Attachment C-8_Schedule of Services Part 2.pdf
PDF 1 MB Posted
- Attached to
- Student Support/Facilities Operation Maintenance Services Federal contract opportunity
- Solicitation number
- 70LCHS25RPFB00001
About this file
This file is Attachment C-8, which contains detailed cleaning service schedules for multiple buildings at the Federal Law Enforcement Training Centers facility. The document outlines specific cleaning requirements and frequencies (As Needed, Daily, 5/Week, 2/Week, 1/Week, 1/Month, 1/Quarter, 2/Year, and 1/Year) for various buildings including dormitories, training facilities, gun cleaning rooms, classrooms, guard houses, and restroom facilities.
The schedules specify detailed cleaning tasks across categories including routine cleaning, floor care, restroom cleaning, glass cleaning, and exterior cleaning. Many facilities require specialized disinfecting procedures using EPA-registered products effective against Novel Coronavirus SARS-CoV-2. Square footage for the buildings ranges from 16 square feet for guard houses to over 52,000 square feet for dormitory spaces. Key cleaning requirements include entrance mats, waste containers, venetian blinds, floors, carpets, restroom facilities, windows, and grounds maintenance. The document provides specific guidelines for when services should be performed, such as daily services being Sunday through Saturday, 5/week services Monday through Friday, and various other scheduled frequencies throughout the year.
View the file
Other files for this federal contract opportunity
Show all 50
Student Support/Facilities Operation Maintenance Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Services
Building No. 230/Weapon Station Total SF: 800 sf (Est.)
FOSS Contractor Staff / Gun Cleaning Room
Frequency As
Needed Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets
Rest Room Cleaning:
Clean Walls/Partitions Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, tissue, towels)
Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X
Exterior Cleaning:
Policing Grounds X X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.
“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Attachment C-8
Federal Law Enforcement Training Centers Contract Number: 70LCHS25RPFB00002
Attachment C-8
Building No. 284 Total SF: 30,105 sf (Est.)
Dormitory (Wing 4) Public Access Areas
Frequency As
Needed Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X* X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Scotchguard/Clean Upholstery X X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X
Rest Room Cleaning:
Clean Walls/Partitions X Clean Urinals/Commodes X X X Clean Mirrors X Clean Sinks/Lavatories X X X Clean Showers X Clean Floors X X
Service Dispensers (Soap, hand sanitizer, tissue, towels)
X X X
Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X
Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.
“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. 285 Total SF: 52,100 sf (Est.)
Dormitory (Wing 5) Public Access Areas
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X* X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Scotchguard/Clean Upholstery X X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X X X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X X X Clean/Disinfect Showers X Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X X
Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday.
“5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A. Note – Additional dormitory service requirements, i.e., making the beds, changing linens, replenishing towels, etc. are described in Section C-5.B.5.b
Building No. 285 Total SF:616 sf (Est.)
Laundry Facility
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Rest Room Cleaning:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Ecoservices are to be performed once per week, i.e., Wednesday.
“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. 286 No Wake Zone, Deck and Surrounding Area Total SF 4,000 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Outdoor Furniture X Scotchguard/Clean Upholstery Low Dust High Dust Floor Care:
Sweep/Blow Decking X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets/Rugs X X Steam Clean Carpets Rest Room Cleaning:
Clean Walls/Partitions X X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers Clean/Disinfect Floors X X Service Dispensers (Soap, tissue, towels) X X Glass Cleaning:
Entrance Doors X X Interior Glass X X Exterior Glass X X Exterior Cleaning:
Policing Grounds X X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. 642A-C Total SF 16ft² ea. (Est.)
Access Control Gate Guard House(s)
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Wipe Down Walls X Wipe Down Countertops X Low Dust High Dust
Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors Interior Glass X Exterior Glass X
Policing Grounds X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed
Building No. 642 Total SF 5,354 sf (Est.)
Visitor Control Center
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers 2 Empty Ash Receptacles/Butt Cans 2 Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors 2 Damp Mop 2 Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:
Clean Walls/Partitions 2 Clean/Disinfect Urinals/Commodes 2 Clean Mirrors 2 Clean/Disinfect Sinks/Lavatories 2 Clean/Disinfect Showers 2 Clean/Disinfect Floors 2 Service Dispensers (Soap, hand sanitizer, tissue, towels)
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.
“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. 650 Total SF Shipping & Receiving Building 1500ft² (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Scotch guard/Clean Upholstery Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:
Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean Showers X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed
Building No. 654 Total SF: 1600 sf (Est.)
