HxsQnbMoC6BRZFr2sssZptlFxpqtX8/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS8wZTBj/YjViNC1mYjE5LTRh/ZTEtOWQzZi1kMjFm/NWNkOWUyNmQuanBn.jpg https://img.companycam.com/8iFP27ByiTUdRbSxrPbDxDaQLQ05WZ_fUyt9SYnPIys/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS8wZWNm/MTkxMC02OTQzLTQy/MWItOWVlOC0zZWRh/ZWFmYTQzZmIuanBn.jpg https://img.companycam.com/URAP4QGTLmtghkhXgJghMk06_6cmpTGcc-ogrCPYOso/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS8zMWQx/MTBiMS0wNzM5LTRi/NTktYTM3OC0yNDMy/ZDdmNTcyMjUuanBn.jpg https://img.companycam.com/w9efBnse44qlW1-wMwOvZMlV0D6MERwLYDL8DnWz1x4/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS80YmE0/ZjFlZS0yYTQ3LTQ0/ZTItOTY2ZC04OWI2/MDNmMjhkZjguanBn.jpg https://img.companycam.com/EyNJLKPo4z2vjeK3VCJI7NhDzMCkm4Ax55AM1bfHrFk/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9iYWJj/M2JlZS0wOWI5LTRh/MGItODBkNy01NTU0/MzE2MDQxMTYuanBn.jpg
Vacuum Center Unit https://img.companycam.com/r-WjOtmbgxdxDJAYkr2WMruVtGceS1vI_FFpvh8UFIM/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS83Yzg5/NWU1Yy02ZWYxLTQ2/MmYtOTdkMS1lNWNh/MWVmM2ZhNmUuanBn.jpg https://img.companycam.com/m8HJPiYj3qnmhlYJAwhhbL0D5OdYk7_VU7T9CUuF25U/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS80NzRh/ZjA0MS1hOTI3LTQ1/MzQtYjA2NS1jYzRi/MjVmZDgxZjMuanBn.jpg https://img.companycam.com/QW97UzHSUgH93JXsd0fOXfnJiFD-NZqJE2l3i0cEG7Q/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9hMGVl/NmNhMC1mNDdlLTQ3/YTUtYWYyYi1hNDY2/YmRmYzE3NDEuanBn.jpg https://img.companycam.com/kNbmoHqkgrejPdadc-2X4q1iDrFhWwkvFVnOvDeQ8QU/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS8yNDk3/MjYzYi1jYzM2LTRm/OTgtODA1Ny0xNDM0/OWFjNjEwODkuanBn.jpg https://img.companycam.com/9igP01pKlBlg5DEb7r-f81Yz4-Y2yzKV6ubdcK9EIcQ/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9hY2I5/Y2ZhOC1iNGE3LTQ1/MWMtOGY2MC02Yjg0/YjFiNmYyMjMuanBn.jpg https://img.companycam.com/P0Xfv6XGPiu0nvpvU0DLgK1qseL2mBXt3xFoQ9GKiv4/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9hZDY2/NGNmZC03YjIwLTRh/MDktODQ1MC0zNDgz/YWI5N2U1YjcuanBn.jpg
Isolated vacuum center - unit leak rate (not to exceed 0.1"Hg per minute)
Pass Fail N/A
System leak rate (not to exceed 0.1" Hg per minute)
Pass Fail N/A
Swing Check Valves - Inlet and outlet from tank, clean and clear of debris
Pass Fail N/A
Swing Check Valves - Pump suction side, clean and clear of debris
Pass Fail N/A
Confirm Storage Tank #1 is in level drain mode
Pass Fail N/A
Confirm Storage Tank #2 is in level drain mode
Pass Fail N/A
Confirm Storage Tank #3 is in level drain mode (if applicable)
Pass Fail N/A
Confirm Storage Tank #4 is in level drain mode (if applicable)
Pass Fail N/A
Make Up Water Filter replaced and is cleaned
Pass Fail N/A
Make Up Water Filter - Issue found in Water Feed
No issues with water feed, water quality was good
Pump #1 https://img.companycam.com/SFJJk6gedIWRXHGD9WS5VPenunlC85PcsCZlB1TwUwM/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS84NTI5/YTM4YS0yOThhLTRi/MjQtYTFkMS02NDQ2/ODRjY2YxMmMuanBn.jpg https://img.companycam.com/MYI5VzbCkvDkRAy0W7VjuKmqWDbvQqasUYfpEzthRe4/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9hZjRh/ZDAwOS1mNDM0LTQw/NmEtYmM4NS1kODAx/ZWM5NjAyY2UuanBn.jpg https://img.companycam.com/ggvQpUo6QU6XuYKEPAeY7c2hYs26G-j98uNDRt3eYxY/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9hZDc4/N2JlMy0wYjg0LTRl/NmItOTk1Mi03ZjI5/MzAwYjJiOTcuanBn.jpg