Attachment 4 - Drawings.pdf

PDF 17 MB Posted

Attached to
HVAC Repair Space Optimization & Renovation PNSY-B43 Federal contract opportunity
Solicitation number
N4008520B2557
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This package of drawings and specifications is for an HVAC repair space optimization and renovation project for Building 43 at the Portsmouth Naval Shipyard. The work includes demolishing existing HVAC, electrical, plumbing and fire protection systems, and installing new systems. Mechanical drawings show demolition and new layouts for HVAC equipment, ductwork and controls on the first floor, mezzanine and attic. Electrical drawings show demolition and new layouts for lighting, power and telecommunications. Additional drawings include architectural, structural, civil and fire protection plans. The solicitation for this project is N4008520B2557 issued by the Naval Facilities Engineering Command. The anticipated award date is unspecified.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Repair Space Optimization & Renovation PNSY-B43, newest first.
File Type Posted
Attachment 6 - Draft Internal Service Requirement List.xlsx XLSX spreadsheet
Attachment 2 - Specifications.pdf PDF
Attachment 7 - Furniture Scope of Work and Specifcation.pdf PDF
N4008520B2557.pdf PDF
Attachment 1 - Bid Form.pdf PDF
encl a - Scope of Work.pdf PDF
Attachment 9 - NAVFAC MIDLANT PWD-Maine - ICS Standard.pdf PDF
Attachment 5 - Draft eOMSI Workbook.xlsx XLSX spreadsheet
Attachment 8 - Project Laydown and Construction Barrier Drawings.pdf PDF
Attachment 3 - Submittal Register.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

G-001 43-19-95

KITTERY, ME

PORTSMOUTH NAVAL SHIPYARD

13 WATER STREET

NEWMARKET, NH

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

G-002 43-19-96

13 WATER STREET

NEWMARKET, NH

GENERAL NOTES EROSION CONTROL NOTES

TRAFFIC NOTES

UTILITY NOTES CONSTRUCTION NOTES

DEMOLITION NOTES

WASTE MANAGEMENT NOTES

GENERAL ARCHITECTURAL NOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

A-001 43-19-97

GRAPHIC SCALE

EXISITING FIRST FLOOR ASBESTOS LOCATION PLAN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

V-101 43-19-98

13 WATER STREET

NEWMARKET, NH

LEAD-CONTAINING PAINT REMOVAL NOTES

EXISTING SECOND FLOOR ASBESTOS LOCATION PLAN

LEGEND

05/07/2020

FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN

GENERAL SHEET NOTES

GRAPHIC SCALE

DEMOLITION KEYNOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AD101 43-19-99

13 WATER STREET

FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN

GENERAL SHEET NOTES

GRAPHIC SCALE

DEMOLITION KEYNOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AD102 43-19-100

13 WATER STREET

ATTIC ARCHITECTURAL DEMOLITION PLAN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AD103 43-19-101

13 WATER STREET

NEWMARKET, NH

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

FIRST FLOOR PLAN

1CIRCULATION PLAN - FIRST FLOOR 2MEZZANINE - REFERENCE ONLY

GRAPHIC SCALE

NEW WORK KEYNOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AE101 43-19-102

13 WATER STREET

NEWMARKET, NH

3STRINGER AND WINDOW ELEVATION SECTION

FIRST FLOOR REFLECTED CEILING PLAN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AE102 43-19-103

13 WATER STREET

NEWMARKET, NH

NEW WORK KEYNOTE

2EXISTING CEILING CASSETTE DETAIL (TYP.)1ENLARGED STAIR ENCLOSURE LIGHTING PLAN

PROPOSED ATTIC PLAN

1ANSI HANDRAIL

2CIRCULATION PLAN ATTIC FLOOR

GENERAL SHEET NOTES

GRAPHIC SCALE

NEW WORK KEYNOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AE103 43-19-104

13 WATER STREET

3CEILING JOIST TO TRUSS DETAIL

0A3-5/8" MTL. STUD WALL

1FIRST FLOOR LUNCH ROOM

GRAPHIC SCALE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AE104 43-19-105

13 WATER STREET

1A6" MTL. STUD WALL

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AE105 43-19-106

13 WATER STREET

NEWMARKET, NH

5TYP JOINT BEARING DETAIL

7TYP CONNECTION AT EXISTING GABLE END TRUSS

44' - 3" OPENING ELEVATION

69' - 0" OPENING ELEVATION

3ELEVATION CHANGE FLOOR TRANSITION

8TYP WALL STUD BRACING DETAIL

1TYP BASE OF WALL DETAIL 2TYP HEADER TO JAMB DETAIL

1EXISTING NORTH ELEVATION (REAR)

2ENLARGED EXISTING NORTH ELEVATION

GRAPHIC SCALE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AE201 43-19-107

1PROPOSED NORTH ELEVATION

2ENLARGED PROPOSED NORTH ELEVATION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AE202 43-19-108

13 WATER STREET

FIRST FLOOR FINISH PLAN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

AF101 43-19-109

13 WATER STREET

NEWMARKET, NH

ROOM FINISH SCHEDULE NOTE:

NEW WORK KEYNOTES

EQUIPMENT TAG SYMBOLS & ABBREVIATIONS

GENERIC HVAC ABBREVIATIONS

FLOW DIAGRAM & CONTROL DIAGRAM EQUIP.

