ATTACHMENT 7 Unit Price Sheet.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- RFP 26-023: PRE-QUALIFY VENDORS
- Solicitation number
- RFP 26-023-336-RFP-3062-2027
- Issued by
- Iowa
About this file
This is a Unit Price Sheet attachment for RFP 26-023 issued by the Iowa Communications Network (ICN), a program of the Iowa Telecommunications and Technology Commission, establishing pre-qualification of vendors to provide telecommunications outside plant services across five designated zones within Iowa. The RFP seeks to pre-qualify three vendors per zone for on-call service delivery including horizontal boring, handhole placement, fiber installation, plowing, trenching, rock boring, rock sawing, bridge and building attachments, asphalt and concrete work, interior duct installation, aerial maintenance services, and splicing labor. Vendor proposals are due November 6, 2026 at 3:00 PM CST. Written questions must be submitted by October 5, 2026 at 4:00 PM central time, with responses provided by October 7. No bidder's conference has been scheduled. All bid proposals remain firm for 120 days, with award potentially made more than 90 days after opening and negotiation and acceptance to be completed within 60 days of Notice of Intent to Award if no appeals are filed.
The unit price sheet requires vendors to provide hourly rates, per-linear-foot rates, per-unit rates, and lump-sum rates across multiple service categories, with rates differentiated by geographic area classifications (Rural, Residential, and Urban). The RFP specifies that this is a qualification-based procurement where the ICN will not necessarily award to the lowest-cost vendor but to the most responsible vendor offering best value after evaluating price and compliance with all RFP provisions. Vendors must provide all labor and materials required for proper installation unless otherwise specified, with contractor-provided materials including HDPE conduit, duct splices, grounding and tracer wires, rock, wire mesh, and other installation materials. Proposals must include one original and one copy on 8.5" x 11" paper plus one soft copy on USB drive with Word/PDF documents and the Unit Price Sheet in native Microsoft Excel format, clearly marked with RFP 26-023 on the outer envelope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1440941-event.pdf | ||
| 26-023 RFP Document.docx | DOCX document | |
| ATTACHMENT 4 Bid Proposal Submittal Form.docx | DOCX document | |
| ATTACHMENT 1 Contractual Terms and Conditions Sample Agreement.docx | DOCX document | |
| ATTACHMENT 5 Vendor Qualifications and Business Information.docx | DOCX document | |
| ATTACHMENT 6 Zone Bid Form.docx | DOCX document | |
| ATTACHMENT 3 Authorization to Release Information.docx | DOCX document | |
| ATTACHMENT 2 Bid Proposal Compliance Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT RATES
| ATTACHMENT 7 |
| UNIT PRICE SHEET |
| RFP XX-XXX |
| VENDOR: |
Vendor to provide unit rates below. Please note language describing unit rate inclusions for labor and materials required to complete service as requested at unit rate provided. Labor rates only unless specifically stated vendor provided materials (typically rock, mesh screen, etc.) All rates must be filled out with dollar amount or NA. If vendor is unable to perform, please indicate with NA in the Rate line item
| Horizontal Boring | ||
| These units include, but are not limited to, locating all existing utilities, installation of the following item or items by conventional dirt drill directional boring methods to a depth of 42" or greater as determined by the ICN Construction Manager, the excavation, backfilling, and compacting of bore pits, restoration to equal or better condition than original, and all other operations required for installation. | ||
| UNIT | RATE | |
| Rural 1 ea 1.25" conduit | LF | |
| Rural 2 ea 1.25" conduit | LF | |
| Rural 1 ea 2" conduit | LF | |
| Rural 2 ea 2" conduit | LF | |
| Rural 3 ea 2" conduit | LF | |
| Rural 1 ea 4" conduit | LF | |
| Rural 1 ea 2" GIP | LF | |
| Rural 2 ea 2" GIP | LF | |
| Residential 1 ea 1.25" conduit | LF | |
| Residential 2 ea 1.25" conduit | LF | |
| Residential 1 ea 2" conduit | LF | |
| Residential 2 ea 2" conduit | LF | |
| Residential 3 ea 2" conduit | LF | |
| Residential 1 ea 4" conduit | LF | |
| Residential 1 ea 2" GIP | LF | |
| Residential 2 ea 2" GIP | LF | |
| Urban 1 ea 1.25" conduit | LF | |
| Urban 2 ea 1.25" conduit | LF | |
| Urban 1 ea 2" conduit | LF | |
| Urban 2 ea 2" conduit | LF | |
| Urban 3 ea 2" conduit | LF | |
| Urban 1 ea 4" conduit | LF | |
| Urban 1 ea 2" GIP | LF | |
| Urban 2 ea 2" GIP | LF |
| Handhole Placement | UNIT | RATE |
| These units include, but are not limited to, locating all existing utilities, installation of the following item or items by potholing to verify the suitability of the location for placement, excavation to the required depth for bedding materials and handhole, backfill, compaction, flush mounted lids, restoration of ROW to equal or better than original. Contractor supplied bedding material and screen, all other operations required for installation per ICN handhole typical. Concrete manhole set within paved areas will be negotiated due to varying conditions. | ||
| Rural Std 24x36x30 | EA | |
| Rural Std 24x36x36 | EA | |
| Rural Lg 48x30x36 | EA | |
| Rural XL 72x30x18 | EA | |
| Residential Std 24x36x30 | EA | |
| Residential Std 24x36x36 | EA | |
| Residential Lg 48x30x36 | EA | |
| Residential XL 72x30x18 | EA | |
| Urban Std 24x36x30 | EA | |
| Urban Std 24x36x36 | EA | |
| Urban Lg 48x30x36 | EA | |
| Urban XL 72x30x18 | EA | |
| Raise existing handhole to grade (up to 3-ft deep, to lid) | EA | |
| Remove and Recover existing handhole (up to 3-ft deep, to lid) | EA |
| Fiber Installation | UNIT | RATE |
| These units include, but are not limited to, installation of fiber optic cable within HDPE, PVC, G.I.P. or other standard conduit (including rodding and roping, as required) | ||
| Existing Duct Rural | LF | |
| Existing Duct Residential | LF | |
| Existing Duct Urban | LF | |
| New Duct Rural | LF | |
| New Duct Residential | LF | |
| New Duct Urban | LF | |
| Pull each additional Fiber Rural | LF | |
| Pull each additional Fiber Residential | LF | |
| Pull each additional Fiber Urban | LF | |
| Blow through existing duct | LF | |
| Existing cable removal within conduit | LF | |
| Urban Lower Cable 36" to 120" | LF |
| Plowing | UNIT | RATE |
| These units include, but are not limited to, locating all existing utilities, direct burying the specific item to a minimum depth of 42" compacting and leveling the plow slot, installation of warning signs, placing warning tape 12" below grade, replacing all items removed for plow operations, and restoration to equal or better condition than original, and all other operations required for installation. Contractor provided conduit to be quoted separately. | ||
| Rural Direct Bury Armored Cable | LF | |
| Rural Plow 1 ea 1.25" Duct | LF | |
| Rural Plow 2 ea 1.25" Duct | LF | |
| Rural Plow 3 ea 1.25" Duct | LF | |
| Rural Plow 1 ea 2" Duct | LF | |
| Rural Plow 2 ea 2" Duct | LF | |
| Rural Plow 3 ea 2" Duct | LF | |
| Residential Direct Bury Armored Cable | LF | |
| Residential Plow 1 ea 1.25" Duct | LF | |
| Residential Plow 2 ea 1.25" Duct | LF | |
| Residential Plow 3 ea 1.25" Duct | LF | |
| Residential Plow 1 ea 2" Duct | LF | |
| Residential Plow 2 ea 2" Duct | LF | |
| Residential Plow 3 ea 2" Duct | LF | |
| Urban Direct Bury Armored Cable | LF | |
| Urban Plow 1 ea 1.25" Duct | LF | |
| Urban Plow 2 ea 1.25" Duct | LF | |
| Urban Plow 3 ea 1.25" Duct | LF | |
| Urban Plow 1 ea 2" Duct | LF | |
| Urban Plow 2 ea 2" Duct | LF | |
| Urban Plow 3 ea 2" Duct | LF |
| Trenching | UNIT | RATE |
| These units are utilized where existing conditions prohibit the use of other installation methods, i.e. plow or bore, as determined by the ICN Construction Manager. These units include, but are not limited to, locating all existing utilities, excavating a trench to provide a minimum of 42" cover over the item placed, placing warning tape and signs, backfilling, compacting, and all other operations necessary to restore the area to original or better condition | ||
| Rural Open Trench | LF | |
| Rural Trench--Cable or One Duct | LF | |
| Rural Trench--Two Ducts | LF | |
| Rural Trench--Three Ducts | LF | |
| Residential Open Trench | LF | |
| Residential Trench--Cable or One Duct | LF | |
| Residential Trench--Two Ducts | LF | |
| Residential Trench--Three Ducts | LF | |
| Urban Open Trench | LF | |
| Urban Trench--Cable or One Duct | LF | |
| Urban Trench--Two Ducts | LF | |
| Urban Trench--Three Ducts | LF |
| Rock Boring - Dirt drill w/rock housing, mud motor, or air hammer | UNIT | RATE |
| These units include, but are not limited to, locating all existing utilities, installation of the following item or items by conventional dirt drill with rock attachment methods to a depth of 42" or greater as determined by the ICN Construction Manager, the excavation, backfilling, and compacting of bore pits, restoration to equal or better condition than original, and all other operations required for installation. | ||
| Rural 1 ea 1.25" Conduit | LF | |
| Rural 2 ea 1.25" Conduit | LF | |
| Rural 1 ea 2" Conduit | LF | |
| Rural 2 ea 2" Conduit | LF | |
| Rural 3 ea 2" Conduit | LF | |
| Rural 1 ea 4" Conduit | LF | |
| Rural 1 ea 2" GIP | LF | |
| Rural 2 ea 2" GIP | LF | |
| Residential 1 ea 1.25" Conduit | LF | |
| Residential 2 ea 1.25" Conduit | LF | |
| Residential 1 ea 2" Conduit | LF | |
| Residential 2 ea 2" Conduit | LF | |
| Residential 3 ea 2" Conduit | LF | |
| Residential 1 ea 4" Conduit | LF | |
| Residential 1 ea 2" GIP | LF | |
| Residential 2 ea 2" GIP | LF | |
| Urban 1 ea 1.25" Conduit | LF | |
| Urban 2 ea 1.25" Conduit | LF | |
| Urban 1 ea 2" Conduit | LF | |
| Urban 2 ea 2" Conduit | LF | |
| Urban 3 ea 2" Conduit | LF | |
| Urban 1 ea 4" Conduit | LF | |
| Urban 1 ea 2" GIP | LF | |
| Urban 2 ea 2" GIP | LF |
| Rock Boring - Dual Rod Rock Drill | UNIT | RATE |
| These units include, but are not limited to, locating all existing utilities, installation of the following item or items by directional boring methods to a depth of 42" or greater within rock as determined by the ICN Construction Manager, the excavation, backfilling, and compacting of bore pits, restoration to equal or better condition than original, and all other operations required for installation. Rock Bore Definition: Defined by ICN where an All-Terrain Horizontal Directional Drilling machine with dual drill pipe, bits, housings, and back reamers—designed specifically for rock applications are required to complete the boring operation. Experienced operators capable of utilizing this equipment are also required. The ICN expects that the bidder owns and is able to operate the described equipment. | ||
| Rural 1 ea 1.25" Conduit | LF | |
| Rural 2 ea 1.25" Conduit | LF | |
| Rural 1 ea 2" Conduit | LF | |
| Rural 2 ea 2" Conduit | LF | |
| Rural 3 ea 2" Conduit | LF | |
| Rural 1 ea 4" Conduit | LF | |
| Rural 1 ea 2" GIP | LF | |
| Rural 2 ea 2" GIP | LF | |
| Residential 1 ea 1.25" Conduit | LF | |
| Residential 2 ea 1.25" Conduit | LF | |
| Residential 1 ea 2" Conduit | LF | |
| Residential 2 ea 2" Conduit | LF | |
| Residential 3 ea 2" Conduit | LF | |
| Residential 1 ea 4" Conduit | LF | |
| Residential 1 ea 2" GIP | LF | |
| Residential 2 ea 2" GIP | LF | |
| Urban 1 ea 1.25" Conduit | LF | |
| Urban 2 ea 1.25" Conduit | LF | |
| Urban 1 ea 2" Conduit | LF | |
| Urban 2 ea 2" Conduit | LF | |
| Urban 3 ea 2" Conduit | LF | |
| Urban 1 ea 4" Conduit | LF | |
| Urban 1 ea 2" GIP | LF | |
| Urban 2 ea 2" GIP | LF |
| Rock Sawing | UNIT | RATE |
| These units include, but are not limited to, locating all existing utilities, installation of the following item or items by rock sawing methods to a depth of 42" or greater within rock as determined by the ICN Construction Manager, restoration to equal or better condition than original, and all other operations required for installation. | ||
| Rural 36-42 inches | LF | |
| Rural depth over 42 inches | LF | |
| Residential 36-42 inches | LF | |
| Residential depth over 42 inches | LF | |
| Urban 36-42 inches | LF | |
| Urban depth over 42 inches | LF |
| Bridge and Building Attachments | UNIT | RATE |
| These units include, but are not limited to, locating all existing utilities, installation of the following item or items by constructing bridge or building attachments. Materials to be provided by contractor and included in rate. | ||
| Rural Core Bore / Seal Up to 2" | EA | |
| Residential Core Bore / Seal Up to 2" | EA | |
| Urban Core Bore / Seal Up to 2" | EA | |
| Rural Core Bore / Seal 4" and larger | EA | |
| Residential Core Bore / Seal 4" and larger | EA | |
| Urban Core Bore / Seal 4" and larger | EA | |
| Rural Ext Bldg Attachment 3" GIP & Pull Box | EA | |
| Residential Ext Bldg Attachment 3" GIP & Pull Box | EA | |
| Urban Ext Bldg Attachment 3" GIP & Pull Box | EA | |
| Rural Bridge Attachments | LF | |
| Residential Bridge Attachments | LF | |
| Urban Bridge Attachments | LF |
| Asphalt & Concrete | UNIT | RATE |
| These units include but are not limited to the locating of all existing utilities, cutting and restoring pavement to grade per the original conditions and pavement thickness as required by the governing local authority, including the backfill and compaction of all base materials, and restoration to equal or better condition than original for surrounding area. | ||
| Asphalt Rural | Sq Ft | |
| Asphalt Residential | Sq Ft | |
| Asphalt Urban | Sq Ft | |
| Concrete Rural | Sq Ft | |
| Concrete Residential | Sq Ft | |
| Concrete Urban | Sq Ft |
| Interior Duct Installation | UNIT | RATE |
| These units include, but are not limited to, locating all existing utilities, installation of the following item or items by installation of interior conduit. Materials to be provided by contractor and included in rate. | ||
| Rural Plenum Duct | LF | |
| Residential Plenum Duct | LF | |
| Urban Plenum Duct | LF | |
| Rural 2" EMT and Int Pull Boxes | LF | |
| Residential 2" EMT and Int Pull Boxes | LF | |
| Urban 2" EMT and Int Pull Boxes | LF |
| Miscellaneous | UNIT | RATE |
| Clear/Restore Right-of-Way | LF | |
| Grubbing | LF | |
| Place Warning Marker-Rural | EA | |
| Place Warning Marker-Residential | EA | |
| Place Warning Marker-Urban | EA | |
| Prep for Locate Ped-Rural | EA | |
| Prep for Locate Ped-Residential | EA | |
| Prep for Locate Ped-Urban | EA | |
| Material Pick Up (from ICN offices at Grimes Building) | EA | |
| QA Personnel | HR | |
| Project Consultation | HR | |
| Permitting/Easements | EA | |
| Backhoe/Mini Excavator (including operator) | HR | |
| Trackhoe Excavator (including operator) | HR |
| Mobilization | UNIT | RATE |
| Mobilization rates are based on three distinct categories based upon what equipment and personnel are required for a specific project. Two fees apply to each project: A base dispatch fee covering the administrative dispatch, physical loading, securing of equipment, and unloading at the site; Travel distance billed separately via the mileage adder. | ||
| Tier 1 - Service Vehicle (Truck & Tech Only) | LS | |
| Definition: Round-trip deployment of a single technician in a standard pickup truck or service van without a towed trailer. Applicable for scopes such as GPS data collection, placing warning markers, site surveys, or visual inspections. | ||
| Tier 2 - Light/Standard Duty (truck & trailer) | LS | |
| Definition: Round-trip deployment of a standard crew and equipment towable by a standard work truck (e.g., mini-excavators, splicing labs, small trenchers, bucket trucks). | ||
| Tier 3 - Heavy Duty (Semi/Lowboy required) | LS | |
| Definition: Round-trip deployment requiring heavy hauling / lowboy transport (e.g., directional bore rigs, large vibratory plows, track hoes). | ||
| Emergency Call-Out | LS | |
| Definition: An additional flat fee applied to any mobilization tier if the vendor is dispatched for emergency repair (e.g., fiber cut) requiring an immediate response or outside normal business hours. | ||
| Tier 1 - Mobilization Mileage Adder | Per Mile | |
| Definition: Standard service vehicle. Per mile rate based on a distance from vendor site to project site. Mileage adder will be calculated on a one-time, round trip basis. | ||
| Tier 2 - Mobilization Mileage Adder | Per Mile | |
| Definition: Light/Standard Duty. Per mile rate based on a distance from vendor site to project site. Mileage adder will be calculated on a one-time, round trip basis. | ||
| Tier 3 - Mobilization Mileage Adder | Per Mile | |
| Definition: Heavy Duty/Lowboy. Per mile rate based on a distance from vendor site to project site. Mileage adder will be calculated on a one-time, round trip basis. |
| Data Collection and Documentation | UNIT | RATE |
| The Vendor shall provide all labor, equipment, transportation, and software necessary to capture accurate GPS coordinate data (Latitude, Longitude, and Elevation) for designated existing outside plant (OSP) fiber optic infrastructure. Accuracy: Survey-grade equipment achieving sub-foot or sub-meter accuracy. Route Capture: Continuous route data at maximum intervals of 25-ft and at every change in direction, depth, or elevation. Feature Capture: Discrete structures must be captured at their center-point. Deliverables: Final data must be submitted in either ESRI Shapefile or KMZ format. | ||
| Bore Logging (continuous HDD profile data collection) | LF | |
| GPS Capture - discrete OSP structure (Handhole, Pedestal, etc.) - Sub-foot | EA | |
| GPS Capture - discrete OSP structure (Handhole, Pedestal, etc.) - Sub-meter | EA | |
| GPS Capture - continuous route data - Sub-foot | LF | |
| GPS Capture - continuous route data - Sub-meter | LF | |
| Post-construction As-Built Documentation (typ. PDF format) | EA |
| Aerial Maintenance Services | UNIT | RATE |
| Aerial Crew Mobilization | HR | |
| Aerial Crew -Hourly Rate | HR | |
| Pole Transfer - Straight Through | EA | |
| Pole Transfer - Not Straight Thru - Re-framing | EA | |
| Cable Tagging per Pole (install cable identification tags on existing cable) | EA | |
| Riser Guard Installation PVC 1 1/2"-2" up to 15' | EA | |
| Remove/Replace Existing Riser Guard | EA | |
| Relocate Aerial Slack - Strand/Lash or ADSS: distance based on length of move | LF | |
| Wreck-Out of Strand/Lash or ADSS cable - including disposal | LF | |
| Replace or New Anchor/Down Guy (contractor supplied materials) | EA |
| Splicing Labor | UNIT | RATE |
| These units are for labor related to splicing. Fusion Splicing should be quoted on a per individual fusion splice (not per cable), EA meaning each strand. | ||
| Splicing Mobilization | LS | |
| Prep Splice Closure | EA | |
| Fusion Splicing 1-12 fibers | EA | |
| Fusion Splicing 13-24 fibers | EA | |
| Fusion Splicing 25-36 fibers | EA | |
| Fusion Splicing 37-48 fibers | EA | |
| Fusion Splicing 49-144 fibers | EA | |
| Fusion Splicing 145+ fibers | EA | |
| FDP/WIC Setup | EA | |
| Mid-sheath Cable Preparation | EA | |
| Unicam/Field-installable Connectors | EA | |
| Off Hours Charge | LS | |
| OTDR Testing 1-12 fibers | EA | |
| OTDR Testing 13-24 fibers | EA | |
| OTDR Testing 25-36 fibers | EA | |
| OTDR Testing 37-48 fibers | EA | |
| OTDR Testing 49-144 fibers | EA | |
| OTDR Testing 145+ fibers | EA |
| NOTES ON VENDOR PROVIDED MATERIALS REQUIREMENTS: |
| HDPE CONDUIT AND SPLICES: |
| 1. HDPE shall be Orange, Smooth Wall, SDR 13.5 |
| 2. Duct Splices shall be made of the following (in order of preference): |
| -Electrofusion |
| -Crimp On |
| -Clamp On/Bolt On (split couplings) |
| -Push On |
| 3. All splices shall be air and water tight |
| 4. Duct splices shall be of a type made specifically for joining HDPE Conduit |
| 5. All duct splices shall be made in such a manner as to allow continuous pulling of cable through duct. |
| OSP FIBER CABLE |
| Single Mode, Single Armor, Gel Free, Loose Tube OSP cable (12-strand minimum, refer to Materials) |
| Tensile Strength: 600 lb short term |
| Attenuation: 0.35/0.25 dB at 1310/1440 nm |
| HANDHOLE(S): |
| Polymer Concrete (Quazite, New Basis, Martin, e.g.) 24"x36"x30" Tier 15 |
| Hybrid Polymer Concrete - Fiberglass (Oldcastle FRP, e.g.) 24"x36"x30" Tier 15 |
| *OTHER CONTRACTOR PROVIDED MATERIAL(S): |
| Contractor shall supply all other materials required for proper installation, including but not limited to: HDPE, Duct Splices, Grounding and Tracer Wires, Rock, Wire Mesh, etc. |
ANY EXCEPTIONS MUST BE AGREED UPON IN WRITING PRIOR TO CONSTRUCTION.
Page &P
File details come from the government source that posted it. Updated .