Attachment 1 - DWG Combined.pdf

PDF 7 MB Posted

Attached to
Building 1055 Chiller Replacement
Solicitation number
W50S8G26BA003
Issued by

About this file

This document is a comprehensive set of architectural and engineering construction drawings for the repair and renovation of Building 1055 at Kirtland Air Force Base in Albuquerque, New Mexico, prepared for the 150 Civil Engineering Squadron by BOVAY Engineers, Inc.

The project scope encompasses structural, electrical, mechanical, plumbing, and HVAC systems modifications required to support computer installation within Building 1055. Key construction deliverables include: sections and details for acoustic wall systems, raised floor assembly with screw jacks, closing plate and trim installations, and step sections; detailed electrical floor plans showing lighting, power distribution, fire panels, and special systems; mechanical plans for the north wing including heating and cooling unit layouts, duct routing, and piping schematics for boiler, chiller, fan coil units, and refrigerant systems; plumbing plans for the new north wing incorporating water closet relocations, waste and vent piping, and fixture connections; HVAC power plans for the north wing detailing equipment specifications and electrical connections; and construction plans identifying keyed notes for proper installation sequencing. The drawings contain extensive keyed notes providing construction requirements, material specifications, connection details, and coordination requirements across all building systems. Sheets are organized by discipline (architectural, electrical, mechanical, plumbing) with scales typically 1/8" = 1'-0" or 1/4" = 1'-0", and the project number is 929934 dated February 2, 2000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .