ATTACHMENT C - Work Summary _ Progress Report.docx

DOCX document 22 KB Posted

Attached to
S208--Miramar Shrine - Turf Renovation Project
Solicitation number
36C78621Q0044
Issued by

About this file

This document contains a work summary and progress report template for a turf renovation project at Fort Rosecrans National Cemetery. The project involves several work items including surveying the turf area, conducting soil tests, renovating the turf, and cleaning flat and upright headstones. The template requires contractors to provide key details such as the total square footage of turf area renovated, number of soil tests conducted, and cemetery sections impacted for each work item. Space is also provided to report any circumstances affecting work progress. The contractor and cemetery director must both sign upon work completion to acknowledge receipt of the progress report.

A related federal contract opportunity involves solicitation number 36C78621Q0044 for a turf renovation project at Miramar National Shrine. No other details are provided about required products or services for this opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Turf Renovation

Fort Rosecrans National CemeteryNational Shrine Project – FY20
Project No.: 892-Mill-FY20-0034/25/2020

ATTACHMENT B

WORK SUMMARY & PROGRESS REPORT
Period Covered:
From:
To:
Cemetery Location:
Contractor:

FORT ROSECRANS NATIONAL CEMETERY

Cabrillo Memorial Drive San Diego, CA 92106

Project Title:

Turf Renovation

Contract No:

Inspection / Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights—

1. Within a reasonable time after the defect was discovered or should have been discovered; and

2. Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

Work Completed & Submitted for Acceptance (This form is not to be used as an Invoice)

ADD. ALT. NO. 1

001
Work Area Survey
Total Square Feet of Turf Area.
· ___________ SF
Cemetery Section(s)
· ___________
002
Agricultural Soil Testing and Recommendations
Total number of soil tests
· _________/ EA
Cemetery Section(s)
· __________
003
Turf Renovation
Total Square Feet of Turf Area.
· ___________ SF
Cemetery Section(s):
· ____________
004
Clean Flat Markers
Markers cleaned
· ___________/ EA
Cemetery Section(s)
· ___________
005
Clean Upright Headstones
Markers cleaned
· ___________/ EA
Cemetery Section(s)
· ___________

Report below any circumstances which may have adversely affected work progress such as weather, turf conditions, strikes, delays by the Government, etc.

Signature of Contractor:
Date Signed
Signature of Cemetery Director / COR
Date Signed
____________________________
______
___________________________
________

Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.

Duplicate Form as Necessary

File details come from the government source that posted it. Updated .