SYMBOLS

GENERIC HVAC SYSTEM TAGS

CALL OUT SYMBOLS

AIR SYSTEM SPECIFIC ABBREVIATIONS

HVAC GENERAL NOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

M-001 43-19-110

FIRST FLOOR HVAC DEMOLITION PLAN

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MD101 43-19-111

13 WATER STREET

NEWMARKET, NH

1ENLARGED FIRST FLOOR HVAC DEMOLITION PLAN

GRAPHIC SCALE

GENERAL SHEET NOTES

ATTIC HVAC DEMOLITION PLAN

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MD102 43-19-112

13 WATER STREET

NEWMARKET, NH

GRAPHIC SCALE

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

1ENLARGED ATTIC HVAC DEMOLITION PLAN

FIRST FLOOR HVAC PLAN

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MH101 43-19-113

13 WATER STREET

NEWMARKET, NH

1ENLARGED FIRST FLOOR HVAC PLAN

GRAPHIC SCALE

GENERAL SHEET NOTES

ENLARGED MEZZANINE HVAC PLAN

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MH102 43-19-114

13 WATER STREET

NEWMARKET, NH

2ENLARGED ROOM 139 HVAC PLAN

GRAPHIC SCALE

GENERAL SHEET NOTES

FIRST FLOOR DUCTWORK PLAN

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MH103 43-19-115

13 WATER STREET

NEWMARKET, NH

GENERAL NOTES

MEZZANINE DUCTWORK FLOOR PLAN

ATTIC PROPOSED HVAC PLAN

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MH104 43-19-116

13 WATER STREET

NEWMARKET, NH

GRAPHIC SCALE

GENERAL SHEET NOTES

NEW WORK KEYNOTES

1ENLARGED ATTIC PROPOSED HVAC PLAN

RETROCOMMISSIONING DEFICIENCIES REMEDY PLAN

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MH105 43-19-117

13 WATER STREET

NEWMARKET, NH

GRAPHIC SCALE

GENERAL SHEET NOTES

KEYNOTES

1ENLARGED RETROCOMMISSIONING DEFICIENCIES REMEDY PLAN

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MH501 43-19-118

13 WATER STREET

NEWMARKET, NH

4SUPPLY RETURN DIFFUSER/REGISTER DUCTWORK & CONNECTION

2CONDENSING UNIT STAND DETAIL 3UNIT HEATER DETAIL

5DIRECT EXPANSION COIL DETAIL

1SPRING VIBRATION ISOLATOR

6HEAT PUMP AND FINTUBE ELEVATION DETAIL

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MH601 43-19-119

13 WATER STREET

SEQUENCE OF OPERATIONS NEW DDC POINTS LIST

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

MI601 43-19-120

13 WATER STREET

NEWMARKET, NH

1ATTIC HVAC CONTROL DIAGRAM

3ROOM 125 & 126 HVAC CONTROL DIAGRAM

GENERAL SHEET NOTES

4ROOM 120 & 120A HVAC CONTROL DIAGRAM

2MEZZANINE HVAC CONTROL DIAGRAM

5ROOM 139A & 139B HVAC CONTROL DIAGRAM

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

E-001 43-19-121

IDENTIFICATION AND MARKINGS

ELECTRICAL

GENERAL NOTES

CONDUCTORS

WIRING DEVICES

CONDUIT & RACEWAY

¾ “

LIGHTING

SAFETY

CIRCUIT BREAKERS

PANEL BOARDS

S

K

13 WATER STREET

SYMBOLS

FIRST FLOOR ELECTRICAL DEMOLITION PLAN

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

ED101 43-19-122

13 WATER STREET

NEWMARKET, NH

GRAPHIC SCALE

GENERAL SHEET NOTES

FIRST FLOOR ELECTRICAL PLAN

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

E-101 43-19-123

13 WATER STREET

NEWMARKET, NH

1ENLARGED OFFICE LIGHTING PLAN

GRAPHIC SCALE

GENERAL SHEET NOTES

PROPOSED TELECOMMUNICATIONS PLAN

NEW WORK KEYNOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

ET101 43-19-124

13 WATER STREET

NEWMARKET, NH

1ENLARGED STAIR ENCLOSURE LIGHTING PLAN

