Attachment_6___Key_Personnel_638602599117628424.docx
DOCX document 87 KB Posted
- Attached to
- Master Agreement AZ|CTR074232
- Contract number
- CTR074232
- Issued by
- Arizona
About this file
This document is an Attachment 6 - Key Personnel form for a Request for Proposal (RFP) Solicitation No. BPM006379 issued by the Arizona Department of Environmental Quality (ADEQ) for Capacity Development/Technical Assistance to Small Public Drinking Water Systems. The document details the professional backgrounds of 12 key personnel from Tata & Howard, a consulting engineering firm based in Marlborough, Massachusetts, who will be involved in performing services for the contract. The key personnel represent various roles including Co-Presidents, Project Managers, Engineers, and Technicians, with professional experience primarily in water system engineering, hydraulic modeling, permitting, and technical assistance for water infrastructure projects.
The proposed services focus on providing technical assistance to small public drinking water systems, including tasks such as water distribution system analysis, hydraulic modeling, capital improvement planning, permitting, design of water infrastructure, and compliance support. The key personnel have extensive experience working with ADEQ and other Arizona water systems, including projects involving water main installations, storage tank permitting, water system assessments, risk and resilience evaluations, and treatment system design. The team members collectively bring decades of experience in water engineering, with professional engineer registrations in multiple states, specialized software certifications, and demonstrated expertise in working with local, state, and federal government agencies, particularly in Arizona and Massachusetts.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Solicitation No. BPM006379
Capacity Development/Technical Assistance to Small Public Drinking Water Systems Arizona Department of Environmental Quality (ADEQ) 1110 W. Washington Street Phoenix, AZ 85007
Attachment 6 – Key Personnel
Answer all questions thoroughly in the spaces provided. Include a Key Personnel form (limit of one page) for each key personnel. Complete this form in full for each proposed key personnel to be involved in performing the services, carrying out the work. It is essential that the Contractor is capable of providing adequate staff of experienced certified/qualified personnel, capable of providing the services to be performed under this contract. If there are more than ten (10) Key Personnel, please utilize the same form for each additional Personnel by making copies of this page as needed.
| 1 |
| Name: |
| Karen L. Gracey, P.E. |
| Job title: |
| Co-President |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Principal |
| Length of employment with the company: |
| 26 years |
| Length of time in current role: |
| 8 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 10% |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| 26 years |
| Proposed position with regard to the Services: |
| Principal |
| Proposed primary responsibilities with regard to the Services: |
| Water Distribution Systems, Hydraulic Modeling, Capital Improvement Planning, Design |
| Describe experience in performing Services similar to those that are to be assigned: |
| ADEQ, AZ – Principal |
· Prepared an ATC and an AOC for a newly discovered public water system (Whispering Winds Apartments water system in Chino Valley, AZ) and exploration of two to three alternatives for arsenic treatment based on water quality conditions, water demand and system complexity.
· Preparation of a Preliminary Engineering Report for Old Concho utilizing the 2014 PER and subsequent 2020 PER addendum as a base. The primary focus was the development of a Phase 1 Improvement project to prioritize the first phase of improvements to meet the Owner’s budget, funding and schedule goals. Coordination with Rural Community Assistance Corporation (RCAC) to update and complete work related to population projections, water demand projections, and financial and funding evaluations. Contract also included preparation of an Environmental Report which was submitted to ADEQ and USDA.
Goodyear, AZ - Project Manager Provided engineering services associated with the update of existing water and sewer system models using InfoWater and InfoSewer computer programs; review of the impact of proposed developments and proposed extensions to the City’s systems; verification of the hydraulic models for the City of Goodyear’s water distribution and wastewater collection systems. Also completed an extended period simulation for the Estrella area between Site 13 and Rainbow Valley. The work included a review of the criticality and useful life of the Site 13 tank and review of pump and tank capacities relative to turnover rates.
| List job-related certifications, training, and education: |
| Affiliations/Memberships: New England Water Works Association (NEWWA), Massachusetts Water Works Association (MWWA) |
Training Certifications: WaterGEMS Software, InfoWater Software Professional Engineer Registration: MA - 46503 Education: University of Vermont - B.S., Civil Engineering, 1998
| 2 |
| Name: |
| Jenna Rzasa, P.E., AZ P.E. Pending |
| Job title: |
| Co-President |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Principal |
| Length of employment with the company: |
| 27 years |
| Length of time in current role: |
| 8 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 10 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| 27 years |
| Proposed position with regard to the Services: |
| Principal |
| Proposed primary responsibilities with regard to the Services: |
| Water Distribution Systems, Hydraulic Modeling, Capital Improvement Planning, Design |
| Describe experience in performing Services similar to those that are to be assigned: |
| Queen Creek, AZ - Principal |
· Completed a Risk & Resilience Assessment in accordance with EPA requirements. Submitted a Report and Certification.
· Prepared the Emergency Response Plan Update for the Town of Queen Creek Water Utility Services Department (TQCUSWD). Incorporated the Diversified Utility assets into the updated ERP.
Flagstaff, AZ - Project Manager
· Provided engineering services for the construction administration and resident observation during the rehabilitation of the Cheshire Tank.
· Provided SCADA and PLC programming and design for the installation of new turbo blowers at the Wildcat Wastewater Treatment Plant and the Rio de Flag Wastewater Treatment Plant.
Hooksett Village Water Precinct, Hooksett, NH - Principal
· Provided engineering services for an above ground asset management condition assessment and water audit for the Hooksett Village Water Precinct.
· Developed a hydraulic model with existing GIS data previously collected and provided by the HVWP. The model was created using InfoWater. It was used to evaluate hydraulic improvements and critical components of the distribution system. The results of the evaluation were used to update the existing Asset Management Plan that was previously created by Tata & Howard under the NHDES Asset Management Grant Program.
· Evaluated the horizontal assets of the Hooksett Village Water Precinct as part of the New Hampshire Department of Environmental Services Asset Management Grant Program. The GIS data was collected via drone imaging with Brown Engineering and integrated into a GIS system by the Granite State Rural Water Authority. Tata & Howard was contracted to evaluate the data, as well as perform a level of service evaluation and a brief over view of capital planning for improvements to the water distribution system.
| List job-related certifications, training, and education: |
| Affiliations/Memberships: Boston Society of Civil Engineers Section/ASCE |
Professional Engineer Registrations: AZ Pending, NH 11941, ME 18613 Education: Worcester Polytechnic Institute, Bachelor of Science, Civil Engineering, 1997
| 3 |
| Name: |
| Randall Pellatz, P.E. |
| Job title: |
| Associate |
| Location of Staff (local or out of state): |
| Flagstaff, Arizona |
| Staff Level of Services per Pricing Sheet: |
| Principal |
| Length of employment with the company: |
| 13 years |
| Length of time in current role: |
| 13 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 100 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| X years |
| Proposed position with regard to the Services: |
| Project Manager |
| Proposed primary responsibilities with regard to the Services: |
| Principal, Technical Reviewer |
| Describe experience in performing Services similar to those that are to be assigned: |
| Arizona Department of Environmental Quality (ADEQ) - Project Officer |
Prepared an Evaluation of Compliance Option Report for the Crown King Water Company water supplies for ADEQ. Draft report included findings, options for compliance, recommendations, and an opinion of probable construction costs for the treatment of the source. The Tunnel Well has elevated levels of cadmium. Alternatives considered for compliance include interconnection with an adjacent system, drilling a new well(s), blending or treatment for the removal of cadmium.
Bellemont Water Company, Flagstaff, AZ - Project Manager Provided general engineering services associated with responding to ADEQ violations and preparing an Application for the Groundwater Compliance 4-Log Removal of Viruses. The scope of services included providing a response to ADEQ’s compliance order and developing a preliminary plan of action for maintaining 4-Log Removal of Viruses for the Bellemont Water System. In addition, a preliminary schematic plan for a chlorination system was developed to provide a residual chlorine concentration throughout the Bellemont Water System. Design services were provided for the proposed disinfection system. Also, completed an assessment of the existing conditions of the Bellemont Water System including recommendations in a letter report.
| List job-related certifications, training, and education: |
| Affiliations/Memberships: |
AWWA - QUAL-SERVE Peer Reviewer Selected to be one of 165 peer reviewers from the 55,000 members of the association to develop a team to review American utilities operations and management. Completed team reviews at Durham, North Carolina, Port St. Lucy, Florida and Littleton, Colorado.
