Attachment_8_-_1st_Floor_Future.pdf

PDF 942 KB Posted

Attached to
Passenger Terminal Improvements
Solicitation number
23-0146-RFP - CCNA - Non-Continuing
Issued by
Pinellas County, Clewiston City, Florida

About this file

The document is a floor plan schematic titled "Ultimate Build-Out (PAL-3) - 1st Floor" for the St. Pete-Clearwater International Airport (PIE) in Florida, detailing the proposed future layout of the passenger terminal. The plan shows a comprehensive redesign of the first floor, including key areas such as Baggage Claim, Ticketing "B", and various airport operations spaces. The color-coded layout indicates future expansions and modifications for different functional zones including security checkpoints, public circulation, maintenance and support areas, and administrative spaces.

The floor plan reveals a strategic approach to terminal improvement, with designated areas for future airport operations, security, and passenger services. The schematic includes color-coded sections for existing and future spaces, demonstrating a phased approach to terminal expansion. Areas such as rental car facilities, baggage handling, and public circulation are carefully integrated into the design. The plan appears to be part of a broader terminal improvement project aimed at enhancing passenger experience and operational efficiency at the St. Pete-Clearwater International Airport.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .