About this file

This Performance Work Statement (PWS) is for dumpster hauling and refuse removal services to support Army and Joint military operations on Oahu, Hawaii. The contract is an Indefinite Delivery/Indefinite Quantity (IDIQ) non-personal services contract for the 25th Infantry Division, requiring the contractor to provide dumpster rental, waste removal, and hauling services across various military installations.

Key service requirements include providing dumpsters in 10, 20, 30, and 40 cubic yard capacities, with specific standards for delivery, removal, daily rental, servicing (routine and urgent), and relocation. The contractor must comply with all U.S., state, and local laws, and be prepared to handle up to 10 dumpsters per day for routine servicing, with additional surge pricing for more than 10 dumpsters. The contract allows for flexibility in periods of performance and potential service additions, covering military training, operations, mobilization, disaster relief, humanitarian efforts, and other Joint dumpster requirements on Oahu.

View the file

Other files for this federal contract opportunity

Other files attached to 25ID Dumpster and Refuse, newest first.
File Type Posted
B08 Amendment 3 Comb SS 25-Q-5001 18SEP25.pdf PDF
Attachment 7 RFQ Questions and Answers 18SEP2025.xlsx XLSX spreadsheet
Attachment 3 B08 Pricing Sheet 15SEP25.xlsx XLSX spreadsheet
B08 Amendment 2 Comb SS 25-Q-5001 15SEP25.pdf PDF
Attachment 7 RFQ Questions and Answers 15SEP2025.xlsx XLSX spreadsheet
Attachment 2 B08 Example Task Order Form 12SEP25.xlsx XLSX spreadsheet
Attachment 3 B08 Pricing Sheet 12SEP25.xlsx XLSX spreadsheet
Attachment 6 Wage Determination 12SEP25.pdf PDF
B08 Amendment 1 Comb SS 25-Q-5001 12SEP25.pdf PDF
Attachment 7 RFQ Questions and Answers 12SEP2025.xlsx XLSX spreadsheet
B08 Comb SS 25-Q-5001 4SEP25.pdf PDF
Attachment 2_B08 Example Task Order Form.xlsx XLSX spreadsheet
Attachment 3_B08 Pricing Sheet.xlsx XLSX spreadsheet
Attachment 4 _Technical Approach.docx DOCX document
Attachment 5_Recent Relevant Work Experience Questionnaire.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APR 24

Performance Work Statement (Includes associated Performance Requirements Summary (PRS)

PERFORMANCE WORK STATEMENT (PWS)

Dumpster Hauling and Refuse IDIQ

Part 1

General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide dumpster and refusal removal services to support Army and Joint military operations at varying locations on Oahu.

1.2 Background: 25TH ID participates in DoD Operations and training events that require these services to sustain the force as they achieve training objectives.

1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.

1.3.1 Specific services for this contract include, but are not limited to, all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide dumpster rental, refuse(waste) removal, and hauling services as defined in this Performance Work Statement (PWS), except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards in this contract.

1.3.2 Due to the volatility of US Army Military exercises and operations, contractors must remain flexible to changes in the periods of performance, quantities, and potential for the addition of services within the general scope of the contract.

1.3.3 It is within the scope of this contract to provide services for, but not limited to, military training, operations, mobilization, disaster relief, humanitarian efforts, or other Joint dumpster and refuse requirements on the island of Oahu.

1.4 Objectives: The objective of the work performed under this contract is to ensure continuous, safe, and reliable waste disposal that supports the customer’s mission.

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The contractor’s existing quality assurance system shall be utilized in accordance with (IAW) FAR 12.208.

1.5.1.1 Reserved.

1.5.1.2 The Contractor shall inform the COR, if applicable, or Contract Specialist otherwise, of issues or potential issues that might affect the performance within two (2) hours of identifying those issues. Verbal reports shall be followed up by written reports within 1 day of discovery of the issue.

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall be performed on U.S. federally recognized holidays unless otherwise directed by the Contracting Officer.

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: Reserved.

