Attachment_1_-_PIE_Master_Plan_-_March_2021.pdf
PDF 195 MB Posted
- Attached to
- Passenger Terminal Improvements
- Solicitation number
- 23-0146-RFP - CCNA - Non-Continuing
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
The document is a Master Plan for St. Pete-Clearwater International Airport (PIE) dated March 2021, prepared for Pinellas County, Florida. The master plan outlines a comprehensive strategy for terminal expansion and airport development, focusing on enhancing passenger facilities and improving overall airport infrastructure. The plan appears to provide a strategic roadmap for future airport growth, addressing potential capacity increases, facility improvements, and long-term operational needs. While specific design details are not fully elaborated in this summary view, the document is clearly aligned with the related state and local contract opportunity for passenger terminal improvements.
The master plan likely includes critical components such as projected passenger traffic, potential terminal layout modifications, infrastructure upgrades, and phased development strategies. The timing of the document (March 2021) suggests it was developed in anticipation of the current terminal expansion project, providing a foundational planning document to guide the architectural and engineering efforts. Though precise financial specifics are not visible in this overview, the plan is presumably intended to support the airport's strategic objectives of enhancing passenger experience, increasing operational efficiency, and preparing for future growth in air travel demand at the St. Pete-Clearwater International Airport.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .