Attachment C-8 Schedule of Services Part 1.pdf

PDF 2 MB Posted

Attached to
Student Support/Facilities Operation Maintenance Services Federal contract opportunity
Solicitation number
70LCHS25RPFB00001
Issued by
Department of Homeland Security Federal Law Enforcement Training Center

About this file

This document is a Schedule of Services (Attachment C-8) detailing the required janitorial and cleaning services for multiple buildings at the Federal Law Enforcement Training Centers in Charleston, SC (Contract Number 70LCHS25RPFB00002). The schedule specifies cleaning frequencies and requirements for 13 different facilities including administrative offices, classrooms, dormitories, dining facilities, training areas, and specialized spaces like firing ranges and physical training rooms.

The schedule breaks down cleaning tasks into categories including routine cleaning, floor care, restroom cleaning, glass cleaning, and exterior cleaning, with frequencies ranging from "as needed" to daily, weekly, monthly, quarterly, semi-annually and annually. Special requirements are defined for certain facilities, such as the dining facility requiring cleaning after each meal service, mat rooms needing cleaning after each class, and the dormitory public access areas requiring frequent checks. Square footage ranges from 500 sq ft for the training house to 188,000 sq ft for the classroom complex, with detailed specifications for cleaning sensitive areas like tactical training simulators and indoor firing ranges requiring HEPA vacuum cleaning. The document provides comprehensive task matrices showing exactly what services are required at what intervals for each building.

View the file

Other files for this federal contract opportunity

Other files attached to Student Support/Facilities Operation Maintenance Services, newest first.
File Type Posted
Section A 70LCHS25RPFB00002 2-26-25.pdf PDF
Section B 70LCHS25RPFB00002 2-26-25.pdf PDF
Section D 70LCHS25RPFB00002.pdf PDF
Section F 70LCHS25RPFB00002 2-26-25.pdf PDF
Section G 70LCHS25RPFB00002 2-26-25.pdf PDF
Janitorial inspection report sample.pdf PDF
Attachment C-2 Buildings Hours of OperationRev.pdf PDF
Attachment C-3 FTC-ADM 44-Survey ReportRev.pdf PDF
Attachment C-7 Dumpsters at FLETC 11-15-23.pdf PDF
C-8 SOS B1 THRU 61 Part 1.pdf PDF
Attachment C-11 Grounds Acreage 11-17-2023.xlsx XLSX spreadsheet
Attachment C-14 Preventive Maintenance Guide.pdf PDF
Exhibit I-1 Summary Subcontract Report SF-295 (1).pdf PDF
Exhibit G-1 Optional Form 347 Order for Supplies or Services (1).pdf PDF
70LCHS25RPFB00001 Attachment 1A- Student Services Prior Experience Questions.pdf PDF
Section A 70LCHS25RPFB00001 2-26-25.pdf PDF
Section B 70LCHS25RPFB00001 2-26-25.xlsx XLSX spreadsheet
Section E 70LCHS25RPFB00001.pdf PDF
Section I 70LCHS25RPFB00001 2-27-25.pdf PDF
Section J Index_70LCHS25RPFB00001.pdf PDF
Section K 70LCHS25RPFB00001 2-26-25.pdf PDF
Attachment C-1 Buildings and Structures.pdf PDF
Attachment C-2 Sample Session Start Dated 1.pdf PDF
Attachment C-6 FTC-ADM-1A FLETC Purchase Requisition PR.xlsx XLSX spreadsheet
Section M 70LCHS25RPFB00001.pdf PDF
70LCHS25RPFB00002 Attachment 1B- Facility Maintenance Prior Experience Questions.pdf PDF
70LCHS25RPFB00001 Attachment 1A- Student Services Prior Experience Questions.pdf PDF
Attachment C-8_Schedule of Services Part 2.pdf PDF
Attachment C-12 Grounds Maintenance Map of FLETC Charleston Complex 11-8-23.pdf PDF
Attachment C-14 2022 GSA PBS Preventive Maintenance Guide.pdf PDF
Attachment C-13 Grounds Maintenance Map of JBS Weapon Station.pdf PDF
Attachment C-9 Contractor Furnished Materials and Supplies.pdf PDF
Attachment C-7 Dumpsters at FLETC 11-15-23.pdf PDF
Attachment C-4 FTC-ADM-1A FLETC Purchase Requisition PR .pdf PDF
Exhibit H-6 OSHA 300 300A Log Report Summary 12-12-2024-.pdf PDF
Exhibit I-3 Personnel Resume Format.pdf PDF
Attachment C-41 Class Party-Picnic Form.pdf PDF
Attachment C-34 FTC-SVC-43--Roleplayer receiving report.pdf PDF
Attachment C-37 FLETC Student Roster Format.xlsx XLSX spreadsheet
Attachment C-32 FTC-ADM-50.pdf PDF
Attachment C-20Standard Form SF 702 Security Container Chec.pdf PDF
Attachment C-18Bus Transportation Inclement Weather_TRAINING DAYS-.pdf PDF
Attachment C-17Summer Weekend Bus Schedule.pdf PDF
Attachment C-16 OFF-CENTER LODGING SHUTTLE SCHEDULE REVISED.pdf PDF
Attachment C-8 FD_FM 025-01 FLETC Hazardous Waste Management Plan - 508.pdf PDF
Attachment C-7_Contractor Furnished Materials .docx DOCX document
Attachment C-5 Government Furnished Equipment-Property Updated 5-1-2024.xlsx XLSX spreadsheet
Section C Intro and General Requirements for Student Support Services .pdf PDF
Section J Index_70LCHS25RPFB00001-70LCHS25RPFB00002.pdf PDF
Section D 70LCHS25RPFB00001.pdf PDF
Show all 50

