Attachment_2_-_IDIQ_Drawings.pdf

PDF 3 MB Posted

Attached to
Protective Coating - Multiple Award IDIQ
Solicitation number
140R3022R0010
Issued by

View the file

Other files

File Type Posted
Sol_140R3022R0010_Amd_0002.pdf PDF
Attachment_5_-_Task_Order_1_-_Price_Schedule_-_RFP_Amendment_002_0002.pdf PDF
140R3022R0010_Questions_and_Answers_-_RFP_Amendment_002_0002.pdf PDF
Attachment_3_-_Task_Order_1_-_Tailbay_Stoplogs_SOW_-_RFP_Amendment_002_0002.pdf PDF
RFP_No__140R3022R0010_-_Protective_Coating_IDIQ_-_Amendment_002_Revised_Pages_0002.pdf PDF
Sol_140R3022R0010_Amd_0001.pdf PDF
140R3022R0010_Questions_and_Answers_0001.pdf PDF
RFP_No__140R3022R0010_-_Protective_Coating_IDIQ_____Amendment_001_Revised_Pages_0001.pdf PDF
Attachment_3_-_Task_Order_1_-_Tailbay_Stoplogs_SOW_-_RFP_Amendment_001_0001.pdf PDF
140R3022R0010_Pre-Proposal_Site_Visit_Attendees_List_(8-11-2022)_0001.pdf PDF
Attachment_11_-_Subcontracting_Plan_Format_-_RFP_Amendment_001_0001.pdf PDF
Attachment_7_-_Site_Visit_Map.pdf PDF
Attachment_9_-_Task_Order_1_-_Bond_Forms.pdf PDF
Attachment_6_-_Task_Order_1_-_Wage_Determination_AZ20220006.pdf PDF
RFP_No__140R3022R0010_-_Protective_Coating_IDIQ.pdf PDF
Attachment_8_-_Task_Order_1_-_Supplemental_Provisions_and_Clauses.pdf PDF
Attachment_4_-_Task_Order_1_-_Drawings.pdf PDF
Attachment_11_-_Subcontracting_Plan_Format.pdf PDF
Attachment_13_-_Past_Performance_Questionnaire.pdf PDF
Attachment_5_-_Task_Order_1_-_Price_Schedule.pdf PDF
Attachment_1_-_IDIQ_Specifications.pdf PDF
Sol_140R3022R0010.pdf PDF
Attachment_10_-_DI-137_Release_of_Claims.pdf PDF
Attachment_12_-_Construction_Invoice_Requirements.pdf PDF
Attachment_3_-_Task_Order_1_-_Tailbay_Stoplogs_SOW.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Base Contract:

Protective Coating IDIQ Drawings (2)

This page intentionally left blank

D

C

B

A

45-301-7961

Projec Wareho

Long-term

Wore house

Q) Warehouse Parking Lot

Parking Lot I 1 Police Checkpoint

---Lower Portal Road

N

--lL

Nevada Sign Area---

Highway 93 Road

NEVADA

CLARK COUNTY

Abandoned NV St.

Switchyar

City of L.A.

Switchyard

M.W.D.

Switchyard

Parking Lot #4

El. 1262

Police 0 Building

Road

Parkin�, Lot I

Parking Lot #2

El. 1357

Parking Lot f3 --------- El. 1275

G) Canoe Launch Site

@ NV Spillway Parking Lot lf7

El. 1236

Visitor Center Parking Structure ot 16

Dam

AZ Employee Parking Lot (18 Elev 1237

Parking Lot I 11

Elev 1260

AZ Spillway Parking@ Lot (19 Elev 1237

@ Parking Lot I 14- Elev 1360

Kingman

Switchyard

ARIZONA

MOHAVE COUNTY

0 200 400

1 UNIT - 200 FEEr

Evaporation

Ponds

1------------------------

: TEMPORARY REVISION � 1

I I

, DATE REVISED 4-04-05 :

LAKE MOHAVE I •

I

' REVISED BY Jls I

I

: Requested By Albert Marquez

I _______________________ !

3 2

Parking Lot f12 Elev 1285

@ Parking Lot (113 Elev 1295

Parking Lot (110 Elev 1250

Paved Area Elev 1335

Parking Lot I 15 Elev 1440

..-1

Evaporation Ponds Road:

ALWAYS THINK SAFETY

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

LOWER COLORADO DAMS OFFICE

HOOVER DAM

PARKING AREA NOS. & ELEVATIONS

DESIGNED_A!cB5.R!_ �'!_O!!_q

CHECKED __________________

JLS

DRAWN _____________ TECH. APPR. _________________

APPROVED _________________ _

M,,W,,\Gm, ENGINEFRING GROUP

Unknown Not Plotted

BOULDER CITY,NEVADA FEBRUARY24, 2OO3 45-301-7961

D

C

B

A

RFP 140R3022R0010 - Attachment 2 Protective Coating IDIQ (Page 1 of 2)

D

C

B

A

1 461 '

Visitor Center

Structure

1 2 1 1 '

4-68" Jet Flow Valves

(NV & AZ)

I I I I i---Upper & Lower Nevada Intake

Towers

30' Stee I Pen stocks

(NV & AZ)

13' Stee I Pen stocks

(NV & AZ)

------J

DD DD D

Canyon Wall

Out I et

Stoney =i----

Gate 0 (NV & AZ)-----

I I

I

I \

I

Arizona Spillway

I ----..,1'-1 -...,_ ____ _ I I I I/

Upper & Lower Arizona Intake

Towers

8 1/2' Dia. Steel Outlet Pipes to

Canyon Wa 11 Outlet Works

(NV & AZ)

D DODD□ D

·,_ D D

2 1

NEVADA LOWER PENSTOCK

NEVADA UPPER PENSTOCK

ARIZONA LOWER PENSTOCK

ARIZONA UPPER PENSTOCK

,-----------------------,: TEMPORARY REVISION [I] '

I

I

' DATE REVISED 6-30-2009 : '

1 REVISED BY / s ,I I

' REQUESTED BY GEORGE WENDT

I

I I _______________________ !

0. DESIGNER GEORGE WENDT - JLS - 6-23-2009

1. GEORGE WENDT. EXPANOED LOWER PENSTOCK COVERAGE -

JLS - 6-23-2009

DWG NOT TO SCALE

EB ALWAYS THINK SAFE1Y

UNITED STATES

DEPARTMENT OF THE I NTERIOR

BUREAU OF RECLAMATION

LOWER COLORADO DAMS OFFICE

HOOVER POWER PLANT

ARIZONA - NEVADA

PENSTOCK EXTERIOR SPOT COATING

DESIGNED_ GI_O!!_GE_ 'i!!f!P"!_ _ _ _ _ _ CHECKED __ :_ ______________ _

DRAWN __ JLS _________ TECH. APPR. _________________

APPROVED _________________ _

CADD SYSTEM

BOULDER CITY, NEVADA

MANAGER, ENGINEERING GROUP

CADD FILENAME

JUNE 21, 2009

45-301-9759

D

C

B

A

RFP 140R3022R0010 - Attachment 2 Protective Coating IDIQ (Page 2 of 2)

Attachment 2 Cover Page.pdf
Attachment 2 - IDIQ Drawings.pdf
1-45-301-7961-R0.pdf
2-45-301-9759-R0.pdf

File details come from the government source that posted it. Updated .