Attachment 6 - Draft Internal Service Requirement List.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- HVAC Repair Space Optimization & Renovation PNSY-B43 Federal contract opportunity
- Solicitation number
- N4008520B2557
About this file
This document contains a draft internal service requirement list and details of a related federal contract opportunity for HVAC repair, space optimization, and renovation services at the Naval Surface Warfare Center in Portsmouth, Virginia. The internal service requirement list is a template to be filled out by the government and contractor, specifying janitorial and cleaning service needs by room such as flooring type, square footage, planned occupancy, and required accessories like paper towel and soap dispensers. The related federal contract opportunity is solicitation number N4008520B2557 seeking HVAC repair, space optimization, and renovation at the Portsmouth Naval Shipyard Building 43. The opportunity is posted by the Department of the Navy Naval Facilities Engineering Command for an unspecified contract value and period of performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Specifications.pdf | ||
| Attachment 7 - Furniture Scope of Work and Specifcation.pdf | ||
| N4008520B2557.pdf | ||
| Attachment 4 - Drawings.pdf | ||
| Attachment 9 - NAVFAC MIDLANT PWD-Maine - ICS Standard.pdf | ||
| Attachment 5 - Draft eOMSI Workbook.xlsx | XLSX spreadsheet | |
| Attachment 8 - Project Laydown and Construction Barrier Drawings.pdf | ||
| Attachment 3 - Submittal Register.xls | XLS spreadsheet | |
| Attachment 1 - Bid Form.pdf | ||
| encl a - Scope of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank ISRL
| NAVFAC Internal Services Requirements List | |||||||||||||||||||||||||||||||||||||
| Project Name (include BLDG#): e-Project# | |||||||||||||||||||||||||||||||||||||
| **** this form needs to be filled out at the end of each phase of the contract and turned into the government no less than 90 days prior to occupancy*** | |||||||||||||||||||||||||||||||||||||
| CURRENT INVENTORY - FILLED OUT BY GOVERNMENT | FILLED OUT BY CONTRACTOR | INFORMATION ONLY | NEW INVENTORY - CONTRACTOR | ||||||||||||||||||||||||||||||||||
| Janitorial Accessories & Cleaning Services Required - ** ATTACH FLOOR PLAN CADD FILE ** | A | ||||||||||||||||||||||||||||||||||||
| Room Use (Administration / Bathroom / Kitchenette / Locker Room, etc) and Room Number | Room # | INFORMATION / LOCATION | removed | replaced | new to building | not part of scope | notes | Room Use (Administration / Bathroom / Kitchenette / Locker Room, etc) | Room Number | Flooring Type (VCT, Resilient, Carpet, Ceramic, Concrete, Wood, other) | Square Footage (Include Shower Floors) | Planned Number of Occupants | Shower Square Footage | Quantities | (Dispensers MUST be compatible with existing Paper and Soap Products. Consult with FSC) | equipment to include in this report are: | Square Footage of Room | Flooring Type (VCT, Tile, Carpet) | Wall Type (Tile or Sheetrock) % | Use (Admin/ Bathroom / Kitchenette, etc) | # of anticipated occupants | Manufacturer | Model Number | Serial Number | *Attach CAD file of building | ||||||||||||
| Floors | Walls | Toilets | Urinals | Sinks | Mirrors | Water Fountains | Lockers | Paper Towel Dispensers | Toilet Paper Dispensers | Soap Dispensers | Soap (Grit) Dispensers | Paper Towel Dispensers | Soap Dispensers | Square Footage of Room | Flooring Type (VCT, Tile, Carpet) | Wall Type (Tile or Sheetrock) % | Use (Admin/ Bathroom / Kitchenette, etc) | # of anticipated occupants | Manufacturer | Model Number | Serial Number | *Attach CAD file of building | |||||||||||||||
