Attachment_9_-_2nd_Floor_Future.pdf
PDF 180 KB Posted
- Attached to
- Passenger Terminal Improvements
- Solicitation number
- 23-0146-RFP - CCNA - Non-Continuing
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is a 2nd floor architectural layout plan for the Ultimate Build-Out (PAL-3) of the St. Pete-Clearwater International Airport (PIE) in Florida. The floor plan illustrates a detailed design for the terminal's second floor, showing future expansion areas and current functional spaces. The plan includes color-coded sections representing different operational zones such as baggage claim, ticketing, public circulation, maintenance/support areas, and future airport operations spaces. The drawing provides a comprehensive overview of the proposed terminal improvements, indicating planned modifications and expansions to enhance the airport's infrastructure and passenger experience.
The layout demonstrates a strategic approach to airport terminal design, with careful consideration of spatial allocation and flow. The color legend reveals planned areas for future airport operations, including security checkpoints, office/airline spaces, and support storage areas. The plan notes "Drawing Not to Scale" and includes a compass orientation, suggesting this is a conceptual and planning-stage document. The design appears to be part of a broader terminal expansion project that aims to improve passenger services, operational efficiency, and accommodate future growth at the St. Pete-Clearwater International Airport.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .