This document includes a statement of work and solicitation for a federal construction contract to replace or refinish flooring in buildings 50 and 51 at RAF Lakenheath in the United Kingdom. The contractor will be required to provide all labor, materials, equipment, transportation, and services to complete replacement of vinyl, carpet and tile flooring as well as refurbishment of wood sports flooring and cafeteria flooring. The work must be performed between June 11th and August 17th 2020. Questions regarding the solicitation are due by March 25th and final proposals are due by April 2nd. The estimated value of the construction is between $1 million and $5 million. The solicitation was issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - 50 51 - Replace or Refinish Flooring - SOW (22 Apr 2020).pdf | ||
| Attachment 1 - Bldg 50 51 Flooring Project - Post Site Visit Questions (22 Apr 2020).pdf | ||
| Solicitation Amendment FA558720R00050004 SF 30.pdf | ||
| Attachment 1 Bldg 50 51 - Replace or Refinish Flooring- SOW (All Docs).pdf | ||
| Solicitation Amendment FA558720R00050003 SF 30.pdf | ||
| Attachment 2 - Site Survey Pictures.pdf | ||
| Attachment 1 - Questions and Answers.pdf | ||
| Attachment 3 - Declaration of Movement - Contractor Personnel.docx | DOCX document | |
| Solicitation Amendment FA558720R00050001 SF 30.pdf | ||
| Solicitation Amendment FA558720R00050002 SF 30.pdf | ||
| Amendment 01 Site Visit Reschedule.pdf | ||
| Attachment 2- Construction Price Breakdown.xls | XLS spreadsheet | |
| Solicitation - FA558720R0005.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
FA5587-20-R-0005
Replace or Refinish Flooring Bldgs. 50 & 51
WR# 70119, 70120, 70121, 70122, 70123
24 Jan 2020
Replace or Refinish Flooring WR# 70119, 70120, 70121, 70122, 70123 Bldgs. 50 & 51
1. Project Overview: Contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and all other items and services for the replacement and refurbishment of flooring in Bldgs 50 & 51 on RAF Lakenheath, IP27 9PN. The Contractor shall conform to all requirements as listed in this statement of work.
2. Project Scope
2.1. Building 51:
2.1.1. Sports Hall Flooring -
Sand wood floor surfaces with a machine using coarse, medium, and fine grades of sandpaper; the edges must be sanded to a smooth edge; the finished surface must be smooth and level, free from scratches. A final disc sanding shall be provided.
After final sanding or buffing, vacuum floors until clean. Do not walk on floors thereafter until finish has been applied and is dry.
Within one day after the final sanding, buffing, and sweeping have been completed, use a tacky rag to clean flooring with a low VOC solvent recommended by the manufacturer of the floor finish material. Follow cleaning with a coating of sealer;
when thoroughly dry, burnish with No. 2 steel wool, using a power machine. After final burnishing and prior to application of final finish coat(s), layout and mark game lines; after game lines are thoroughly dry, apply final finish coat.
Lines to be reinstated like for like, excluding the hopscotch and adding number squares. Location to be confirmed by the customer. Logo to be painted in the center of the Sports Hall. Logo size to be 8’x8’ (Attached document Eagle Logo).
2.1.2. Cafeteria Flooring –
Cafeteria Pulastic Floor to be refurbished to provide a flat seamless finish. Logo to be painted in the center of the Cafeteria Floor. Logo size to be 8’x8’ (Attached document Eagle Logo).
2.1.3. Vinyl Flooring -
Contractor shall remove all existing flooring (Vinyl, Carpet & Tile) and base boards.
Contractor shall dispose of through appropriate methods and in compliance with local regulations. All floor areas shall be “made good” by the Contractor, including, but not limited to, filling holes, levelling uneven surfaces, removing adhesives/dirt/debris. Contractor shall supply and install replacement laminate and underlay for all areas as specified in the highlighted floor plan attached.
2.1.3.1. Contractor shall ensure Vinyl Flooring is high density durable vinyl type floor system, such as VM 30 ALTRO non-slip flooring or USAFE approved equivalent and suitable for heavy traffic.
2.1.3.2. Contractor shall ensure Vinyl Flooring is the correct pile height for the application to ensure doors passes freely.
2.1.3.3. Contractor shall ensure that suitable door threshold joining strips are used.
2.1.3.4. Contractor shall ensure new stair nosing is highly durable and suitable for the facility
2.1.3.5. Contractor shall ensure all existing adhesive, dirt, debris etc. is removed prior to installing the Vinyl Flooring.
2.1.3.6. Contractor shall ensure Classrooms have a 1 meter Vinyl border around each room. (Colors to be approved by Facility manager)
Replace or Refinish Flooring WR# 70119, 70120, 70121, 70122, 70123
2.1.3.7. Contractor shall ensure that Vinyl colour options are made available to the Government prior to installation. Contractor shall provide colour samples when requested. Colour shall be determined by the Government after being provided with options. Materials shall be approved with an AF3000 and Material specifications will be provided with Material submittal.
2.1.3.8. Contractor shall remove all Skirting boards/baseboards where necessary.
All boards should be reinstalled and painted to provide a seamless finish.
2.2. Building 50:
2.2.1. Vinyl Flooring -
Contractor shall remove all existing flooring (Vinyl, Carpet & Tile) and base boards.
Contractor shall dispose of through appropriate methods and in compliance with local regulations. All floor areas shall be “made good” by the Contractor, including, but not limited to, filling holes, levelling uneven surfaces, removing adhesives/dirt/debris. Contractor shall supply and install replacement laminate and underlay for all areas as specified in the highlighted floor plan attached.
2.2.1.1. Contractor shall ensure Vinyl Flooring is high density durable vinyl type floor system, such as VM 30 ALTRO non-slip flooring or USAFE approved equivalent and suitable for heavy traffic.
2.2.1.2. Contractor shall ensure Vinyl Flooring is the correct pile height for the application to ensure doors passes freely.
2.2.1.3. Contractor shall ensure that suitable door threshold joining strips are used.
2.2.1.4. Contractor shall ensure new stair nosing is highly durable and suitable for the facility
2.2.1.5. Contractor shall ensure all existing adhesive, dirt, debris etc. is removed prior to installing the Vinyl Flooring.
2.2.1.6. Contractor shall ensure Classrooms have a 1 meter Vinyl border around each room. (Colors to be approved by Facility manager)
2.2.1.7. Contractor shall ensure that Vinyl colour options are made available to the Government prior to installation. Contractor shall provide colour samples when requested. Colour shall be determined by the Government after being provided with options. Materials shall be approved with an AF3000 and Material specifications will be provided with Material submittal.
2.2.1.8. Contractor shall remove all Skirting boards/baseboards where necessary.
All boards should be reinstalled and painted to provide a seamless finish.
2.3. Gymnasium Floor and Cafeteria Floor are the first priority. All yellow highlighted area on the floor plan (Classrooms/Offices) are the second priority. All blue highlighted areas on the attached floor plan (Common Areas & Stairways) are the third priority.
2.4. Contractor shall employ the work shift methodology best suited to complete all Contract work suitable for use NO LATER THAN (NLT) the Construction Complete Date (CCD).
