This solicitation is for repairs to the Cruz Bay Visitor Center, docks, and surrounding grounds in the U.S. Virgin Islands. The National Park Service is seeking dredging, bulkhead repairs, pier replacement, and other structural work. The estimated dredge area is 15,138 square feet with a dredge volume of 1,900 cubic yards to a depth of -8 feet MLLW. Bulkhead repairs include spall patching, crack repairs, void filling behind concrete caps, and installation of new fendering systems and cleats. The fixed pier will be replaced with 14-inch steel pipe piles driven to a minimum tip elevation. The response date is June 15, 2021 and the period of performance is 365 days.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST JOHN
ST THOMAS
T
H
I
S
P
R
O
J
E
C
T
CRUZ BAY
BOUNDARY OF
VIRGIN ISLANDS
NATIONAL PARK
VISITOR CENTER
U
N
I
T
E
D
K
N
G
D
O
M
U
N
I
T
D
T
A
T
E
S
U.S. VIRGIN ISLANDS
ST. JOHN
UNITED STATES
GULF OF MEXICO
SOUTH AMERICA
PACIFIC OCEAN
YUCATAN
C
A
R
I
B
B
E
A
N
A
ATLANTIC OCEAN
ST. JOHN
ST. THOMAS
PUERTO RICO
ST. CROIX
VIRGIN ISLANDS
CUBA
JAMAICA
HAITI
NOT TO SCALE
CRUZ BAY
ST. JOHN
NOT TO SCALE
T H
P
O
J E
C
T
A
M
REPAIRS TO FACILITY IMPACTED BY
HURRICANES IRMA AND MARIA
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
SOUTHEAST VIRGIN ISLANDS
1 22
175150
VIIS 244623
REPAIR CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK, St. John, USVI
SCALE OF MILES
SCALE OF KILOMETERS
0.5 1
0.5 1
1.5 2
1.5 2
2.5 3
CRUZ BAY
VISITOR CENTER
NOT TO SCALE
Project Manager Date
QUALITY DESIGN CERTIFICATION
OR
OR
Development (Title I)
Prepared in Accordance with Design by Design Development (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Design Development (Title I)
Drawing No.
Date
STATEREGION COUNTY
NAME OF PARK
TITLE OF PROJECT
CROFT & ASSOCIATES - P15PC00467
PRIME / ARCH / MEP:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL:
MOFFATT & NICHOL
MIAMI, FLORIDA
SheetMark REVISION Date Initial
LOCATION WITHIN PARK
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
UNITED STATES
DEPARTMENT OF THE INTERIOR
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
CONSTRUCTION DOCUMENTS
LEGENDS & SYMBOLS:
MATCH LINE MARK
KEYNOTE
DETAIL NUMBER
ELEVATION NUMBER
DRAWING NUMBER
SHEET NO. (WHERE SHOWN)
ELEVATION NUMBER
COLUMN LINE NUMBER
ROOM NUMBER AND LEVEL
SHEET NO. (WHERE SHOWN)
PARTITION TYPE
DOOR NUMBER
ELEVATION MARKS
WINDOW TYPE
GRID LINE
W1
A1
A101
A1
A101
A1
A101
SECTION NUMBER
A101
A1
A*
BUILDING SECTION
DETAIL
EXTERIOR ELEVATION
TITLES
INTERIOR ELEVATION
INDICATES WINDOW ABOVE
SHEET NO. (WHERE SHOWN)
SHEET NO. (WHERE SHOWN)
ROOM NAME NAME
SHEET NO. (WHERE SHOWN)
SECTION NUMBER
A101
A1
WALL SECTION
SHEET NO. (WHERE SHOWN)
COLUMN GRID
A102, A103
A1
A101
MAP
MM
MGC
2021-05-20
SHEET INDEX AND
GENERAL INFORMATION
G2
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
A
M
AT
AVG AVERAGE
AUTO AUTOMATIC
ARCH
ARCHITECT (URAL)
ANOD ANODIZED
ALUM ALUMINUM
ALT ALTERNATE
A/C AIR CONDITIONING
ADMIN ADMINISTRATION
ABV ABOVE
ADA AMERICANS W/ DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ACT ACOUSTICAL TILE
BM BEAM
BRG BEARING
BOT BOTTOM
BLDG BUILDING
CAB CABINET
CARP CARPET
CJ CONTROL JOINT
CLG CEILING
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CONTRACTING OFFICER
COL COLUMN
CONST CONSTRUCTION
CONC CONCRETE
CONT CONTINUOUS
COR CONTRACTING OFFICER
REPRESENTATIVE
CW COMPOSITE WOOD
DEM
DEMOLISH, DEMOLITION
DN DOWN
DBL DOUBLE
DIFF DIFFUSER
DIA DIAMETER
DIM DIMENSION
DTL DETAIL
DWG DRAWING
EA EACH
ENCL
ENCLOSE (URE)
ELEC
EIFS
ELECTRICAL
EP ELECTRICAL PANEL
EL, ELEV
ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRICAL WATER COOLER
EXT EXTERIOR
EXIST EXISTING
EXP J EXPANSION JOINT
FD FIELD DETERMINE
FFE FINISHED FLOOR ELEVATION
FFL FINISHED FLOOR LINE
FE FIRE EXTINGUISHER
FRP FIBER REINFORCED PANEL
FT FOOT/FEET
FRT FIRE RETARDANT TREATED
FLUOR FLUORESCENT
FTG FOOTING
GEN GENERAL
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GWB GYPSUM WALL BOARD
HDWR HARDWARE
HVAC
HEATING, VENTILATION & AIR
CONDITIONING
HC HANDICAP
HCB HANDICAP COUPON BOOTH
HGT HEIGHT
H HIGH
HM HOLLOW METAL
HORIZ HORIZONTAL
INSUL INSULATION
INT INTERIOR
ID INSIDE DIAMETER
JAN JANITOR
LBL LABEL
LAV LAVATORY
L LONG
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LVT LUXURY VINYL TILE
MAX MAXIMUM
NIC NOT IN CONTRACT
MAINT MAINTENANCE
MAT MATERIAL
MCG METAL CORNER GUARD
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
MIN MINIMUM
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPP OPPOSITE
OS OVERFLOW SCUPPER
PREFAB PREFABRICATED
PL PLATE
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PT PRESSURE TREATED
QTY QUANTITY
REINF
REINFORCE (D) (ING)
R, RAD
RADIUS
RCP REFLECTED CEILING
PLAN
RD ROOF DRAIN
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
SHT SHEET
SPK SPEAKER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STRUCT STRUCTURAL
ST STEEL TUBE
STL STEEL
STO STORAGE
SUSP SUSPENDED
TEMP TEMPERED
TE TOP ELEVATION
TEL TELEPHONE
TV TELEVISION
THK THICK
TBD TO BE DETERMINED
T & G TONGUE & GROOVE
TOC TOC OF CAP
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VAR VARIES
VERT VERTICAL
VIF VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
ABBREVIATIONS:
INDEX OF DRAWINGS
SHEET SUB SHEET TITLE OF SHEET
1 G1 COVER SHEET
2 G2 SHEET INDEX AND GENERAL INFORMATION
3 G3 OVERALL EXISTING CONDITIONS PLAN
4 G4 PHOTOGRAPHS OF EXISTING CONDITIONS
5 D1 DEMOLITION PLAN
6 D2 DEMOLITION DETAILS
7 S1.1 DREDGING NOTES
8 S1.2 DREDGING SITE PLAN
9 S1.3 DREDGING SECTIONS
10 S1.4 DREDGING CONTAINMENT AREA
11 S2.1 STRUCTURAL NOTES
12 S2.2 SITE PLAN
13 S2.3 STRUCTURAL SITE PLAN (1 OF 2)
14 S2.4 STRUCTURAL SITE PLAN (2 OF 2)
15 S2.5 FIXED PIER
16 S2.6
FIXED PIER DETAILS (1 OF 3)
17 S2.7
FIXED PIER DETAILS (2 OF 3)
18 S2.8
FIXED PIER DETAILS (3 OF 3)
19 S2.9
BULKHEAD REPAIRS DETAILS (1 OF 2)
20 S2.10
BULKHEAD REPAIRS DETAILS (2 OF 2)
21 S2.11 STRUCTURAL DETAILS
22 S3 BORING LOGS
MLLW= 0.00 FT
MHHW=+0.93 FT
EPOCH: 1983-2001
NOAA TIDAL STATION:
HART BAY, ST JOHNS, VI [9751456]
MSL, NAVD88,
VIVD09 =+0.48 FT
MHW=+0.85 FT
MLW=+0.11 FT
GENERAL NOTES:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
SUPERVISION AND COORDINATION OF ALL CONSTRUCTION
PROCEDURES.
2. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE
WITH THE APPLICABLE CODES AND ORDINANCES IN EFFECT
AT THE TIME OF CONSTRUCTION OUTLINED ON G2 AND S2.1.
IN THE EVENT OF A CONFLICT, THE MORE STRINGENT
REQUIREMENT SHALL GOVERN AND BE MET.
3. ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR
AND THE CONTRACTING OFFICER MUST BE NOTIFIED OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
4. WHERE A DETAIL IS SHOWN FOR ONE CONDITION, IT SHALL
APPLY TO ALL LIKE OR SIMILAR CONDITIONS, EVEN THOUGH
NOT SPECIFICALLY MARKED ON THE DRAWINGS.
5. CONTRACTOR SHALL REMOVE PROMPTLY AND LEGALLY ALL
ACCUMULATED DEBRIS, PROTECT ALL EXPOSED PORTIONS
OF WORK FROM ELEMENTS, AND SECURELY STORE ALL
ITEMS TO BE USED FOR CONSTRUCTION.
6. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING
UNDERGROUND UTILITIES PRIOR TO EXCAVATION.
7. NO UNDERGROUND UTILITIES SURVEY HAS BEEN
PERFORMED THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONARY MEASURES TO PROTECT THE PUBLIC AND
ADJACENT PROPERTIES FROM DAMAGE THROUGHOUT
CONSTRUCTION.
8. ANY EXISTING UTILITIES TO BE ABANDONED SHALL BE
PROPERLY DISCONNECTED, PLUGGED OR CAPPED, AS
REQUIRED BY CODE OR SOUND CONSTRUCTION PRACTICE.
9. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE
MADE FROM THE DRAWINGS OR SPECIFICATIONS WITHOUT
FIRST SECURING WRITTEN PERMISSION FROM THE
CONTRACTING OFFICER.
10. WHERE LACK OF INFORMATION, OR ANY DISCREPANCY
SHOULD APPEAR IN THE DRAWINGS OR SPECIFICATIONS,
REQUEST WRITTEN INTERPRETATION FROM THE
CONTRACTING OFFICER BEFORE PROCEEDING WITH THAT
PORTION OF THE WORK.
11. WHEN A SYSTEM OR ASSEMBLY IS SPECIFIED, ALL
NECESSARY PARTS AND MATERIALS REQUIRED FOR A
COMPLETE INSTALLATION/SYSTEM SHALL BE INSTALLED
ACCORDING TO THE MANUFACTURERS INSTRUCTIONS.
12. COORDINATE WITH ALL TRADES THE LOCATIONS OF SLEEVES
OR OTHER PRESET ACCESSORIES INVOLVING OTHER
TRADES.
13. THESE PLANS SHOULD BE STUDIED AND USED IN THEIR
ENTIRETY AS INFORMATION VITAL TO EACH STAGE OF
CONSTRUCTION.
14. GENERAL CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR COMPLETION OF ALL WORK SHOWN OR
REASONABLY IMPLIED BY THESE DRAWINGS AND/OR
SPECIFICATIONS.
15. DETAILS TAKE PRECEDENCE OVER PLANS & ELEVATIONS -
LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER
SMALLER SCALE DRAWINGS.
16. MANUFACTURES AND MODELS REFLECTED ON DRAWINGS
ARE DESIGN BASIS ONLY UNLESS SPECIFICALLY NOTED AS “
SOLE SOURCE ” . FOR ITEMS NOT LABELED AS “ SOLE
SOURCE ” , EQUIVALENT PRODUCT SUBSTITUTIONS ARE
PERMITTED PROVIDED THEY OFFER THE SAME OR BETTER
PERFORMANCE AND ARE APPROVED BY THE CONTRACTING
OFFICER THROUGH FORMAL SUBMITTAL PROCESS.
17. CONTRACTOR SHALL PROTECT ALL MATERIALS ON THE
JOBSITE FROM THE ELEMENTS AND ENSURE MATERIALS DO
NOT DEVELOP MOLD THROUGHOUT THE PROJECT.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
ALL REQUIRED BUILDING AND CONSTRUCTION PERMITS
PRIOR TO THE COMMENCEMENT OF ANY WORK.
19. ANY ITEMS NOT BEING DEMOLISHED ARE TO BE PROTECTED
DURING CONSTRUCTION. IF DAMAGED OR DESTROYED,
REPLACE OR REPAIR DAMAGED OR DESTROYED ITEMS WITH
APPROVED ITEMS AT NO EXPENSE TO THE NATIONAL PARK
SERVICE.
20. THE DESIGN OF THIS PROJECT IS BASED UPON INFORMATION
PROVIDED BY NATIONAL PARK SERVICE THROUGH EXISTING
DRAWINGS AND ON-SITE OBSERVATION. VERIFY ALL EXISTING
DIMENSIONS AND CONDITIONS PRIOR TO COMMENCING
WORK. IF EXISTING CONDITIONS ARE NOT AS DEPICTED OR
ANTICIPATED, NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY UPON DISCOVERY AND DO NOT PROCEED
WITHOUT APPROVAL. IF CONTRACTOR PROCEEDS WITHOUT
APPROVAL, THE CONTRACTOR ACCEPTS FULL LIABILITY FOR
THAT PORTION OF CONSTRUCTION.
21. WORK MAY REQUIRE BOTH BARGE-BASED AND UPLAND
CONSTRUCTION EQUIPMENT. NO INFORMATION RELATED TO
THE BULKHEAD RATED CAPACITY IS AVAILABLE.
CONTRACTOR SHALL AVOID LOCATING HEAVY EQUIPMENT
ADJACENT TO IT.
22. THE CONTRACTOR SHALL PLACE CONSTRUCTION DEBRIS
CONTROL DEVICES, TURBIDITY CURTAINS, BOOMS,
TARPAULINS, FLOATS, STAGING, AND OTHER DEVICES AS
NECESSARY TO PREVENT CONSTRUCTION DEBRIS FROM
ENTERING THE WATER AND AIRBORNE MATERIALS FROM
LEAVING THE IMMEDIATE VICINITY OF THE SITE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF
ANY MATERIALS DEPOSITED OUTSIDE THE WORK AREA.
23. UPLAND TOPOGRAPHIC AND BOUNDARY DATA PROVIDED BY
"S&ME." SURVEY WAS PERFORMED IN SEPTEMBER 2020.
24. HYDROGRAPHIC SURVEY DATA PROVIDED BY "BIOIMPACT
INC." DATED SEPTEMBER 2020. WATER DEPTHS ARE
EXPRESSED IN FEET AND REFERENCED TO MLLW.
25. GEOTECHNICAL EXPLORATION COMPLETED BY GEOCONSULT
MARCH 2021.
26. GEOTECHNICAL DATA FROM GEOTECHNICAL REPORT TITLED
"GEOTECHNICAL ENGINEERING REPORT, REPLACEMENT PIER,
NATIONAL PARK SERVICE VISITORS' CENTER, SAINT JOHN,
UNITED STATES VIRGIN ISLANDS" ISSUED BY GEOCONSULT
AND DATED APRIL 28, 2021.
27. NO EXISTING UTILITIES INFORMATION IS AVAILABLE AT THE
PROJECT SITE.
28. UPLAND GRADE ELEVATIONS ARE IN FEET AND ARE
REFERENCED TO THE TO NAVD88 - GEOID 12B (EQUIVALENT
TO VIVD09). NO DATUM CONVERSION IS REQUIRED BETWEEN
VIVD09 AND MEAN SEA LEVEL (MSL) AS PER FEMA ADVISORY
HAZARD RESOURCES MAP FOR USVI.
29. HORIZONTAL CONTROL COORDINATES ARE IN FEET AND ARE
REFERENCED TO NAD83 PUERTO RICO AND VIRGIN ISLANDS.
30. TIDAL DATA ARE PER NOAA TIDAL STATION IN HART BAY, ST
JOHNS, VI [9751456], ARE BASED ON THE 1983-2001 TIDAL
EPOCH AND ARE NOT GUARANTEED TO REPRESENT
CONDITIONS WHICH MAY OCCUR DURING CONSTRUCTION.
ACTUAL WATER LEVELS MAY VARY FROM LEVELS INDICATED.
THE CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN
ESTIMATES OF WATER LEVELS WHICH MAY OCCUR DURING
CONSTRUCTION. VARIATION OF TIDAL LEVELS FROM THOSE
INDICATED OR CONTRACTOR'S ESTIMATION OF TIDAL LEVELS
SHALL NOT BE CONSIDERED AS A CLAIM FOR ADDITIONAL
COMPENSATION OR DELAY OF WORK.
31. THE CONTRACTOR SHALL CONSIDER AND PLAN FOR, ON A
DAILY BASIS, THE EFFECT OF TIDAL FLUCTUATIONS IN THE
EXECUTION OF THE WORK.
32. THE CONTRACTOR SHALL ABIDE BY ALL APPLICABLE
FEDERAL AND LOCAL ENVIRONMENTAL PROTECTION
STANDARDS, LAWS, AND REGULATIONS.
33. UNANTICIPATED DEBRIS UNCOVERED DURING DEMOLITION
SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF
NPS CONTRACTING OFFICER. CONTRACTOR SHALL NOTIFY
THE NPS CONTRACTING OFFICER OF ALL CONFLICTS WITH
EXISTING UTILITIES.
34. THE CONTRACTOR SHALL REMOVE ALL BARGES, WORK
BOATS, STAGING, AND OTHER TEMPORARY PLATFORMS
AND/OR AREAS AT THE COMPLETION OF WORK.
35. ALL TEMPORARY FENCING SHALL BE IN ACCORDANCE WITH
STANDARD INDEX NO. 452 OF THE FDOT ROADWAY AND
TRAFFIC DESIGN STANDARDS.
36. THE PROJECT SITE IS LOCATED IN AN ACTIVE WATERWAY.
THE CONTRACTOR SHALL CONSIDER AND PLAN FOR THE
EFFECTS OF PASSING VESSELS.
37. CONTRACTOR SHALL COORDINATE UPLAND STAGING,
MARINE WORKS, GENERAL CONSTRUCTION OPERATIONS,
SECURE CONSTRUCTION AREAS AND ALL
COORDINATIONS/APPROVALS WITH NPS CONTRACTING
OFFICER AND VIRGIN ISLANDS PORT AUTHORITY.
38. CONTRACTOR SHALL CONDUCT CONSTRUCTION
OPERATIONS IN SUCH A WAY THAT ALLOWS ACCESS BY NPS
TO/FROM THE BASIN. CONTRACTOR SHALL NOT INTERFERE,
AFFECT OR LIMIT NPS OPERATIONS (INCLUDING ACCESS TO
UPLAND PARK UTILITIES AND AMENITIES).
DEFINITIONS:
1. DIMENSIONS NOTED AS "CLEAR" SHALL BE FROM
FINISHED FACE TO FINISHED FACE
2. "TYPICAL" MEANS TYPICAL FOR ALL SIMILAR
CONDITIONS, UNO
3. WHEREVER THE TERM "OR EQUAL" IS USED, IT
SHALL MEAN EQUAL PRODUCT AS APPROVED BY
CONTRACTING OFFICER.
APPLICABLE CODES:
· INTERNATIONAL BUILDING CODE (IBC) 2018, WITH APPENDICES • INTERNATIONAL EXISTING
BUILDING CODE (IEBC) 2018, WITH APPENDICES
· NFPA 101 (LIFE SAFETY CODE)
· NFPA NATIONAL FIRE CODES, INCLUDING ANNEXES (EXCEPT NFPA 5000)
· ALL APPLICABLE LOCAL CODES, STANDARDS, AND ORDINANCES
· OWNER ’ S INSURANCE UNDERWRITER
· ASCE 7-16 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
· ACI 301-16 SPECIFICATIONS FOR STRUCTURAL CONCRETE
· ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY
· ACI 530-13 BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY STRUCTURES
· AISC STEEL CONSTRUCTION MANUAL, 14TH EDITION
· ANSI/AWC NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION (NDS) (2015)
· ANSI/AFPA SPECIAL DESIGN PROVISIONS FOR WIND AND SEISMIC (SDPWS) (2008)
· INTERNATIONAL PLUMBING CODE (IPC) (2018)
· ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY STANDARDS
· MOST CURRENT EDITION OF ALL APPLICABLE SMACNA STANDARDS (2016)
· NATIONAL ELECTRICAL SAFETY CODE (NESC) (2017)
· NFPA 70 NATIONAL ELECTRICAL CODE (NEC) (2017)
· NFPA 780 STANDARDS FOR THE INSTALLATION OF LIGHTNING PROTECTION SYSTEMS (2020)
· UNDERWRITER ’ S LABORATORY (UL) (PRODUCT SAFETY)
· FLORIDA BUILDING CODE (USED ONLY AS A GUIDELINE FOR ROOF MATERIALS THAT ARE
HURRICANE COMPLIANT)
· MIAMI-DADE APPROVAL (USED ONLY AS A GUIDELINE FOR ROOF MATERIALS THAT ARE
HURRICANE COMPLIANT)
· NATIONAL HISTORIC PRESERVATION ACT, 1966 AS AMENDED
· SECRETARY OF INTERIOR STANDARDS FOR REHABILITATION, CODIFIED 36 CFR 67
· SECRETARY OF THE INTERIOR STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES
ABA ARCHITECTURAL BARRIERS ACT
FBC FLORIDA BUILDING CODE
FEC FIRE EXTINGUISHER CABINET
USVI U.S. VIRGIN ISLAND
EXTERIOR INSULATION AND FINISH
SYSTEM
ES EACH SIDE
TOD TOP OF DECK
TOB TOP OF BEAM
BID ITEM SUMMARY:
THE WORK OUTLINED ON THESE DRAWINGS AND
SPECIFICATIONS SHALL BE BID ACCORDING TO SPEC
SECTION 012700 - CONTRACT LINE ITEMS. LINE ITEMS 2, 3,
AND 6 REPRESENT THE MARINE WORK ASSOCIATED WITH
THIS PROJECT AND ARE SHOWN ON THIS SET OF
DRAWINGS. LINE ITEMS 1, 4, AND 5 REPRESENT THE
LANDSIDE WORK ASSOCIATED WITH THIS PROJECT AND
ARE SHOWN ON THE LANDSIDE WORK DRAWINGS
(SEPARATE SET). SPECIFICATIONS ARE COMBINED INTO
ONE SPECIFICATION MANUAL FOR BOTH THE LANDSIDE
AND MARINE WORK. BELOW IS A SUMMARY OF THE
CONTRACT LINE ITEMS INDICATED ON THIS SET OF
DRAWINGS.
CONTRACT LINE ITEM NO. 2 - MARINE WORK – BULKHEAD
REPAIRS: SEE SHEETS S2.1 THROUGH S2.11.CONTRACT
LINE ITEM NO. 2 - MARINE WORK – BULKHEAD REPAIRS:
SEE SHEETS S2.1 THROUGH S2.11.
CONTRACT LINE ITEM NO. 3 - MARINE WORK - DREDGING:
SEE SHEETS S1.1 THROUGH S1.4.
CONTRACT LINE ITEM NO. 6 - MARINE WORK – PIER
REPLACEMENT: SEE SHEETS S2.1 THROUGH S2.11.
-6 .4
5-
-8.00
''S
T
''S
T
''S
T
''S
T
''S
T
''S
T
''S
T
E
BALL FIELD
LITTLE CRUZ BAY
DIESEL FUEL
TANK
WOODEN
STAIRS
MEMORIAL
VISITORS CENTER
FIXED PIER
BULKHEAD
CULVERT
PLAYGROUND
(NIC)
CONCRETE
SIDEWALK
PRIVATE PROPERTY
RESTROOMS
PAVILLION
DRAINAGE CHANNEL
PARKING LOT
TRAFFIC BOLLARD,
LOCATION
APPROX (TYP)
PROPERTY OF THE VIRGIN
ISLANDS PORT AUTHORITY
0+00
0+50
1+00
4+00
4+50
4+56
MAP
MM
MGC
2021-05-20
OVERALL EXISTING
CONDITIONS PLAN
G3
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
20' 0' 20'
40'
SCALE: 1''=20'
LEGEND
BATHYMETRIC CONTOUR
PROJECT STATIONING
GRADE ELEVATION
PHOTO LOCATION, SEE SHEET G4
-2.30
5.00
3+00
C1
G4
A4
G4
B1
G4
A1
G4
C3
G4
B3
G4
B4
G4
A3
G4
C1
G4
B2
G4
C2
G4
A2
G4
C4
G4
MAP
MM
MGC
2021-05-20
PHOTOGRAPHS OF
EXISTING CONDITIONS
G4
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
CLEAT (TYP)
TIMBER FENDER
SYSTEM
EXTRUDED
D-FENDER (TYP)
TIMBER FENDER
SYSTEM
EXTRUDED
D-FENDER (TYP)
CONCRETE
WALL
CONCRETE CAP
TIMBER
FENDER
SYSTEM
CONCRETE
WALL
CONCRETE DECK
H-PILE
CULVERT
CONCRETE CAP
SPALLS
CRACKING
GAP
FAILING PATCH
CONCRETE CAP
CRACKS
CONCRETE
CAP SPALLS
CAP
C1
G3
TYPICAL BULKHEAD
SCALE: NOT TO SCALE
C2
G3
TYPICAL PIER
SCALE: NOT TO SCALE
C3
G3
TYPICAL FENDER SYSTEM
SCALE: NOT TO SCALE
C4
G3
BOX CULVERT
SCALE: NOT TO SCALE
B1
G3
SPALL
SCALE: NOT TO SCALE
B2
G3
STRUCTURAL CRACKING
SCALE: NOT TO SCALE
B3
G3
JOINT GAP
SCALE: NOT TO SCALE
B4
G3
COLD JOINT GAP
SCALE: NOT TO SCALE
A1
G3
SURFACE CRACKING
SCALE: NOT TO SCALE
A2
G3
CRACKING AND SPALLING
SCALE: NOT TO SCALE
A3
G3
DAMAGED CLEAT
SCALE: NOT TO SCALE
A4
G3
VOID BEHIND CAP
SCALE: NOT TO SCALE
-6 .4
5-
-8.00
''S
T
''S
T
''S
T
''S
T
''S
T
''S
T
''S
T
E
DEMOLISH EXISTING
FENDER SYSTEM
DEMOLISH
EXISTING PIER
BULKHEAD, TO
REMAIN
LITTLE CRUZ BAY
MEMORIAL, TO REMAIN
VISITORS CENTER,
TO REMAIN
BULKHEAD,
TO REMAIN
CULVERT AND CULVERT
CLEATS, TO REMAIN
PLAYGROUND
(NIC)
CONCRETE
SIDEWALK, TO
REMAIN
LOADING
RAMP, TO
REMAIN
CLEAT TO BE
REMOVED/DISPOSED
(TYP)
81.58'
A/C
PAVEMENT,
TO REMAIN
CRANE PAD. DEMOLISH
ANCHOR BOLTS
CLEATS ON
CULVERT TO
REMAIN
MAP
MM
MGC
2021-05-20
DEMOLITION PLAN
D1
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
ESTIMATED DEMOLITION
QUANTITIES
ITEM QUANTITY
FENDER SYSTEM 410 LF
FIXED PIER 816 SF
H-PILES 18
BULKHEAD CLEATS 30
DEMOLITION NOTES:
1. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO STRICTLY CONTAIN THE
DEMOLITION WITHIN THE LIMITS OF THE REQUIRED CONSTRUCTION AND AVOID ANY DAMAGE TO
THE EXISTING STRUCTURES. PLAN SHALL INCLUDE DETAILED MEANS AND METHODS OF
DEMOLITION WORK.
2. ANY DAMAGE INCURRED IN EXECUTION OF THIS CONTRACT TO ANY PART OF THE
PROPERTY/STRUCTURE NOT SPECIFICALLY DESIGNATED FOR DEMOLITION SHALL BE REPAIRED,
REPLACED, AND/OR RECONSTRUCTED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AS
DIRECTED BY NPS CO AT THE EXPENSE OF THE CONTRACTOR.
3. ALL DEMOLISHED MATERIAL, EXCEPT AS NOTED OTHERWISE, BECOMES THE PROPERTY OF, AND
SHALL BE COMPLETELY REMOVED AND DISPOSED OF BY THE CONTRACTOR. THE REMOVAL,
HANDLING, AND DISPOSAL OF ALL DEMOLITION MATERIALS SHALL BE IN STRICT ACCORDANCE
WITH ALL LOCAL, AND ENVIRONMENTAL REQUIREMENTS.
4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME FAMILIAR WITH THE
MATERIALS TO BE DISPOSED OF AND ALL GOVERNING AGENCY REQUIREMENTS.
5. UTILITIES INFORMATION IS NOT AVAILABLE. BEFORE DEMOLITION START, CONFIRM WITH NPS
THE PRESENCE OF ANY EXISTING UTILITIES IN THE VICINITY OF THE PROJECT SITE .
6. THE CONTRACTOR IS RESPONSIBLE TO CONTROL FUGITIVE DUST ORIGINATING FROM THE
PROJECT SITE DURING CONSTRUCTION BY WATERING OR OTHER METHODS AS REQUIRED.
7. ACTIVITIES REQUIRED FOR REMOVAL OF ENVIRONMENTALLY CONTAMINATED MATERIALS AND
DEVICES IF PRESENT, SHALL BE COORDINATED THROUGH NPS CONTRACTING OFFICER.