Arizona Grade 4 Water and Wastewater Treatment Operator Acquired the necessary training and passed the exams to accomplish the highest State’s Wastewater and Water Treatment certification.
Flagstaff, AZ, Gillette, WY and HWS Employee Awards Recognized for accomplishments, performance results, dedication, work ethic, and cost saving projects.
Professional Engineer Registrations: AZ, WY Education: University of Nebraska - Bachelor of Science, Civil Engineering, 1973
| 4 |
| Name: |
| Jerald A. Postema |
| Job title: |
| Client Service Specialist |
| Location of Staff (local or out of state): |
| Avondale, Arizona |
| Staff Level of Services per Pricing Sheet: |
| Technician III |
| Length of employment with the company: |
| 7 years |
| Length of time in current role: |
| 7 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 75 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| X years |
| Proposed position with regard to the Services: |
| Field Technician |
| Proposed primary responsibilities with regard to the Services: |
| Meet with staff, review site conditions, review documentation, Permitting, Water System Improvements, Water Distribution Systems, Design, ATC and AOC |
| Describe experience in performing Services similar to those that are to be assigned: |
| ADEQ, AZ - Project Manager |
Contractual work for small water systems through ADEQ Small Water Systems Program.
EUSI, AZ - Project Manager
· Provided services as the Water Treatment Plant Supervisor for the City of Tempe through 2020.
· Provided interim JGM Water Treatment Plant Supervisor for the City of Tempe in 2018.
Coolidge, AZ - Project Manager Revised boiler plate specification documents provided by the City of Coolidge for the rehabilitation of twelve manholes. Assisted with the Bid process with response to up to three Requests for Information.
Public Works Director - 4 Years, City of Tualatin Management of the City of Tualatin’s Water Distribution System, Wastewater Collections System, Storm Water System, Streets, Right of Ways, Sidewalks, Parks, Greenway, Fleet, and Facilities, including planning, organizing, direction, oversight, maintenance service and inventory control. Administering a $14.5 million Operation and Maintenance budget and a $10+ million CIP budget. Management of the City’s solid waste franchise, recycling program, pavement management program, and Emergency Management Program. Working in an advanced technical and supervisory capacity, coordinating and assigning work for crews consisting of 4 Managers and 40 full time and part time Office and Field Staff in a union environment.
| List job-related certifications, training, and education: |
| State of Arizona Certification: OP021761, expires November 30, 2021 |
· Water Distribution Systems. Classification 4 License.
· Water Treatment Systems. Classification 4 License.
· Wastewater Collections. Classification 2 License.
· Wastewater Treatment. Classification 2 License.
Michigan Plumbing and Mechanical Contractors Association - Certification of Attendance for Cross Connection Control Devices.
AWWA Security Planning for Drinking Water Systems, An Operational Approach - Certificate of Completion.
Michigan Compost Operator Certificate AWWA Silver Drop Award Education: Grand Valley State University - B.S., Public Administration, 1981
| 5 |
| Name: |
| Allison M. Shivers, P.E. |
| Job title: |
| Project Manager |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Project Manager I |
| Length of employment with the company: |
| 7 years |
| Length of time in current role: |
| 2 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 50 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| 15 years |
| Proposed position with regard to the Services: |
| Project Manager |
| Proposed primary responsibilities with regard to the Services: |
| Permitting, Water System Improvements, Water Distribution Systems, Design, ATC and AOC |
| Describe experience in performing Services similar to those that are to be assigned: |
| ADEQ, AZ – Project Manager |
· Design and permitting assistance for the installation of approximately 8,750 linear feet of water main for the Mayer Domestic Water Improvement District (DWID) in Mayer, AZ and associated service lateral replacements.