Student Support/Facilities Operation Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Services

Building No. 1 Total SF: 50,000ft² (Est.)

Headquarters Bldg., Administrative Offices

Frequency As

Needed Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets

Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X

Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X

Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.

“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Federal Law Enforcement Training Centers Charleston SC Contract Number: 70LCHS25RPFB00002

Attachment C-8

Building No. 11 Total SF 4,100ft² (Est.)

Maritime Training Classroom

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning/Disinfecting:

Entrance Mats X Empty Waste Containers X X All areas listed below to Disinfect X X Clean Venetian Blinds X Scotchguard/Clean Upholstery Low Dust X High Dust X Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning/Disinfecting:

Clean Walls/Partitions X X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.

“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Federal Law Enforcement Training Centers Charleston SC Contract Number: 70LCHS25RPFB00002

Building No. 16 Total SF: 22,500 sf (Est.)

Administrative Offices / IT Mgmt / FOSS Offices

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.

“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 17 Total SF 5,775ft² (Est.)

Administrative Building

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Y

Routine Cleaning/Disinfecting:

Entrance Mats X Empty Waste Containers X X All areas listed below to Disinfect X Clean Venetian Blinds X Scotchguard/Clean Upholstery Low Dust X High Dust X Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning/Disinfecting:

Clean Walls/Partitions X X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.

“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 39 Total SF 141,185 ft² Dormitory Public Access Areas (rest rooms, lobby, lounges, laundry facilities etc.)

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X* X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Scotch guard/Clean Upholstery X

X

Low Dust

High Dust

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X* X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X* X Clean/Disinfect Showers X Clean/Disinfect Floors X* X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X* X

Glass Cleaning:

Entrance Doors X X Interior Glass X Exterior Glass

Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.

“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.

Exact Requirements are outlined in C-5.A.

Note – Additional dormitory service requirements are described in Section C-5.B.5.b

Building No. 43 Total SF: 26,772ft² (Est.)

Dining Facility

Frequency

As Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Clean Ceiling Fans X Low Dust X High Dust X Kitchen Equipment/Appliances X X

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer tissue, towels)

X X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.

“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.C.5.a.1.f.1 **Note – For this building only for sanitary and health concerns, daily cleaning services shall be performed after each meal served – breakfast, lunch, supper.

Building No. 46 Total SF: 39,600ft² (Est.)