8. ALL SURVEY MONUMENTS WITHIN LIMITS OF CONSTRUCTION ARE TO BE PROTECTED.
9. TREATED TIMBER SHALL BE DISPOSED OF IN ACCORDANCE WITH LOCAL REGULATIONS.
10. ALL CONCRETE SHALL BE ASSUMED TO BE STEEL REINFORCED.
11. THE EIGHTEEN STEEL H PILES SUPPORTING THE PIER SHALL BE EXTRACTED FULL LENGTH.
EVERY ATTEMPT SHALL BE MADE TO REMOVE/EXTRACT THE ENTIRE LENGTH OF PILE. ALL
EXTRACTED AND/OR CUT PILES SHALL BE DISPOSED OF IN AN APPROVED LOCATION. A PILE MAY
NOT BE CUTOFF UNTIL, IN THE OPINION OF THE CONTRACTING OFFICER, THE CONTRACTOR HAS
EXHAUSTED ALL REASONABLE MEANS TO EXTRACT THE PILES SHALL BE CUT AT A MINIMUM AT
1.0 FT BELOW THE TARGET DREDGE DEPTH RECORD LOCATION OF ANY CUT PILES AND PROVIDE
SURVEY TO NPS CO UPON COMPLETION OF DEMOLITION. PILE EXTRACTION MUST COMPLY WITH
PERMIT REQUIREMENTS.
12. DEMOLITION QUANTITIES ARE ESTIMATED BASED ON TOPOGRAPHIC SURVEY DATA PROVIDED BY
"CROFT AND ASSOCIATES" AND AS OBSERVED DURING FIELD INSPECTION. UNANTICIPATED
SUBMERGED DEBRIS AND UTILITIES MAY BE PRESENT AT THE PROJECT SITE AND MUST BE
REMOVED BY THE CONTRACTOR. DEMOLITION QUANTITIES ON SITE TO BE CONFIRMED BY THE
CONTRACTOR.
13. DEMOLITION OF HARDWARE, CONCRETE ANCHORS, REINFORCED CONCRETE REQUIRED FOR
REPAIR, AND OTHER MISCELLANEOUS COMPONENTS RELATED TO THE WORK SHOWN ON THESE
PLANS IS CONSIDERED INCIDENTAL TO THE WORK.
LEGEND
BATHYMETRIC CONTOUR
DEMO AREA
GRADE ELEVATION
-2.30
20' 0' 20'
40'
SCALE: 1''=20'
5.00
A1
D2
A2
D2
DEMOLISH 4"Dx5"Wx±36"L
EXTRUDED 'D' FENDER,
SEE NOTE 1
DEMOLISH 3/4"Ø ANCHOR
BOLT, MIX SS AND GALV,
@ ±40" O.C.
2'-0"
DEMOLISH 6x10 BLOCKING, LENGTH VARIES
DEMOLISH 4x10
WALE (TYP)
6"
DEMOLISH 3/4"Ø
ANCHOR BOLT
COLD JOINT (TYP)
1'-0"±
SIDEWALK,
TO REMAIN
DEMOLISH 4x10 BLOCKING, LENGTH VARIES
SHEETPILE
WALL ,TO
REMAIN
MUDLINE VARIES
CONCRETE CAP,
TO REMAIN
REMOVE/DISPOSE MOORING
CLEAT AND HARDWARE
(TYP)
EL.+/-3.00' MSL
C2
S2.10
10'-0"
REMOVE/DISPOSE MOORING
CLEAT AND HARDWARE (TYP)
DEMOLISH
CONCRETE PIER
DEMOLISH
3x8 WALE
DEMOLISH APPROX. 8"x8" HP STEEL
SECTION, CONCRETE ENCASED
DEMOLISH CONCRETE ENCASED
STEEL BEAM AT H-PILE (TYP)
DEMOLISH 12"ر
SPLICE PLATE
EXTRACT FULL
LENGTH OF H-PILE
DEMOLISH CONCRETE
ENCASEMENT
MUDLINE ELEVATION VARIES
MAP
MM
MGC
2021-05-20
DEMOLITION DETAILS
D2
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
1' 0'-0'' 6"
1'
SCALE: 1 1/2"=1'-0''
LEGEND
DEMO AREA
DEMOLITION NOTES:
1. EXISTING EXTRUDED D-FENDER ARE SCATTERED THROUGHOUT. CONTRACTOR SHALL FIELD
VERIFIED QUANTITIES.
2. COMPONENT SIZES AND ALL DIMENSIONS SHOWN THIS SHEET ARE APPROXIMATE.
3. FENDER SYSTEM CONFIGURATION VARIES THROUGHOUT LENGTH OF BULKHEAD. DETAIL C3 ON
SHEET G4 SHOWN TYPICAL CONFIGURATIONS.
4. STEEL H-PILES EXHIBIT SEVERE CORROSION AND SECTION LOSS WHERE THE CONCRETE
ENCASEMENT HAS FAILED IN THE TIDAL/SLASH ZONE. CONTRACTOR METHOD OF PILE
EXTRACTION MUST ACCOUNT FOR PILE INTEGRITY.
A1
D1
DETAIL - FENDER DEMOLITION
SCALE: 1 1/2" = 1'-0"
A2
D1
DETAIL - PIER DEMOLITION
SCALE: 1 1/2" = 1'-0"
MGC
2021-05-20
DREDGING NOTES
S1.1
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
A
M
ENVIRONMENTAL MEASURES
1. DURING WATERSIDE CONSTRUCTION, THE CONTRACTOR SHALL
MONITOR THE TURBIDITY LEVELS TO ENSURE THAT TERRITORIAL
WATER QUALITY STANDARDS ARE MAINTAINED AND CONSTRUCTION
METHODS ARE IN ACCORDANCE WITH THE PERMITS.
2. DURING CONSTRUCTION THE CONTRACTOR SHALL PLACE EROSION
CONTROL DEVICES AND MEASURES AROUND THE PROJECT AREA AND
OTHER AREA(S) NEEDED TO PREVENT EROSION AND THE MIGRATION
OF SEDIMENT TO POINTS OUTSIDE THE DEMOLITION/CONSTRUCTION
AREA(S).
3. CONTRACTOR SHALL DEPLOY TURBIDITY CURTAINS AS SHOWN WITHIN
THE PROJECT TURBIDITY CONTROL LIMITS. TURBIDITY CURTAINS
SHALL BE DEPLOYED IN A MANNER NOT TO ENTANGLE OR HARM
MARINE RESOURCES.
4. TURBIDITY CURTAINS SHALL NOT BE RELOCATED/REMOVED FROM
AREA UNTIL TURBIDITY LEVELS WITHIN THE ENCLOSED AREA RETURN
TO 0 NTU's ABOVE BACKGROUND LEVELS IN ACCORDANCE WITH THE
APPROVED TURBIDITY MONITORING CRITERIA.
5. TURBIDITY CURTAINS SHALL BE SECURED WITH TEMPORARY STEEL OR
TIMBER PILINGS AT SUFFICIENT SPACING TO MAINTAIN
CONTROL/FUNCTION. A WEIGHT SYSTEM CAN ALSO BE UTILIZED IF
PRACTICAL.
DEBRIS REMOVAL
1. UNANTICIPATED SUBMERGED DEBRIS MAY BE PRESENT AT THE
PROJECT SITE AND MUST BE REMOVED BY THE CONTRACTOR,
DEMOLITION QUANTITIES ON SITE TO BE CONFIRMED BY THE
CONTRACTOR. CONTRACTOR SHALL INVESTIGATE THE PRESENCE OF
DEBRIS WITHIN THE PROJECT AREA PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL INVESTIGATE DEBRIS SIGNATURES WITHIN THE
PROJECT AREA PRIOR TO CONSTRUCTION.
3. ALL DEBRIS SHALL BE RECOVERED AND DISPOSED OF AT AN
APPROVED UPLAND DISPOSAL SITE.
4. SUBMIT DEBRIS REMOVAL REPORT WITH LOAD TICKETS AND
REPRESENTATIVE PHOTOGRAPHS OF DEBRIS REMOVED. PROVIDE
COORDINATES OF MAJOR DEBRIS ITEMS RECOVERED AND REMOVED.
GENERAL EROSION AND TURBIDITY CONTROL
NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH, INSTALL, AND
MAINTAIN TURBIDITY AND EROSION CONTROL MEASURES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO FURNISH, INSTALL, AND
MAINTAIN TURBIDITY BARRIERS IN ALL PERMANENT BODIES OF WATER
REGARDLESS OF WATER DEPTH AROUND THE WORK AREA DURING ALL
DREDGING. THE CONTRACTOR HAS THE OPTION TO ENCLOSE THE
ENTIRE WATERSIDE OF THE SITE, WITHIN THE LIMITS OF DISTURBANCE,
OR TO INSTALL AND MOVE THE TURBIDITY BARRIERS IN STAGES.
TURBIDITY MANAGEMENT PLAN TO BE SUBMITTED TO THE
CONTRACTING OFFICER FOR APPROVAL PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
3. THE APPROPRIATE TURBIDITY AND EROSION CONTROL
METHODOLOGIES SELECTED BY THE CONTRACTOR FOR THIS PROJECT
SHOULD BE MADE FOLLOWING ASSESSMENT OF THE PLANS AND
PROJECT SITE SPECIFIC FACTORS AND AFTER CONSULTATIONS AS
NEEDED WITH THE CONTRACTING OFFICER AND APPROPRIATE
AGENCIES. THE CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING
ANY AND ALL NECESSARY PERMITS FOR SUCH ACTIVITY; SEVERAL
FACTORS TO CONSIDER ARE LISTED BELOW:
A. CLAY CONTENT IN EXCAVATED MATERIALS AND/OR
PERMEABILITY'S RATES
B. DEPTH OF CUT
C. AMBIENT GROUND WATER LEVELS
D. ACTUAL RAINFALL AMOUNTS AND TIME OF YEAR RELATIVE TO
NORMAL RAINY SEASON
E. PROXIMITY TO WETLANDS, WATER BODIES, OR OFFSITE
PROPERTIES
F. CLASS DESIGNATION OF RECEIVING WATER BODY.
G. DENSITY, TYPE, AND PROXIMITY OF UPLAND VEGETATION TO BE
RETAINED DURING CONSTRUCTION (FOR USE AS POSSIBLE
FILTRATION AREAS)
H. EXISTING TOPOGRAPHY AND DIRECTIONS OF SURFACE FLOW
I. TYPE OF EQUIPMENT USED
J. PROJECT TYPE
K. DURATION OF CONSTRUCTION ACTIVITIES
L. AMBIENT QUALITY OF SURFACE AND GROUNDWATER
M. TEMPORARY CONTAINMENT AREAS LOCATION AND DIMENSIONS
5. AT THE ONSET OF CONSTRUCTION, THE CONTRACTOR, AS THE PARTY
RESPONSIBLE FOR IMPLEMENTATION OF THE EROSION AND SEDIMENT
CONTROL PLAN, SHALL ASSESS THE ABOVE CONDITIONS AND FACTORS
AND SELECT THE APPROPRIATE METHODS OF PROTECTION.
