Sol_140P2021R0076_Amd_0002.pdf
PDF 6 MB Posted
- Attached to
- VIIS 244623 Cruz Bay
- Solicitation number
- 140P2021R0076
About this file
This document summarizes a solicitation for repair work at the Cruz Bay Visitor Center in the Virgin Islands National Park. The solicitation seeks offers for landside and marine construction services to repair damage from Hurricanes Irma and Maria. Landside work includes building repairs, landscaping, roof replacement, window installation, HVAC replacement, and interior refreshes. Marine work consists of bulkhead repairs, dredging approximately 2,000 cubic yards of material, and replacing a 785 square foot pier. The period of performance is 365 days from notice to proceed on September 6, 2022. Offers are due by May 31, 2022 and shall be submitted electronically to the National Park Service contracting staff. The solicitation will be awarded as a firm fixed price contract between $5-10 million to the offeror providing the best value based on evaluation of past performance, technical approach, management approach, and price.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2021R0076 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
VIIS 24462305/05/20220002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/14/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
VIIS 244623 Repairs to Cruz Bay Visitors Center, Docks and Surrounding Grounds
1. Incorporate the questions and answers into the solicitation.
2. To attach the virtual preproposal meeting attendees sheet.
3. Post the virtual preproposal meeting slide-deck.
Legacy Doc #: NPS
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Matthew Carpenter
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140P2021R0076 Amendment 0002
Questions and Answers
1. Question: Section E.3, Factor 2, Subfactor 2B Schedule instructs us to assume a NTP date of 11/1/2021 for our construction schedule. Can you confirm if this is intended to mean 11/1/2022, or if another date is intended to serve as the assumed NTP date?
Answer: The NTP assumes date will be September 6, 2022
2. Question: Does the mounting hardware for the D-fenders need to be stainless steel or is hot dipped galvanized sufficient for this project?
Answer: Yes, they must be stainless steel.
3. Question: Does the Buy American Act apply to this project.
Answer: Yes.
4. Question: Can you confirm the size of the fenders mounted vertically 3'-0" OC below the horizontal 4" D-fenders?
Answer: The plans show a 10" high D-fender with an 8" wide base. Typically, the base is equal to or larger than the height.
Size of the fenders mounted vertically 3'-0" OC below the horizontal 4" D-fenders is 10x10 (see below).
Also, please note that for the fender system at the pier the following change is being proposed:
United States Department of the Interior
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
12795 W. Alameda Parkway
P.O. Box 25287
Denver, Colorado 80225-0287
VIIS 244623 Repairs to Cruz Bay Visitor Center, Docks, and Surrounding Grounds Solicitation Number 140P2021R0076 Virtual Visit Attendees – May 4, 2022
Name Company / Agency E-mail Matthew Carpenter National Park Service DSC matthew_carpenter@nps.gov
Carlos Garcia National Park Service DSC carlos_garcia@contractor.nps.gov Kate Randall National Park Service DSC kate_randall@nps.gov
Trinie Harrington National Park Service DSC heidi_harrington@nps.gov Holly Mester National Park Service DSC holly_mester@nps.gov
Scott Simmons National Park Service VIIS scott_simmons@nps.gov Nigel Fields National Park Service VIIS nigel_fields@nps.gov
Jeffrey Morgan Croft jmorgan@croftae.com Eric Cusin J. Benton Construction ecusin@jbcvi.com
Jerome Boschulte Custom Builder custombuildersvi.com Jerry Otto Custom Builder custombuildersvi.com
Pre-Proposal Teleconference
Repairs to Cruz Bay Visitor Center, Docks, and Surrounding Grounds Impacted by Hurricanes
Irma and Maria
Virgin Islands National Park St. John, USVI
Solicitation: 140P2021R0076
NPS PMIS #: VIIS 244623
May 4, 2022
E X P E R I E N C E Y O U R A M E R I C A
Presenter Notes Presentation Notes Matt
SOLICITATION NO.140P2021R0076
SUMMARY OF SOLICITATION AND AWARD INFORMATION
Refer to the Solicitation for complete information.
• PRE PROPOSAL VIRTUAL MEETING – May 4, 2022
• SITE VISIT – May 18, 2022, 10:00 a.m. Atlantic Standard Time. Meet at Cruz Bay Visitor Center.
• PRE PROPOSAL QUESTIONS DUE – May 24, 2022
• OFFERS DUE – May 31, 2022 4:00 PM MT / 6:00 PM ET
• SUBMISSION – Email only to: matthew_carpenter@nps.gov / carlos_Garcia@contractor.nps.gov /
CS_DSC_Proposal_Submission@nps.gov
• SECTION L – 52.216-1 – Type of Contract – Firm Fixed Price
• NAICS Code: 236220
• ESTIMATED PRICE RANGE: $5,000,000 to $10,000,000
• THIS IS A COMPETIVE PROCUREMENT THAT IS FULL AND OPEN
• PERIOD OF PERFORMANCE: 365 days after Notice to Proceed
SOLICITATION INFORMATION & CRITERIA
Presenter Notes Presentation Notes Matt mailto:matthew_carpenter@nps.gov mailto:carlos_Garcia@contractor.nps.gov mailto:CS_DSC_Proposal_Submission@nps.gov
PRE-PROPOSAL CONFERENCE QUESTIONS
• Administrative questions are the only questions permitted to be asked and answered during this conference. Please state your name and company before you ask your question. The question will be repeated, and responses provided. The CO requests all non-administrative questions be submitted in writing via email to both the CO, Matthew Carpenter, and the CS, Carlos Garcia as follows:
matthew_carpenter@nps.gov carlos_garcia@contractor.nps.gov Responses to questions that may be stated during the pre-proposal virtual conference or site visit do not change the Solicitation document.
• Changes to the Solicitation document shall be made as an amendment to the solicitation document. Answers to questions received will be issued as an amendment to the solicitation.
• Offerors are required to fill out and sign the acknowledgment of amendments received (SF1442 Section 19) and include this when submitting their offer on the Form 1442.
PRE-PROPOSAL CONFERENCE QUESTIONS
Presenter Notes Presentation Notes Matt mailto:matthew_carpenter@nps.gov mailto:carlos_garcia@contractor.nps.gov
QUESTIONS AFTER PRE-PROPOSAL CONFERENCE
• CO requests that all questions be submitted in writing via email to both the CO, Matthew
Carpenter, and the CS, Carlos Garcia, as follows:
matthew_carpenter@nps.gov carlos_garcia@contractor.nps.gov
Questions and answers will be issued by written amendment posted as an amendment to the solicitation. Offerors are required to fill out and sign the acknowledgment of amendments received (SF1442 Section 19) and include this when submitting our offer on the Form 1442.
• The DEADLINE FOR QUESTIONS IS: May 24, 2021 4:00PM MT/ 6:00PM ET. This Virtual pre-proposal meeting will be available via amendment. There will not be any recording of this meeting or site visit.
PRE-PROPOSAL CONFERENCE QUESTIONS
Presenter Notes Presentation Notes Matt mailto:matthew_carpenter@nps.gov mailto:carlos_garcia@contractor.nps.gov
AGENDA
• INTRODUCTIONS (Contracting)
• Attendees List will be included in an amendment
• Meeting Participation logistics – Agenda posted with
Solicitation amendments
• PARK & PROJECT OVERVIEW (Park / DSC PM)
• PROJECT OVERVIEW - SCOPE OF WORK –
OVERALL (A/E)
• BID INFORMATION (Contracting)
• BID CLINS (Contracting)
• CONCLUSION
Presenter Notes
Kate
THE STORY OF THE PARK
You’ll be working in a national park—think a very green and tropical Yellowstone. Virgin Islands National Park was established in 1956, and protects coral reefs and sandy beaches and bays, Danish ruins, dry tropical forest and animals and scenic views, and many stories.
Working in a national park is an amazing opportunity, and we welcome you to work with us to help preserve the park’s resources.
It is also a responsibility. We tread lightly, being careful not to injure the plants and animals and cultural objects that surround us. We leave things as we find them.
The purpose of Virgin Islands National Park is to preserve and protect for public benefit and inspiration outstanding scenic features, Caribbean tropical marine and terrestrial ecosystems in their natural conditions, and cultural heritage from pre-Columbian through Danish colonial times.
Presenter Notes
SCOTT
ORIENTATION
Presenter Notes
PROJECT OVERVIEW
• This project addresses repair and resiliency upgrades to the Cruz Bay Visitor Center building, surrounding grounds, and Little Cruz Bay in response to Hurricanes Irma and Maria in 2017
• 12-month Period of Performance
• Project Phasing - Visitor Center and Law Enforcement functions maintained during construction
• Minimize impact on public and NPS dock use (coordination, timing, and duration)
• Parking and staging areas are limited
Presenter Notes
SCOPE OF WORK
Purpose of Work:
Repair damage caused by Hurricanes Maria and Irma and increase resiliency of structures, marine and land for future storms.