| Office | 125 | Current VCT Floor, Will Become Epoxy Floor Covering | X | 112 square feet, See AE101 for room labels | Toilet Paper Dispensers | Recessed Trash Cans | |||||||||||||||||||||||||||||||
| Office | 126 | Current VCT Floor, Will Become Epoxy Floor Covering | X | 126 sqaure feet | Flooring | Fixtures | |||||||||||||||||||||||||||||||
| Office | 139A | Current VCT Floor, Will Become Epoxy Floor Covering | X | 117 square feet | |||||||||||||||||||||||||||||||||
| Office | 139B | Current VCT Floor, Will Become Epoxy Floor Covering | X | 117 square feet | |||||||||||||||||||||||||||||||||
| Corridor | 139 | Current VCT Floor, Will Become Epoxy Floor Covering | X | 176 square feet | |||||||||||||||||||||||||||||||||
| Lunch Room | 120 | Current VCT Floor, Will Become Epoxy Floor Covering | X | 675 square feet | |||||||||||||||||||||||||||||||||
| Men's Lockeroom | 112 | Current VCT Floor, Will Become Epoxy Floor Covering | X | 333 sqaure feet | |||||||||||||||||||||||||||||||||
| Locksmith Shop | 104 | Current VCT Floor, Will Become Epoxy Floor Covering | X | 414 sqaure feet | |||||||||||||||||||||||||||||||||
| Fire Alarm Testing | 104A | Current VCT Floor, Will Become Epoxy Floor Covering | X | 282 sqaure feet | |||||||||||||||||||||||||||||||||
| Egress Stair | N/A | New wood framed stair to attic | X | 156 sqaure feet |
Blank ISRL (2)
| NAVFAC Internal Services Requirements List | |||||||||||||||||||||||||||
| Project Name (include BLDG#): e-Project# | |||||||||||||||||||||||||||
| **** this form needs to be filled out at the end of each phase of the contract and turned into the government no less than 90 days prior to occupancy*** | |||||||||||||||||||||||||||
| CURRENT INVENTORY - FILLED OUT BY GOVERNMENT | FILLED OUT BY CONTRACTOR | INFORMATION ONLY | NEW INVENTORY - CONTRACTOR | ||||||||||||||||||||||||
| Janitorial Cleaning Services Required - ** ATTACH FLOOR PLAN CADD FILE ** | A | ||||||||||||||||||||||||||
| Room Use (Administration / Bathroom / Kitchenette / Locker Room, etc) and Room Number | Room # | INFORMATION / LOCATION | removed | replaced | new to building | not part of scope | notes | Room Use (Administration / Bathroom / Kitchenette / Locker Room, etc) | Room Number | Flooring Type (VCT, Resilient, Carpet, Ceramic, Concrete, Wood, other) | Square Footage (Include Shower Floors) | Planned Number of Occupants | Shower Square Footage | equipment to include in this report are: | Square Footage of Room | Flooring Type (VCT, Tile, Carpet) | Wall Type (Tile or Sheetrock) % | Use (Admin/ Bathroom / Kitchenette, etc) | # of anticipated occupants | Manufacturer | Model Number | Serial Number | *Attach CAD file of building | ||||
| Floors | Walls | Paper Towel Dispensers | Soap Dispensers | Square Footage of Room | Flooring Type (VCT, Tile, Carpet) | Wall Type (Tile or Sheetrock) % | Use (Admin/ Bathroom / Kitchenette, etc) | # of anticipated occupants | Manufacturer | Model Number | Serial Number | *Attach CAD file of building | |||||||||||||||
| Toilet Paper Dispensers | Recessed Trash Cans | ||||||||||||||||||||||||||
| Flooring | Fixtures |
| ACCESSORIES | Room Number | Quantities | (Dispensers MUST be compatible with existing Paper and Soap Products. Consult with FSC) | ||||||||
| Toilets | Urinals | Sinks | Mirrors | Water Fountains | Lockers | Paper Towel Dispensers | Toilet Paper Dispensers | Soap Dispensers | Soap (Grit) Dispensers |
File details come from the government source that posted it. Updated .