Conference Center
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.
“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. 654 Total SF: 9,453 sf (Est.)
MLEA Staff Offices
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors/Stairwells X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, tissue, towels) X Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday.
“1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. 677 Total SF Flying While Armed Training Venue 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Scotch guard/Clean Upholstery X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff Strip/Wax/Buff Vacuum Carpets/Rugs X X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning:
Clean Walls/Partitions Clean/Disinfect Urinals/Commodes Clean Mirrors Clean/Disinfect Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, tissue, towels) Glass Cleaning:
Entrance Doors Interior Glass X X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed
Building No. 682 Total SF 2,925 sf (Est.)
Maritime Instructional Offices/Classroom
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X All areas listed below to Disinfect X X Clean Venetian Blinds X Scotchguard/Clean Upholstery Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Rest Room Cleaning/Disinfecting:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed
Building No. 686 Total SF Tactical Training Center 12,180 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X Scotch guard/Clean Upholstery Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning:
Clean Walls/Partitions X Clean Urinals/Commodes X X Clean Mirrors X Clean Sinks/Lavatories X X Clean Showers X X Clean Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed
Building No. 700 Total SF 5,600ft² (Est.)
VFR/FWA
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X X Low Dust X X High Dust X
Floor Care:
Sweep/Dust Mop Floors Damp Mop Spray/Wax/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X X Spot Clean Carpets Steam Clean Carpets X Rest Room Cleaning:
Clean Walls/Partitions X X Clean/Disinfect Urinals/Commodes X X Clean Mirrors X X Clean/Disinfect Sinks/Lavatories X X Clean/Disinfect Showers X X Clean/Disinfect Floors X X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X X
Glass Cleaning:
Entrance Doors X X Interior Glass X X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed
Building No. 705 Total SF: 5,200ft² (Est.)
Driver Training Instructional Offices/Classrooms
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs X Spot Clean Carpets X Steam Clean Carpets X Bay/Garage Area – Sweep Floors X Rest Room Cleaning:
Clean Walls/Partitions X Clean Urinals/Commodes X Clean Mirrors X Clean Sinks/Lavatories X Clean Showers X Clean Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.
“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Raid House Neighborhood
Building No. 1842 Building No. 1843 Building No. 1844 Building No. 1845 Building No. 1846 Estimated SF Total 9821ft²
Needed
Daily
5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Vacuum Carpet Steam Clean Carpet Rest Room Cleaning:
Clean Walls/Partitions N/A Clean/Disinfect Urinals/Commodes N/A Clean Mirrors N/A Clean/Disinfect Sinks/Lavatories N/A Clean/Disinfect Floors N/A Service Dispensers (Soap, hand sanitizer tissue, towels)
N/A
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December.
“1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. Buildings Q1 and Q2 Total SF 2000 sf (Est.)
Pier Quebec
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Scotchguard/Clean Upholstery Low Dust High Dust
Floor Care:
Sweep/Blower Floors X Damp Mop Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning: (5 Port-O-Potties) Clean Walls/Partitions X X Clean Urinals/Commodes X X Clean Mirrors Clean Sinks/Lavatories Clean/Disinfect Showers Clean/Disinfect Floors Service Dispensers (Soap, hand sanitizer, tissue, towels)
Glass Cleaning:
Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September.
Exact Requirements are outlined in C-5.A.
Building No. FAD Range 1 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X Low Dust X High Dust X
Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Building No. FAD Range 3 Classroom Total SF: 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2 (see list), or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to:
handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 3 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 4 Classroom Total SF: 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2 (see list), or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to:
handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 5 Classroom Total SF: 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice
Building No. FAD Range 4 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice
Building No. FAD Range 5 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X X Empty Waste Containers X X Empty Ash Receptacles/Butt Cans X X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X X Interior Glass X Exterior Glass X required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice
Building No. FAD Range 6 Tower Total SF: 200 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors Interior Glass Exterior Glass required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range Restroom Total SF: 480 sf (Est.)
Frequency
As Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X Damp Mop X Spray/Buff Strip/Wax/Buff Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Rest Room Cleaning/Disinfecting:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, hand sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors Interior Glass Exterior Glass Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.”2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect: The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice machines, and common area phones. Disinfected surfaces should be allowed to air dry.
Building No. FAD Range 4/5 Gun Cleaning Room Total SF: 600 sf (Est.)