Land Work:
1.) Landscaping 2.) Roof Replacement 3.) Window/Door Replacement 4.) HVAC System Replacement 5.) Solar Power System Installation 6.) Interior Refreshing (Lighting, Ceilings, Finishes) 7.) ABA Modifications
Marine Work:
1.) Bulkhead Repairs 2.) Pier Replacement 3.) Dredging
Cruz Bay Visitor Center Site
Sea Plane Ramp – Dredge Material Drying Site
Little Cruz Bay
Presenter Notes
Jeff
Landside Work – Site Landscaping
Presenter Notes
# 1
# 1
# 1
# 3
# 2
Landside Work - Exterior
- Window Replacement
- Roof Replacement
- Shutter Replacement
- Wall/Stair Repairs
- Gutter/Downspout Replacement
- Prep and Repaint exterior
- Roof Mounted Solar Panel Installation
- Exterior Light Fixture Replacement
Presenter Notes
# 1
# 1
# 3
# 2
Landside Work - Exterior
- Window Replacement
- Roof Replacement
- Shutter Replacement
- Wall/Stair Repairs
- Gutter/Downspout Replacement
- Prep and Repaint exterior
- Roof Mounted Solar Panel Installation
- Exterior Light Fixture Replacement
- Mechanical Platform Construction
Presenter Notes
# 1
# 1
# 3
Landside Work - Interior
- New Wall Finishes - Water Heater Replacement
- Minor Floorplan Changes (Back of House) - HVAC System Replacement
- Light Fixture Replacement - New Interior Signage
- New Kitchenette - Modifications for ABA
Presenter Notes
# 1
# 1
# 3
Landside Work - Interior
- New Wall Finishes - Water Heater Replacement - New Solar PV Equipment
- Minor Floorplan changes (Back of House) - HVAC System Replacement
- Light Fixture Replacement - New Interior Signage
- Foam Insulation Installation in Attic - Modifications for ABA
Presenter Notes
# 1
# 1
# 3
Landside Work – Phasing
- Visitor Contact
- Law Enforcement
Presenter Notes
~480-LF
Bulkhead
785-SF
Pier
Marine Work
• Bulkhead Repairs
• Pier Replacement
• Dredging
2000-CY
Dredge
Presenter Notes
Bulkhead – Existing Conditions
• Concrete Cracking and Spalling
• Cold Joint Gaps
• Damaged Cleats
• Damaged Fender System
Presenter Notes
Pier – Existing Conditions
• Severe Corrosion
• Spalling Concrete
Pier – New
• Like-in-Kind
• Same Footprint
Presenter Notes
Presenter Notes
Marine Work Dredging – Scope Area
Presenter Notes
Dredging – Turbidity Barriers
Presenter Notes
Dredging – Drying Site
Presenter Notes
Dredging – Drying Site
Presenter Notes
SITE SCOPE REVIEW – KEY CONSIDERATIONS
o Pay attention to the CLINs and break your pricing out accordingly.
o Parking and staging area is limited. Make sure you are considering the limited available area logistically.
o Project phasing is a major component inside the building. Law Enforcement and the gift shop portion of the building is to remain operation as much as possible. Utilities supporting these functions must remain operational.
o Project scheduling of the marine side work will have to be evaluated carefully with the Park and bulkhead/Pier users prior to starting work. Advance notice of this work must be issued for all Bay users and schedule must be maintained with regards to all marine work.
o Water monitoring must be provided for the marine work as outlined in the drawings and specifications at the Contractor’s expense.
o Commissioning must be provided for the marine work as outlined in the drawings and specifications at the Contractor’s expense.
o Visitor Center parking, playground, walkways, and comfort stations are to remain functional throughout construction.
KEY SCOPE CONSIDERATIONS
Presenter Notes
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
Following is a brief summary of key points in SECTION L of the Solicitation. Refer to the Solicitation for complete information.
VOLUME I, TECHNICAL PROPOSAL – SUBMISSION REQUIREMENTS
1. Proposals shall be submitted via email. Proposals submitted via any means other than email shall not be accepted.
2. Proposals shall be sent to all of the following:
• Contracting Officer, Matthew Carpenter, matthew_carpenter@nps.gov
• Contract Specialist, Carlos Garcia, carlos_garcia@contractor.nps.gov
• CS_DSC_Proposal_Submission@nps.gov
3. Title subject line for all proposal submissions shall contain the solicitation number, Park-PMIS, and number of total emails, per the following example: Subj: 140P2021R0076, VIIS 244623, email 1 of 3
4. Submit proposals in separate VOLUMES (I and II) in the FORMATS specified, containing CONTENTS required.
Each volume shall be submitted in separate email attachments.
5. Size limits: Individual email attachments shall be no larger than 38 MB. Each email shall be no larger than 100 MB.
6. Offerors shall verify receipt of proposals.
SOLICITATION INFORMATION & CRITERIA
Following is a brief summary of key points in SECTION L of the Solicitation. Refer to the Solicitation for complete information.
VOLUME I, TECHNICAL PROPOSAL – FORMAT, ORGANIZATION, CONTENTS
FORMAT: Submit one (1) original signed electronic copy. No hard copies shall be submitted.