https://img.companycam.com/zPeoiarwFMeqOJfoWnKVISAAd5piEabrGV3957qGTGE/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS8zZTBk/OTA2Zi0xNWI0LTQ1/ODYtOGZiMy00NGZh/ODZmYzdiN2UuanBn.jpg https://img.companycam.com/-b4FTdAnIs6Wv7liUyvP0_kOioyRuYK9U7lbo7Md5yU/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS85NDIy/MzNmZC04ZjA2LTQ1/NGEtODM2NC04NDgz/NjRiMjBkMDkuanBn.jpg https://img.companycam.com/xVUx1XzCwixdQEaJ6mX0S09PSPuSROCgO4711f_ia-U/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS83OWZh/MDQwMy04MzdhLTRj/ZjUtYTM2My0wYTRj/OWUwZTc2NDMuanBn.jpg
Pump Filter Changed
Pass Failed N/A
Pump radiator cleaned and flushed
Pass Failed N/A
Pump water jacket cleaned and flushed
Pass Failed N/A
Pump heat exchanger; cleaned or converted to flow spool (circle one)
Pass Failed N/A
Fresh Water make up Solenoid supply line or fill/overflow
Pass Failed N/A
Fresh Water Flow Control Valve
Pass Failed N/A
Debris Type found in Fresh Water make up Solenoid supply line , Fresh Water Flow Control Valve or fill/overflow -
Clean
Pump Manually operated to check for capacity (must run to minimum of 18"Hg
Pass Failed N/A
WYE Strainer - Cleaned
Yes No N/A
WYE Strainer - Debris Type found in Strainer
Clean
2" Check Valve - Cleaned
Yes No N/A
2" Check Valve - Debris Type found in Check Valve
Clean
Additional Comments regarding Vacuum Pump 1
1) We removed the front housing of the Vacuum Pump and no real evidence of build up.
List any additional PM parts used or installed outside of PUMP filters (Pump filters are included in the PM Service) https://img.companycam.com/xWH97fsrJiLvR5yaNlN_Kmo3-b3FzRe1MU-4Z8DIqZ0/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS82M2Mw/ZjYxNS1kMWYyLTQ1/MTItYmU1OS1jZmUx/YTA2MmI3MDMuanBn.jpg https://img.companycam.com/llcIuQCnvsArDLjF3P33b2zcsrqDfUT1Q82JifYO9iU/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS85N2Qz/ZGM3Yi1kMzkyLTQy/NjgtYWM1MS1iNTMz/MTJlZjVjMjcuanBn.jpg https://img.companycam.com/_P6zReCoivxZ1BR9MND6IqAXZQIyHhb5Vccg0G7t_aQ/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS80YTBj/OWNiNS0xYTk4LTRh/ZTktYWRhYS01NWM2/ZDg4M2ViMzcuanBn.jpg https://img.companycam.com/o8x38ORIi5ieelipGao72XHsmHe8FBXDPHc3kHUW87c/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9lNWUw/MDRlZi1lODc2LTQ4/NTgtODAyYi01ZWQ0/MzE0ODgwZGIuanBn.jpg
Pump filter changed
Pump radiator cleaned and flushed
Pass Failed N/A
Pump water jacked cleaned and flushed
Pass Failed N/A
Pump heat exchanger; cleaned or converted to flow spool (circle one)
Pass Failed N/A
Water make up line connected and operating; Overflow operational?
Pass Failed N/A
Pump manually operated to check for capacity (must run to minimum of 18" Hg
Pass Failed N/A
WYE Strainer - Cleaned
Yes No N/A
WYE Strainer - Debris Type found in Strainer
Clean
Pump #2 https://img.companycam.com/NF_LEMpXQ3Kpzo-VBgySNqtlVYo4pYT0mRO_seJG_EE/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS84YWZh/YzYzOC02ZWI1LTQ4/NjctYjA4Mi0xZDky/Yjc4YjFiNjIuanBn.jpg https://img.companycam.com/v-QAxsAQHqNPQwO50xRwikSqEJkMcicdZAq_gDjXaL8/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS85N2Fj/MWY4Ni1mMTlkLTQ3/ZDYtYjEwOC1mZDA4/ODQwOTdlZmQuanBn.jpg
2" Check Valve - Cleaned
Yes No N/A
2" Check Valve - Debris Type found in Check Valve
Clean
Additional Comments Regarding Vacuum Pump 2
The impeller is rubbing against the face plate causing wear on the face plate. The Vac pump is building vacuum and holding vacuum pressure.
