Attachment_2_-_IDIQ_Drawings.pdf

PDF 3 MB Posted

Attached to
Protective Coating - Multiple Award IDIQ Federal contract opportunity
Solicitation number
140R3022R0010
Issued by
Department of the Interior Bureau of Reclamation

View the file

Other files for this federal contract opportunity

Other files attached to Protective Coating - Multiple Award IDIQ, newest first.
File Type Posted
Attachment_5_-_Task_Order_1_-_Price_Schedule_-_RFP_Amendment_002_0002.pdf PDF
140R3022R0010_Questions_and_Answers_-_RFP_Amendment_002_0002.pdf PDF
Sol_140R3022R0010_Amd_0002.pdf PDF
RFP_No__140R3022R0010_-_Protective_Coating_IDIQ_-_Amendment_002_Revised_Pages_0002.pdf PDF
Attachment_3_-_Task_Order_1_-_Tailbay_Stoplogs_SOW_-_RFP_Amendment_002_0002.pdf PDF
Attachment_3_-_Task_Order_1_-_Tailbay_Stoplogs_SOW_-_RFP_Amendment_001_0001.pdf PDF
RFP_No__140R3022R0010_-_Protective_Coating_IDIQ_____Amendment_001_Revised_Pages_0001.pdf PDF
140R3022R0010_Questions_and_Answers_0001.pdf PDF
Sol_140R3022R0010_Amd_0001.pdf PDF
Attachment_11_-_Subcontracting_Plan_Format_-_RFP_Amendment_001_0001.pdf PDF
140R3022R0010_Pre-Proposal_Site_Visit_Attendees_List_(8-11-2022)_0001.pdf PDF
Attachment_7_-_Site_Visit_Map.pdf PDF
RFP_No__140R3022R0010_-_Protective_Coating_IDIQ.pdf PDF
Attachment_6_-_Task_Order_1_-_Wage_Determination_AZ20220006.pdf PDF
Attachment_9_-_Task_Order_1_-_Bond_Forms.pdf PDF
Attachment_13_-_Past_Performance_Questionnaire.pdf PDF
Attachment_4_-_Task_Order_1_-_Drawings.pdf PDF
Attachment_11_-_Subcontracting_Plan_Format.pdf PDF
Attachment_8_-_Task_Order_1_-_Supplemental_Provisions_and_Clauses.pdf PDF
Attachment_10_-_DI-137_Release_of_Claims.pdf PDF
Attachment_3_-_Task_Order_1_-_Tailbay_Stoplogs_SOW.pdf PDF
Attachment_12_-_Construction_Invoice_Requirements.pdf PDF
Sol_140R3022R0010.pdf PDF
Attachment_1_-_IDIQ_Specifications.pdf PDF
Attachment_5_-_Task_Order_1_-_Price_Schedule.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Base Contract:

Protective Coating IDIQ Drawings (2)

This page intentionally left blank

D

C

B

A

45-301-7961

Projec Wareho

Long-term

Wore house

Q) Warehouse Parking Lot

Parking Lot I 1 Police Checkpoint

---Lower Portal Road

N

--lL

Nevada Sign Area---

Highway 93 Road

NEVADA

CLARK COUNTY

Abandoned NV St.

Switchyar

City of L.A.

Switchyard

M.W.D.

Switchyard

Parking Lot #4

El. 1262

Police 0 Building

Road

Parkin�, Lot I

Parking Lot #2

El. 1357

Parking Lot f3 --------- El. 1275

G) Canoe Launch Site

@ NV Spillway Parking Lot lf7

El. 1236

Visitor Center Parking Structure ot 16

Dam

AZ Employee Parking Lot (18 Elev 1237

Parking Lot I 11

Elev 1260

AZ Spillway Parking@ Lot (19 Elev 1237

@ Parking Lot I 14- Elev 1360

Kingman

Switchyard

ARIZONA

MOHAVE COUNTY

0 200 400

1 UNIT - 200 FEEr

Evaporation

Ponds

1------------------------

: TEMPORARY REVISION � 1

I I

, DATE REVISED 4-04-05 :

LAKE MOHAVE I •

I

' REVISED BY Jls I

I

: Requested By Albert Marquez

I _______________________ !

3 2

Parking Lot f12 Elev 1285

@ Parking Lot (113 Elev 1295

Parking Lot (110 Elev 1250

Paved Area Elev 1335

Parking Lot I 15 Elev 1440

..-1

Evaporation Ponds Road:

ALWAYS THINK SAFETY

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

LOWER COLORADO DAMS OFFICE

HOOVER DAM

PARKING AREA NOS. & ELEVATIONS

DESIGNED_A!cB5.R!_ �'!_O!!_q

CHECKED __________________

JLS

DRAWN _____________ TECH. APPR. _________________

APPROVED _________________ _

M,,W,,\Gm, ENGINEFRING GROUP

Unknown Not Plotted

BOULDER CITY,NEVADA FEBRUARY24, 2OO3 45-301-7961

D

C

B

A

RFP 140R3022R0010 - Attachment 2 Protective Coating IDIQ (Page 1 of 2)

D

C

B

A

1 461 '

Visitor Center

Structure

1 2 1 1 '

4-68" Jet Flow Valves

(NV & AZ)

I I I I i---Upper & Lower Nevada Intake

Towers

30' Stee I Pen stocks

(NV & AZ)

13' Stee I Pen stocks

(NV & AZ)

------J

DD DD D

Canyon Wall

Out I et

Stoney =i----

Gate 0 (NV & AZ)-----

I I

I

I \

I

Arizona Spillway

I ----..,1'-1 -...,_ ____ _ I I I I/

Upper & Lower Arizona Intake

Towers

8 1/2' Dia. Steel Outlet Pipes to

Canyon Wa 11 Outlet Works

(NV & AZ)

D DODD□ D

·,_ D D

2 1

NEVADA LOWER PENSTOCK

NEVADA UPPER PENSTOCK

ARIZONA LOWER PENSTOCK

ARIZONA UPPER PENSTOCK

,-----------------------,: TEMPORARY REVISION [I] '

I

I

' DATE REVISED 6-30-2009 : '

1 REVISED BY / s ,I I

' REQUESTED BY GEORGE WENDT

I

I I _______________________ !

0. DESIGNER GEORGE WENDT - JLS - 6-23-2009

1. GEORGE WENDT. EXPANOED LOWER PENSTOCK COVERAGE -

JLS - 6-23-2009

DWG NOT TO SCALE

EB ALWAYS THINK SAFE1Y

UNITED STATES

DEPARTMENT OF THE I NTERIOR

BUREAU OF RECLAMATION

LOWER COLORADO DAMS OFFICE

HOOVER POWER PLANT

ARIZONA - NEVADA

PENSTOCK EXTERIOR SPOT COATING

DESIGNED_ GI_O!!_GE_ 'i!!f!P"!_ _ _ _ _ _ CHECKED __ :_ ______________ _

DRAWN __ JLS _________ TECH. APPR. _________________

APPROVED _________________ _

CADD SYSTEM

BOULDER CITY, NEVADA

MANAGER, ENGINEERING GROUP

CADD FILENAME

JUNE 21, 2009

45-301-9759

D

C

B

A

RFP 140R3022R0010 - Attachment 2 Protective Coating IDIQ (Page 2 of 2)

Attachment 2 Cover Page.pdf
Attachment 2 - IDIQ Drawings.pdf
1-45-301-7961-R0.pdf
2-45-301-9759-R0.pdf

File details come from the government source that posted it. Updated .