1.5.4.2 Government Facility Operating Hours: Reserved.

1.5.4.3 Contractor Support Hours: The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential. See Part 5 of the PWS for specifics; coordinate with the Contracting Officer Representative (COR), if applicable, for scheduling during contract performance.

1.5.4.3.1 Contractor Work Plan: Reserved.

1.5.5 Training Holidays: Reserved.

1.5.6 Place of Performance: The place of performance under this contract includes but is not limited to Schofield Barracks, Bellows AFB / MCTAB, KTA, Dillingham Air Field, Wheeler Army Air Field, HMR/Basilan, and other military installations. If required and authorized, the place of performance under this contract may cover all of Oahu. Services shall only be performed on the island of Oahu, Hawaii.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Security Program: Reserved.

1.6.2 Personnel Security Clearance Requirements: Reserved.

1.6.3 Installation Access: Access to U.S. and Host Nation installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.

The contractor shall comply with requirements of electronic or web-based systems for vehicle and personnel passes in order to gain unfettered access to military installations.

Contractor personnel performing work under this contract shall not have been convicted of any felony and shall pass a criminal background check prior to access the installation.

The Government reserves the right to deny access to or ban any Contractor employee from the installation.

The Contractor shall safeguard all Government equipment, information, facilities, and property provided for Contractor use.

Access and General Protection/Security Policy and Procedures: Contractor and all associated sub-contractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contract or Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

For Contractors That Do Not Require CAC, but Require Access to a DoD Facility or Installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate

Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.6.3.1 Installation Pass Log: Reserved.

1.6.3.2 Individual Termination or Expiration of Employment: Reserved.

1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes, if applicable, and return them to the issuing office within 3 days.

1.6.3.4 Common Access Cards (CAC) and CAC Log: Reserved.

1.6.4 Background Checks: Reserved.

1.6.4.1 U.S. Citizen: Reserved.

1.6.4.2 Local Nationals and Third Country Nationals: Reserved.

1.6.5 Physical Security: The Contractor shall safeguard their own equipment without the assistance of the US Government.

1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.

1.7 Key Control: Reserved.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include

Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.

Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Communication: Contractor must ensure that the contractor manager and/or site manager is able to communicate in English.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 Reserved.

1.12.2 Reserved.

1.13 Contractor Travel: Any contractor travel is done so at the expense of the contractor.

1.14 Other Direct Costs (ODCs): Reserved.

1.15 Data Rights: Reserved.

1.17 Non-Disclosure Requirements: Reserved.

1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., http://www.dimoc.mil/resources/limitations/ contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.18 Non-Disclosure Statements: Reserved.

1.19 Organizational Conflict of Interest (OCI): Reserved.

1.20 Phase In /Phase Out Period: Reserved.

1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:

Contractor activities shall be conducted in a safe manner that minimizes accidents as well as any impacts on Army operations and members of the public. Contractor shall comply with applicable Federal, State, and local codes and standards, including safety and occupational health requirements, as well as any additional specific requirement contained in this PWS.

1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein, as well as all applicable Host Nation Safety Laws and Regulations.

1.21.2 Emergency Services: The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment.

The Contractor will, in turn, notify the KO and the Requiring Activity (RA) Point of Contact (POC) within 30 minutes of the incident.

The Contractor may, at their option, use the Installation’s Emergency Services, available by dialing 9-1-1. Emergency medical treatment and other emergency services for Contractor personnel are the responsibility of the Contractor, including any fees or charges imposed.

1.22 Environmental Compliance: The contract shall adhere to all host nation environmental laws, to include, but not limited to, the proper disposal of hazardous materials.

1.22.1 Environmental Compliance Plan and Program: Reserved.

1.23 Required Training: Reserved.

1.24 ATOPSEC

1.24.1 AT Level I training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I Awareness training within 7 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 7 calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website:

http://jko.jten.mil

1.24.2 . Access and general protection/security policy and procedures: This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.24.3 For contractors that do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.24.4 iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 14 calendar days of contract award and within 14 calendar days of new employees commencing performance with the results reported to the COR NLT 14 calendar days after contract award.

http://jko.jten.mil/

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract

Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to identify the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Work Day - The number of hours per day the Contractor provides services in accordance with the contract.

