Attachment 13 Drawing P-121.pdf

PDF 193 KB Posted

Attached to
HVAC Humidity Environmental Control Evaluation Federal contract opportunity
Solicitation number
FA671223Q0004
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R E

F

S S

V

2" V

3" SS

4" SS

(EXIST.)

LAV-2

FD

SH-3

LAV-1

LAV-3

FD

FD

WC-2

WC-1

FD

MS

FD

FCO

SK

EWC

FCO

FCO

FCO

2"VTR

NEW TO EXIST, INTERFACE

NEW TO EXIST INTERFACE

3" SS

(EXIST.)

WC-2

CAP

WF

WFWF

EWS

SH-1

SH-2

FD

UR-2

3" SS

FFD

4" SS

4" SS

4" SS

(EXIST.)

3" SS

3" SS 3" SS

S S

V

2" SS

2" V

/2

V

1 1/2" V

2" V

3"VTR

2" V

FD (EXIST.)

FS-1

FCO

FCO

1 1/2" V

FD (EXIST.)

FCO (EXIST.)

S S

(E X

IS

T

3" SS

4" SS

UP TO 3"VTR

VEST

115A

JAN

ELEC

COMM

CLEAN UP

TLT

113A

COMPOSITE

SHOP

SINK/SHWR

LOCKER/TLT

114A

CORRIDOR

SMCO OFFICES

MXMF FLT

CHIEF

SMCO OFFICE

ART OFFICE

METALS TECH

SMCO TOOL

ROOM

CORRIDOR

CORRIDOR

MECHANICAL

M01

SHEET METAL

BREAK &

TRAINING

ROOM

VEST

113B

LOCKER

113C

SINK/SHWR

3" SS

3" SS 3" SS

3" SS ABOVE CEILING,

SERVING MEZZANINE

3" SS ABOVE CEILING,

SERVING MEZZANINE

3" SS ABOVE CEILING,

SERVING MEZZANINE

FD

(Mezz.)

FD

(Mezz.)

FD

(Mezz.)

2 2.1 3 3.1 4 4.1 4.11 5 5.1 6 6.1 7

A

A.1

B

B.1

B.11

USB-2

FD

FD

FD

FCO

3" SS 3

S S

3" SS

2" V

2" V

2" V

3" STACK VENT UP TO 3"

VTR AND SAN STACK DN

3" SS

3" SS

CLEANOUT

PLUG

2" V

/1 P-122 /1 P-122

V

S S

2" VTR

FD

1 1/2" V

A

KEY PLAN

US Army Corps of Engineers

LOUISVILLE

1 2 3 4 5

D

B

A

C

DISTRICT

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

P

IT

T S

B U

R G

H A

IR

R

E S

E R

V E

S T

A T

IO

N

C O

N S

O L

ID

A T

E D

B U

IL

D

IN

G

R E

N O

V A

T

IO

N S

P N

J L S

S

J L S

S

J L S

S

AS-BUILT

W Q

R -1

-C

-0

P-121

B U

IL

D

IN

G

P L U

M B

IN

G

D W

V F

IR

S

T F

L O

O R

P L A

N

A R

E A

A

V A

M A

D O

R

V A

M A

D O

R

K M

IL

L

E R

-1 -2

SCALE: 1/8" = 1'-0"

BUILDING 417 - PLUMBING DWV FIRST FLOOR PLAN - AREA A

4'0 8' 16'

GRAPHIC

N

PLUMBING GENERAL NOTES

1 FIELD VERIFY LOCATION AND INVERTS OF SITE

UTILITIES AND INTERIOR BUILDING SERVICES PRIOR

TO CONSTRUCTION / INSTALLATION

2 WHERE PLUMBING PIPES MUST PENETRATE

THROUGH STRUCTURAL BEAMS, SEE STRUCTURAL

DRAWING DEATILS AND SCHEDULES. BEAM

OPENING DETAILS AND SCHEDULES CAN BE FOUND

ON DRAWING S-532

3 COORDINATE ALL ASPECTS OF WORK WITH OTHER

TRADES PRIOR TO AND DURING CONSTRUCTION /

INSTALLATION

4 UNDERGROUND SANITARY SEWER PIPING BELOW

FLOOR SLAB AND EXTENDING THROUGH FLOOR

SHALL BE 2" MINIMUM

5 PROVIDE CLEANOUT IN ACCESSIBLE LOCATION AT

THE BASE OF ALL PLUMBING RISERS

6 SEE PROJECT PLUMBING NOTES ON DRAWING P-001

FOR ADDITIONAL INFORMATION

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

File details come from the government source that posted it. Updated .