About this file

This file contains architectural drawings and planning documents for the Phase II renovation of the Mineral Resource Building Core Lab at West Virginia University's Evansdale Campus in Morgantown, West Virginia. The drawings, created by Luke Cunningham on September 30, 2025, include comprehensive floor plans, elevations, finish specifications, and equipment layouts for the first floor renovation project. The scope of work encompasses demolition of existing cabinetry, replacement of countertops, utility valves, sinks, and faucets, installation of new electrical outlets and data ports, replacement of air/vacuum lines and valves, and the addition of new eye wash stations and safety equipment. The project specifies the use of Durcon epoxy resin countertops in Lunar White finish, LVT flooring from Mohawk Group in Fleuri 920 pattern, and painted wood cabinetry with specific color schemes including Pure White, Naval, and Tricorn Black finishes.

The renovation includes 27 specialty laboratory equipment installations requiring various electrical specifications ranging from 110V to 220V single phase power, including liquid pumps, pressure control panels, sample saws, permeameters, balances, retort systems, and other analytical equipment. The drawings indicate ADA-compliant features including an ADA sink station and accessibility considerations throughout the lab space. All existing outlets and junction boxes are to be salvaged and reinstalled on new countertops, with the college required to remove existing equipment prior to construction commencement. The project documentation includes detailed casework schedules, fixture specifications from manufacturers such as Watersaver for plumbing fixtures and eyewash stations, and complete finish plans with color specifications for walls, cabinets, and flooring materials.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:19 PM

9/30/2025MRB 142 Renovation - Phase II G000Title Sheet

Attachment C - MRB Phase II Drawings & Information

Sheet List Sheet Number Sheet Name G000 Title Sheet A000 Overall Existing First Floor A100 Existing Floor Plan A101 Demo First Floor Plan A200 Proposed Floor Plan A300 Elevations A400 Finish Plan A600 Electrical & Data Plans A700 3D Views

REVISIONS

# Desc Date

UP

FE

EP

FE

Room Legend

CORE LAB

ELECTRIC

ELECTRIC / DATA

CORE LAB

LAB152

143 135 133 133B

133A

CIR15

151E2

ELEC

102AE1

ELEC

148A

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:20 PM

9/30/2025MRB 142 Renovation - Phase II A000Overall Existing First Floor

1/16" = 1'-0"1 Existing First Floor

EMERGENCY PANEL - MRB 221

TFE

A V

A V

A A

V V

V V

V VA A A A

4 2

A A

CORE LAB

S1

EXISTING LIGHT SWITCH

EXISTING ELECTRICAL OUTLET

EXISTING DATA OUTLET

ELECTRICAL PANEL

THERMOSTAT

FIRE EXTINGUISHERFE

CARD READER

EP

T

UTILITY VALVE (AIR / VACUUM)V

SAFETY SHOWERSS

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:21 PM

9/30/2025MRB 142 Renovation - Phase II A100Existing Floor Plan 1/4" = 1'-0"1 Existing Floor Plan

LEGEND

A V

A V

A A

V V

V V

V VA A A A

4 2

A A

COLLEGE TO REMOVE

EQUIPMENT BEFORE

CONSTRUCTION BEGINS

FI

R

E

REPLACE COUNTERTOPS,

UTILITY VALVES, SINKS,

AND FAUCETS

REPLACE COUNTERTOPS,

UTILITY VALVES, SINKS,

AND FAUCETS

REMOVE (2) CABINETS

SALVAGE ALL OUTLETS &

JUNCTION BOXES TO

REINSTALL ON NEW

COUNTERTOPS

S1 EXISTING LIGHT SWITCH

EXISTING ELECTRICAL OUTLET

FIRE EXTINGUISHERFE

DEMO/REMOVE

V EXISTING AIR / VACUUM LINE & VALVE

EXISTING DATA PORT

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:25 PM

9/30/2025MRB 142 Renovation - Phase II A101Demo First Floor Plan 1/4" = 1'-0"1 Demo First Floor Plan

LEGEND

E

G

FI

E

G

FI

E

G

FI

E

E

G

FI

E

G

FI

E

G

FI

E

G

FI

4 2

E

G

FI

E

G

FI

E

G

FI

E

G

FI

V V V VA A

A A

A V

A V

A A

V V

A

A A

A

A300 3

2 A3.1

A3.2

A300

REPLACE COUNTERTOPS,

UTILITY VALVES, SINKS,

AND FAUCETS

REPLACE COUNTERTOPS,

UTILITY VALVES, SINKS,

AND FAUCETS

ALL OUTLETS TO REMAIN

ON COUNTERTOP

CAULK PERIMETER OF NEW COUNTERTOPS

NEW EYE WASH

PROPOSED ELECTRICAL OUTLET (WHITE)E

NEW WALL (SEE WALL TYPE BELOW)

1i CR CARD READER

PROPOSED DATA PORT (WHITE)D

NEW AIR / VACUUM LINE & VALVE

FE FIRE EXTINGUISHER

PROPOSED LIGHT SWITCH (WHITE)S

T THERMOSTAT

V EXISTING AIR / VACUUM LINE & VALVE

GFCI

E

S 1D

V

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:28 PM

9/30/2025MRB 142 Renovation - Phase II A200Proposed Floor Plan

DRAFT

1/4" = 1'-0"1 Proposed Floor Plan

LEGEND

ADA STATION

CTP

NEW AIR/VACUUM

FIXTURES

PT3

NEW AIR/VACUUM

FIXTURES

NEW PLUMBING

FIXTURES

NEW PLUMBING

FIXTURES

ADA

CTP CTP

FIRE

HOSE

PAINT TO MATCH CABINETS

(PT3)

PAINT TO MATCH WALL

V.I.F.

