Attachment 1a - Caswell Rd LF Final Leachate System Enhancements - Sept 2003 (ID 3312307) - reduced.pdf

PDF 5 MB Posted

Attached to
2026 Closed Landfill Leachate Systems Improvements
Solicitation number
2132954
Issued by
Tioga County, Garden City South CDP, New York

About this file

This is a technical specification document for leachate system enhancements at the Caswell Road Landfill, prepared in September 2003. The project encompasses multiple scope elements including cleaning and videoing of all leachate collection piping as specified in Bids #6 and #7, repair or replacement of piping infrastructure as detailed on Sheet C-503 of Attachment 2, installation of remote monitoring equipment within the gauging station with additional details provided on Sheet C-501 of Attachment 2, and repair and replacement of valves according to specifications on Sheet C-502 of Attachment 2. The document references coordination with the owner regarding repair versus replacement decisions for identified infrastructure components.

The document serves as a technical attachment to a larger bid package and establishes the specific work requirements and reference documents necessary for contractors to develop proposals. All work is contingent upon owner approval for repair or replacement determinations, with detailed engineering drawings and specifications provided in referenced attachments to guide execution of the leachate system enhancement project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Megan Steward Cloud

Megan Steward Callout ALL LEACHATE COLLECTION PIPING SHOWN ON THIS SHEET SHALL BE CLEANED AND VIDEOED AS DESCRIBED IN BID #6 AND #7

TO BE REPAIRED OR REPLACED AS SHOWN ON SHEET C-503, ATTACHMENT 2 AS AGREED UPON WITH THE OWNER.

Megan Steward Callout TO BE REPAIRED OR REPLACED AS SHOWN ON SHEET C-503, ATTACHMENT 2 AS AGREED UPON WITH THE OWNER.

Megan Steward

TO BE REPAIRED OR REPLACED AS SHOWN ON SHEET C-503, ATTACHMENT 2 AS AGREED UPON WITH THE OWNER.

REMOTE MONITORING EQUIPMENT TO BE INSTALLED WITHIN THE GAUGING STATION. SEE ADDITIONAL DETAIL ON SHEET C-501, ATTACHMENT 2.

Megan Steward

VALVES TO BE REPAIRED AND REPLACED AS SHOWN ON SHEET C-502, ATTACHMENT 2

File details come from the government source that posted it. Updated .