It is the Contractor’s responsibility to manage their work practices in a manner that will allow them to meet the CCD including but not limited to multiple work shifts. If multiple shifts are necessary to complete all Construction works, the Contractor will ensure that their Site Supervision, Site Safety and Health Officer (SSHO), and Contractor Quality Control Specialist or Manager (CQC Specialist or Manager) roles are fully represented during 100% of their site construction time.
Replace or Refinish Flooring WR# 70119, 70120, 70121, 70122, 70123
3. Furniture/Equipment Removal/Replacement: Contractor shall be required to remove all furniture/equipment/fixtures from the work area and place it in a designated area to be determined prior to start date. Contractor shall be responsible for dismantling furniture where required. Once the refurbishment works have been completed, contractor shall be responsible for placing all furniture/equipment back, in the same location/condition as they were when removed. Contractor shall re-assemble furniture as required. Contractor shall ensure all necessary precautions are taken to avoid causing damage to the furniture/equipment
4. Installation Requirements
4.1. Buildings 50 and 51 are school facilities the customer has highlighted that the works must be completed during Summer Recess. The Summer Recess dates are 11th June 2020 to 17th August 2020.
5. Project Deliverables
5.1. Contractor shall provide a separate Risk Assessment and Methods Statement (RAMS) within 15 days after contract award
5.2. Contractor shall provide documentation of all materials and equipment to be utilized on this project for Government review using AF3000
5.2.1. 48 CES must review all submittals
5.2.2. Contracting Officer approval must be granted before commencing work
5.2.3. Initial submittals must be received by the Government within 15 days after date of contract award
5.3. Contractor shall provide a completed asset change form upon project completion, but prior to project closeout (template to be provided by the Customer)
5.3.1. Asset change shall be in the form of UNIFORMAT II (example to be provided by the Customer)
5.4. Contractor shall provide at least 2 disks of O&Ms prior to project closeout
5.5. Contractor shall provide all warranty information
6. Project Completion
6.1. Pre-Final Inspection: A pre-inspection will be conducted in which the government will create a “snag list” of any deviations found. The Contractor shall be required to complete those items prior to a final inspection.
6.2. Final Inspection: Upon completion of the snag list, a final inspection will be completed.
6.3. Contractor shall request an inspection in writing to the Contracting Officer at least 5 days in advance
6.4. Project will be documented on a project evaluation form.
7. Hours of Operation
7.1. The Contractor shall perform all works under this contract during the following dates
11th June 2020 – 17th August 2020. Normal base hours 7:00 to 17:00. Weekend work and extended work hours are approved if required.
7.2. The Contractor shall understand that escort flight is ONLY available normal weekdays 7:00-17:00. The Contractor shall provide all internal escorts for any works deemed necessary to be completed outside these hours.
Replace or Refinish Flooring WR# 70119, 70120, 70121, 70122, 70123
7.3. Escort Flight need a min of 2 weeks’ notice (ideally 3)
7.4. The Contractor may find it necessary to deviate from these hours to ensure timely completion of the work at no additional cost to the Government. If it is deemed necessary, the Contractor shall inform the Construction Inspector and Contracting Officer at least two days prior.
7.5. Holidays: If schedule works falls on an observed U.K. or U.S holiday, prior approval is required from the Construction Inspector and Contracting Officer at least two days prior.
8. Terminology
8.1. Contracting Officer: The Contracting Officer refers to a person with authority to enter into, administer, change and/or terminate contracts, and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority.
8.2. Maintenance Management: The contractor is responsible for inspecting surfaces to be worked on to determine condition and material quantities needed. The contractor is also responsible for scheduling resources to accomplish all requirements.
8.3. Government Quality Assurance: The Government will rely on the contractor’s quality control program and the performance management approach to assess performance whenever possible. However, the Government reserves the right to perform additional inspections as necessary, utilizing the inspection/acceptance provisions in the clauses FAR 52.213-4 Terms and Conditions—Simplified Acquisitions (Other than Commercial Items) and FAR 52.246-12 Inspection of Construction.
9. General Information
9.1. Project Manager/Site Superintendent: The Contractor is responsible for providing a fully qualified Project Manager or designated individual (telephone number and email address) who shall be physically present during contract performance. The designated individual must possess equal or higher skills comparable to the qualified Project Manager. Project Manager or designated individual shall be responsible for management and coordination of the contract and shall be the point of contact with Government representatives. The Contractor shall provide names of the Project Manager or designated individual to the CO in writing before contract performance begins. The Project Manager or designated individual must possess good command of the English language in both reading and writing and must be able to speak fluently and coherently. The Project Manager or designated individual shall be available to respond to inquiries issued from the CO during any period when work operations are being performed on RAF Lakenheath/Mildenhall/Feltwell and associated Geographically Separated Units (GSU). The project manager/alternate shall have full authority to act for the contractor on matters relating to the daily operation of the contract. Project manager and alternate must have complete knowledge and basic skills of the SOW and all facets of works. The alternate project manager shall have full supervisory authority during the absences of the project manager.
9.2. Roster: Contractor shall provide a complete roster of all personnel working on these requirements prior to commencing work. Roster must include names, trade specialty, date of birth, phone number, and official identification number. The contractor shall notify the Contracting Officer and Construction Inspector of any changes to the list in writing. All new personnel must possess and demonstrate the qualifications that are equal or above the qualifications of the personnel being replaced.
Replace or Refinish Flooring WR# 70119, 70120, 70121, 70122, 70123
10. Task Order Performance
10.1. Performance Evaluation Meetings: The Contracting Officer, Construction Inspector and other government personnel as deemed appropriate will meet periodically with the Contractor to review the contractor’s performance. The CO will apprise the contractor of the government’s views of the project performance. The contractor will apprise the government of any problems being experienced. Appropriate actions shall be taken to resolve any outstanding issues. The contractor may also request a meeting at any time during contract period.
10.2. The COR/PM will visit the job site at an appropriate interval to inspect the project. If desired, the COR will document performance, weather conditions, personnel on site, and level of effort. If documentation is made, the Contractor shall be allowed to view the documentation to validate and dispute any information.
11. Environmental and Utility Concerns
11.1. Selections of Materials: Environmentally friendly materials are preferred when possible. Environmentally friendly paints are those which do not contain metals such as lead, chromium, cadmium, barium, arsenic, mercury, selenium, or silver. They will also not contain hazardous/flammable solvents such as methyl ethyl ketone, xylene, or toluene. Latex or water-based paints are the preferred type of paint. The decision to use an environmentally friendly paint should not result in an unacceptably short life of painted surface or should it be applied in a poor manner.
11.2. Environmental, Health, and Safety: the Contractor shall ensure all employees receive the necessary environmental, health, and safety training to ensure compliance with all Occupational Safety and Health Acts (OSHA) and federal and local laws of the United Kingdom. The more restrictive of the guidance’s will apply. The contractor shall protect the health and safety of the employees and the community.
11.3. Pollution Prevention: “Pollution Prevention” and “Source Reduction” are defined in the Pollution Prevention Act of 1990, 42 U.S.C 13101-13109. This is to identify pollution prevention opportunities and shall not be construed to require the contractor to conduct actives not otherwise required by the program.
