Attachment 7 - QASP.docx

DOCX document 32 KB Posted

Attached to
Industrial Hygiene and Ergonomic Program Support Services
Solicitation number
SP3300-25-Q-0034
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract opportunity. The QASP outlines the Government's plan to ensure the Contractor provides the required industrial hygiene and ergonomic program support services as specified in the Performance Work Statement (PWS). The key details include:

The COR will monitor Contractor performance through Government inspections and review of reports to ensure compliance with contract terms and identify any nonconforming services. Inspections will be conducted on a pass/fail basis, and the Contractor will be required to correct any deficiencies noted. The QASP defines the performance measures, surveillance methods, and procedures the Government will use to assess the Contractor's timeliness and quality of services across various PWS requirements such as IH support, meetings, emergent support, asbestos consultation, and the respirator protection program. The COR will document inspection results and notify the Contracting Officer of any Contractor non-responsiveness or unacceptable performance for appropriate action.

View the file

Other files

File Type Posted
SP3300-25-Q-0034 - Amendment 0002.docx DOCX document
SP3300-25-Q-0034 - Amendment 0001.docx DOCX document
Attachment 1 - Performance Work Statement.docx DOCX document
Attachment 5 - IH Implementation Plan.docx DOCX document
Attachment 4 - Scheduled Emergent Events.pdf PDF
Attachment 6 - IH Risk Assessment Codes.docx DOCX document
SP3300-25-Q-0034.doc DOC document
Attachment 3 - Contractor Supplied IH Field Supplies.xls XLS spreadsheet
Attachment 8 - Schedule of Services.xlsx XLSX spreadsheet
Attachment 2 - CAC Procedures.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7

QUALITY ASSURANCE SURVEILLANCE PLAN

A. The Quality Assurance Surveillance Plan (QASP) is the Government’s plan to ensure the Contractor provides the required support services and adheres to the quality standards as specified in the Performance Work Statement (PWS). Both the Contractor and the Government will agree to the terms of the contract. During the life of the contract, administrative procedures such as inspections, documentation and retention of records, which reflect the Contractor’s performance, will be retained.

B. The Contractor shall also maintain all records of performance for a minimum of six (6) months after the completion of this contact.

C. The Contracting Officer’s Representative (COR) will monitor performance to ensure services are received and carried out in accordance with the standards set forth in the PWS. This monitoring shall be done via Government inspection and review of the various reports and documentation generated in performance of the support requirements. This QASP will be used to monitor compliance with contract terms and conditions, identify nonconforming services to determine appropriate action. This plan sets forth the method and manner by which the Government intends to conduct surveillance of work under the contract and is subject to the unilateral change by the Government without modification of the contract. All work required by the contract is subject to surveillance whether or not specifically included in the plan. When the Contractor performance fails to achieve the acceptable performance standards and is clearly the fault of the Contractor, the COR will prepare a Contract Discrepancy Report (CDR) and forward it to the Contracting Officer (KO) to issue to the Contractor. In response to the CDR, the Contractor shall explain within seven working days, in writing, why performance was unacceptable, how performance will be returned to acceptable standards and how recurrence of the problem will be prevented in the future. The KO will evaluate the Contractor’s explanation and determine the appropriate action(s).

1. Inspections: The COR is responsible for technical oversight of the Contractor’s performance. The COR’s duties shall include, but are not limited to, assurance of the completion of work in a quality manner, resolution of quality concerns, and payment for services rendered. This responsibility includes the determination of adequacy of services performed by the contractor in accordance with the terms and conditions of the contract. The COR will perform inspections on behalf of the Government and will confer with the Contractor regarding any problems encountered in the performance of the work.

2. Deficiencies: Once an inspection has been conducted, the Contractor and KO will be notified via electronic mail of its results. Inspections will be documented on a pass/fail basis. When a failed inspection occurs, the Contractor shall be allowed the time to correct all noted deficiencies. The Contractor should resolve the deficiencies as documented by the COR in the failed inspection report. The COR will perform a re-inspection and further assess the area or item of concern once again on a pass/fail basis.

3. Re-Performance of Work: When the Contractor re-performs services as a result of the inspections defined in this section, and the Contractor does not meet the standards identified in the PWS, the Government may desire that the work be re-performed prior to the completion of the contract. If this is the case, the Contractor shall perform the service at no additional cost to the Government.

