ATTACHMENT E - Contractors Employee Statement of Compliance.docx

DOCX document 20 KB Posted

Attached to
S208--Miramar Shrine - Turf Renovation Project
Solicitation number
36C78621Q0044
Issued by

About this file

This document contains an attachment for a federal contract to perform turf renovation work at Fort Rosecrans National Cemetery. Key details include:

  • The attachment is a compliance statement form for contractor employees to acknowledge their understanding of performance standards when working at a national cemetery, which is considered a national shrine. It requires the employee's initials and signature committing to protect gravesites and remains, use approved tools and methods for working, and immediately notify officials if any remains are exposed.

  • The related solicitation is for turf renovation work at Miramar National Shrine in San Diego under Solicitation Number 36C78621Q0044 from the Department of Veterans Affairs National Cemetery Administration. The work includes renovating turf areas while following the strict compliance standards for protecting and showing respect for burial sites and honors veterans' service.

  • Adherence to the compliance form is essential for any employee or contractor performing the turf renovation to maintain the high standards of care and memorialization at the national cemetery. Immediate reporting of any incident involving remains is also required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Turf Renovation

Fort Rosecrans National CemeteryNational Shrine Project – FY20
Project No.: 892-Mill-FY20-0034/25/2020

ATTACHMENT D

CONTRACTOR’S EMPLOYEE STATEMENT OF COMPLIANCE

EMPLOYEE NAME:______________________________
POSITION/TITLE:______________________________
DATE:______________________________

Please check the appropriate blank.

____New Employee, New Contractor
____Annual Confirmation for current Employees or Contractor(s) (Due on Nov. 1 of each Contract year or immediately after NTP.)

FOR ALL EMPLOYEES

I have been briefed and understand the following guidance:

INITIALS

_________The National Cemetery Administration honors veterans with a final resting place and lasting memorial that commemorate their service to our Nation. National Cemeteries are National Shrines. Therefore, the standards for management, maintenance, appearance and operational procedures have been established by the National Cemetery Administration to reflect this Nations’ concern and respect for those interred there. For this reason, my strict adherence to the Performance Work Statement, Performance Work Requirements Summary and Guidance Specifications shall be required and shall be essential.
_________I will remain aware of the remains buried in the grounds where work is being performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.
_________I will not walk, stand, lean, sit or jump on headstones, markers, or monuments. Nor will I drive over them.
_________I will not place or lean tools, equipment, or other items on headstones, markers, or monuments at any time.
_________I have been briefed on the approved methods and tools to remove headstones and markers from their sockets in accordance with the Contract Specifications. I will use the tools and methods approved by the Contracting Officer Representative (COR) to lift headstones and markers out of the ground in order to avoid damage; pickaxes are not an acceptable tool.
_________I will not place headstones or markers on dirt piles or mud once they are removed from their sockets; in order to show appropriate respect towards the families visiting the gravesites and the remains that are buried, I will ensure headstones and markers are carefully stored on each associated gravesite and protected from damage or soiling, in accordance with Contract Specifications.
_________I understand that the Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.
_________Should any on-site activity, incident, emergency, or disaster result in exposure and/or damage to any remains, container for remains (i.e., casket or urn), or outer burial container, I will IMMEDIATELY notify the Cemetery Director, the COR and/or the Contracting Officer; I will take immediate steps to protect and render safe any exposed remains; and stop any further work until the Cemetery Director provides the Contractor ‘s Supervisor guidance regarding disposition of the remains and permission to proceed.

SIGNATURE BLOCK

Signature Printed Name Date

IF THIS STATEMENT IS THE EMPLOYEE’S ANNUAL COMPLIANCE STATEMENT, THIS COMPLIANCE STATEMENT MUST BE RETURNED TO THE COR BY NOVEMBER 1 OR AFTER NTP.

AS TO STATEMENTS OR COMMITMENTS OF FUTURE ACTIONS, THIS COMPLIANCE STATEMENT COVERS THE PERIOD FROM OCTOBER 1 OF THE CALENDAR YEAR DURING WHICH THIS COMPIANCE STATEMENT IS DUE THROUGH SEPTEMBER 30 OF THE NEXT CALENDAR YEAR.

File details come from the government source that posted it. Updated .