· Provide engineering services to provide permitting assistance for installation of a storage tank and booster pump for the Bradshaw Mountain View Water System in Spring Valley, Arizona. Permits were for Approval to Construct (ATC) and Approval of Construction (AOC). Work also included a design report.
· Design and permitting assistance for installation of approximately 2,600 linear feet of water main and the associated water service lateral replacements for the Jackson Acres Domestic Water Improvement District (DWID) in Prescott, Arizona.
· Prepared an ATC and an AOC for a newly discovered public water system (Whispering Winds Apartments water system in Chino Valley, Arizona) and exploration of two to three alternatives for arsenic treatment based on water quality conditions, water demand and system complexity.
ADEQ, AZ – Project Engineer
· ATC and AOC permitting for the well and storage tank for the Star Vale leisure living community in Star Valley, Arizona.
· AOC permitting for the 33,000 gallon storage tank for the Verde Lakes Dinky Water System in Camp Verde, Arizona.
· Design and ATC and AOC permitting for the 10,000 gallon steel water storage tank for the McNeal Water Company water system. ATC included a design report including a description of all tank components and describe how the well and storage tank will work with the other distribution system components to meet demands. AOC included record drawings.
· Preparation of a Preliminary Engineering Report for Old Concho utilizing the 2014 PER and subsequent 2020 PER addendum as a base. The primary focus was the development of a Phase 1 Improvement project to prioritize the first phase of improvements to meet the Owner’s budget, funding and schedule goals. Coordination with Rural Community Assistance Corporation (RCAC) to update and complete work related to population projections, water demand projections, and financial and funding evaluations. Contract also included preparation of an Environmental Report which was submitted to ADEQ and USDA.
| List job-related certifications, training, and education: |
| Certification and Training: OSHA10, AutoCAD Civil 3D, InfoWater, MicroStation |
Professional Engineer Registration: RI – 11872 Education: Northeastern University, B.S., Civil and Environmental Engineering, 2009
| 6 |
| Name: |
| James V. Hoyt, P.E. |
| Job title: |
| Senior Project Manager |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Project Manager II |
| Length of employment with the company: |
| 14 years |
| Length of time in current role: |
| 5 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 20 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| 17 years |
| Proposed position with regard to the Services: |
| Project Manager |
| Proposed primary responsibilities with regard to the Services: |
| Permitting, Water System Improvements, Water Distribution Systems, Design, ATC and AOC, Hydraulic Modeling |
| Describe experience in performing Services similar to those that are to be assigned: |
| ADEQ, AZ – Project Manager |
· ATC and AOC permitting for the well and storage tank for the Star Vale leisure living community in Star Valley, Arizona.
· AOC permitting for the 33,000 gallon storage tank for the Verde Lakes Dinky Water System in Camp Verde, Arizona.
· Design and ATC and AOC permitting for the 10,000 gallon steel water storage tank for the McNeal Water Company water system. ATC included a design report including a description of all tank components and describe how the well and storage tank will work with the other distribution system components to meet demands. AOC included record drawings.
· Preparation of a Preliminary Engineering Report for Old Concho utilizing the 2014 PER and subsequent 2020 PER addendum as a base. The primary focus was the development of a Phase 1 Improvement project to prioritize the first phase of improvements to meet the Owner’s budget, funding and schedule goals. Coordination with Rural Community Assistance Corporation (RCAC) to update and complete work related to population projections, water demand projections, and financial and funding evaluations. Contract also included preparation of an Environmental Report which was submitted to ADEQ and USDA.
· Provided design and permitting services to connect the Roberts Well to the distribution system for the Mayer Domestic Water Improvement District (DWID) in Mayer, Spring Valley, and Poland Junction, Arizona.