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Routine Cleaning/Disinfecting:
Entrance Mats X Empty Waste Containers X Empty Ash Receptacles/Butt Cans X Clean Venetian Blinds X All areas listed below to Disinfect X X Low Dust X High Dust X Floor Care:
Sweep/Dust Mop Floors X X Damp Mop X X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Steam Clean Carpets Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October. “2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed annually, i.e., September. Exact Requirements are outlined in C-5.A.
Disinfect The contractor shall wipe down all solid, high contact surfaces using a disinfectant from the EPA-registered list of products identified as effective against Novel Coronavirus SARS-CoV-2, or other product containing the same active ingredient(s) at the same or greater concentration than those on the list. Contractor shall use the product in accordance with directions provided by the manufacturer. Examples of solid, high contact or high touch surfaces include but are not limited to: handrails, door knobs, key cards, light switches, countertops, water faucets and handles, work surfaces, elevator buttons, sinks, toilets and control handles, restroom stall handles, toilet paper and other paper dispensers, door handles and push plates, water cooler and drinking fountain controls, ice
Building No. Restroom Facility Total SF 1000 sf (Est.)
Pier Quebec
Needed
Daily 5/Wk 2/Wk 1/Wk 1/Mo 1/Qtr 2/Yr 1/Yr
Space Cleaning:
Entrance Mats Empty Waste Containers Empty Ash Receptacles/Butt Cans Clean Venetian Blinds Scotchguard/Clean Upholstery Low Dust High Dust Floor Care:
Sweep/Blower Floors X Damp Mop X Spray/Buff X Strip/Wax/Buff X Vacuum Carpets/Rugs Spot Clean Carpets Rest Room Cleaning:
Clean Walls/Partitions X Clean/Disinfect Urinals/Commodes X Clean Mirrors X Clean/Disinfect Sinks/Lavatories X Clean/Disinfect Showers X Clean/Disinfect Floors X Service Dispensers (Soap, sanitizer, tissue, towels)
X
Glass Cleaning:
Entrance Doors X Interior Glass X Exterior Glass X Exterior Cleaning:
Policing Grounds X
SPECIAL REQUIREMENTS: “As Needed” – In addition to the daily requirement, these services may be required more frequently than others, i.e., if a spill occurs, waste containers overflowing, etc. “Daily” services are to be performed Sunday through Saturday. “5//Wk” services are to be performed once each day, Monday through Friday. “2/Wk” services are to be performed two times per week, i.e., Monday & Thursday. “1/Wk” services are to be performed once per week, i.e., Wednesday. “1/Mo” services are to be performed once per month, i.e., first Tuesday. “1/Qtr” services are to be performed quarterly, i.e., January, April, July, & October.
“2/Yr” services are to be performed semiannually, i.e., June & December. “1/Yr” services are to be performed
| SOS Bldg 230 |
| FOSS Contractor Staff / Gun Cleaning Room |
| Attachment C-8 |
Frequency
| SOS Bldg 284 |
| Frequency |
| Entrance Mats |
| Damp Mop |
| Clean Walls/Partitions |
| SOS Bldg 285-A |
| Dormitory (Wing 5) Public Access Areas |
| Frequency |
| SOS Bldg 285-B |
| Laundry Facility |
| Frequency |
| SOS Bldg 286 |
| Frequency |
| SOS Bldg 642 A-C |
| Access Control Gate Guard House(s) |
| Frequency |
| SOS Bldg 642 |
| Frequency |
| SOS Bldg 650 |
| Frequency |
| SOS Bldg 654-A |
| Frequency |
| Entrance Mats |
| Damp Mop |
| Clean Walls/Partitions |
| SOS Bldg 654-B |
| Frequency |
| Entrance Mats |
| Damp Mop |
| Clean Walls/Partitions |
| SOS Bldg 677 |
| Frequency |
| SOS Bldg 682 |
| Frequency |
| SOS Bldg 686 |
| Frequency |
| SOS Bldg 700 |
| Frequency |
| Entrance Mats |
| Damp Mop |
| Clean Walls/Partitions |
| SOS Bldg 705 |
| Frequency |
| SOS Bldg 1842_1843_1844_1845_1846 Raid Houses |
| Frequency |
| SOS Bldg Q1_Q2 Pier Quebec |
| Frequency |
| SOS FAD Range Towers and Classrooms |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| Frequency |
| SOS Restroom Facility @ Pier Q |
| Frequency |
File details come from the government source that posted it. Updated .