Work Week - Monday through Friday, unless otherwise specified.

2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification

IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services

The contractor is solely responsible to provide the necessary services, facilities, utilites, equipment, and so forth in order to meet the requirements in this contract.

3.1 Services: Reserved.

3.2 Facilities: Reserved.

3.3 Utilities: Reserved.

3.4 Equipment: Reserved.

3.5 Special Tooling and Test Equipment: Reserved.

3.6 Materials: Reserved.

3.7 Training: Reserved.

3.8 Common Access Cards (CAC): Reserved.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services.

4.2 Secret Facility Clearance: Reference paragraph 4.1.

4.3 Materials: Reference paragraph 4.1.

4.4 Vehicles and Equipment: Reference paragraph 4.1.

PART 5

SPECIFIC TASKS

5.1 Basic Services: The Contractor shall provide services for dumpster rental, hauling, delivery, dumping, and pick-up of dumpsters as defined in this Performance Work Statement

(PWS).

5.2 Tasks: Tasks consist of the following sub paragraphs. The contractor may provide an alternative solution that meets the requirements.

5.2.1: Dumpsters: The contractor shall provide dumpster and related services. This includes but is not limited to the delivery and pick-up of dumpsters (ranging from 10 to 40 cubic yard capacity), servicing of dumpsters, and relocation of dumpsters.

(a) STD: Dumpster - a waste receptacle of varying size and dimension, commonly described in cubic yard capacity. Cubic yard capacities required include 10,20,30 and 40 cubic yard internal capacity. Each dumpster shall have proper signage placards attached to indicate types of items that can or cannot be placed into dumpsters (e.g.

restrictions on c-wire or HAZMAT).

An illustrative example of 10-40-yard dumpster with accompanying size comparisons.

(b) STD: Delivery / Removal - The contractor shall be responsible for placing and recovering the dumpster(s) in a safe and secure manner at the designated locations within the requested timeframe. Dumpsters will be emplaced in such a way as to prevent tipping or falling over. The contractor shall be liable for any damages that may arise caused by the failure to properly place and secure the dumpster(s). Defective dumpster(s) will be rejected by the government and replaced by the vendor at no expense to the government. All equipment shall be emplaced and ready for use no later than 1200 on the first day of the period of performance, and picked up no later than 48 hours after the end of the period of performance. Removal includes the final servicing (paragraph d below).

(c) STD: Daily Rental. The contractor shall be responsible for providing each individual dumpster for the amount of days specified at the Task Order.

(d) STD: Servicing of dumpsters- Routine and Surge. Contractor must empty dumpster of all contents to include recyclables. The schedule of required servicing will be dictated at the Task Order. The contractor shall be prepared to empty up to 10 dumpsters per day for routine servicing. Any day that requires more than 10 dumpsters emptied will include an additional surge price per dumpster, not including the first 10 dumpsters. For example, if 15 total dumpsters are emptied, 10 will be emptied at the standard service rate, and 5 will be emptied at the surge rate. Dumpster servicing must be completed on the scheduled day to be considered surge servicing. Hazmat items will not be placed in the dumpster.

An illustrative example of a dumpster off-load/on-load.

(e) STD: Servicing of dumpsters – Urgent. The contractor shall service a dumpster within 8 hours of request from the KO or COR. If contractor cannot complete the urgent service within 8 hours, any subsequent service performed shall be considered routine.

Contractor must empty dumpster of all contents to include recyclables; hazmat items will not be placed in the dumpster. Urgent Dumpsters are not typically scheduled. The task order will identify whether Urgent servicing is required. If required, an allocation will be pre-paid for and used at the KOs discretion throughout the performance of the Task Order. Whatever is not used will be de-obligated at the completion of performance. For example, if 10 Urgent services are contracted for at the Task Order, and only 8 are used, the price of the 2 unused urgent services will be de-obligated from the contract.

(f) STD: Relocation of dumpsters –For this PWS a Relocation refers to moving a previously delivered dumpster to a new site. A Relocation will be authorized without restrictions on distance or area. Relocation of dumpsters are not typically scheduled.

