This document provides details for a federal contract opportunity to develop an aggregate pit and crush material for stockpiling. The U.S. Forest Service plans to solicit offers for a firm-fixed price contract between $500,000 to $1,000,000. The scope of work is to develop the Cabin Hollow Pit located approximately 15 miles northeast of Fairview, Utah, crush up to 43,500 cubic yards of aggregate material, and place it in stockpiles within or near the pit location. There are also options to crush additional material in quantities ranging from 28,000 cubic yards up to 5,000 cubic yards. Offerors are required to submit proposals in accordance with the forthcoming solicitation. The contract will be awarded as a single award and conform with the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LS21R0007-0004.pdf | ||
| Attachment 10 - Cabin Hollow Pit Layout.pdf | ||
| Attachment 9 - Questions and Answers 20210903.pdf | ||
| 1240LS21R0007-0003.pdf | ||
| Attachment 8 - Location map from Fairview.pdf | ||
| Attachment 1 - Schedule of Items v02.xls | XLS spreadsheet | |
| 1240LS21R0007-0002.pdf | ||
| Attachment 7 - Q and A 1240LS21R0007 - Cabin Hallow Pit Crushing.docx | DOCX document | |
| 1240LS21R0007-0001.pdf | ||
| RFP 1240LS21R0007 - Cabin Hallow Pit Crushing.pdf | ||
| Attachment 4 - 171 - Weed and Disease Prevention.pdf | ||
| Attachment 5 - FSSS All Assembled.pdf | ||
| Attachment 2 - Cabin Hallow Pit Crushing SOW.pdf | ||
| Attachment 1 - Schedule of Items.xls | XLS spreadsheet | |
| Attachment 3 - WD UT20210052.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 314
Section 314. — STOCKPILED AGGREGATES
Description
314.01 This work consists of furnishing and placing material in a stockpile for future use by the Government. Pit or quarry development work consists of clearing, grubbing, stripping topsoil, removing overburden, constructing access roads, conducting restoration activities, and performing other incidental work required for pit or quarry development.
Material
314.02 Conform to the following Section:
Gradation
Table 703-3 Gradation Limits for
Surface Course Gradation and Plasticity Index
Sieve Size Percent by Mass Passing
Designated Sieve
(AASHTO T 27 & T 11)
1 inch 100
¾ inch 97 – 100
3/8 inch 65 – 85
No. 4 45 – 64
No. 16 25 – 42
No. 40 16 – 29
No. 200 8 – 18
Plasticity index*
4 to 10
(*) If % Passing No. 200 is 8% to 12% and PI is less than 4, added 2% bentonite by weight.
Construction Requirements
314.03 General. Conform to the gradation and quality requirements specified in the Section identified for the material.
314.04 Stockpile Site. The Government will acquire the permits and rights to stockpile aggregate from sources identified in the contract if the material is stockpiled for future use.
Section 314
Prepare a plan of operation. Do not perform work within a Government-provided source until a plan of operation for the development of the source is accepted. Submit quality control plan a minimum of two weeks for approval before start of work.
Obtain CO approval before preparing sites. Prepare sites as necessary to accommodate the quantity of material to be stockpiled in a manner that prevents contamination of the stockpiles.
Prepare new sites as follows:
(a) Clear and grub according to Section 201;
(b) Grade, shape, and compact the site to a uniform cross-section that drains; and
(c) Place, compact, and maintain a minimum 6-inch layer of crushed aggregate over the stockpile site and access roads for stabilization.
Obtain CO approval before stockpiling aggregates.
314.05 Stockpile. Build aggregate stockpiles in layers not to exceed 36 inches in thickness. Make the side slopes of each layer no flatter than 1V:1.5H. Spread aggregates with trucks or other approved pneumatic-tire equipment. Complete each layer before depositing aggregates on the next layer. Do not allow aggregates from the layer being built to run down over lower layers. Do not drop aggregates from a bucket or spout in one location to form a cone-shaped pile. Do not push aggregates into piles. Make the stockpiles neat and regular in shape.
Use plank runways or other suitable methods to avoid tracking dirt or other foreign matter onto the stockpiled material when operating trucks on stockpiles.
Space stockpiles far enough apart or install partitions to prevent the mixing of aggregate gradations.
Protect stockpiles for future use with an approved cover.
314.06 Acceptance. Preparation of stockpile sites and construction of stockpiles will be evaluated under Subsections 106.02 and 106.04. Submit a minimum of one representative gradation for each day of crushing.
Clearing and grubbing will be evaluated under Section 201.
Measurement
314.07 Measure the Section 314 pay items listed in the bid schedule according to Subsection 109.02.