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

S-101 43-19-125

13 WATER STREET

NEWMARKET, NH

GRAPHIC SCALE

1STAIR FRAMING PLAN

3STAIR PENETRATION PLAN

7TYP. STAIR STRINGER CONNECTIONS5FLOOR LEVELING DETAIL 6TYP. JOIST HANGER DETAIL

GENERAL SHEET NOTES

4VEHICLE PRECAST BOLLARD DETAIL

2EXT SLAB ON GRADE DETAIL

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

F-001 FAC-YR-NUM

FIRE ALARM NOTES

13 WATER STREET

FIRE SPRINKLER NOTES

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FX101 FAC-YR-NUM

13 WATER STREET

NEWMARKET, NH

FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN

FIRST FLOOR PROPOSED FIRE SPRINKLER MODIFICATIONS

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FX102 FAC-YR-NUM

13 WATER STREET

NEWMARKET, NH

NEW WORK KEYNOTES

LEGEND

KEY MAP - ATTIC

1ENLARGED ATTIC DEMOLITION FIRE SPRINKLER MODIFICATIONS 2ENLARGED ATTIC PROPOSED FIRE SPRINKLER MODIFICATIONS

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FA101 FAC-YR-NUM

13 WATER STREET

NEWMARKET, NH

FIRST FLOOR FIRE ALARM EXISTING PLAN

NEW WORK KEYNOTES

LEGEND

FIRST FLOOR PROPOSED FIRE ALARM MODIFICATION PLAN

GENERAL NOTES

A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FA102 FAC-YR-NUM

13 WATER STREET

NEWMARKET, NH

LEGEND

GENERAL NOTES

ATTIC PROPOSED FIRE ALARM MODIFICATION PLAN

GRAPHIC SCALE N

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

F-101 FAC-YR-NUM

13 WATER STREET

NEWMARKET, NH

LEGEND

FIRST FLOOR LIFE SAFETY MODIFICATION PLAN

LIFE SAFETY AND BUILDING CODE DATA

1ATTIC STAIR ENCLOSURE PARTIAL PLAN

BASE/SUBBASE LAYER

SUBGRADE SOIL

HOT BITUMINOUS PAVEMENT

1% SLOPE FROM BUILDING

EXISTING BUILDING

GRAPHIC SCALE

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

C-101 43-19-132

13 WATER STREET

NEWMARKET, NH

SITE PLAN

1SILTSACK INLET SEDIMENT CONTROL DEVICE

GENERAL NOTES

2TYPICAL PAVEMENT SECTION

LEGEND

EXISTING STORMWATER LINE PER

NAVFAC TOTAL MAP

LIMIT OF SAWCUT

CONCRETE PAD

EXISTING CATCH BASIN

EXISTING CONTOUR

CONCRETE

Sheets and Views
B43 HVAC REPAIR SPACE OPTIMIZATION-G-001
B43 HVAC REPAIR SPACE OPTIMIZATION-G-002
B43 HVAC REPAIR SPACE OPTIMIZATION-A-001
B43 HVAC REPAIR SPACE OPTIMIZATION-V-101
B43 HVAC REPAIR SPACE OPTIMIZATION-AD101
B43 HVAC REPAIR SPACE OPTIMIZATION-AD102
B43 HVAC REPAIR SPACE OPTIMIZATION-AD103
B43 HVAC REPAIR SPACE OPTIMIZATION-AE101
B43 HVAC REPAIR SPACE OPTIMIZATION-AE102
B43 HVAC REPAIR SPACE OPTIMIZATION-AE103
B43 HVAC REPAIR SPACE OPTIMIZATION-AE104
B43 HVAC REPAIR SPACE OPTIMIZATION-AE105
B43 HVAC REPAIR SPACE OPTIMIZATION-AE201
B43 HVAC REPAIR SPACE OPTIMIZATION-AE202
B43 HVAC REPAIR SPACE OPTIMIZATION-AF101
B43_MECHANICAL-M-001
B43_MECHANICAL-MD101
B43_MECHANICAL-MD102
B43_MECHANICAL-MH101
B43_MECHANICAL-MH102
B43_MECHANICAL-MH103
B43_MECHANICAL-MH104
B43_MECHANICAL-MH105
B43_MECHANICAL-MH501
B43_MECHANICAL-MH601
B43_MECHANICAL-MI601
B43 HVAC REPAIR SPACE OPTIMIZATION-E-001
B43 HVAC REPAIR SPACE OPTIMIZATION-ED101
B43 HVAC REPAIR SPACE OPTIMIZATION-E-101
B43 HVAC REPAIR SPACE OPTIMIZATION-ET101
B43 HVAC REPAIR SPACE OPTIMIZATION-S101
B43 HVAC REPAIR SPACE OPTIMIZATION_C-DSGN-C-101

File details come from the government source that posted it. Updated .