CONSTRUCTION SEQUENCING SHOULD BE PLANNED PRIOR TO
INITIATION TO PROVIDE ADEQUATE PROTECTION OF WATER QUALITY.
6. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES TO BE
DESIGNED, MANUFACTURED, AND INSTALLED IN ACCORDANCE WITH
2006 FDOT DESIGN STANDARDS - INDEX NO. 102.
7. TURBIDITY BARRIERS TO BE MANUFACTURED AND INSTALLED IN
ACCORDANCE WITH 2006 FDOT DESIGN STANDARDS - INDEX NO. 103.
8. ADDITIONAL EROSION AND TURBIDITY CONTROL MEASURES THAN
THOSE PRESENTED MAY BE REQUIRED DUE TO CONSTRUCTION
SEQUENCING AND UNFORESEEN WEATHER CONDITIONS. THESE
ADDITIONAL EROSION AND TURBIDITY CONTROL MEASURES, INCLUDING
EXTRAS FOR MATERIALS AND LABOR, MUST BE PROVIDED BY THE
CONTRACTOR.
9. IF APPLICABLE, HAY BALES OR SILT SCREENS SHALL BE INSTALLED
PRIOR TO LAND CLEARING ACTIVITIES AND MAINTAINED FOR THE
DURATION OF THE PROJECT UNTIL ALL SOIL IS STABILIZED.
10. FLOATING TURBIDITY BARRIERS SHALL BE INSTALLED IN FLOWING
SYSTEMS OR ALONG OPEN-WATER SHORELINES PRIOR TO INITIATION
OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE
PROJECT UNTIL ALL SOIL IS STABILIZED.
11. THE INSTALLATION OF TEMPORARY EROSION CONTROL BARRIERS
SHALL BE COORDINATED WITH THE CONSTRUCTION OF PERMANENT
EROSION CONTROL FEATURES TO THE EXTENT NECESSARY TO ASSURE
EFFECTIVE AND CONTINUOUS CONTROL OF EROSION AND WATER
QUALITY THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE.
12. THE TYPE OF EROSION CONTROL BARRIERS USED SHALL BE GOVERNED
BY THE NATURE OF THE CONSTRUCTION OPERATION AND SOIL TYPE
THAT WILL BE EXPOSED. SILTY AND CLAYEY MATERIAL MAY REQUIRE
SOLID SEDIMENT BARRIERS TO PREVENT TURBID WATER DISCHARGE,
WHILE SANDY MATERIAL MAY NEED ONLY SILT SCREENS OR HAY BALES
TO PREVENT EROSION. DIVERSION DITCHES OR SWALES MAY BE
REQUIRED TO PREVENT TURBID STORMWATER RUNOFF FROM BEING
DISCHARGED TO WETLANDS OR SURFACE WATERS. IT MAY BE
NECESSARY TO EMPLOY A COMBINATION OF BARRIERS, DITCHES, AND
OTHER EROSION/TURBIDITY CONTROL MEASURES IF CONDITIONS
WARRANT.
WATER QUALITY MONITORING PLAN
1. WATER QUALITY MONITORING SHALL BE CONDUCTED FOR TURBIDITY
DURING DREDGING ACTIVITIES AT THREE TEST STATIONS: 1)
BACKGROUND, 2) COMPLIANCE, AND 3) MIXING ZONE. THE
BACKGROUND STATION SHALL BE LOCATED OFFSHORE OF THE
PROJECT AREA OUTSIDE OF THE MIXING ZONE AND ANY TURBIDITY
GENERATED BY DREDGING ACTIVITIES. THE COMPLIANCE STATION
SHALL BE LOCATED OUTSIDE THE MIXING ZONE AND SINGLE OR DOUBLE
TURBIDITY BARRIERS OFFSHORE OF THE PROJECT AND IN THE DENSEST
PORTION OF ANY VISIBLE TURBIDITY PLUME. THE MIXING ZONE STATION
SHALL BE LOCATED INSIDE THE LIMITS OF THE MIXING ZONE AND THE
TURBIDITY BARRIERS.
2. SHOULD THE COMPLIANCE TURBIDITY EXCEED THE BACKGROUND,
WORK SHALL CEASE AND THE CONTRACTING OFFICER SHALL BE
NOTIFIED IMMEDIATELY. OPERATIONS SHALL NOT RESUME UNTIL
CORRECTIVE MEASURES HAVE BEEN TAKEN AND TURBIDITY HAS
RETURNED TO ACCEPTABLE LEVELS. NTU's ABOVE 3 WILL BE ALLOWED
WITHIN THE MIXING ZONE.
3. TESTING WITHIN THE LIMITS OF THE MIXING ZONE WILL BE CONDUCTED
TO VERIFY COMPLIANCE WITH THE GREATER OF BACKGROUND AND
TERRITORIAL WATER QUALITY STANDARDS PRIOR TO REMOVAL OF THE
TURBIDITY BARRIERS (REVIEW USACE AND CZM PERMITTING FOR
ADDITIONAL INFORMATION). ONCE DREDGING OPERATIONS ARE
COMPLETE AND COMPLIANCE AT THE MIXING ZONE STATION IS MET,
TESTING AT THE MIXING ZONE STATION MAY BE SUSPENDED.
4. WATER QUALITY TESTING SHALL OCCUR TWICE DAILY DURING
DREDGING, AT LEAST FOUR HOURS APART FOR TURBIDITY. SAMPLES
SHALL BE COLLECTED AT TWO FEET ABOVE THE MUDLINE AND TWO
FEET BELOW THE WATER SURFACE AT EACH STATION AND SHALL BE
ANALYZED WITHIN 30 MINUTES OF COLLECTION. THE ANALYZED DATA
SHALL BE DOCUMENTED AND REPORTED TO THE APPROPRIATE
REGULATORY AGENCIES WITHIN SEVEN DAYS AFTER COMPLETION OF
EACH TEST. MONITORING REPORTS SHALL CONTAIN THE FOLLOWING
INFORMATION:
A. PERMIT NUMBER
B. DATES OF SAMPLING AND ANALYSIS
C. STATEMENT DESCRIBING METHODS USED IN COLLECTION,
HANDLING, STORAGE, AND ANALYSIS OF THE SAMPLES
D. MAP INDICATING SAMPLE LOCATIONS
E. STATEMENT BY INDIVIDUAL RESPONSIBLE FOR THE
IMPLEMENTATION OF THE SAMPLING PROGRAM CONCERNING
THE AUTHENTICITY, PRECISION, LIMITS OF DETECTION AND
ACCURACY OF DATA
F. CONSTRUCTION ACTIVITIES
5. MONITORING REPORTS SHALL ALSO INCLUDE THE FOLLOWING
INFORMATION FOR EACH SAMPLE:
A. TIME OF DAY
B. DEPTH OF WATER BODY
C. DEPTH OF SAMPLE
D. ANTECEDENT WEATHER CONDITIONS
E. TIDAL STAGE AND DIRECTION OF FLOW
F. WIND DIRECTION AND VELOCITY
DREDGE MATERIAL TESTING
1. CONTRACTOR TO CONFIRM WITH THE PROPOSED DISPOSAL SITE
(BOVONI LANDFIELD) REGARDING ANY TESTING THAT MAY BE REQUIRED
FOR THE DISPOSAL OF THE DREDGED MATERIAL.
2. NON-HAZARDOUS DREDGE MATERIAL MAY BE BENEFICIALLY REUSED AS
FILL MATERIAL ON SITE, IF NEEDED.
TB
T B
T B
TB TB TB
T B
T B
CONST.
BARGE
TB
CONST.
BARGE
TBTB
TURBIDITY BARRIERS AND TESTING
1. THE CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN TURBIDITY CONTROL CURTAIN AROUND
WORK AREA. THE PURPOSE OF THE CURTAIN IS TO AVOID ANY DEBRIS FROM GOING INTO THE MAIN
WATERS. THE CONTRACTOR HAS THE OPTION TO ENCLOSE THE ENTIRE WATERSIDE OF THE SITE, WITHIN THE LIMITS OF DISTURBANCE, OR TO INSTALL AND MOVE THE CURTAIN IN STAGES. THE
CONTRACTOR SHALL MAINTAIN SUCH CURTAINS AT ALL TIMES IN THE AREAS WHERE WORK IS IN
PROGRESS.
OFF SHORE
PLAN
ALONG SHORE
PLAN
CONSTRUCTION NOTES FOR FABRICATED SILT FENCE
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR
STAPLES.
2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED
EVERY 2'-0" AT TOP & MID SECTION.
3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVERLAPPED
BY SIX INCHES & FOLDED.
4. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES"
DEVELOP IN THE SILT FENCE.