11.4. Hazardous Materials/Chemical Management: All hazardous material use requires authorization prior to bringing the material on base. “Hazardous Material” includes many materials for which is there a manufacturer SDS, such as and not limited to:
cleaning supplies, paints, solvents, sealants, lead acid batteries, fuels, and herbicides.
12. List of Attachments
12.1. Attachment 1 - Building 50 GF_FF Floor Plan – Dims
12.2. Attachment 2 - Building 51 GF_FF Floor Plan - Dims
12.3. Attachment 3 - Building 50, 51 Highlighted Floor Plans
12.4. Attachment 4 - Stair Nosing Example Photo
12.5. Attachment 5 - Classroom Border Example Photo
12.6. Attachment 6 - Cafeteria & Sports Hall Logo
12.7. Attachment 7 - Replace and Refurbish Flooring Bldg. 50 & 51 - DODEA Asbestos Survey
B
L D
G
G
R O
U N
D
F
L O
O R
P
A
N
Attachment 1 - Building 50 GF_FF Floor Plan – Dims
D
G
F
I R
S T
F
O
A
Attachment 1 - Building 50 GF_FF Floor Plan – Dims
1 1
U S
A F
E
P H
A S
E
I
B L D
G
F
L O
A
N
IMAGE ONLY
IMAGE ONLY
TEAM:
iNTERVIEW SHEET:
CATCODE:
EXTERIOR WALL:
INTERIOR WALL:
NORTH ARROW:
ADJOINING STR.:
LIST UNIT/FLIGHT & ROOM#S:
F
F
I
C
I
A
L
U
E
L
Y
Attachment 2 - Building 51 GF_FF Floor Plan - Dims
AutoCAD SHX Text Project Number:
AutoCAD SHX Text Plot Date:
AutoCAD SHX Text Plot Scale:
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DESIGN BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
REVIEWED BY:
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SEQUENCE NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
MM/DD/YY
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
REV
AutoCAD SHX Text
COMMENT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text TETRATECH 800 OAK RIDGE TURNPIKE SUITE A-600 OAK RIDGE, TN 37830 PH:(865)483-9900/FAX:(865)482-6647
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
RAF LAKENHEATH SUFFOLK, ENGLAND SPACE UTILIZATION STUDY
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text 100-ten-t98781 TO 0114
D
G
F
I R
O
A
Attachment 2 - Building 51 GF_FF Floor Plan - Dims
Attachment 3 - Building 50, 51 Highlighted Floor Plans
Lakenheath Elementary School 2017 AHERA Asbestos Management Plan
A-1
Appendix A: Laboratory Sample Results
A-2
This page intentionally left blank
RJ Lee Group, Inc.
350 Hochberg Road, Monroeville, PA 15146
Tel: 724-325-1776 | Fax: 724-733-1799
ALPHA Facilities Solutions 2716 Mission Street
Attention: Thomas Valli Telephone: 412-979-6139
AOH1046821-0
Pittsburgh, PA 15203
09/26/2017
09/19/2017
Lakenheath E.S.
Laboratory Report
Report Date
Sample Receipt Date
Authorization/P.O. No.
RJ Lee Group Job No.
Client Job No./Name
Method: EPA/600/R-93/116
Analysis: Asbestos in Bulk Samples
Non-Fibrous Materials(%)Homogeneous
Client Sample Number
Asbestos Detected(%)
Analyst - Analysis Date
Non-Asbestos Fibers(%)
Matrix Material
RJLG Sample Number
# of Layers
10415387.HPL UK17-LAE-263A Yes LKS-09/26/2017
Description:
1 Q, CA, M
White Plaster
ND 100
10415388.HPL UK17-LAE-263B Yes LKS-09/26/2017
Description:
1 Q, CA, M
White Plaster
ND 100
10415389.HPL UK17-LAE-264A Yes LKS-09/26/2017
Description:
1 Q, CA, B, M
Green Tile
ND <1 CE 100
10415390.HPL UK17-LAE-264B Yes LKS-09/26/2017
Description:
1 Q, CA, B, M
Green Tile
ND <1 CE 100
Client Job No./Name: Lakenheath E.S. RJ Lee Group Job No: AOH1046821-0
Laboratory Report (Cont)
Non-Fibrous Materials(%)Homogeneous
Client Sample Number
Asbestos Detected(%)
Analyst - Analysis Date
Non-Asbestos Fibers(%)
Matrix Material
RJLG Sample Number
# of Layers
10415391.HPL UK17-LAE-265A Yes LKS-09/26/2017
Description:
1 Q, CA, B, M
Brown Material
2 CH 98
10415392.HPL UK17-LAE-265B Yes AKB-09/26/2017
Description:
1 B, M
Black Mastic
4 CH 2 CE 94
10415393.HPL UK17-LAE-266A Yes AKB-09/26/2017
Description:
1 B, M
Gray Fibrous Material
ND 60 MW 40
10415394.HPL UK17-LAE-266B Yes AKB-09/26/2017
Description:
1 B, M
Gray Fibrous Material
ND <1 CE 60 MW 40
10415395.HPL UK17-LAE-267A Yes AKB-09/26/2017
Description:
1 B, M
Gray Strips
ND 5 CE 3 FG 92
10415396.HPL UK17-LAE-267B Yes AKB-09/26/2017
Description:
1 B, M
Gray Strips
ND 5 CE 95
10415397.HPL UK17-LAE-268A Yes AKB-09/26/2017
Description:
1 B, M
Gold Glue
ND <1 CE <1 SF 100
10415398.HPL UK17-LAE-268B Yes AKB-09/26/2017
Description:
1 B, M
Gold Glue
ND 100
Non-Fibrous Materials(%)Homogeneous
Client Sample Number
Asbestos Detected(%)
Analyst - Analysis Date
Non-Asbestos Fibers(%)
Matrix Material
RJLG Sample Number
# of Layers
10415399.HPL UK17-LAE-269A Yes AKB-09/26/2017
Description:
1 B, M
Off White Woven Material
ND 95 CE 5
10415400.HPL UK17-LAE-269B Yes AKB-09/26/2017
Description:
1 M
Off White Woven Material
ND 99 CE 1
10415401.HPL UK17-LAE-269C Yes AKB-09/26/2017
Description:
1 B, M
Off White Woven Material
ND <1 CE <1 MW 100
10415402.HPL UK17-LAE-270A Yes EB-09/26/2017
Description:
1 CA, B, OP, M
Tan Mastic
ND 10 CE 90
10415403.HPL UK17-LAE-270B Yes EB-09/26/2017
Description:
1 CA, B, OP, M
Tan Mastic
ND 10 CE 90
10415404.HPL UK17-LAE-271A Yes EB-09/26/2017
Description:
1 Q, CA, OP,
M
Gray Material
ND 100
10415405.HPL UK17-LAE-271B Yes EB-09/26/2017
Description:
1 CA, OP, MI,
M
Gray Material
ND <1 CE 100
10415406.HPL UK17-LAE-272A Yes EB-09/26/2017
Description:
1 CA, OP, M
Brown Putty
ND <1 FG 100
Non-Fibrous Materials(%)Homogeneous
Client Sample Number
Asbestos Detected(%)
Analyst - Analysis Date
Non-Asbestos Fibers(%)
Matrix Material
RJLG Sample Number
# of Layers
10415407.HPL UK17-LAE-272B Yes EB-09/26/2017
Description:
1 CA, OP, M
Brown Putty
ND 2 CE 98
10415408.HPL UK17-LAE-273A Yes EB-09/26/2017
Description:
1 CA, B, OP, M
Black Material
ND 100
10415409.HPL UK17-LAE-273B Yes EB-09/26/2017
Description:
1 CA, B, OP,
MI, M
Black Material
ND 100
10415410.HPL UK17-LAE-274A Yes EB-09/26/2017
Description:
1 CA, OP, MI,
M