Student Center & Gym

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Scotch guard/Clean Upholstery X X Odor Control X X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Clean/service equipment X X Clean/exercise mats/mat rooms and Basketball Court

X X

Vacuum Carpets/Rugs/Mats X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning/Disinfecting:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean Showers & Drains X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Note – Janitorial services for the FLETC Express Store and Barbershop are done under a separate contract.

Building No. 46-A Total SF: 39,600ft² (Est.)

Trainer’s office/therapy room and Medical office

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Scotch guard/Clean Upholstery X X Odor Control X X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Clean/service equipment X X Clean exercise mats/tables X X Vacuum Carpets/Rugs X Spot Clean Carpets X X Steam Clean Carpets X Restroom/Therapy Room/Exam Room:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean whirlpool X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

**Medical office to be cleaned after office closes**

Building No. 46-B Total SF: 39,600ft² (Est.)

2nd Floor Administrative Offices

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X Clean Mirrors X Clean Sinks/Lavatories X Clean Showers X Clean Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 49 Total SF 500ft² Armory

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans Clean Venetian Blinds Low Dust X High Dust X

Sweep/Dust Mop Floors X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer tissue, towels)

Glass Cleaning:

Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:

Policing Grounds X Training Vehicles

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday.

“5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 53 Total SF Hangar Offices 2200ft² (Est.)

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X Clean Mirrors X Clean Sinks/Lavatories X Clean Showers X Clean Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.

“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 59 Total SF: 10,595ft² (Est.)

Swimming Pool

Frequency

As Needed

Daily 2x Daily

3x Daily

1/Wk 2/Wk 3x/Wk 1/Mo 1/Qtr

Routine Cleaning:

Entrance Mats X Sweep/Mop Floors X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Low Dusting X High Dusting X

Floor Care:

Sweep/Squeegee X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Floors X Clean/Disinfect Shower X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X

Glass Cleaning:

Interior Glass X Entrance Doors X Exterior Glass X Exterior Cleaning:

Outdoor Lawn Furniture X Policing Grounds X Pool Requirements:

Vacuum Pool X Water Testing (Chlorine, Bromine, pH) X Check Automatic Chlorination System – Add chemicals as necessary

Check Pool Temperature X Backwash Filters X Check CO2 Tanks X Clean hair and lint trap X Check Automatic Controller X X Wipe down stainless hardware X X Clean in-line pool filtration system X X Check bolts on lifeguard chairs, ladders, and diving boards

Inspect Eyewash Station X

Building No. 61 Total SF: 188,000ft² (Est.)

Classroom Complex / Guard Post / Govt & Contractor Staff Offices

Frequency

As Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Classroom Furniture/Equipment

X X

Low Dust X High Dust X Curtain Cleaning, Commercial** X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors X X Interior Glass X X Exterior Glass X X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday.

“2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday.

“1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

**Refers to curtains hanging in the auditorium.

Building No. 62-1 thru 62-5 Total SF: 2,500 each (Est.)

MAT Rooms & Locker Room

Frequency

As Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Clean Exercise Mats/Mat Rooms X X Low Dust X X High Dust X Odor Control X X

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Seams of Mats X X Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean/ Floors X Clean Showers X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.

“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.C.5.a.1.f.1 **Note – Mats should be cleaned after each class to include vacuuming and mopping/disinfecting.

Building No. 63-1, 63-3, 63-4, 63-6, 63-7, 63-9, 63-10, 63-12, 63-13, 63-15, 63-18,63-22, 63-23, 63-25, 63-26, 63-27, 63-28, 63-29, 63-30 Boat Boarding Platforms Total SF: 13@ 924 sf Each

Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans Clean Venetian Blinds X Clean Upholstery X Low Dust X High Dust X X Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff Strip/Wax/Buff Vacuum Carpet/Rugs X Spot Clean Carpets X Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer,tissue, towels)

X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.

“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 63-2, 63-5, 63-8, 63-11, 63-14, 63-24 Total SF: 5 @ 570 sf Each Classrooms

Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Upholstery Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpet/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions Clean Urinals/Commodes Clean Mirrors Clean Sinks/Lavatories Clean Showers Clean Floors Service Dispensers (Soap, hand sanitizer tissue, towels)

Glass Cleaning:

Entrance Doors Interior Glass Exterior Glass

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.

