Attachment 4 - 171 - Weed and Disease Prevention.pdf

PDF 265 KB Posted

Attached to
Cabin Hallow Pit Crushing Federal contract opportunity
Solicitation number
1240LS21R0007
Issued by
Department of Agriculture Forest Service

About this file

This document contains a federal contract solicitation for pit development and crushing services. The U.S. Forest Service is seeking a firm-fixed price contract between $500,000 to $1,000,000 to crush up to 43,500 cubic yards of aggregate and place it in stockpiles within or near the Cabin Hollow Pit located approximately 15 miles northeast of Fairview, Utah. The base option is for crushing 28,000 cubic yards, with additional options to crush up to an additional 28,000, 6,000, 1,500, and 5,000 cubic yards. The scope of work also includes pit development and roughing in an access road to the pit. Questions regarding the solicitation should be directed to the contracting officer Brandon Wilson by email.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

171 - Weed and Disease Prevention

Description

171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands and prior to leaving National Forest System lands.

Material

171.02 Conform to the following Subsection:

Water 725.01

Construction Requirements

171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.

Perform all work at an approved facility. Provide the CO with an opportunity to inspect the equipment prior to loading or unloading from a trailer.

171.04 Equipment. Use a high pressure washing system.

For work at a commercial washing facility, use an approved facility.

171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment.

Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.

171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment.

Rewash the construction equipment as necessary or as directed.

171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.

Measurement

171.08 Do not measure weed prevention for payment.

Payment

171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.