FACTOR 1 – PROJECT EXPERIENCE
SUBFACTOR 1A – PROJECT EXPERIENCE
SUBFACTOR 1B – KEY PERSONNEL EXPERIENCE
FACTOR 2 –TECHNICAL APPROACH
SUBFACTOR 2A – TECHNICAL APPROACH
SUBFACTOR 2B – SCHEDULE
FACTOR 3 – MANAGEMENT APPROACH
FACTOR 4 – PAST PERFORMANCE
Following is a brief summary of key points in SECTION L of the Solicitation. Refer to the Solicitation for complete information.
VOLUME II, BUSINESS AND PRICE PROPOSAL – FORMAT, ORGANIZATION, CONTENTS
FORMAT: Submit one Submit one (1) original signed electronic copy. No hard copies shall be submitted.
ORGANIZATION: Include a Table of Contents with tabs for hard copy formats and folders and files for electronic formats named as follows:
• SF1442
• AMENDMENTS
• SECTION B PRICE SCHEDULE
• SCHEDULE OF VALUES
• SF 24 BID BOND
• SECTION K REPRESENTATIONS AND CERTIFICATIONS
• GENERAL REFERENCES
• SUBCONTRACTING PLAN (only required for large businesses)
SECTION M – EVALUATION FACTORS FOR AWARD
A. BASIS FOR AWARD: Following is a brief summary of key points in SECTION M of the Solicitation.
Refer to the Solicitation for complete information.
1. The Government will conduct a source selection using the Best Value Continuum Tradeoff Process defined at FAR
Part 15.1. The Contracting Officer (CO) will obligate and award a contract to the offeror who submits a proposal the Source Selection Authority (SSA) determines conforms to solicitation requirements; is fair and reasonable; and provides the best value to the government considering all evaluation factors combined as detailed below. For this acquisition, the CO is the SSA.
2. The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.
3. Additionally, pursuant to FAR 52.215-1(f), Contract Award, contained herein:
• The Government may reject any or all proposals if such action is in the Government’s interest.
• The Government may waive informalities and minor irregularities in proposals received.
• The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them to be necessary.
SOLICITATION INFORMATION & CRITERIA
Presenter Notes
Matt
EVALUATION FACTORS
Following is a brief summary of key points in SECTION M of the Solicitation. Refer to the Solicitation for complete information.
RELATIVE IMPORTANCE OF EVALUATION FACTORS:
• Technical Proposal: Factors 1 – 3 are listed in descending order of importance. Subfactors are of equal importance.
• Past Performance: Factor 4, Past Performance is less important than Factors 1 – 3 when combined.
• Overall: All evaluation factors other than price, when combined are approximately equally important to price
CONTRACT PRICE LIST (Refer to the Solicitation for complete information).
Contract Line Item Number (CLIN) Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1 Landside Work - Building Repairs (Interior/Exterior) 1 LS
2 Marine Work - Bulkhead Repairs 1 LS
3 Marine Work - Dredging 1 LS
TOTAL BASE PRICE (Contract Line Item Number 1 through 3) ---------------------------------------------------------------------------------
4 Landside Work - PV Power System 1 LS
5 Landside Work - Landscaping 1 LS
6 Marine Work - Pier Replacement 1 LS
7 Landside Work - Pavilion Repairs 1 LS
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 4 through 7) -------------------------------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 7) ----------------------------
Thank you for Your Interest in this Project
E X P E R I E N C E Y O U R A M E R I C A
National Park Service U.S. Department of the Interior
| VIIS 244623Virtual Visit Attendees |
| VIIS 244623A PreProposal Presentation |
| �Pre-Proposal Teleconference���Repairs to Cruz Bay Visitor Center, Docks, and Surrounding Grounds Impacted by Hurricanes Irma and Maria��Virgin Islands National Park�St. John, USVI���Solicitation: 140P2021R0076�NPS PMIS #: VIIS 244623��May 4, 2022 |
| Slide Number 2 |
| PRE-PROPOSAL CONFERENCE QUESTIONS |
| QUESTIONS AFTER PRE-PROPOSAL CONFERENCE |
| AGENDA |
| THE STORY OF THE PARK |
| ORIENTATION |
| PROJECT OVERVIEW |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| KEY SCOPE CONSIDERATIONS |
| SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS�Following is a brief summary of key points in SECTION L of the Solicitation. Refer to the Solicitation for complete information. |
| SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS�Following is a brief summary of key points in SECTION L of the Solicitation. Refer to the Solicitation for complete information. |
| SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS�Following is a brief summary of key points in SECTION L of the Solicitation. Refer to the Solicitation for complete information. |
| SECTION M – EVALUATION FACTORS FOR AWARD |
| EVALUATION FACTORS |
| Slide Number 31 |
| Thank you for Your Interest in this Project |
Amendment 0002 VIIS 244623 Page 2