List any additional PM Parts used or installed outside of Pump Filters (Pump Filters are included in the PM Service) https://img.companycam.com/ypCsGzBTx-tKIUmBy8KzmzMyNvgkLDTAoC-zquBS2Wo/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS8yNGIz/ZWQ3ZS0xZjhlLTQy/MjktYmY0Ni02OWYw/NmQ5MDNhMWYuanBn.jpg https://img.companycam.com/shMo1guALUx7ZR6kVZCHxOoXFzSbGcrLkHENUdg3Fb0/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9jODI3/ODhiNy0xYmU1LTQw/NjMtYTdmMS1jZGQ4/M2Y3MTBiZTMuanBn.jpg https://img.companycam.com/ValgTdbzbXaDKNBUqgN3_R2mfWL14_8TW38oRf2gAY4/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9jMzM5/NDIyYi03MzE5LTQ4/MTctOGIwYi1lZDcz/OTI5OWU0MDAuanBn.jpg https://img.companycam.com/hvilsOEIP6EUSesnGZXq0_fqIS9C0zi_XmymYXZe-IQ/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9lMDZh/ZDQxZi1mODJjLTRj/NjUtOGEzNC1iZjZi/OTAyYzMzMTYuanBn.jpg
Add your comments/notes regarding the vacuum center below;
Tank 1 and Tank 2 need to have the debris removed from the float and also the inside of the tanks should be washed down
Additional Comments regarding Vacuum Center https://img.companycam.com/LJu94NKQBCH35zKrDXD0kYLYP_R7LaXgEHLOB8rf3fk/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS81NDhj/YmExYi02ZTYwLTRk/NmYtYmQ5Ni0wYjg2/MDEzNDcxZTcuanBn.jpg https://img.companycam.com/kPRDR8gI3AVH3sLnY4lQhYGD-GAcdHRdDPLPLwvhcm0/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS83MjA3/ZWQyNy1iYzcyLTQz/NjItOGJmYS0zMmQ5/ZTQ5MWI0NDAuanBn.jpg https://img.companycam.com/WJ8eD75J4zEsQtFuwuQb8UH7rpfLWUjO6BwtQf3SQOs/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS81YjRj/OTFlOC1mMWI0LTQy/MDMtYjE1Yi1kNGI1/YmM5NGM1Y2EuanBn.jpg https://img.companycam.com/xVUx1XzCwixdQEaJ6mX0S09PSPuSROCgO4711f_ia-U/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS83OWZh/MDQwMy04MzdhLTRj/ZjUtYTM2My0wYTRj/OWUwZTc2NDMuanBn.jpg
Is unit currently in operation
Does unit currently display any alarms
Yes No N/A
Verify that grinder has proper rotation (Verify placard rotation direction)
Yes No N/A
Grinder https://img.companycam.com/CCix3kUogjd236onH3-rHu18gXiSNdNb3rDPOu_9nAg/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS80MzQ0/NWZkYi00NzFjLTQx/ZDItYjc3NS03Zjlh/ZmQ4YjI2MzkuanBn.jpg https://img.companycam.com/-b4FTdAnIs6Wv7liUyvP0_kOioyRuYK9U7lbo7Md5yU/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS85NDIy/MzNmZC04ZjA2LTQ1/NGEtODM2NC04NDgz/NjRiMjBkMDkuanBn.jpg https://img.companycam.com/n5Bdw7SAKM41GoZyuGmFoQstXi3_-FTTIiuWbyZpGO0/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS9iMTA4/OGNmYi1lMjFiLTQ5/OTUtYTkwYS0zZDE4/NjlhOTFhNTUuanBn.jpg
Perform the following procedure to manually test the grinder jam sequence. Withing 3 (three) seconds, rotate the grinder control switch (3) times from OFF/RESET to REMOTE, then from OFF/RESET to ON.
Verify the grinder rotates in the forward direction for (1) one second, then begins three reversals.
Visually witness grinder shaft turns in the opposite direction for this step
At the end of the three (3) reversals, the JAMMED indicator light will flash steadily.
Visually identify that the indicator at the Grinder Panel activates and illimunates as stated above
Place the Grinder Control Panel Switch in the OFF/RESET position to RESET the motor controller PLC and the JAMMED indicator
Performing the step above will return the grinder to normal operation
Additional comments regarding the Grinder(s)
No issues at this time
Notes
Extraction Valves inspected and operational
EPI Controllers operational and timing is correct
Pass Failed N/A
Men's Restroom https://img.companycam.com/ulUKLsdggSnWx8JshXIED0HbgLMy-v2NtSVPfMjs1zA/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS84MDkx/NDg3Yy1jYmU0LTQw/YTctYmE2NS1hZWIy/MWIzNGEzNDUuanBn.jpg
Photo Eye / Push Button Operational
Pass Fail N/A
Vacuum hose/tubing not pinched or restricted
Pass Failed N/A
In-line red mini check valve installed on vacuum source tubing to controller
Pass Failed N/A
Lift Component function tested and operational via a trickle test
Pass Failed N/A
Accumulators inspected and operational
Pass Failed N/A
Sensor port line has no traps or kinks
Pass Failed N/A
Vacuum lift piping properly braced, no loose bracing
Pass Failed N/A
Overhead piping, if visible from the floor, properly braced, no loose or swaying piping
Pass Failed N/A
List any compromised X-Valves with SN's, Controller SN's and the locations where components were replaced.