NEW AIR/VACUUM FIXTURES

" SANITARY LINE IN CHASE

REMOVABLE PANEL

C H

AS

E

EYE WASH STATION

ADA SINK

A25 - DURCON DROPIN SINK

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:34 PM

9/30/2025MRB 142 Renovation - Phase II A300Elevations

1/4" = 1'-0"1 142 North Elevation

1/4" = 1'-0"3 142 East Elevation

1/4" = 1'-0"2 142 West Elevation

Casework Schedule

Type Mark Finish Height Width Depth Comments Count

ADA PAINTED WOOD ADA SINK PANEL 1

CTP LUNAR WHITE 3' - 0" <varies> DURCON EPOXY RESIN

COUNTERTOP - LUNAR WHITE

REVISIONS

1/2" = 1'-0"4 ADA Sink Section

A300

60"

1/ 2"

ADA SINK

V.

I.F

/1 6"

CTP

CTP

CTP

CTP

CTP

CTP

PT2

PT2

MATCH FLOORING UNDER SINK

(14 SF)

NEW EYE WASH

CTP

V.

I.F

ADA SINK FIXTURE- MFG; WATERSAVER - L412VB-BH

ADA SINK - A25

NON-ADA SINK FIXTURE - MFG; WATERSAVER - L412VB

NON ADA SINK - D25

EYEWASH - MFG; WATERSAVER; MODEL EW1022

AIR/VACUUM - MFG; WATERSAVER - L2880-131WSA

PT1

PT2

PURE WHITE SW7005

WALLS

NAVAL SW6244

ACCENT WALLS

TRICORN BLACK SW6258

CABINETS

PT3

COUNTERTOP

CTP - DURCON - LUNAR WHITE

FLOORING

LVT FLOORING

MFG; MOHAWK GROUP; STONEWORK

COLOR; FLEURI 920 (12"X24")

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:34 PM

9/30/2025MRB 142 Renovation - Phase II A400Finish Plan 1/4" = 1'-0"1 Finish Plan

REVISIONS

# Desc Date

FIXTURE LEGEND

FINISH LEGEND

E

G

FI

E

G

FI

E

G

FI

E

E

G

FI

E

G

FI

E

G

FI

E

G

FI

4 2

E

G

FI

E

G

FI

E

G

FI

E

G

FI

V V V VA A

A A

A V

A V

A A

V V

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:35 PM

9/30/2025MRB 142 Renovation - Phase II A601Equipment Plan 1/4" = 1'-0"1 Equipment Plan

Specialty Equipment Schedule

# EQUIPMENT NAME POWER

1 LIQUID PUMP 2-110V

2 PRESSURE CONTROL PANEL

3 SAMPLE SAW 110V

4 RESISTIVITY CELL 2 - 110V

5 GAS PERMEAMETER 110V

6 LIQUID PERMEAMETER 110V

7 MICRO BALANCE 110V

8 MICRO BALANCE 110V

9 PERMEAMETER

10 PREL-3 3-110V

11 ACID FLOW TEST APPARATUS

12 HELIUM POROSIMETER 110V

13 HELIUM POROSIMETER

14 CORE DRILL 220V Single Phase

15 CORE CLEANING APPARATUS 110V

16 CS 7000 RETORT 2-110V - Special Plug

17 SEIVE SEPERATOR 110V

18 CAPILLARY PRESSURE APPARATUS

19 SURFACE TENSIOMETER 110V

20 INTERFACIAL TENSIOMETER 110V

21 MICRO BALANCE 110V

22 AJP-100 110V

23 GAS ISOTHERM ABSORPTION SYSTEM 110V & 220V

24 CENTRIFUGE RETORT 2 - 110V

25 ISOTEMP 110V

26 VACUUM PUMP 110V

26 VACUUM PUMP 110V

27 DISTILLED WATER TANK

West Virginia University Facilities PlanningR

Drawn By: LUKE CUNNINGHAM Date:

Drawing Created for Planning Purposes Only

9/30/2025 1:04:45 PM

9/30/2025MRB 142 Renovation - Phase II A7003D ViewsREVISIONS

G000 - Title Sheet
A000 - Overall Existing First Floor
A100 - Existing Floor Plan
A101 - Demo First Floor Plan
A200 - Proposed Floor Plan
A300 - Elevations
A400 - Finish Plan
A601 - Equipment Plan
A700 - 3D Views

File details come from the government source that posted it. Updated .