Blue Tile
ND <1 CE 100
10415411.HPL UK17-LAE-274B Yes EB-09/26/2017
Description:
1 CA, OP, MI,
M
Blue Tile
ND 5 FG 95
10415412.HPL UK17-LAE-275A Yes EB-09/26/2017
Description:
1 CA, B, OP, M
Tan Mastic
ND 10 CE 90
10415413.HPL UK17-LAE-275B Yes EB-09/26/2017
Description:
1 CA, B, OP, M
Tan Mastic
ND 15 CE 85
10415414.HPL UK17-LAE-276A Yes EB-09/26/2017
Description:
1 OP, M
Gray Material
ND 2 CE 90 MW 8
Non-Fibrous Materials(%)Homogeneous
Client Sample Number
Asbestos Detected(%)
Analyst - Analysis Date
Non-Asbestos Fibers(%)
Matrix Material
RJLG Sample Number
# of Layers
10415415.HPL UK17-LAE-276B Yes EB-09/26/2017
Description:
1 CA, OP, MI,
M
Gray Material
ND 1 CE 90 MW 9
10415416.HPL UK17-LAE-277A Yes EB-09/26/2017
Description:
1 OP
White Fabric
ND 100 SF <1
10415417.HPL UK17-LAE-277B Yes EB-09/26/2017
Description:
1 OP, M
White Fabric
ND 100 SF <1
10415418.HPL UK17-LAE-277C Yes EB-09/26/2017
Description:
1 OP, M
White Fabric
ND 100 SF <1
10415419.HPL UK17-LAE-278A Yes EB-09/26/2017
Description:
1 OP, M
Gray Fabric
ND 100 SF <1
10415420.HPL UK17-LAE-278B Yes EB-09/26/2017
Description:
1 OP, M
Gray Fabric
ND 100 SF <1
Non-Fibrous Materials(%)Homogeneous
Client Sample Number
Asbestos Detected(%)
Analyst - Analysis Date
Non-Asbestos Fibers(%)
Matrix Material
RJLG Sample Number
# of Layers
Authorized Signature:
Elizabeth Brown
DISCLAIMER NOTES
· "ND" indicates no asbestos was detected; the method detection limit is 1%.
· "Trace" or "<" indicates asbestos was identified in the sample, but the concentration is less than the method quantitation limit. PLM coefficients of variance range from approximately 1.8 at the quantitation limit of 1% to 0.1 at high fiber concentrations.
· Samples are archived for three months following analysis and are then properly discarded.
· These results are submitted pursuant to RJ Lee Group's current terms and conditions of sale, including the company's standard warranty and limitation of liability provisions. No responsibility or liability is assumed for the manner in which these results are used or interpreted.
· This test report relates to the items tested.
· This report is not valid unless it bears the name of a NVLAP Lab Code 101208-0 approved signatory.
· Any reproduction of this document must be in full in order for the report to be valid.
· This report may not be used to claim product endorsement by NVLAP Lab Code 101208-0, any agency of the U.S. Government or any other laboratory accrediting agency.
· Polarized-light microscopy is not consistently reliable in detecting asbestos in floor coverings and similar nonfriable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or treated as "non-asbestos-containing."
· Sample(s) for this project were analyzed at our: Monroeville, PA (AIHA #100364, NY ELAP #10884) facility.
· If RJ Lee Group, Inc. did not collect the samples analyzed, the verifiability of the laboratorys results are limited to the reported values.
· ((((100-A)/B)*C*100)+0.99)/100 = Asbestos Detected (%), where A=weight loss, B=total # of points counted, and C=total # of asbestos fibers counted.
ASBESTOS
= Amosite
= Actinolite
= Anthophyllite
= Chrysotile
= Crocidolite
= Tremolite
NON-ASBESTOS
= Cellulose
= Mineral Wool
= Fibrous Glass
= Synthetic Fibers = Hair
= Wollastonite
= Other Fibers
NON-FIBROUS MATERIALS
= Amphibole
= Binder
= Carbonates
= Clay
= Feldspar
= Gypsum
= Hydromagnesite
= Miscellaneous
= Mica
= Opaque = Organic
= Perlite
= Quartz
= Tar
= Vermiculite
AM
AC
AN
CH
CR
TR
CE
MW
FG
SF
H
W
OF
AM
B
CA
CL
F
G
HY
M
MI
OP
OR
P
Q
V
RJ Lee Group, Inc 350 Hochberg Road
Monroeville, PA 15146 Tel: (724) 325-1776 | Fax (724) 733-1799
NOTES
1. “<” indicates results less than analytical sensitivity. “---” indicates that sample was not analyzed.
2. Sample(s) for this project were analyzed at our: Monroeville, PA (AIHA #100364, NVLAP #101208-0, NY ELAP #10884) facility.
3. If RJ Lee Group, Inc. did not collect the samples analyzed, the verifiability of the laboratory's results are limited to the reported values.
4. Trace indicates <1% asbestos was identified.
5. Abbreviations: N/A-Not Applicable, Chry-Chrysotile Asbestos, Amph-Amphibole Asbestos, Asb-Asbestos Amphibole, Cleavage-Cleavage Amphibole.
6. Samples will be held for 90 days and then disposed of per Federal regulations.
7. These results are submitted pursuant to RJ Lee Group’s current terms and conditions of sale, including the company’s standard warranty and limitation of liability provisions. No responsibility or liability is assumed for the manner in which these results are used or interpreted.
DISCLAIMER
RJ Lee Group, Inc. is accredited by the New York Department of Health Environmental Laboratory Program (NY ELAP) for the bulk analysis by TEM of non-friable organically bound materials. This report may not be used to claim product endorsement by NY ELAP, or any other regulatory or laboratory accrediting agency. Any reproduction of this document must be in full in order for the report to be valid. This report is not valid unless it bears the name of a NVLAP approved signatory.
These results are submitted pursuant to RJ Lee Group's current terms and conditions of sale, including the company's standard warranty and limiting provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, RJ Lee Group will store the samples for a period of ninety (90) days before discarding. A shipping and handling fee will be assessed for the return of any sample.
Final Laboratory Report TEM Compositional Analysis
Attention: Thomas Valli ALPHA Facilities Solutions 2716 Mission Street Pittsburgh, PA 15203
Report Date:
Sample Receipt Date:
RJ Lee Group Job No.:
Authorization/P.O. No.:
Samples Received:
Client Job No.:
09/29/2017 09/19/2017
AOH1046821-1
Lakenheath E.S.