4. Performance Measures. Performance Measures will be assessed on a Pass and Fail Grading System as defined below:

Rating
Definitions
Pass
When performance complies with the PWS
Fail
When performance does not comply with the PWS

D. Method of Surveillance. There are various surveillance methods used to monitor contract performance and compliance. When selecting the appropriate method, the COR will take into consideration task criticality, task complexity, time availability, and mission requirements. The following methods of surveillance will be used to assess contract performance under this contract:

1. Periodic Surveillance (daily, weekly, monthly, quarterly, etc.) of Contractor performance, reports and other deliverable documentation will be conducted by the COR. The COR will determine the frequency necessary to ensure the Contractor’s performance and work product complies with the standards set forth in the PWS.

2. Customer Complaints will be used by the COR to evaluate Contractor performance. Upon receipt of a customer complaint, the COR will conduct an investigation to validate the complaint and to confirm whether the Contractor’s reported performance constituted a discrepancy.

E. Procedures. The COR will perform inspections to ensure Contractor compliance with the appropriate paragraphs in the PWS, other government requirements, and the Contractor’s own procedures, and will record the results of the inspections, noting the date and time. If inspection indicates a performance standard is not met, the KO will notify the Contractor of the deficiency for correction. The Contractor will be given a reasonable time after notification to correct the unacceptable performance. The length of time allowed to correct the problem will depend upon the requirement, complexity of corrective action(s) and the deficiency. The Contractor will notify the KO if the time allowed for correction is not adequate. The COR will not consider the correction action(s) until all deficiencies have been corrected and determined by the COR to be adequate (Government follow-up). Contractor non-responsiveness, deficiencies not adequately addressed or corrected after notification of such, or estimated dates of completion that are not acceptable to the COR will be forwarded to the KO for action.

F. The chart below provides timely and quality performance standards for specific requirements already stated in the PWS:

CUI

SP3300-25-Q-0034

Page of

TIMELINESS AND QUALITY

PWS

Paragraph Reference

Performance Objective
Performance Standard
Method of Surveillance
1.1.A
IH support services
Contractor provides
COR
the IH personnel
surveillance

required to perform

the tasks identified
Customer
in the PWS.
complaints
5.1.B.
Meetings
Contractor medical personnel meets with COR weekly
COR

surveillance

5.1.A.
Scheduling IH services
Contractor contacts
COR
service requested
surveillance

within 1 workday

of the request.
Customer

complaints

5.1.B.
Meetings
Contractor IH personnel
COR
Attend meetings as
surveillance

Specified in the PWS

5.2.1.A.
Emergent IH Support
Contractor provides
COR
IH support for
surveillance

emergent issues and

provides written report
Customer
within the time specified
complaints

in the PWS

5.2.1.C.
Asbestos
Contractor
COR
provides asbestos
surveillance

consultation

support as
Customer
specified in the
complaints

PWS

5.2.1.H
IH based Employee
Contractor
COR
Complaints
investigates
surveillance

Government

personnel
Customer
complaints within
complaints

1 workday of receipt.

5.2.2
IH Implementation
Contractor submits and
COR
Plan
implements the plan
surveillance

within 30 calendar days

After contract award
Customer

complaints

5.2.3
IH Training
Contractor
COR
conducts IH
surveillance

training as

specified in the
Customer
PWS.
complaints
5.2.4.C.
Respirator Protection
Contractor
COR
Program
administers the
surveillance

respirator

protection
Customer
program as
complaints

specified in the

PWS.

5.2.4.D.
Personal Protective
Contractor
COR
Equipment (PPE)
evaluates work
surveillance
Program
site operations,
provides
Customer
recommendations
complaints

for operational changes and/or

PPE.

5.2.4.E.
Confined Space
Contractor
COR
Program
administers the
surveillance

confined space

program IAW
Customer
regulatory
complaints

requirements.

5.2.4.F.
Hearing
Contractor
COR
Conservation
administers the
surveillance
Program
hearing
conservation
Customer
program IAW
complaints

regulatory requirements.

5.2.C-6.F
Customer Service
Contractor consistently meets customer/co-worker expectations
COR Surveillance

Customer complaints

File details come from the government source that posted it. Updated .