The task order will identify the number of Relocations requested. If required, an allocation will be pre-paid for and used at the KOs discretion throughout the performance. The contractor shall relocate dumpster(s) upon request within 24 hours of notification from the KO or COR. Whatever is not used will be de-obligated at the completion of performance. For example, if 10 Relocation ervices are contracted for at the Task Order, and only 8 are used, the price of the 2 unused relocations will be de-obligated from the contract.

(g) STD: Additional Requirements: For any special requirements for disposal (e.g. c-wire, etc.), the government will include that special disposal requirement for the individual dumpster at the Task Order. The contractor is responsible for ensuring that the additional cost for the removal for the specific requirement is priced appropriately when responding to the Task Order solicitation.

(h) STD: Scheduling – Service schedules shall be confirmed in writing at least 3 days in advance. Requested changes to the service schedule, such as delaying servicing a day, can be completed via phone, but shall be later documented in writing. The contractor shall communicate as early as possible if they cannot accommodate change requests, or are unable to perform scheduled services.

(i) STD: Ordering. The Quantity will be specified on the Order Form at the Task Order.

This base IDIQ contract will have 1 CLIN for dumpster services with ELINs. ELINs are listed below for specified categories of delivery/removal, servicing, surge requirements, urgent service, and relocation. Sizes are cubic yard volume.

ELIN AA01 10c yrd Dumpster Delivery / Removal ELIN AA02 20c yrd Dumpster Delivery / Removal ELIN AA03 30c yrd Dumpster Delivery / Removal ELIN AA04 40c yrd Dumpster Delivery / Removal ELIN AA05 10c yrd Daily Rental ELIN AA06 20c yrd Daily Rental ELIN AA07 30c yrd Daily Rental ELIN AA08 40c yrd Daily Rental ELIN AA09 10c yrd Dumpster Service ELIN AA10 20c yrd Dumpster Service ELIN AA11 30c yrd Dumpster Service ELIN AA12 40c yrd Dumpster Service ELIN AA13 Surge Dumpster Service (more than 10 units/day) ELIN AA14 Urgent Dumpster Service (within 8 hours) ELIN AA15 Dumpster Relocation (within 24 hours) ELIN AA16 Additional Requirements (e.g c-wire disposal) List of the different contract line item numbers (CLIN)

5.2.2: Servicing, Maintenance, and Security: The following paragraphs are applicable to all services described in this PWS.

(a) STD: Contractor is responsible of furnishing all materials, labor, management, supervision, tools, components, supplies, services and equipment necessary to deliver, set-up, install, perform daily services, and remove the equipment required for services.

All services are for 24 hours a day unless otherwise specified at the Call. The contractor shall ensure equipment is safe, serviceable, and ready for use 24hrs per day, unless otherwise specified.

(b) STD: All equipment shall be delivered in serviceable conditions without holes, cracks, or leaks, or corrosion. The Contractor is solely responsible for the cleanliness, maintenance, fueling, and other costs associated with providing all services in this

PWS.

(c) STD: Repairs/Replacement/Maintenance. The contractor shall make necessary repairs to equipment upon identification of deficiencies. The contractor shall make repairs identified by the COR within 24 hours. The contractor shall respond to emergencies within four (4) hours when notified by the COR or contracting officer. Emergency is defined as the inability to use the service (latrine, etc) as intended or a safety concern.

(d) STD: The contractor is responsible for the security of contractor equipment. The government is not liable for usage, theft, loss, damages, or replacement costs.

(e) STD: Safety gear. The Contractor shall ensure that all employees are supplied and use proper safety equipment (i.e. gloves, safety glasses and boots) and follow APF policy for safety procedures.

(f) STD: The contractor shall provide all fuel, oils, insurance, tools, base access, economic zone fees, entry fees, repairs, maintenance, and any other operational costs for all services and equipment to be fully operational for the duration of this contract. These will not be priced separately and will be built into the total contract price.

5.2.3: The Contractor shall, at no additional cost to the Government, obtain all licenses and permits required for performance of work and for complying with all applicable local, state, and federal laws, rules, and regulations.