Method: Chatfield Technical Consulting Limited, SOP-1988-02.Rev1.
------------------------Weight Percent-------------------------
Client Sample Number RJLG Sample Number Sample Description Starting Weight
(gm) Organic Acid Soluble Residue Chry Amph Total
Asbestos Amphibole
Type
UK17-LAE-264C* 10415421.HT 0.16870 24 67 4 5 0 5
UK17-LAE-265C* 10415422.HT 0.10330 74 4 11 11 0 11
UK17-LAE-267C* 10415423.HT 0.19050 56 30 14 0 0 0
UK17-LAE-268C* 10415424.HT 0.08940 95 4 1 0.04 0 0.04
UK17-LAE-270C* 10415425.HT 0.04040 39 58 3 0 0 0
UK17-LAE-272C* 10415426.HT 0.15740 59 31 10 0 0 0
RJ Lee Group, Inc. Final Laboratory Report (contʹd) RJ Lee Group Job No: AOH1046821-1 Client: ALPHA Facilities Solutions Client Job No/Name: Lakenheath E.S. Report Date: 09\29\2017
NOTES
1. “<” indicates results less than analytical sensitivity. “---” indicates that sample was not analyzed.
2. Sample(s) for this project were analyzed at our: Monroeville, PA (AIHA #100364, NVLAP #101208-0, NY ELAP #10884) facility.
3. If RJ Lee Group, Inc. did not collect the samples analyzed, the verifiability of the laboratory's results are limited to the reported values.
4. Trace indicates <1% asbestos was identified.
5. Abbreviations: N/A-Not Applicable, Chry-Chrysotile Asbestos, Amph-Amphibole Asbestos, Asb-Asbestos Amphibole, Cleavage-Cleavage Amphibole.
6. Samples will be held for 90 days and then disposed of per Federal regulations.
7. These results are submitted pursuant to RJ Lee Group’s current terms and conditions of sale, including the company’s standard warranty and limitation of liability provisions. No responsibility or liability is assumed for the manner in which these results are used or interpreted.
DISCLAIMER
RJ Lee Group, Inc. is accredited by the New York Department of Health Environmental Laboratory Program (NY ELAP) for the bulk analysis by TEM of non-friable organically bound materials. This report may not be used to claim product endorsement by NY ELAP, or any other regulatory or laboratory accrediting agency. Any reproduction of this document must be in full in order for the report to be valid. This report is not valid unless it bears the name of a NVLAP approved signatory.
These results are submitted pursuant to RJ Lee Group's current terms and conditions of sale, including the company's standard warranty and limiting provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, RJ Lee Group will store the samples for a period of ninety (90) days before discarding. A shipping and handling fee will be assessed for the return of any sample.
------------------------Weight Percent-------------------------
Client Sample Number RJLG Sample Number Sample Description Starting Weight
(gm) Organic Acid Soluble Residue Chry Amph Total
Asbestos Amphibole
Type
UK17-LAE-273C* 10415427.HT 0.02170 37 41 22 0 0 0
UK17-LAE-274C* 10415428.HT 0.13170 72 22 5 0 0 0
UK17-LAE-275C* 10415429.HT 0.09010 96 4 Trace 0 0 0
Authorized Signature:
Monica McGrath
D-1
Appendix D: Summary of Materials
Table D-1 - Summary of Asbestos-Containing Materials for Lakenheath ES
Table D-2 - Summary of Non-Asbestos Materials for Lakenheath ES
Table D-3 - Summary of Other Materials for Lakenheath ES
D-2
This page intentionally left blank
Quantities are approximate and not intended for abatement bidding purposes. 1 2018
Bldg.
No.
Homo.
Mtl.
No.
Material Description
AHERA
CAT Locations Quantity Friable Overall
Condition Type of Damage Accessibility Potential for
Air Erosion Potential for
Vibration Potential for
Damage EPA Ass.
CAT
Cleaning Required
Recommended Management Actions
Begin Date
End Date
Material Management Procedure Unit Cost Est. Qty.
(Unit) Est. Cost Comments
Number Date Result
Building: 50
50 062
SUBFLOOR
MATERIAL,
LIGHT GRAY
CEMENT BOARD MISC.
102, 104, 106, 111, 112, 113, 114, 115, 116, 124, 125, 126, 127, 132, 133, 134, 101/103, 105A, 121B 60 SF
0696-LES-062A
0696-LES-062B
0696-LES-062C
30-Jun-96 30-Jun-96 30-Jun-96
CH 25-30%
CH 25-30%
CH 25-30% NO UNDAMAGED NONE LOW LOW LOW
LOW
POTENTIAL 8 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN. SUBFLOOR MATERIAL 1.5
THIS MATERIAL IS LOCATED
WHERE PIPES PASS
THROUGH THE FLOOR
BENEATH A CEMENTITIOUS
SUBFLOOR LOCATED UNDER
CARPETS. THIS MATERIAL
WAS NOT ACCESSIBLE FOR
ADEQUATE INSPECTION
BECAUSE IT IS LOCATED
UNDER EXISTING FLOOR
MATERIALS.
50 070
SHEET GASKET,
4" - 6"
DIAMETER, RED,
ON PIPE FLANGE
CONNECTIONS MISC.
A301, A302, A303, A304, A305, CRAWLSPACE 1,
CRAWLSPACE 2,
CRAWLSPACE 3,
CRAWLSPACE 4,
CRAWLSPACE 5 318 EA
0797-LKE-070A
0797-LKE-070B
0797-LKE-070C
30-Jul-97 30-Jul-97 30-Jul-97
CH 30-40%
CH 40%
CH 40% NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
GASKET MATERIAL
AND FLEX
CONNECTORS 4.5
NOT ALL THIS MATERIAL
WAS ACCESSIBLE FOR
ADEQUATE INSPECTION DUE
TO CONFINED SPACE
LOCATIONS.
50 118
FLOOR
ADHESIVE,
WHITE, UNDER
LIGHT GRAY
WITH BLACK
SPECKS
RESILIENT
FLOOR
SHEETING MISC.
C101, C103, C104, C105, C106, C201, C203, C204, C205, J103, S101.1, S101.2, S102.1, S102.2, 200A 9,000 SF
0500-LAE-118A
0500-LAE-118B
0500-LAE-118C
UK12-LAE-118D*
04-May-00 04-May-00 04-May-00 23-Jan-12
ND
ND
ND
CH 1.02% NO UNDAMAGED NONE LOW LOW LOW
LOW
POTENTIAL 8 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
FLOOR ADHESIVE
(MASTIC) 24
*SAMPLE WAS ANALYZED BY
TEM AND RESULT WAS
>0.1% ASBESTOS. THIS
MATERIAL IS CONSIDERED
TO BE ACM. MN 118 AND MN
200 ARE SIMILAR IN
APPEARANCE BUT WERE
INSTALLED AT DIFFERENT
TIMES. THIS IS THE
ADHESIVE FOR MN 115.
