This document contains an offeror price sheet and details of a federal contract solicitation. The U.S. Agency for Global Media is seeking proposals to replace the high voltage air conditioning system at its transmitting station in Kuwait. Offerors must submit pricing for both prime contractor and subcontractor work on the design and construction of the new HVAC system. The price sheet templates include line items for direct materials, labor, equipment, taxes, overhead, profit, and bond premium costs. Proposals are due by the date specified in Solicitation Number 951700-21-R-0013, which provides additional requirements and specifications for the HVAC replacement project at the transmitting station. Award is expected to be a firm-fixed-price contract to the responsible offeror with the lowest evaluated price.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES AGENCY FOR GLOBAL MEDIA

KUWAIT TRANSMITTING STATION

HIGH VOLTAGE AIR CONDITIONING (HVAC)

REPLACEMENT SYSTEM

SOLICITATION NO. 951700-21-R-0013

ATTACHMENT E

OFFEROR PRICE SHEET

ATTACHMENT B

OFFEROR PRICE SHEET

OFFEROR PRICE SHEET Date:

CONTRACT TITLE:

HVAC System Replacement at the Kuwait Transmitting Station, Transmitter Hall 5-6

OFFICE:

Kuwait Transmitting Station

DESCRIPTION:

PRIME CONTRACTOR'S WORK CONTRACTORS'S PROPOSAL

1. Direct Materials

2. Sales Tax on Materials 0.00% of line 1

3. Direct Labor

4. Insurance, Taxes, and Fringe B 0.00% of line 3

5. Rental Equipment

6. Sales Tax on Rental Equipment 0.00% of line 5

7. Equipment Ownership and Operating Expenses

8. Subtotal

9. Prime's Field Office Overhead 0.00% of line 8

10. SUBTOTAL (add lines 8 and 9)

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0

0 0 0

SUBCONTRACTOR'S WORK CONTRACTORS'S PROPOSAL

11. Direct Materials

12. Sales Tax on Materials 0.00% of line 11

13. Direct Labor

14. Insurance, Taxes, and Fringe B 0.00% of line 13

15. Rental Equipment

16. Sales Tax on Rental Equipment 0.00% of line 15

17. Equip. Ownership and Operating Expns

18. SUBTOTAL (add lines 11-17)

19. Field Overhead 0.00% of line 18

20. SUBTOTAL (add lines 18&19)

21. Home Office Overhead 0.00% of line 18

22. Profit 0.00% of line 20

23. SUBTOTAL (Add Lines 20-22)

0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

SUMMARY CONTRACTORS'S PROPOSAL

24. Prime Contractor's Work (from line 10)

25. Sub-contractor's Work (from line 23)

26. SUBTOTAL (add lines 24 and 25)

27. Prime's Field Office Overhead o 0.00% of line 25

28. Prime's Home Office Overhead 0.00% of line 24

29. SUBTOTAL (add lines 26 - 28)

30. Prime's Profit 0.00% of line 29

31. SUBTOTAL (add lines 29 - 30)

32. Prime Contractor's Bond Premiu 0.00% of line 31

33. TOTAL COST (Add Lines 31 and 32)

0 0 0

0 0 0

0 0

0 0 0

0 0 0

0 0

0 0 0

0 0

0 0 0

0 0 0

Name & Title of Preparer: Date: