This document provides details for a federal contract opportunity to design and construct a parking structure at the William S. Middleton Memorial Veterans Hospital in Madison, Wisconsin. The Department of Veterans Affairs seeks a single firm-fixed-price contract with a Service-Disabled Veteran-Owned Small Business for design-build services including architectural, structural, civil, landscaping, mechanical, electrical and security systems work. The selected contractor will design and construct a approximately 350,000 square foot, 5-level precast concrete parking structure with approximately 900-1000 spaces, a new 3-bay truck dock facility and 6000 square foot storage and administrative space. The performance period is approximately 485 calendar days from notice to proceed. The solicitation will be issued in November 2021 with a North American Industry Classification System code of 236220 and size standard of $39.5 million.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAMADMicheG Rectangle
VHAMADMicheG Line
VHAMADMicheG Polygon
VHAMADMicheG Line
VHAMADMicheG Text Box Possible Elevated Corridor connection point (to Corridor on 3rd Floor).
VHAMADMicheG Line
VHAMADMicheG Text Box
PROPOSED AREA FOR NEW PARKING STRUCTURE:
*All power shutdowns and/or tie-ins that will affect hospital operations need to be scheduled during off-tour/weekends time periods at no additional costs to the VA.
*Should temporary/mobile generators be required to temporarily maintain hospital functions, all costs shall be by the DB Contractor.
*All lay down and staging areas for the job site shall be within the highlighted job site limits.
*All crane and large equipment mobilizations outside of the job site areas shall be accomplished during off-tour hours.
*This structure is not anticipated to provide any vertical or lateral future expansions.
VHAMADMicheG Line
VHAMADMicheG Text Box Projects by the City of Shorewood (Bus stop, walk-bridge, new stop lights) at the intersection of University Bay Drive and University Avenue are anticipated to potentially impact access at point(s) during the VA Parking Structure Project construction.
VHAMADMicheG Polygon
VHAMADMicheG Line