50 241
FLOOR
ADHESIVE,
YELLOW AND
BLACK, UNDER
GRAY CARPET MISC. 106A 315 SF
UK12-LAE-241A
UK12-LAE-241A*
UK12-LAE-241B
UK12-LAE-241C*
23-Jan-12 23-Jan-12 23-Jan-12 23-Jan-12
CH 2%
CH 21%
CH 2%
ND NO UNDAMAGED NONE LOW LOW LOW
LOW
POTENTIAL 8 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
FLOOR ADHESIVE
(MASTIC) 6
*SAMPLE WAS ANALYZED BY
TEM AND RESULT WAS
>0.1% ASBESTOS. THIS
MATERIAL IS CONSIDERED
TO BE ACM.
Building: 51
51 055
FLOOR
ADHESIVE,
BLACK, UNDER
1' X 1' GRAY
RESILIENT
FLOOR TILE MISC. J101 140 SF
0396-LES-055A
0396-LES-055B
0396-LES-055C
19-Mar-96 19-Mar-96 19-Mar-96
CH <1%
CH 1-3%
CH 3-5% NO UNDAMAGED NONE LOW LOW LOW
LOW
POTENTIAL 8 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
FLOOR ADHESIVE
(MASTIC) 3
THIS IS THE ADHESIVE FOR
MN 009.
51 056
SHEET GASKET,
8" DIAMETER,
RED, ON BOILER
TANK PIPE
FLANGE
CONNECTIONS MISC. M109 4 EA
0396-LES-056A
0396-LES-056B
0396-LES-056C
19-Mar-96 19-Mar-96 19-Mar-96
CH 35-40%
CH 55-60%
CH 50-55% NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
GASKET MATERIAL
AND FLEX
CONNECTORS 1.5
THIS MATERIAL IS
ENCLOSED WITH METAL
JACKETS.
51 057
SHEET GASKET,
4" DIAMETER,
RED, ON PIPE
FLANGE
CONNECTIONS MISC. 171, M109 50 EA
0396-LES-057A
0396-LES-057B
0396-LES-057C
19-Mar-96 19-Mar-96 19-Mar-96
CH 60-65%
CH 85-90%
CH 75-80% NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
GASKET MATERIAL
AND FLEX
CONNECTORS 1.5
SOME OF THIS MATERIAL IS
ENCLOSED WITH METAL
JACKETS. THIS MATERIAL
MAY BE LOCATED IN OTHER
AREAS THROUGHOUT THE
BUILDING AND/OR IN PIPE
RUNS LEADING TO THIS
BUILDING. DURING THE
2017 SURVEY, THIS
MATERIAL WAS
INACCESSIBLE FOR
ADEQUATE INSPECTION.
Table D-1 - Summary of Asbestos-Containing Materials for Lakenheath ES
Sample Information
Quantities are approximate and not intended for abatement bidding purposes. 2 2018
No.
Homo.
Mtl.
No.
Material Description
AHERA
CAT Locations Quantity Friable Overall
Condition Type of Damage Accessibility Potential for
Air Erosion Potential for
Vibration Potential for
Damage EPA Ass.
CAT
Cleaning Required
Recommended Management Actions
Begin Date
End Date
Material Management Procedure Unit Cost Est. Qty.
(Unit) Est. Cost Comments
Number Date Result
Table D-1 - Summary of Asbestos-Containing Materials for Lakenheath ES
Sample Information
51 059
SUBFLOOR
MATERIAL,
WHITE CEMENT
BOARD MISC.
153, 155, 156, 157, 158, 159, 160, 161, 169 35 SF
0396-LES-059A
0396-LES-059B
0396-LES-059C
27-Jun-96 27-Jun-96 27-Jun-96
CH 60-75%
CH 60-75%
CH 60-75% NO UNDAMAGED NONE LOW LOW LOW
LOW
POTENTIAL 8 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN. SUBFLOOR MATERIAL 1.5
THIS MATERIAL IS LOCATED
BELOW THE HEAT PIPING
ACCESS PANELS. IT IS
COVERED WITH A
CEMENTITIOUS SUBFLOOR
AND RESILIENT FLOOR TILE.
THIS MATERIAL WAS NOT
ACCESSIBLE FOR ADEQUATE
INSPECTION BECAUSE IT IS
COVERED BY EXISTING
FLOORING MATERIALS.
51 060
THERMAL TAPE,
BLACK,
ASPHALTIC, ON
FLOOR
RADIATOR PIPES TSI
155, 157, 158, 159, 160, 161, 169 15 LF
0396-LES-060A
0396-LES-060B
0396-LES-060C
27-Jun-96 27-Jun-96 27-Jun-96
CH 30-35%
CH 30-35%
CH 30-35% NO UNDAMAGED NONE HIGH LOW LOW
SIGNIFICANT
POTENTIAL 6 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
PIPE OR PIPE FITTING
INSULATION 1.5
THIS MATERIAL IS LOCATED
ON PIPE STUBS NEAR THE
EXIT DOORS IN EACH OF
THE LISTED ROOMS. THE
PIPE STUBS ARE LESS THAN
2" IN LENGTH.
51 067
SUBFLOOR
MATERIAL,
WHITE ROPE
PADS BELOW
WOOD FLOOR MISC. 180 2,000 SF ASSUMED ACM 27-Jun-96 - NO UNDAMAGED NONE LOW LOW LOW
LOW
POTENTIAL 8 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN. SUBFLOOR MATERIAL 15
THIS MATERIAL IS USED FOR
SHOCK ABSORPTION FOR
THE GYMNASIUM FLOORING.
THIS MATERIAL WAS NOT
ACCESSIBLE FOR ADEQUATE
INSPECTION BECAUSE IT IS
LOCATED UNDER EXISTING
FLOORING MATERIALS.
51 264
RESILIENT
FLOOR TILE, 9"
X 9" DARK
GREEN WITH
WHITE STREAKS MISC. T203A 40 SF
UK17-LAE-264A
UK17-LAE-264B
UK17-LAE-264C*
08-Sep-17 08-Sep-17 08-Sep-17
ND
ND
CH 5% NO DAMAGED
DETERIORA
TION MEDIUM LOW LOW POTENTIAL 8 NO
1. REPAIR THIS MATERIAL
WITHIN ONE YEAR OF RECEIPT
OF THIS REPORT.
2. MINIMUM QUALIFICATIONS
TO CONDUCT THIS ACTION ARE
MAINTENANCE PERSONNEL
WHO HAVE RECEIVED
TRAINING IN REPAIR OF
DAMAGED ACM.
3. AFTER REPAIR IS
COMPLETED, CONSULT THE
O&M MANUAL CONCERNING
SAFE CUSTODIAL PROCEDURES
FOR THIS MATERIAL.
4. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
RESILIENT FLOOR
TILE OR SHEETING 5.5
*SAMPLE WAS ANALYZED BY
TEM AND RESULT WAS
>0.1% ASBESTOS. THIS
MATERIAL IS CONSIDERED
TO BE ACM. 3 SF OF THIS
MATERIAL IS DAMAGED IN
ROOM T203A AND NEEDS TO
BE REPAIRED. THE
ADHESIVE FOR THIS
MATERIAL IS MN 265.
51 265
FLOOR
ADHESIVE,
BLACK, UNDER
9" X 9" DARK
GREEN WITH
WHITE STREAKS
RESILIENT
FLOOR TILE MISC. T203A 40 SF
UK17-LAE-265A
UK17-LAE-265B
UK17-LAE-265C*
08-Sep-17 08-Sep-17 08-Sep-17
CH 2%
CH 4%
CH 11% NO UNDAMAGED NONE LOW LOW LOW
LOW
POTENTIAL 8 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
FLOOR ADHESIVE
(MASTIC) 1.5
*SAMPLE WAS ANALYZED BY
TEM AND RESULT WAS
>0.1% ASBESTOS. THIS
MATERIAL IS CONSIDERED
TO BE ACM. THIS IS THE
ADHESIVE FOR MN 264.
Building: 52
52 215
SHEET GASKET,
18" SQUARE,
BLACK PAINTED,
WHITE CORE,
ON BOILER
BURNER PLATE MISC. M101 3 EA
0306-LAE-215A
0306-LAE-215B
0306-LAE-215C
13-Mar-06 13-Mar-06 13-Mar-06
CH 75%
CH 85%
CH 85% NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
GASKET MATERIAL
AND FLEX
CONNECTORS 1.5
52 216
ROPE GASKET,
42" DIAMETER,
WHITE, ON
BOILER DOOR MISC. M101 3 EA
0306-LAE-216A
0306-LAE-216B
0306-LAE-216C
13-Mar-06 13-Mar-06 13-Mar-06
CH 90%
CH 90%
CH 90% YES UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 YES
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
GASKET MATERIAL
AND FLEX
CONNECTORS 1.5
Quantities are approximate and not intended for abatement bidding purposes. 3 2018
No.
Homo.
Mtl.
No.
Material Description
AHERA
CAT Locations Quantity Friable Overall
Condition Type of Damage Accessibility Potential for
Air Erosion Potential for
Vibration Potential for
Damage EPA Ass.
CAT
Cleaning Required
Recommended Management Actions
Begin Date
End Date
Material Management Procedure Unit Cost Est. Qty.
(Unit) Est. Cost Comments
Number Date Result
Table D-1 - Summary of Asbestos-Containing Materials for Lakenheath ES
Sample Information
52 217
SHEET GASKET,
4" - 6"
DIAMETER, RED
SURFACE,
WHITE CORE,
ON PIPE FLANGE
CONNECTIONS MISC. M101 2 EA
0306-LAE-217A
0306-LAE-217B
0306-LAE-217C
13-Mar-06 13-Mar-06 13-Mar-06
CH 36%
ND
CH 39% NO UNDAMAGED NONE MEDIUM LOW LOW POTENTIAL 5 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
GASKET MATERIAL
AND FLEX
CONNECTORS 1.5
Building: 55
55 001
CEMENT
ROOFING
PANEL, GRAY,
CORRUGATED MISC. 101, 102, 103, C101, T101 2,400 SF 06528 23-Sep-87 CH 30% NO UNDAMAGED NONE HIGH LOW LOW
SIGNIFICANT
POTENTIAL 6 NO
1. NO IMMEDIATE ABATEMENT
REQUIRED.
2. CONSULT THE O&M MANUAL
CONCERNING SAFE CUSTODIAL
PROCEDURES FOR THIS
MATERIAL.
3. CONTINUE SURVEILLANCE
OF THIS MATERIAL UNDER THE
ASBESTOS MANAGEMENT PLAN.
EXTERIOR
WEATHERPROOFING
MATERIALS 9
THIS MATERIAL IS EXPOSED
IN SOME LISTED LOCATIONS.
1 2018
No.
Homo.
Mtl. No.
Material Description
AHERA
CAT Locations Comments
Number Date Result
Building: 50
50 005
WALL TILE, 1' X 1'
WHITE, PINHOLE,
FISSURED, GLUED-
ON MISC. M205
06541 06542 06543 06544 06545 06546 06547 06548
01-Jul-88 01-Jul-88 01-Jul-88 01-Jul-88 01-Jul-88 01-Jul-88 01-Jul-88 01-Jul-88
ND
ND
ND
ND
ND
ND
ND
ND
THE ADHESIVE FOR THIS MATERIAL
IS MN 077.
50 052
WALL PLASTER,
PINK, SMOOTH
SURFACE SURF.
102, 104, 105, 106, 110, 111, 112, 113, 114, 115, 116, 124, 125, 126, 127, 130, 131, 132, 133, 134, 200, 201, 201, 202, 203, 204, 205, 206, 209, 210, 211, 212, 213, 214, 215, 220, 222, 223, 224, 225, 226, 230, 232, 233, 234, 235, 236, 237, C101, C102, C103, C104, C105, C106, C201, C202, C203, C204, C205, J103, M205, S101.1, S101.2, S102.1, S102.2, T132A, T133A, 101/103, 105A, 106A, 111A, 111B, 111C, 121A, 121B, 124A, 127A, 127B, 133B, 200A, 211A, 211B, 211C, 221A, 221B
0511-LKE-023A
0511-LKE-023B
0511-LKE-023C
0511-LKE-023D
0511-LKE-023E
0511-LKE-023F
0511-LKE-023G
23-Jun-89 23-Jun-89 23-Jun-89 23-Jun-89 23-Jun-89 23-Jun-89 23-Jun-89
ND
ND
ND
ND
ND
ND
ND
50 076
WALLBOARD, 1/2"
THICK, TAN
PAPER, LIGHT
PINK CORE MISC. T127B, 127A, 127B
0797-LKE-076A
0797-LKE-076B
0797-LKE-076C
30-Jul-97 30-Jul-97 30-Jul-97
ND
ND
ND
THE JOINT COMPOUND FOR THIS
MATERIAL IS MN 135.
50 077
WALL TILE
ADHESIVE,
YELLOW, UNDER
1' X 1' WHITE,
PINHOLE,
FISSURED, WALL
TILE MISC. M205
0797-LKE-077A
0797-LKE-077B
0797-LKE-077C
30-Jul-97 30-Jul-97 30-Jul-97
ND
ND
ND
THIS IS THE ADHESIVE FOR MN
005.
50 080
CEILING BOARD,
1/2" THICK, GRAY
CORE MISC. C204
0797-LKE-080A
0797-LKE-080B
0797-LKE-080C
30-Jul-97 30-Jul-97 30-Jul-97
ND
ND
ND
NO ASSOCIATED JOINT COMPOUND
COULD BE FOUND FOR THIS
MATERIAL.
50 114
CEILING TILES, 2'
X 2' WHITE,
PINHOLE,
FISSURED,
SUSPENDED MISC.
110, 113, 131, 200, 220, 230, C101, C103, C105, C106, C201, C203, C204, C205, S101.1, S101.2, S102.1, S102.2, 106A
0500-LAE-114A
0500-LAE-114B
0500-LAE-114C
03-May-00 03-May-00 03-May-00
ND
ND
ND
50 115
RESILIENT FLOOR
SHEETING, LIGHT
GRAY WITH
BLACK SPECKS MISC.