A. POSTS: STEEL EITHER "I" OR "U" TYPE
B. FENCE: WOVEN WIRE, 14 GA. 6" MAX. MESH OPENING
C. FILTER CLOTH: SHALL MEET NCDOT, STANDARD SPECIFICATION, SECTION 893
TURBIDITY CURTAIN TO BE USED
DURING CONSTRUCTION
WORK AREA
EXISTING SHORELINE
ANCHOR AT SHORELINE
TURBIDITY CURTAIN TO ENCLOSE
WORKING/DISTURBANCE AREA
DURING CONSTRUCTION
WORK AREA
TABLE OF QUANTITIES
DREDGE AREA 15,138 SQ FT
DREDGE VOLUME 1,900 CY
-6 .4
''S
T
''S
T
''S
T
''S
T
''S
T
''S
T
''S
T
E
LITTLE CRUZ BAY
MEMORIAL
VISITORS CENTER
BULKHEAD
CULVERT
PLAYGROUND
(NIC)
APPROXIMATE LOCATION
OF IN-WATER PROPERTY
LINE
LIMITS OF
MAINTENANCE
DREDGING
0+50.00
1+00.00
T B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
0+00
0+50
1+00
4+00
4+50
WP1
WP2
WP3
DREDGE TO - 8.0 FT MLLW
TURBIDITY BARRIER
BULKHEAD
FACE
BULKHEAD
FACE
WORKING POINT TABLE
WP #
NORTHING
839979.05
839952.30
840000.86
EASTING
1224933.60
1224878.55
1224702.99
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
20' 0' 20'
40'
SCALE: 1''=20'
NOTE:
1. HYDROGRAPHIC SURVEY DATA PROVIDED BY "BIOIMPACT INC." DATED
SEPTEMBER 2020. WATER DEPTHS ARE EXPRESSED IN FEET AND
REFERENCED TO MLLW.
2. NO EXISTING UTILITIES INFORMATION IS AVAILABLE AT THE PROJECT
SITE.
3. MAINTENANCE DREDGE TARGET DEPTH (-8.0 FT MLLW) AND DREDGE
EXTENT PROVIDED BY NPS BASED ON PREVIOUS MAINTENANCE
DREDGING PERFORMED IN LITTLE CRUZ BAY.
4. LOCATION OF IN-WATER PROPERTY LINE IS APPROXIMATE.
CONTRACTOR TO CONFIRM BY LICENSED SURVEYOR.
5. HORIZONTAL CONTROL COORDINATES ARE IN FEET AND ARE
REFERENCED TO NAD83 PUERTO RICO AND VIRGIN ISLANDS.
6. DREDGE VOLUME DOES NOT INCLUDE OVERDREDGE.
LEGEND:
APPROXIMATE LIMITS OF IN-WATER PROPERTY LINE
EXISTING BATHYMETRIC CONTOUR
DREDGING AREA
PARKING AREA
TURBIDITY BARRIER
TABLE OF QUANTITIES
DREDGE AREA
15,138 SQ FT
DREDGE VOLUME
1,900 CY
MAP
MM
MGC
2021-05-20
DREDGING SITE PLAN
S1.2
TB
L
E V
A T
I O
N
F
E
T
M
L L
W
E L
E V
A T
I O
N
E
T
M
L L
W
OFFSET IN FEET
FROM BULKHEAD
0+50.00
-10
-8
-6
-4
-2
-10
-8
-6
-4
-2
0 100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180
E L
E V
A T
I O
N
E
T
M
L L
W
E L
E V
A T
I O
N
E
T
M
L L
W
OFFSET IN FEET
FROM BULKHEAD
1+00.00
-10
-8
-6
-4
-2
-10
-8
-6
-4
-2
0 100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180
E L
E V
A T
I O
N
E
T
M
L L
W
E L
E V
A T
I O
N
E
T
M
L L
W
OFFSET IN FEET
FROM BULKHEAD
1+50.00
-10
-8
-6
-4
-2
-10
-8
-6
-4
-2
0 100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180
E L
E V
A T
I O
N
E
T
M
L L
W
E L
E V
A T
I O
N
E
T
M
L L
W
OFFSET IN FEET
FROM BULKHEAD
2+00.00
-10
-8
-6
-4
-2
-10
-8
-6
-4
-2
0 100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180
E L
E V
A T
I O
N
E
T
M
L L
W
E L
E V
A T
I O
N
E
T
M
L L
W
OFFSET IN FEET
FROM BULKHEAD
2+50.00
-10
-8
-6
-4
-2
-10
-8
-6
-4
-2
0 100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180
E L
E V
A T
I O
N
E
T
M
L L
W
E L
E V
A T
I O
N
E
T
M
L L
W
OFFSET IN FEET
FROM BULKHEAD
3+00.00
-10
-8
-6
-4
-2
-10
-8
-6
-4
-2
0 100-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180
EXISTING GRADES
DREDGE TO
-8.0 FT MLLW
EXISTING BULKHEAD
DREDGE TO
-8.0 FT MLLW
DREDGE TO
-8.0 FT MLLW
DREDGE TO
-8.0 FT MLLW
DREDGE TO
-8.0 FT MLLW
DREDGE TO
-8.0 FT MLLW
EXISTING GRADES
EXISTING GRADES
EXISTING GRADES
EXISTING GRADES
EXISTING GRADES
EXISTING BULKHEAD
EXISTING BULKHEAD
EXISTING BULKHEAD
EXISTING BULKHEAD
+3.48 FT MLLW (+3.00 FT MSL)
+3.48 FT MLLW (+3.00 FT MSL)
+3.48 FT MLLW (+3.00 FT MSL) +3.48 FT MLLW (+3.00 FT MSL)
+3.48 FT MLLW (+3.00 FT MSL)
+3.48 FT MLLW (+3.00 FT MSL)
MLLW 0.0 FT
MLLW 0.0 FT
MLLW 0.0 FT
MLLW 0.0 FT
MLLW 0.0 FT
MLLW 0.0 FT
EXISTING BULKHEAD
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
MAP
MM
MGC
2021-05-20
DREDGING SECTIONS
S1.3
30' 0' 30'
60'
HORIZONTAL SCALE: 1''=30'
3' 0' 3'
6'
VERTICAL SCALE: 1''=3'
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
MM
MGC
2021-05-20
DREDGING
CONTAINMENT AREA
S1.4
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
NOTES
1. CONTAINMENT AREA TO ENABLE DRYING OF DREDGED MATERIAL. DREDGED
MATERIAL WILL BE TAKEN TO THE PROPER FACILITY FOR DISPOSAL (BOVONI
LANDFIELD), WHEN SUITABLE FOR TRANSPORTATION.
2. LOCATION AND DIMENSIONS OF CONTAINMENT AREA ARE APPROXIMATE BASED
ON AVAILABLE AREA AND EXECTED PRODUCTION RATES. CONTRACTOR TO
ESTABLISH FINAL CONFIGURATION OF THE CONTAINMENT AREA ON-SITE BASED
ON UPLAND AVAILABILITY AND DREDGING RATES. CONTRACTOR TO CONFIRM
THE FINAL EXTENT OF THE CONTAINMENT AREA WITH THE CO.
3. CONTAINMENT AREA SHALL BE ENCLOSED BY SILT FENCES, HAY BALES OR
GEOTEXTILE SOCKS TO PREVENT SEDIMENT RUNOFF AND COMPLY WITH
PERMIT REQUIREMENTS AND WATER QUALITY STANDARDS.
APPROXIMATE LIMITS OF
CONTAINMENT AREA
(7000 SF APPROX)
BOAT RAMP AREA
(DO NOT BLOCK)
CONTAINMENT AREA
DREDGING AREA
TRUCK ACCESS
ROUTE
B1
S1.4
CONTAINMENT AREA
SCALE: NOT TO SCALE
4' 0'-0'' 4'
8'
SCALE: 1/4"=1'-0''
NPS VISITOR
CENTER
BARGE UNLOADING
AREA
MGC
2021-05-20
STRUCTURAL NOTES
S2.1
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
DESIGN CRITERIA
1. LIVE LOAD:
A. 100PSF UNIFORM LIVE LOAD WITH 400LB CONCENTRATED LOAD
2. WIND LOAD:
A. WIND LOADS CALCULATED IN ACCORDANCE WITH ASCE 7-16
B. WIND LOAD CRITERIA AND PARAMETERS:
BASIC DESIGN WIND SPEED: 165 MPH
RISK CATEGORY: II
EXPOSURE CATEGORY: D
3. SEISMIC LOAD:
A. RISK CATEGORY: II
B. SITE CLASS: D
C. PGA: 0.49
D. S
S
: 1.24
E. S
: 0.43
STEEL PILE DRIVING REQUIREMENTS
1. PILE SERVICE LOADS
2. STEEL PIPE PILES SHALL BE DRIVEN TO THE MINIMUM TIP ELEVATION
INDICATED USING A HAMMER OF AN APPROVED TYPE, AND WITH A CAPACITY
AT LEAST EQUAL TO THE HAMMER MANUFACTURER'S RECOMMENDATION FOR
THE TOTAL WEIGHT OF THE PILE AND CHARACTERISTICS OF SUBSURFACE
MATERIAL TO BE ENCOUNTERED.
3. THE CONTRACTOR SHALL MONITOR PILE INSTALLATION AND PREPARE THE
PILES FOR THE GEOTECHNICAL ENGINEER TO MAKE THE APPROPRIATE
CONNECTIONS TO THE MONITORING EQUIPMENT. CONTRACTOR TIME,
EQUIPMENT, AND MATERIALS NECESSARY FOR THE PDA TESTING SHALL BE
CONSIDERED INCIDENTAL TO THE INSTALLATION OF THE PILES.
4. ALL PILES SHALL BE DRIVEN TO THE REQUIRED CAPACITY BASED ON THE
DRIVING CRITERIA ESTABLISHED HEREIN AND BY THE TEST PILE PROGRAM IN
ACCORDANCE WITH ASTM D4945 AND THE TECHNICAL SPECIFICATIONS BUT,
UNDER NO CIRCUMSTANCES, SHALL THE PILE TIP ELEVATION BE HIGHER THAN
THE MINIMUM EMBEDMENT DEPTH INDICATED. THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF ANY PILES THAT DO NOT
REACH THE REQUIRED PILE TIP ELEVATIONS.
5. ALL PILE TESTING EQUIPMENT SHALL BE IN ACCORDANCE WITH ASTM D4945.
TEST PILES SHALL BE AT LEAST 10 FEET LONGER THAN REQUIRED TO REACH
THE ESTIMATED TIP ELEVATIONS. IF A SHORTER PILE MEETS THE CRITERIA
ESTABLISHED HEREIN AND FROM THE TECHNICAL SPECIFICATIONS, IT SHALL
BE REDUCED UNDER THE DISCRETION OF THE CONTRACTOR AT NO
ADDITIONAL EXPENSE TO THE OWNER. THE CONTRACTOR SHALL COMPLETE
THE TEST PILE PROGRAM PRIOR TO ORDERING PRODUCTION PILES.