Goodyear, AZ – Senior Project Engineer Provided engineering services associated with the update of existing water and sewer system models using InfoWater and InfoSewer computer programs; review of the impact of proposed developments and proposed extensions to the City’s systems; verification of the hydraulic models for the City of Goodyear’s water distribution and wastewater collection systems. Also completed an extended period simulation for the Estrella area between Site 13 and Rainbow Valley. The work included a review of the criticality and useful life of the Site 13 tank and review of pump and tank capacities relative to turnover rates.
| List job-related certifications, training, and education: |
| Training Certifications: ArcGIS, WaterGems Software, InfoWater Software, InfoSewer Software, AutoCAD |
Professional Engineer Registration: MA - 49891 Education: University of Massachusetts, Lowell, B.S., Civil and Environmental Engineering, 2007
| 7 |
| Name: |
| Michael F. Knox |
| Job title: |
| Client Service Specialist |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Technician II |
| Length of employment with the company: |
| 6 years |
| Length of time in current role: |
| 6 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 25 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| 48 years |
| Proposed position with regard to the Services: |
| Project Manager |
| Proposed primary responsibilities with regard to the Services: |
| ERP Training, Risk & Resiliency Assessment |
| Describe experience in performing Services similar to those that are to be assigned: |
| Marlborough; Milford; Rowley; Spencer; Webster; Melrose, MA and Several Others - Client Service Specialist |
Provided Emergency Response Plan Training to comply with MassDEP guidelines of 10 hours of annual training. Seven TCHs are given to all participants.
Fairhaven Water Department; Melrose; Shrewsbury, MA and Several Others - Client Service Specialist Completed a Risk & Resilience Assessment in accordance with U.S. EPA requirements. Submitted a Report & Certification.
Cherry Valley and Rochdale Water District Leicester, MA - Superintendent
· Provided direct supervision of daily operation of the District’s water treatment facility administrative and operational staff
· Initiated the upgrade of the District’s computerized billing system
· Develop District’s yearly operating budget
· Develop District’s short and long term capital improvement program
· Maintain local, state and federal drinking water compliance standards
· Provide technical review of proposed subdivisions and expansion of District’s distribution system
· Provided resident engineering for water and wastewater construction projects
· Prepared state and federal loan and grant applications to fund water and sewer construction projects
| List job-related certifications, training, and education: |
| Affiliations/Memberships: American Water Works Association, 1992-2017, New England Water Works Association, 1992-2017, Massachusetts Water Works Association, 1979 - Present, Upper Blackstone Water Pollution Abatement District, Board of Directors, 2000-2003, Chairman, Massachusetts Water / Wastewater Agency Response Network, 2008-2011 |
Accreditations: MA Drinking Water Supply Facilities Certified Grade 2 Operator - License # 1177, MA Drinking Water Supply Facilities Certified Grade 3T - License # 5729 MA Waste Water Treatment Plant Operators Certified Grade 3-M Full - License # 3315 MA Department of Public Safety Hoisting Engineer License # 50447 MA Department of Public Safety Journeyman Pipefitter License # 3060 Education: Johnson & Wales University, RI - B.S., Mechanical Engineering, 1995 Worcester Junior College, MA - A.S., Electrical Engineering, 1975
| 8 |
| Name: |
| Ryan P. Neyland, P.E. |
| Job title: |
| Vice President |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Project Manager III |
| Length of employment with the company: |
| 19 years |
| Length of time in current role: |
| 5 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 20 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| 19 years |
| Proposed position with regard to the Services: |
| Project Manager, Technical Review for Treatment |
| Proposed primary responsibilities with regard to the Services: |
| Water Treatment, Water System Improvements, Construction Administration/Management |
| Describe experience in performing Services similar to those that are to be assigned: |
| Arizona Department of Environmental Quality, AZ - Project Manager |
Prepared an Evaluation of Compliance Options for the Crown King Water Company water supplies for ADEQ. The evaluation report included our findings, treatment options for compliance, our recommendations, and an opinion of probable construction costs for the treatment of the sources. The existing tunnel Well No. 1 has elevated levels of cadmium and this well and other wells have shown elevated levels of iron and manganese. Alternatives considered for compliance included interconnection with an adjacent system, drilling a new well(s), blending of source water, or treatment for the removal of iron, manganese, and cadmium.
Falmouth, MA - Project Manager
· Designed and provided construction administration services for a new Dissolved Air Flotation (DAF) treatment facility with a design capacity of 8.4 million gallons per day (mgd). The Long Pond Water Treatment Plant (WTP) utilizes coagulation, mixing, flocculation, DAF, ozonation, dual media filtration including granular activated carbon (GAC), chemical feed for corrosion control and disinfection, and an advanced SCADA system for control of the Class IV fully automated surface water treatment facility. The project was funded under the Massachusetts Drinking Water State Revolving Fund (SRF) Program.
· Design, permitting, bidding, and construction administration services for the media replacement and rehabilitation of the existing greensand pressure filters at the Crooked Pond Water Treatment Plant, including chemical feed upgrades, new instrumentation, and SCADA modifications.
Barnstable, MA - Technical Reviewer Provided engineering design, bid and award services for a new GAC filtration building at the Maher Water Treatment Facility. The project included a conceptual design for planning and cost estimating purposes and final design for construction. Upgrades at the existing water treatment facility included a new prefabricated building, greensand plus pressure filters for iron and manganese removal, carbon filtration equipment for treatment of perfluorinated compounds, space in the building for future process equipment for treatment of 1,4 Dioxane, transfer of chemical feed equipment from the existing treatment facility to the new building, SCADA upgrades, and associated piping, appurtenances, electrical, HVAC, and site work.
| List job-related certifications, training, and education: |
| Affiliations/Memberships: American Water Works Association, New England Water Works Association |
Professional Engineer Registration: MA - 48460 Education: Worcester Polytechnic Institute - M.S., Environmental Engineering, 2005 and B.S., Chemical Engineering, 2003
| 9 |
| Name: |
| Michael J. Kaczowka |
| Job title: |
| Project Designer |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Project Engineer II |
| Length of employment with the company: |
| 9 years |
| Length of time in current role: |
| 9 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 50 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| 9 years |
| Proposed position with regard to the Services: |
| Project Engineer II |
| Proposed primary responsibilities with regard to the Services: |
| Permitting, Water System Improvements, Water Distribution Systems, Design, ATC and AOC, Hydraulic Modeling |
| Describe experience in performing Services similar to those that are to be assigned: |
| ADEQ, AZ – Project Engineer |
· Design and permitting assistance for the installation of approximately 8,750 linear feet of water main for the Mayer Domestic Water Improvement District (DWID) in Mayer, AZ and associated service lateral replacements.
· Provide engineering services to provide permitting assistance for installation of a storage tank and booster pump for the Bradshaw Mountain View Water System in Spring Valley, Arizona. Permits were for Approval to Construct (ATC) and Approval of Construction (AOC). Work also included a design report.
· Design and permitting assistance for installation of approximately 2,600 linear feet of water main and the associated water service lateral replacements for the Jackson Acres Domestic Water Improvement District (DWID) in Prescott, Arizona.
· Prepared drawings for construction of the Arsenic Treatment System at Whispering Winds Apartments water system in Chino Valley, Arizona.
Littleton, MA - Project Engineer Provided design and permitting of 7,000 linear feet of new 8-inch diameter water main for Littleton Electric Light and Water Department and completed an alternatives analysis to review two different raw water transmission main options to connect a new well site to the new water treatment plant.
Lynnfield Water District, MA - Engineer Provided engineering services for the design of approximately 1,200 linear feet of new 8-inch and 6-inch diameter ductile iron water main on Locust Street and Ingalls Terrace including the following: retain the services of a qualified surveyor, prepare and submit a MA DOT non-vehicular access permit, prepare plans and specifications, prepare up to 15 contract documents for use during the bidding process, assist in the bidding process, and prepare addenda as necessary.