e.g. Zone / Lift #'s
Men's Toilets Z4 L5 & 6 Push button needs to be replaced. ABM is replacing them.
Additional Comments regarding Men's Restroom(s)
N/A
Extraction Valves inspected and operational
EPI Controller operational and timing correct?
Yes No N/A
Photo Eye / Push Button Operational?
Yes No N/A
Vacuum Hose/Tubing not pinched or restricted?
Yes No N/A
Inline Mini Check valve installed on vacuum source line to EPI controller?
Yes No N/A
Accumulators inspected and operational?
Yes No N/A
Vacuum lift piping properly braced?
Yes No N/A
Overhead piping - Secure and not moving (visible areas)
Yes No N/A
Women's Restroom https://companycam-pending.s3.amazonaws.com/dc23ab4b-0bfe-442b-8d62-6fb4a7034894.jpg https://companycam-pending.s3.amazonaws.com/8d4a42aa-a70c-4b5c-929f-3cf23c43f185.jpg
Additional comments regarding Women's Restroom?
Found two flooded X-valves in women's restroom Z2 L8 & 9. X-valves replaced and supplied by ABM.
https://companycam-pending.s3.amazonaws.com/c508873d-1dde-413d-bef3-8a8a32733076.jpg https://img.companycam.com/MncwZ93L8taODcg3k3c-xmeEZZSs1tHcUzHN8cRrJEU/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS83YTEx/OTg2ZC00ZjE3LTQ4/MDMtOGUwZi04YTli/YTFiYzY1NWIuanBn.jpg https://img.companycam.com/0U6P-sIXiHc596B33WTeYcykkNSL36gb0zwNsSezwr0/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS81NTBl/ZWViOC1lZGRjLTRl/NzAtOGNlOC0zY2Rm/ZDQ1MWM0ODIuanBn.jpg https://img.companycam.com/9DEVbOvJ3k2JLkwrV8QUDGYHHdXvDpoFGBEEBDAFHcM/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS8yNTcz/N2Q1Yi1hNTRmLTRl/NzUtYWI2Zi00YTMy/OGVkNjY5ODguanBn.jpg https://img.companycam.com/TfES3_d5sNZZUXT76y9rg09kNrNold9PnXJ4PnFdsWE/rs:fit:4032:4032/q:80/aHR0cHM6Ly9jb21w/YW55Y2FtLXBlbmRp/bmcuczMuYW1hem9u/YXdzLmNvbS85NDAz/ZDMxNi1hNGM5LTRk/ZTEtYTdiOC0wNjU3/YTRjMGUxNzYuanBn.jpg https://companycam-pending.s3.amazonaws.com/11ca2679-00c5-4762-ac40-c4dca4d0c7d5.jpg
Add notes below
Found two flooded X-valves in women's restroom Z2 L8 & 9. X-valves replaced and supplied by ABM.
Men's Toilets Z4 L5 & 6 Push button needs to be replaced. ABM is replacing them.
Additional comments regarding valves and lifts; explain any "Failed" or "Other" notation with specific locations of the infractions in the store
List outstanding observations below
The overall system looks to be in good condition, just need to create weekly checks to help minimize any issues.
General Observations
Outstanding Issues / Recommendations https://companycam-pending.s3.amazonaws.com/8d4a42aa-a70c-4b5c-929f-3cf23c43f185.jpg https://companycam-pending.s3.amazonaws.com/dc23ab4b-0bfe-442b-8d62-6fb4a7034894.jpg https://companycam-pending.s3.amazonaws.com/11ca2679-00c5-4762-ac40-c4dca4d0c7d5.jpg https://companycam-pending.s3.amazonaws.com/c508873d-1dde-413d-bef3-8a8a32733076.jpg
List any Outstanding Issues / Recommendations below
Tank 1 and Tank 2 need to have the debris removed from the float and also the inside of the tanks should be washed down
List first/last name of the manager
David Ortega - Chief Engineer
Date of service
12/09/2025
Facility Manager or Superintendent you Checked In/Out with
List first/last name of technician who performed the PM service
Darren Young and Clayton Damon
Date of service
12/9/25
Technician(s) who performed the Preventative Maintenance