6. NO JETTING OR SPUDDING ALLOWED. SEE TECHNICAL SPECIFICATIONS FOR
DRIVING REQUIREMENTS.
7. CONTRACTOR SHALL COORDINATE PILE DRIVING SCHEDULE SO AS TO NOT
INTERFERE WITH OR BE DETRIMENTAL TO THE CONCRETE PLACEMENT AND
CURING OPERATIONS.
CODES AND STANDARDS
ALL WORK SHALL CONFORM TO THE MINIMUM REQUIREMENTS FOR THE
FOLLOWING CODES AND STANDARDS:
1. INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION.
2. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE), MINIMUM DESIGN LOADS FOR
BUILDINGS AND OTHER STRUCTURES, ASCE/ANSI 7-16.
3. AMERICAN CONCRETE INSTITUTE (ACI), BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE AND COMMENTARY, ACI 318-14, 2014.
4. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), SPECIFICATION FOR
STRUCTURAL STEEL BUILDINGS AISC 360-16.
5. AMERICAN WELDING SOCIETY (AWS), STRUCTURAL WELDING CODE - STEEL,
AWS D1.1, 2015.
MISCELLANEOUS STEEL
1. ALL STEEL WORK SHALL BE IN ACCORDANCE WITH AISC CODE OF STANDARD
PRACTICE FOR STRUCTURAL STEEL FOR BUILDINGS AND BRIDGES (AISC).
2. STEEL PIPE PILES SHALL USE ASTM A252, GRADE 3 (MOD).
3. ALL MISCELLANEOUS STEEL SHAPES, PLATES AND BARS, SHALL CONFORM TO
ASTM A36 EXCEPT WHERE NOTED.
4. ALL CHANNEL SECTIONS SHALL USE ASTM A36.
5. ALL MOORING FITTINGS SHALL USE ASTM A27, GRADE 65-35.
6. STEEL PLATE NOTED AS GRADE 50 SHALL CONFORM TO ASTM A572, GRADE 50.
7. ALL BOLTS SHALL CONFORM TO ASTM A307, UNO ON THE DRAWINGS.
8. ALL ANCHOR BOLTS SHALL CONFORM TO ASTM F1554, GRADE 55 (TYPICAL),
UNO.
9. PROVIDE BLEED HOLES IN EMBEDDED PLATES AND SHAPES AT 24-IN, ON
CENTER MAXIMUM.
10. ALL NUTS SHALL BE ASTM A563, UNO.
11. ALL WASHERS SHALL BE ASTM F436, UNO.
12. ALL STEEL ITEMS SHALL BE HOT-DIP GALVANIZED IN ACCORDANCE WITH ASTM
A 123 OR ASTM A 153, UNO.
REINFORCED CONCRETE
1. ALL CONCRETE WORK SHALL BE PERFORMED IN ACCORDANCE WITH ACI 301,
AND CONFORM TO SPECIFICATION SECTION 03 31 29, UNO.
2. ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE WITH 28-DAY
COMPRESSIVE STRENGTH AS LISTED:
A. FIXED PIER: 5000PSI
B. ALL OTHER: 4000PSI
3. ALL DETAILING, FABRICATION AND ERECTION OF REINFORCING STEEL SHALL
CONFORM TO THE ACI MANUAL OF STANDARD PRACTICE FOR DETAILING
REINFORCED CONCRETE STRUCTURES: ACI 315 AND ACI SP-66.
4. REINFORCING STEEL
a. ALL REINFORCING STEEL SHALL BE DEFORMED STEEL BARS CONFORMING
TO ASTM A615, GRADE 60.
b. MECHANICAL SPLICES SHALL DEVELOP AT LEAST 125 PERCENT OF THE
YIELD STRENGTH OF THE BAR IN TENSION.
c. REINFORCING SHALL BE SUPPORTED AS SPECIFIED BY THE CONCRETE
REINFORCING STEEL INSTITUTE (CRSI) MANUAL OF STANDARD PRACTICE
(MSP). REINFORCING STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE
ACI MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED
CONCRETE STRUCTURES", ACI 315.
d. PROVIDE THE FOLLOWING CONCRETE COVER OVER REINFORCEMENT, UNO.
CONCRETE AGAINST GROUND................. 3"
EXPOSED CONDITIONS.............................. 3"
5. ALL EXPOSED CORNERS SHALL BE CHAMFERED 3/4 IN.
6. CONSTRUCTION JOINTS SHALL BE PROVIDED ONLY AS NOTED ON THE
DRAWINGS AND AS SPECIFICALLY PERMITTED BY THE CONTRACTING OFFICER.
7. PROVIDE MOIST CURING FOR 7 DAYS
8. GROUT SHALL BE NON-METALLIC AND NON-SHRINK WITH A MINIMUM 28 DAY
COMPRESSIVE STRENGTH OF 8,000 PSI, UNLESS OTHERWISE NOTED.
ADHESIVE ANCHORS
1. USE OF DRILLED ADHESIVE CONCRETE ANCHORS, WHERE NOT SPECIFIED IN
THE DOCUMENTS, SHALL BE SUBJECT TO APPROVAL BY THE CONTRACTING
OFFICER.
2. EPOXY OR ADHESIVE-TYPE ANCHORS SHALL BE INSTALLED IN ACCORDANCE
WITH THE MANUFACTURER'S RECOMMENDATIONS. SPECIAL INSPECTION IS
REQUIRED FOR ADHESIVE ANCHORS.
3. PROVIDE ASTM F1554 GR55 ANCHORS, HOT DIP GALVANIZED, DIAMETER AS
NOTED ON THE DETAILS.
4. MINIMUM CONCRETE EMBEDMENT PER MANUFACTURER'S
RECOMMENDATIONS.
5. THE EPOXY ADHESIVE MUST BE APPROVED FOR WET AND SUBMERGED USE
AND SHALL MEET ALL THE FOLLOWING TYPICAL PERFORMANCE CRITERIA
WHEN CURED AT 85 DEGREES FAHRENHEIT.
CONCRETE REPAIR:
1. THE DRAWINGS SHOW GENERAL TYPES, LOCATIONS, AND EXTENTS OF
DEFECTS, DETERIORATION, AND DAMAGES OBSERVED DURING INSPECTIONS
COMPLETED IN SEPTEMBER 2020. THE LOCATIONS AND EXTENTS OF THE
DEFECTS AND DAMAGES SHOWN ON THESE DRAWINGS ARE APPROXIMATE.
EXACT LOCATIONS AND QUANTITIES FOR REPAIR MUST BE VERIFIED IN THE
FIELD.
2. THE CONTRACTOR SHALL PREPARE THE REPAIR AREAS BY REMOVING MARINE
GROWTH, DEGRADED/LOOSE CONCRETE, AND CORROSION BY-PRODUCTS AS
NECESSARY TO QUANTIFY THE EXTENT OF THE REPAIR. THE CONTRACTOR
SHALL PRODUCE A DETAILED REPAIR TABLE INDICATING THE TYPE, LOCATION,
GEOMETRY, AND QUANTITY OF REPAIR. REPAIR TABLE SHALL BE INCLUDED IN
THE AS-BUILT DRAWINGS.
3. CONCRETE WORK SHALL COMPLY WITH THE PROVISIONS OF ACI 301 AND ACI
318, UNLESS NOTED OTHERWISE.
4. REINFORCING IN THE REPAIR AREAS SHALL BE PROVIDED WITH A MINIMUM OF
3 INCHES CONCRETE COVER OR MATCH EXISTING UNLESS NOTED OTHERWISE.
5. EXPOSED CONCRETE EDGES SHALL HAVE A 3/4 INCH CHAMFER, OR MATCH
EXISTING CHAMFER UNLESS NOTED OTHERWISE.
6. CAST-IN-PLACE CONCRETE COMPRESSIVE STRENGTH SHALL BE 4,000 PSI
(MINIMUM) AT 28 DAYS. PROVISIONS OF THE AMERICAN CONCRETE INSTITUTE
(ACI 318-14) UNLESS NOTED OTHERWISE.
7. CAST-IN-PLACE REPAIR CONCRETE SHALL CONFORM TO SPECIFICATION
SECTION 03 31 29.
8. CONCRETE REPAIRS CONSIST OF SMALL PATCH REPAIRS. NO DISTINCTION IS
MADE BETWEEN SPALLS AND DELAMINATIONS SINCE REPAIRS ARE THE SAME.
9. REMOVE DELAMINATED OR DETERIORATED CONCRETE UNTIL SOUND
CONCRETE IS ENCOUNTERED. CHIPPED OUT AREA SHALL EXTEND AN
ADDITIONAL 3" ALL AROUND.
10. CHECK SURFACES TO ENSURE THEY ARE FREE FROM LOOSE AGGREGATE OR
ADDITIONAL DELAMINATIONS.
11. CHIPPED OUT AREA SHALL BE NOT LESS THAN 1" CLEAR AROUND ALL
EXPOSED REINFORCING BARS.
12. EDGES OF THE CHIPPED OUT AREA SHALL BE SAWCUT PERPENDICULAR TO
THE CONCRETE SURFACE FOR A MINIMUM DEPTH OF 1". DO NOT SAWCUT
THROUGH EXISTING REINFORCING BARS. SAWCUT SHALL NOT EXTEND
BEYOND CHIPPED OUT AREA.
13. EXPOSED REINFORCING BARS SHALL BE CLEANED OF SCALE, RUST, DIRT, OIL,
AND OTHER DELETERIOUS MATERIALS.
14. REINFORCING STEEL SHALL CONFORM TO ASTM A615 GRADE 60, UNLESS
NOTED OTHERWISE.
15. REINFORCING BARS SHALL CONFORM TO ASTM A-706 AND WELDED IN
ACCORDANCE WITH AWS D1.4. E70XX LOW-HYDROGEN ELECTRODES SHALL BE
USED IN WELDING ASTM A-706 BARS. WELDING OF STAINLESS STEEL MATERIAL
SHALL CONFORM TO AWS D1.6.
16. SPLICES SHALL BE STAGGERED BY LENGTH OF SPLICE OR 6" MINIMUM, WITH
NO MORE THAN 50% OF THE BARS BEING SPLICED AT ANY ONE LOCATION.