5.2.4: Invoicing: All Contractor invoices shall be submitted via Wide Area Work Flow (WAWF) using contract line item numbers (CLINs). The contractor shall be required to establish account(s), access method(s), log-in(s), and get necessary training in order to submit invoices through WAWF. Invoices not submitted via WAWF shall not be accepted or paid.

5.3 Service Contract Reporting

5.3.1 System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address: www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website. From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to http://www.sam.gov/

September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement.

Steps for Submitting a Service Contract Report (SCR)

1. Go to www.sam.gov and log in.

2. Select Entity Registrations and then select Service Contract Reporting.

3. SAM displays your entities which have service contracts and meet the reporting criteria.

Select View by entity to see the service contracts for each entity.

4. Next, select Add for the service contract against which you want to create a Service

Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.

5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:

• Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).

• Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.

6. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.

7. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service Contract page where you can create other SCRs or edit an existing SCR.

Steps for Editing a Submitted Report

1. Follow steps 1-4 above. Any previously submitted SCR will have a View/Edit button instead of an Add button.

2. Select View/Edit. You will be able to view the current SCR, edit available fields, and resubmit the record. You can also delete previously entered information altogether.

STD: All information provided by the Contractor shall be accurate, complete, and not exceed suspense dates noted in corresponding paragraph above.

STD: All reports shall be submitted if required thresholds are met. No deviation is permitted.

http://www.sam.gov/

PART 6

APPLICABLE PUBLICATIONS

6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.

6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)

6.1.2 Department of Defense Security Agreement (DD Form 441)

6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)

6.1.4 Installation Access Control (AE Reg 190-16)

6.1.5 The Army Physical Security Program (AR 190-13)

6.1.6 Contractor Identification (AE Reg 27-715)

6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)

6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)

6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)

6.1.10 Information Assurance (AR 25-2)

6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)

6.1.12 Policies and Procedures for Property Accountability (AR 735-5)

PART 7

ATTACHMENT AND TECHNICAL EXHIBIT LISTING

7. Attachment and Technical Exhibit List

7.1 Technical Exhibit A – Performance Requirements Summary

7.2 Technical Exhibit B – Deliverables Schedule

7.3 Technical Exhibit C – Call Sheet

TECHNICAL EXHIBIT A

PERFORMANCE

OBJECTIVE

STANDARD PERFORMANCE

THRESHOLD

ACCEPTABLE

QUALITY

LEVELS (AQLs)

METHOD OF

SURVEILLANCE

PRS#1 - PWS para (5.2.1) Contractor shall comply with all listed Dumpster Service, delivery, and relocation standards.

Standards are specified in 5.2.1.

Contractor must adhere to U.S., state, and local laws.

Services will be 100% compliant with no defect.

Periodic Inspection

Customer Feedback

PRS#2 - PWS para (5.2.2) Contractor shall comply with all listed servicing, Standards are specified in 5.2.2.

Contractor must adhere to U.S., Services will be 100% compliant with no defect.

100% Inspection

Periodic Inspection

Customer Feedback maintenance, and Security standards.

state, and local laws.

PRS#3 - PWS para (1.1) Contractor shall comply with all establish standards, laws, and regulations.

The Contractor shall conduct work in accordance with this PWS and all applicable U.S., state, and local laws, regulations, standards, provisions, and directives to include applicable publications in Part 5.

Services will be 100% compliant with no defect.

Random Sample

TECHNICAL EXHIBIT B

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Name and contact information of the Contract Manager and designated alternate

Within 3 days of award

1 copy Email KO and

COR

Names and Photocopies of Identification for all Contractor Employees requiring access to the place/location of performance

Within 3 days of award

1 copy MS Word or PDF KO and

COR

Contractor Quality Control Plan (QCP)

NLT 3

days prior to start work

1 copy MS Word or PDF KO and

COR

Delivery/Service Maintenance Schedule

NLT 24

hours prior to each day of service

1 copy Email COR

Equipment Pre- Inspection Sheet

3 days after delivery

1 copy PDF KO and

COR

Equipment Post- Inspection Sheet

3 days after completion of services

1 copy PDF KO and

COR