C101, C103, C104, C105, C106, C201, C203, C204, C205, J103, S101.1, S101.2, S102.1, S102.2, 200A
0500-LAE-115A
0500-LAE-115B
0500-LAE-115C
UK12-LAE-115D*
03-May-00 03-May-00 03-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED TO BE ACM. MN 115
AND MN 199 ARE SIMILAR IN
APPEARANCE BUT WERE INSTALLED
AT DIFFERENT TIMES. THE
ADHESIVE FOR THIS MATERIAL IS
MN 118.
50 116
CEILING TILES, 2'
X 2' WHITE, SAND
TEXTURE WITH
PINHOLE,
SUSPENDED MISC.
111, 112, 114, 115, 116, 124, 125, 126, 127, 130, 132, 133, 134, 209, 210, 211, 212, 213, 214, 215, 222, 223, 224, 225, 226, 232, 233, 234, 235, 236, 237, T124A, T132A, T133A, T134A, T134B, 111B, 111C, 121A, 121B, 124A, 124B, 132B, 133B, 211A, 211B, 211C, 221A, 221B
0500-LAE-116A
0500-LAE-116B
0500-LAE-116C
03-May-00 03-May-00 03-May-00
ND
ND
ND
MN 116 AND MN 193 ARE SIMILAR
IN APPEARANCE BUT WERE
INSTALLED AT DIFFERENT TIMES.
Table D-2 - Summary of Non-Asbestos Materials for Lakenheath ES
2 2018
No.
Homo.
Mtl. No.
Material Description
AHERA
CAT Locations Comments
Number Date Result
Table D-2 - Summary of Non-Asbestos Materials for Lakenheath ES
Sample Information
50 117
SINK COATING,
ASPHALTIC, 6" X
6" BLACK PAD,
UNDER
STAINLESS STEEL
BOWL, SET IN
WOOD PATTERN
LAMINATE
COUNTERTOP MISC.
111, 112, 113, 114, 115, 116, 124, 126, 132, 133, 134, 232, 233, 234, 235, 236, 237, 105A, 221B
0500-LAE-117A
0500-LAE-117B
0500-LAE-117C
UK12-LAE-117D*
06-May-00 06-May-00 06-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED TO BE ACM.
50 119
FLOOR ADHESIVE,
WHITE, UNDER
20" X 20" GRAY
RAISED DOT
RUBBER FLOOR
TILE MISC.
111, 112, 113, 114, 115, 116, 124, 125, 126, 127, 132, 133, 134, 209, 210, 212, 213, 214, 215, 222, 223, 224, 225, 226, 232, 233, 234, 235, 236, 237, M205, T124A, T132A, T133A, T134A, T134B, 121A, 121B, 124A, 124B, 132B, 133B, 221A, 221B
0500-LAE-119A
0500-LAE-119B
0500-LAE-119C
UK12-LAE-119D*
04-May-00 04-May-00 04-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED TO BE ACM. MN 119
AND MN 195 ARE SIMILAR IN
APPEARANCE BUT WERE INSTALLED
AT DIFFERENT TIMES.
50 120
FLOOR ADHESIVE,
YELLOW, UNDER
BLUE CARPETS MISC.
111, 112, 113, 114, 115, 116, 124, 125, 126, 127, 209, 210, 211, 212, 213, 214, 215, 233, 111B, 111C, 121A, 121B, 211A, 211B, 211C
0500-LAE-120A
0500-LAE-120B
0500-LAE-120C
UK12-LAE-120D*
04-May-00 04-May-00 04-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED TO BE ACM.
50 121
FLOOR ADHESIVE,
YELLOW, UNDER
OLIVE CARPET MISC. 110, 130, 131, 106A
0500-LAE-121A
0500-LAE-121B
0500-LAE-121C
04-May-00 04-May-00 04-May-00
ND
ND
ND
THE 2017 AHERA INSPECTION
TEAM CONFIRMED THE EXISTENCE
OF THIS MATERIAL AND UPDATED
THE INFORMATION BASED UPON
CURRENT CONDITIONS.
50 122
RESILIENT FLOOR
TILE, 1' X 1' GRAY MISC. 111A
0500-LAE-122A
0500-LAE-122B
0500-LAE-122C
UK12-LAE-122D*
04-May-00 04-May-00 04-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED TO BE ACM. THE
ADHESIVE FOR THIS MATERIAL IS
MN 123.
50 123
FLOOR ADHESIVE,
YELLOW, UNDER
1' X 1' GRAY
RESILIENT FLOOR
TILE MISC. 111A
0500-LAE-123A
0500-LAE-123B
0500-LAE-123C
UK12-LAE-123D*
04-May-00 04-May-00 04-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED TO BE ACM. THIS IS
THE ADHESIVE FOR MN 122.
50 124
FLOOR ADHESIVE,
YELLOW, UNDER
TAN CARPET MISC.
132, 133, 134, 232, 233, 234, 235, 236, 237
0500-LAE-124A
0500-LAE-124B
0500-LAE-124C
UK12-LAE-124D*
04-May-00 04-May-00 04-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED TO BE ACM.
50 125
WALLBOARD, 1/2"
THICK, GRAY
PAPER, WHITE
CORE MISC.
111, 112, 113, 114, 115, 116, 124, 125, 126, 127, 131, 132, 133, 134, 200, 209, 210, 211, 212, 213, 214, 215, 220, 222, 223, 224, 225, 226, 230, 232, 233, 234, 235, 236, 237, C103, C105, C201, C203, S101.1, S101.2, S102.1, S102.2, T132A, T134B, 111A, 111B, 111C, 121A, 121B, 132B, 211A, 211B, 211C, 221A, 221B
0500-LAE-125A
0500-LAE-125B
0500-LAE-125C
04-May-00 04-May-00 04-May-00
ND
ND
ND
THE JOINT COMPOUND FOR THIS
MATERIAL IS MN 126.
3 2018
No.
Homo.
Mtl. No.
Material Description
AHERA
CAT Locations Comments
Number Date Result
Table D-2 - Summary of Non-Asbestos Materials for Lakenheath ES
Sample Information
50 126
JOINT
COMPOUND,
WHITE MISC.
111, 112, 113, 114, 115, 116, 124, 125, 126, 127, 131, 132, 133, 134, 200, 209, 210, 211, 212, 213, 214, 215, 220, 222, 223, 224, 225, 226, 230, 232, 233, 234, 235, 236, 237, C103, C105, C201, C203, S101.1, S101.2, S102.1, S102.2, T132A, T134B, 111A, 111B, 111C, 121A, 121B, 132B, 211A, 211B, 211C, 221A, 221B
0500-LAE-126A
0500-LAE-126B
0500-LAE-126C
UK12-LAE-126D*
04-May-00 04-May-00 04-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED TO BE ACM. THIS IS
THE JOINT COMPOUND FOR MN
125.
50 135
JOINT
COMPOUND,
WHITE MISC. T127B, 127A, 127B
0500-LAE-135A
0500-LAE-135B
0500-LAE-135C
UK12-LAE-135D*
08-May-00 08-May-00 08-May-00 23-Jan-12
ND
ND
ND
ND
*SAMPLE WAS ANALYZED BY TEM
AND RESULT WAS NO ASBESTOS
DETECTED. THIS MATERIAL IS NOT
CONSIDERED…