West Newbury, MA - Engineer Develop new source off Dole Place. Work includes designing a concrete masonry meter/chemical injection building, a submersible pump, pitless adaptor, approximately 200 linear feet of 6-inch diameter and 50 feet of 8-inch ductile iron water main installed by traditional excavation. The meter/chemical injection building contained the flow meter, soft-starter, chemical injection, and instrumentation for the new bedrock well. Additional services include water distribution system modification, permitting, submittal to MassDEP professional services during the bidding and award phases.
| List job-related certifications, training, and education: |
| Certifications/Training: AutoCAD, ArcGIS |
Education: University of Massachusetts Amherst, B.S., Civil and Environmental Engineering, 2015
| 10 |
| Name: |
| Kai D. Kapossy |
| Job title: |
| Engineer II |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Engineer in Training |
| Length of employment with the company: |
| 2 years |
| Length of time in current role: |
| 2 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 50 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| X years |
| Proposed position with regard to the Services: |
| Engineer in Training |
| Proposed primary responsibilities with regard to the Services: |
| Hydraulic Modeling, Water System Improvements, Water Distribution Systems, Capital Improvement Planning |
| Describe experience in performing Services similar to those that are to be assigned: |
| Arizona Dept. of Environmental Quality, AZ - Engineer |
· Engineering services to provide permitting assistance for installation of a storage tank and booster pump for the Bradshaw Mountain View Water System in Spring Valley, Arizona. Permits are for Approval to Construct and Approval of Construction. Work also includes a design report.
· Provide permitting assistance for the installation of a 40,000 gallon steel storage tank for the Heber Domestic Water Improvement District (DWID) in Heber, Arizona.
· Engineering services to provide permitting assistance for installation of two 5,000 gallon poly storage tanks for the Rim Trail Domestic Water Improvement District (DWID) in Payson, Arizona.
· Engineering services to provide permitting assistance for installation of a groundwater well for the American Legion Water System in Bouse, Arizona.
· Provided design and permitting assistance for installation of approximately 2,600 linear feet of water main and the associated water service lateral replacements for the Jackson Acres Domestic Water Improvement District (DWID) in Prescott, Arizona.
Northampton, MA - Engineer Completed an Asset Management Plan Update for the Northampton water system. The purpose of the Asset Management Plan was to identify areas of the water distribution system in need of rehabilitation, repair, or replacement; and to prioritize improvements to make the most efficient use of the City’s capital budget. In addition to distribution system water mains, water supply and storage needs were evaluated and prioritized.
Danbury CT - Engineer A hydraulic evaluation was completed for the City of Danbury’s water distribution system. The evaluation identified water mains that do not have sufficient capacity to meet recommended fire flow demands.
Worcester, MA - Engineer Providing engineering services to the City of Worcester for various projects including updating the hydraulic model and Capital Efficiency Plan, as-needed hydraulic modeling, Water Storage Tanks Engineering Evaluation, and a large water main lining options evaluation.
| List job-related certifications, training, and education: |
| Certifications/Training: ArcGIS, AutoCAD |
Education: University of Massachusetts Dartmouth, B.S., Civil Engineering/Environmental Resource Engineering Concentration, 2022
| 11 |
| Name: |
| Kimberly A. Frary |
| Job title: |
| Engineer I |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Engineer in Training |
| Length of employment with the company: |
| 2 years |
| Length of time in current role: |
| 2 years |
| Proposed percentage of overall time to be dedicated to the Services: |
| 50 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| X years |
| Proposed position with regard to the Services: |
| Engineer in Training |
| Proposed primary responsibilities with regard to the Services: |
| Hydraulic Modeling, Water System Improvements, Water Distribution Systems, Capital Improvement Planning |
| Describe experience in performing Services similar to those that are to be assigned: |
| ADEQ, AZ –Engineer |
· Design and permitting assistance for the installation of approximately 8,750 linear feet of water main for the Mayer Domestic Water Improvement District (DWID) in Mayer, AZ and associated service lateral replacements.
· Design and permitting assistance for installation of approximately 2,600 linear feet of water main and the associated water service lateral replacements for the Jackson Acres Domestic Water Improvement District (DWID) in Prescott, Arizona.
Attleboro, MA - Engineer Providing design, bidding, and construction of approximately 4,700 linear feet of water main on Bishop Street in Attleboro, Massachusetts.
Wayland, MA - Engineer Design of approximately 2,500 linear feet of water main replacement on River Road in Wayland, Massachusetts.
Cherry Valley & Rochdale Water District, MA - Engineer Design for new 12-inch ductile iron water main on Sargent Street from end of existing 8-inch ductile iron water main to Main Street.
Milford Water Department, MA - Engineer
· Updated the Capital Improvements and Asset Management Plan for the water system for the Town of Milford, MA.
· Provided engineering services for the Myrtle Street, Poplar Street, and Exchange Street water main re-bid, construction administration, and resident project representative services.
· Provide engineering services related to construction administration services for the Godfrey Brook Water Treatment Plant. Site work includes clearing and grubbing, grading, water mains, valves, hydrants, fittings, and appurtenances, electrical, standby generator, sub-grade infiltration system stormwater controls, RCP culvert replacement, chain link fence, submersible well pumps and motors for seven gravel packed wells, precast buried concrete raw water metering vault and residuals storage tank, and improvements to the gravel access road driveway to the treatment plant and the gravel access road from the treatment plant to the wells.
| List job-related certifications, training, and education: |
| Certifications/Training: ArcGIS, AutoCAD |
Education: Worcester Polytechnic Institute, Environmental Engineering, 2022
| 12 |
| Name: |
| Michael J. Koehler |
| Job title: |
| Project Designer |
| Location of Staff (local or out of state): |
| Marlborough, Massachusetts |
| Staff Level of Services per Pricing Sheet: |
| Project Engineer I |
| Length of employment with the company: |
| 1 year |
| Length of time in current role: |
| 1 year |
| Proposed percentage of overall time to be dedicated to the Services: |
| 50 % |
| If applicable, length of time in related experience with large local, state or federal government agencies: |
| X years |
| Proposed position with regard to the Services: |
| Project Engineer I |
| Proposed primary responsibilities with regard to the Services: |
| Hydraulic Modeling, Water System Improvements, Water Distribution Systems, Capital Improvement Planning |
| Describe experience in performing Services similar to those that are to be assigned: |
| ADEQ, AZ –Project Designer |
Conducting a feasibility study to determine the viability of consolidating various water systems in proximity to the Town of Chino Valley, Arizona Limits into their water system. Eight systems have been identified within the vicinity of the Town; Quail Ridge Community Water system, Appaloosa Water Company, Manneken Apartments, Double G Mobile Home Park, Road Runner Mobile Home Park, Chino Meadows II Water Company, Mountain View Mobile Home Park, and ACME Water Company.
Newton, MA – Project Designer Performing hydrant inspections on all City owned hydrants. Inspections completed in accordance with AWWA Manual of Water Supply Practices M17: Fire Hydrants.
Westfield, MA - Project Designer Provided engineering services and resident project representation for the construction of the 2.0 mg Provin Mountain Water Storage Tank and demolition of the 5.0 mg previous Provin Mountain Tank.
West Bridgewater Water Department, MA - Project Designer Providing final design of Manley Water Treatment Plant for PFAS removal and design of water treatment plant for iron and manganese with provisions for future PFAS treatment at Cyr Street and Norman Avenue.
Grafton Water District, MA - Project Designer Providing engineering services for a Supply and Demand Analysis for the Grafton Water District. Services include using population and local building development projections for the Grafton Water District through Fiscal Year 2045 to forecast water demand projections in preparation for future water source needs.
Wayland, MA - Project Designer Providing construction administration and resident project representative services for a new water main on River Road and the Transfer Station Access Road in Wayland, Massachusetts. Preparing record as built drawings.
| List job-related certifications, training, and education: |
| Certifications/Training: AutoCAD, Matlab, 3Dmax, DAWs |
Education:
University of Arizona, M.S. Environmental Engineering, B.S. Civil Engineering, 2016 Loyola University New Orleans, B.A. English Literature, minor in Mathematics, 2012
Solicitation Attachment – Key Personnel | Revision No. 1 | Revised 11-22 image1.jpg
File details come from the government source that posted it. Updated .