“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 63-16, 63-17, 63-21 Tactical Training Simulators – Conex Total SF: 3 @ 1,440 sf Each

Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean/Remove Training Simmunition Residue X X Low Dust High Dust

Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Carpet/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, tissue, towels) Glass Cleaning:

Entrance Doors X X Interior Glass X X Exterior Glass X X

Policing Grounds X X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.

“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 63-22, 63-23 Total SF: 2 @ 924sf Each

Needed

Daily

5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning/Disinfecting:

Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean/Remove Training Simmunition Residue X X All areas listed below to Disinfect X X Low Dust High Dust Floor Care:

Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Carpet/Rugs X X Spot Clean Carpets X X Steam Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, tissue, towels) X Glass Cleaning:

Entrance Doors X X Interior Glass X X Exterior Glass X X

Policing Grounds X X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.

“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2 (see list), or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer..

Building No. 64 Total SF Indoor Firing Range 44,000 sf (Est.)

Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Rest Room Cleaning:

Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean/ Showers X X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Indoor Range Cleaning:

Sweep/Dust Mop Floors (Concrete) X Damp Mop (Concrete) X Vacuum Range (HEPA Vacuum) X Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday.

“5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Monday “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A. *Interior Glass includes glass in range control tower.

Building No. 65 Total SF: 33,696 sf (Est.)

Physical Techniques Building

Frequency

As Needed

Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Odor Control X X Clean Venetian Blinds Low Dust X High Dust X Clean Ceiling Fans X Floor Care:

Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Clean/Service Equipment X X Clean exercise mats/Mat Rooms X X Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers X X Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)

X X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.

“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Note: Due to high volume of student activity all areas will need to be checked for cleanliness every two hours.

Building No. 169 Total SF: 600 sf (Est.)

Training House, Pier Q

Frequency As

Needed Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds Low Dust High Dust

Floor Care:

Sweep/Dust Mop Floors X Damp Mop Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets

Rest Room Cleaning:

Clean Walls/Partitions Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, tissue, towels)

Glass Cleaning:

Entrance Doors Interior Glass X Exterior Glass X

Exterior Cleaning:

Policing Grounds X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.

“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

Building No. 202 Total SF Skills Enhancement Training Building 38,000 sf (Est.)

Frequency As

Needed Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr

Routine Cleaning:

Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X

Floor Care:

Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets Steam Clean Carpets

Rest Room Cleaning:

Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers X Clean/Disinfect Floors X

Service Dispensers (Soap, hand sanitizer tissue, towels)

X X

Glass Cleaning:

Entrance Doors X Interior Glass X Exterior Glass X

Exterior Cleaning:

Policing Grounds X Training Vehicles X X

SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday.

“5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.

SOS Bldg 1
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 11
Frequency
SOS Bldg 16
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 17
Frequency
SOS Bldg 39
Dormitory Public Access Areas (rest rooms, lobby, lounges, laundry facilities etc.)
Frequency
SOS Bldg 43
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 46
Student Center & Gym
Frequency
SOS Bldg 46-A
Trainer’s office/therapy room and Medical office
Frequency
SOS Bldg 46-B
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 49
Frequency
SOS Bldg 53
Frequency
SOS Bldg 59
Frequency
Entrance Mats
Sweep/Squeegee
Clean Walls/Partitions
Interior Glass
Vacuum Pool
Check Automatic Chlorination System – Add chemicals as necessary
X
Check Pool Temperature
Check CO2 Tanks
Clean hair and lint trap
Check Automatic Controller
Wipe down stainless hardware
Clean in-line pool filtration system
SOS Bldg 61
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 62-1 thru 62-5
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 63-1 thru 63-30
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
Frequency
Frequency

Classrooms

SOS Bldg 63-22_63-23
Frequency
SOS Bldg 64
Frequency
SOS Bldg 65
Frequency
Entrance Mats
Damp Mop
Clean Walls/Partitions
SOS Bldg 169
Training House, Pier Q
Attachment C-8

Frequency

SOS Bldg 202
Frequency

File details come from the government source that posted it. Updated .