ATTACHMENT C - Work Summary _ Progress Report.docx
DOCX document 22 KB Posted
- Attached to
- S208--Miramar Shrine - Turf Renovation Project
- Solicitation number
- 36C78621Q0044
About this file
This document contains a work summary and progress report template for a turf renovation project at Fort Rosecrans National Cemetery. The project involves several work items including surveying the turf area, conducting soil tests, renovating the turf, and cleaning flat and upright headstones. The template requires contractors to provide key details such as the total square footage of turf area renovated, number of soil tests conducted, and cemetery sections impacted for each work item. Space is also provided to report any circumstances affecting work progress. The contractor and cemetery director must both sign upon work completion to acknowledge receipt of the progress report.
A related federal contract opportunity involves solicitation number 36C78621Q0044 for a turf renovation project at Miramar National Shrine. No other details are provided about required products or services for this opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Turf Renovation
| Fort Rosecrans National Cemetery | National Shrine Project – FY20 |
| Project No.: 892-Mill-FY20-003 | 4/25/2020 |
ATTACHMENT B
| WORK SUMMARY & PROGRESS REPORT |
| Period Covered: |
| From: |
| To: |
| Cemetery Location: |
| Contractor: |
FORT ROSECRANS NATIONAL CEMETERY
Cabrillo Memorial Drive San Diego, CA 92106
Project Title:
Turf Renovation
Contract No:
Inspection / Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights—
1. Within a reasonable time after the defect was discovered or should have been discovered; and
2. Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
Work Completed & Submitted for Acceptance (This form is not to be used as an Invoice)
ADD. ALT. NO. 1
| 001 |
| Work Area Survey |
| Total Square Feet of Turf Area. |
| · ___________ SF |
| Cemetery Section(s) |
| · ___________ |
| 002 |
| Agricultural Soil Testing and Recommendations |
| Total number of soil tests |
| · _________/ EA |
| Cemetery Section(s) |
| · __________ |
| 003 |
| Turf Renovation |
| Total Square Feet of Turf Area. |
| · ___________ SF |
| Cemetery Section(s): |
| · ____________ |
| 004 |
| Clean Flat Markers |
| Markers cleaned |
| · ___________/ EA |
| Cemetery Section(s) |
| · ___________ |
| 005 |
| Clean Upright Headstones |
| Markers cleaned |
| · ___________/ EA |
| Cemetery Section(s) |
| · ___________ |
Report below any circumstances which may have adversely affected work progress such as weather, turf conditions, strikes, delays by the Government, etc.
| Signature of Contractor: |
| Date Signed |
| Signature of Cemetery Director / COR |
| Date Signed |
| ____________________________ |
| ______ |
| ___________________________ |
| ________ |
Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.
Duplicate Form as Necessary
File details come from the government source that posted it. Updated .