17. FORMS SHALL BE WATER TIGHT.
18. DO NOT FEATHER EDGES OF REPAIR.
19. AT INTERFACES BETWEEN EXISTING AND NEW CONCRETE, ROUGHEN EXISTING
SURFACE TO 1/4" AMPLITUDE MINIMUM.
BERTHING ANALYSIS
1. BERTHING FORCES ON SHIP CRITERIA OUTLINED HEREIN WITH BERTHING
ENERGIES CALCULATED FOR THE VESSEL PARTICULARS AND BERTHING
VELOCITITES AS SHOWN IN THE TABLE BELOW:
REINFORCEMENT EVALUATION NOTES:
1. WHERE REINFORCING STEEL IS ENCOUNTERED, THE CONTRACTOR MUST
ASSESS CONDITION AND REPAIR IF NECESSARY PRIOR TO COMPLETING
CONCRETE REPAIRS. REMOVE ALL HEAVY CORROSION AND SCALE FROM
REINFORCING BARS BY HAND TOOLS OR WIRE BRUSH.
2. MEASURE EXPOSED BAR DIAMETERS TO DETERMINE ORIGINAL BAR SIZE AND
EXISTING DIAMETER.
3. EVALUATE EXPOSED REINFORCEMENT SECTION LOSS FOR EACH REPAIR AS
FOLLOWS:
A. STIRRUPS:
SINGLE/MULTIPLE BARS: REPAIR ANY BAR W/ A SECTION LOSS GREATER
THAN 10% (SEE ALLOWABLE BAR DIAMETER CHART, 90% AREA)
B. LONGITUDINAL:
SINGLE BAR: REPAIR ANY BAR WITH A SECTION LOSS GREATER THAN 25%
(SEE ALLOWABLE BAR CHART, 75% AREA)
MULTIPLE BARS: NOTIFY THE ENGINEER IF THE TOTAL AREA LOSS FOR A
GROUP OF BARS EXCEEDS 10% (THE ENGINEER SHALL DETERMINE THE
NEED & EXTENT OF REINF REPAIR BASED ON REBAR TYPE, LOCATION, &
REINF DESIGN).
4. ALLOWABLE BAR DIAMETER CHART: THE 75% AREA DIAMETER COLUMN LISTS
THE DIAMETER OF BARS CORRESPONDING TO A 25% LOSS OF STEEL.
SIMILARLY, THE 80% AND 90% AREA DIAMETER COLUMNS REFER TO THE
DIAMETER CORRESPONDING TO 20% AND 10% LOSS OF STEEL RESPECTIVELY.
ASTM C881, TYPES I, II, IV AND V, GRADE 3, CLASSES B & C
PROPERTY TEST METHOD CRITERIA
GEL TIME ASTM C881/C881M 40 MINUTES
FLEXURAL STRENGTH ASTM D790
5,500 PSI
SHEAR STRENGTH ASTM D732
3,500 PSI
BOND STRENGTH , 2 DAYS
ASTM C882/C882M
2,200 PSI
BOND STRENGTH, 14 DAYS
ASTM C882/C882M
4,600 PSI
COMPRESSIVE STRENGTH ASTM D695
10,000 PSI
COMPRESSIVE MODULUS ASTM D695
280,000 PSI
WATER ABSORPTION ASTM D570 0.10 PERCENT
#3
#4
#5
#6
#7
#8
#9
#10
#11
DIAMETERBAR SIZE
11/32"
15/32"
19/32"
23/32"
27/32"
15/16"
1 1/16"
1 7/32"
1 11/32"
DIAMETER
5/16"
7/16"
17/32"
21/32"
3/4"
7/8"
31/32"
1 3/32"
1 7/32"
90% AREA 75% AREA
ALLOWABLE BAR
DIAMETER CHART
100% AREA
(SQ IN)
0.11
0.20
0.31
0.44
0.60
0.79
1.00
1.27
1.56
DIAMETER
11/32"
15/32"
9/16"
11/16"
25/32"
29/32"
1 1/32"
1 5/32"
1 9/32"
80% AREA
BAR DIAMETER
ORIGINAL MILL
SCALE UNOXIDIZED
LIGHT TO MEDIUM
OXIDIZED SECTION
(CLEANING REQ'D)
HEAVY
OXIDIZED
SECTION
(CLEANING
REQ'D)
STRUCTURE PILE TYPE
COMPRESSION (TON) LATERAL (TON)
FIXED PIER 14" Ø x 0.625" SPP 34 5
DESIGN VESSEL
NAME
NPS USVI CENTER
CONSOLE
FISHING CHARTER
LIBERTY
UNITS
LOA 30 42 FT
BEAM 11 15 FT
DRAFT 3.5 3.5 FT
DISPLACEMENT 10000 30000 LBS
BERTHING VELOCITY 0.98 0.98 FPS
TYPE OF BERHTING FAVORABLE FAVORABLE
-6 .4
''S
T
''S
T
''S
T
''S
T
''S
T
''S
T
''S
T
E
SEE SHEET S2.3
SEE SHEET S2.4
T B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
0+00
0+50
1+00
4+00
4+50
LITTLE CRUZ BAY
MEMORIAL
VISITORS CENTER
BULKHEAD
CULVERT
PLAYGROUND
(NIC)
CONCRETE
SIDEWALK
FIXED
PIER
MAP
MM
MGC
2021-05-20
SITE PLAN
S2.2
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
20' 0' 20'
40'
SCALE: 1''=20'
B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
T
B
0+00
0+50
1+00
82'
F
0+81
0+85
0+00
0+50
1+00
1 4
A1
S2.10
A1
S2.10
A2
S2.10
WP1
WP2
WP3
WP4
LADDER
(TYP)
REPAIR SPALLED
CONCRETE
PATCH COLD JOINTS ALONG
FACE OF CONCRETE CAP
REPAIR TYPICAL STRUCTURAL
CRACKING ALONG FACE OF
CONCRETE CAP
INSTALL BULKHEAD
CLEAT (TYP)
SOLAR
NAVIGATION
LIGHT
FILL VOIDS BEHIND
CONCRETE CAP AND
REPAIR PAVEMENT
FIRE
EXTINGUISHER
CABINET
REPAIR TYPICAL SURFICIAL
CRACKING THROUGHOUT TOP
OF CONCRETE CAP
INSTALL NEW
FENDERING SYSTEM
EDGE OF FIXED PIER
BEGIN NEW FENDER SYSTEM (STA 0+85)
A2
S2.6
TURBIDITY BARRIER
LIMITS OF MAINTENANCE
DREDGING
C3
S2.10
LADDER (TYP)
A1
S2.11
LADDER (TYP)
A1
S2.11
PIER CLEAT
(TYP)
A1
S2.10
TP-1
TP-2
RP-1
A1
S2.6
BM
-5
CULVERT EXISTING
CLEAT (TYP)
ADD DINGHY D-RING
(BETWEEN STATIONS 0+40 TO
1+40 ONLY)
WORKING POINT TABLE
WP #
NORTHING
840015.45
839981.22
839990.29
840024.53
EASTING
1224917.35
1224843.30
1224839.11
1224913.16
DESCRIPTION
SE CORNER OF FIXED PIER
SW CORNER OF FIXED PIER
NW CORNER OF FIXED PIER
NE CORNER OF FIXED PIER
BENCHMARK (SURVEY MONUMENT) TABLE
BM #
BM-1
BM-2
BM-3
BM-4
BM-5
BM-6
NORTHING
840096.95
840003.97
840064.20
840175.80
840091.99
840265.82
EASTING
1224649.76
1224707.69
1224667.91
1224804.75
1224977.43
1225072.82
DESCRIPTION
CONC. MONUMENT
CONC. MONUMENT
NAIL
NAIL
NAIL
NAIL
MAP
MM
MGC
2021-05-20
STRUCTURAL SITE PLAN
(1 OF 2)
S2.3
DATE:
TECH REVIEW:
DESIGNED:
SUB SHEET NO.
DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF SHEET
A/E FIRM
CROFT
KENNESAW,
GERGIA.
MOFFATT &
NICHOL
175150
MIAMI, FLORIDA.
CRUZ BAY VISITOR CENTER
VIRGIN ISLANDS NATIONAL PARK
VIIS 244623
10' 0' 10'
20'
SCALE: 1''=10'
M A
T C
H L
I N
E
S
H E
DEFECT REPAIR TABLE
KEYNOTE STATION DEFECT WIDTH DEPTH LENGTH
1 0+05 CRACK 1/8" - 1/2" - Full
2 0+10 SPALL 8" 8" 15'
2 0+40 SPALL W/ EFFLO 6" 6" 1'
2 0+50 SPALL 2" 2" 1'
4 0+53 VOID BEHIND WALL 2' 21" -
2 0+60 SPALL 12" 6" 1'
1 0+90 CRACK 1/16" - -
4 0+90 VOID BEHIND WALL 24" 21" -
2 1+15 CORNER SPALL 6" 2" 5'
2 1+30 SPALL 6" 8" 1'
4 1+34 VOID BEHIND WALL 12" 25" -
2 1+42
(2) SPALLS
3" 6" 0'-8"
4 2+00 CORNER SPALL 3" 6" 2'-6"
1 2+05 CRACK 3/16" - 5'
1 2+30 CRACK 3/16" - 15'
- THROUGHOUT COLDJOINT GAP - - -
- THROUGHOUT SURFICIAL CRACKING - - -
- THROUGHOUT LONGITUDINAL CRACKING FULL - -
- THROUGHOUT MINOR RANDOM SPALLING <6" <1" <6"
KEY MAP
LEGEND
KEYNOTE
FIRE EXTINGUISHER
PILE
BULKHEAD CLEAT
PIER CLEAT
EXISTING CULVERT CLEAT
LADDER
NAVIGATION LIGHT
WORK POINT
TEST PILE
BORING
BENCHMARK
F
D1
S2.5
A2
S2.9
B3
S2.6
NOTES
1. HORIZONTAL CONTROL COORDINATES ARE IN FEET AND ARE
REFERENCED TO NAD83 PUERTO RICO AND VIRGIN ISLANDS.
2. SEE SHEET S2.1 FOR TEST PILE REQUIREMENTS.
3. CONTRACTOR…