The document is a floor plan schematic titled "Ultimate Build-Out (PAL-3) - 1st Floor" for the St. Pete-Clearwater International Airport (PIE) in Florida, detailing the proposed future layout of the passenger terminal. The plan shows a comprehensive redesign of the first floor, including key areas such as Baggage Claim, Ticketing "B", and various airport operations spaces. The color-coded layout indicates future expansions and modifications for different functional zones including security checkpoints, public circulation, maintenance and support areas, and administrative spaces.
The floor plan reveals a strategic approach to terminal improvement, with designated areas for future airport operations, security, and passenger services. The schematic includes color-coded sections for existing and future spaces, demonstrating a phased approach to terminal expansion. Areas such as rental car facilities, baggage handling, and public circulation are carefully integrated into the design. The plan appears to be part of a broader terminal improvement project aimed at enhancing passenger experience and operational efficiency at the St. Pete-Clearwater International Airport.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .