This document contains a submittal register and related federal contract opportunity solicitation. The submittal register outlines various pre-construction, construction, and closeout submittals required for the canopy replacement project at Eielson Air Force Base in Alaska. Submittals include schedules, plans, samples, certifications, test reports, and as-built documents.
The solicitation seeks proposals for a design-build contract to replace exterior canopies at Building 2200. The project scope involves removing foundations of previously demolished canopies, an existing front entry canopy, a BBQ canopy, and replacing all exterior canopies. The anticipated price range is $250,000 to $500,000. This will be a total small business set-aside with a firm fixed price contract. Proposals are due February 24, 2022. A pre-proposal site visit will be held on February 2, 2022. Questions are due by February 7th. The contracting agency is the Department of the Air Force Pacific Air Forces.
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | CONSTRUCTION DOCUMENT | SUBMITTAL REGISTER |
| JOB NAME: | Canopy Replacement B2200 |
B2200
| LOCATION: | EIELSON AFB, ALASKA | |||||||||||||||||
| CONTRACT NO: | FTQW 21-1010 | |||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 01 20 00 | 01 | Preconstruction Submittals | Schedule of Prices | 1.3 | G | |||||||||||||||
| 1 | 01 30 00 | 01 | Preconstruction Submittals | View Location Map | 1.4 | |||||||||||||||
| 2 | 01 30 00 | 01 | Preconstruction Submittals | Progress and Completion Pictures | 1.5 | |||||||||||||||
| 3 | 01 30 00 | 04 | Samples | Color Boards | 1.3 | |||||||||||||||
| 4 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Baseline Construction Schedule | 1.2 | G | ||||||||||||||
| 5 | 01 32 16.00 20 | 07 | Certificates | Monthly Updates | 1.4 | G | ||||||||||||||
| 6 | 01 33 00 | 01 | Preconstruction Submittals | Submittal Register | 1.7 | G | ||||||||||||||
| 7 | 01 35 13 | 01 | Preconstruction Submittals | Construction Operation Plan | 3.1 | G | ||||||||||||||
| 8 | 01 35 26 | 01 | Preconstruction Submittals | Accident Prevention Plan (APP) | 1.6 | G | ||||||||||||||
| 9 | 01 35 26 | 06 | Test Reports | Notifications and Reports | 1.11 | |||||||||||||||
| 10 | 01 35 26 | 06 | Test Reports | Accident Reports | 1.11.2 | G | ||||||||||||||
| 11 | 01 35 26 | 06 | Test Reports | LHE Inspection Reports | 1.11.3 | |||||||||||||||
| 12 | 01 35 26 | 07 | Certificates | Crane Operators/Riggers | 1.5.1.4 | |||||||||||||||
| 13 | 01 35 26 | 07 | Certificates | Standard Lift Plan | 1.6.2.2 | |||||||||||||||
| 14 | 01 35 26 | 07 | Certificates | Critical Lift Plan | 1.6.2.3 | G | ||||||||||||||
| 15 | 01 35 26 | 07 | Certificates | Activity Hazard Analysis (AHA) | 1.7 | |||||||||||||||
| 16 | 01 35 26 | 07 | Certificates | Confined Space Entry Permit | 1.8.1 | |||||||||||||||
| 17 | 01 35 26 | 07 | Certificates | Hot Work Permit | 1.8.1 | G | ||||||||||||||
| 18 | 01 35 26 | 07 | Certificates | Certificate of Compliance | 1.11.4 | |||||||||||||||
| 19 | 01 35 26 | 07 | Certificates | License Certificates | 1.13 | |||||||||||||||
| 20 | 01 45 00.00 10 | 01 | Preconstruction Submittals | Contractor Quality Control (CQC) Plan | 3.2 | G | ||||||||||||||
| 21 | 01 45 00.00 10 | 06 | Test Reports | Verification Statement | 3.5.2 | |||||||||||||||
| 22 | 01 50 00 | 01 | Preconstruction Submittals | Construction Site Plan | 1.3 | G | ||||||||||||||
| 23 | 01 50 00 | 01 | Preconstruction Submittals | Traffic Control Plan | 2.2 | G | ||||||||||||||
| 24 | 01 57 19 | 01 | Preconstruction Submittals | Preconstruction Survey | 1.6.1 | |||||||||||||||
| 25 | 01 57 19 | 01 | Preconstruction Submittals | Regulatory Notifications | 1.6.2 | |||||||||||||||
| 26 | 01 57 19 | 01 | Preconstruction Submittals | Environmental Protection Plan (EPP) | ||||||||||||||||
| 27 | 01 57 19 | 01 | Preconstruction Submittals | Stormwater Notice of Intent and copy of ADEC approval | ||||||||||||||||
| 28 | 01 57 19 | 01 | Preconstruction Submittals | Dirt and Dust Control Plan | 1.7.11.1 | |||||||||||||||
| 29 | 01 57 19 | 01 | Preconstruction Submittals | Employee Training Records | 1.6.5 | |||||||||||||||
| 30 | 01 57 19 | 01 | Preconstruction Submittals | Environmental Manager Qualifications | 1.6.4 | |||||||||||||||
| 31 | 01 57 19 | 01 | Preconstruction Submittals | Completed Checklist For Spruce Lake Disposal | G | |||||||||||||||
| 32 | 01 57 19 | 01 | Preconstruction Submittals | Notice of Intent For Asbestos Abatement | ||||||||||||||||
| 33 | 01 57 19 | 01 | Preconstruction Submittals | Notice Of Building Demolition | ||||||||||||||||
| 34 | 01 57 19 | 01 | Preconstruction Submittals | Stormwater Pollution Prevention Plan (SWPPP) | ||||||||||||||||
| 35 | 01 57 19 | 01 | Preconstruction Submittals | Evidence Of Delivery Of SWPPP to ADEC | ||||||||||||||||
| 36 | 01 57 19 | 01 | Preconstruction Submittals | Contaminated Soil Sampling And Analysis Plan (SAP) | ||||||||||||||||
| 37 | 01 57 19 | 01 | Preconstruction Submittals | Contaminated Soil Sampling And Analysis Field Report | ||||||||||||||||
| 38 | 01 57 19 | 01 | Preconstruction Submittals | Initial Contractor Hazardous Material Inventory | G | |||||||||||||||
| 38 | 01 57 19 | 01 | Preconstruction Submittals | EAFB Waste Disposal Disposal, Borrow pit Worksheet | G | |||||||||||||||
| 39 | 01 57 19 | 06 | Test Reports | Laboratory Analysis | 3.7.1.1.2 | |||||||||||||||
| 40 | 01 57 19 | 06 | Test Reports | Inspection Reports | 3.2.1.3 | |||||||||||||||
| 41 | 01 57 19 | 06 | Test Reports | Solid Waste Management Report | 3.7.2.1 | |||||||||||||||
| 42 | 01 57 19 | 07 | Certificates | Employee Training Records | 1.6.5 | |||||||||||||||
| 43 | 01 57 19 | 07 | Certificates | Erosion and Sediment Control Inspector | 1.6.5 | |||||||||||||||
| 44 | 01 57 19 | 07 | Certificates | ADEC Transport, Treatment, & Disposal Approval Form For Contaminated Media (ATT) | G | |||||||||||||||
| 45 | 01 57 19 | 11 | Closeout Submittals | Stormwater Pollution Prevention Plan Compliance Notebook | 3.2.1.4 | |||||||||||||||
| 46 | 01 57 19 | 11 | Closeout Submittals | Stormwater Notice of Termination to ADEC | ||||||||||||||||
| 47 | 01 57 19 | 11 | Closeout Submittals | Waste Determination Documentation | 3.7.1 | |||||||||||||||
| 48 | 01 57 19 | 11 | Closeout Submittals | Disposal Documentation for Hazardous and Regulated Waste | 3.7.3.6 | G | ||||||||||||||
| 49 | 01 57 19 | 11 | Closeout Submittals | Assembled Employee Training Records | 1.6.5 | |||||||||||||||
| 50 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Permit | G | |||||||||||||||
| 51 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Report | 3.7.2.1 | G | ||||||||||||||
| 52 | 01 57 19 | 11 | Closeout Submittals | Hazardous Waste/Debris Management | 3.7.3.1 | G | ||||||||||||||
| 53 | 01 57 19 | 11 | Closeout Submittals | Regulatory Notifications | 1.6.2 | |||||||||||||||
| 54 | 01 57 19 | 11 | Closeout Submittals | Sales Documentation | 3.7.2.1 | |||||||||||||||
| 55 | 01 57 19 | 11 | Closeout Submittals | Contractor Certification | ||||||||||||||||
| 56 | 01 57 19 | 11 | Closeout Submittals | As-Built Topographic Survey | ||||||||||||||||
| 57 | 01 57 19 | 11 | Closeout Submittals | ADEC Approved Disposal Facility Weight and/or Acceptance Ticket for Contaminated Soil | G | |||||||||||||||
| 58 | 01 57 19 | 11 | Closeout Submittals | ADEC Approved Disposal Facility Certificate of Thermal Incineration or Disposal of Contaminated Soil along with Confirmatory Sample Results | G | |||||||||||||||
| 59 | 01 74 19 | 01 | Preconstruction Submittals | Waste Management Plan | 1.6 | G | ||||||||||||||
| 60 | 01 78 00 | 03 | Product Data | Manufacturer's Warranties | G | |||||||||||||||
| 61 | 01 78 00 | 03 | Product Data | Warranty Management Plan | 1.6.1 | G | ||||||||||||||
| 62 | 01 78 00 | 03 | Product Data | Warranty Tags | 1.6.3 | G | ||||||||||||||
| 63 | 01 78 00 | 03 | Product Data | Spare Parts Data | 1.4 | |||||||||||||||
| 64 | 01 78 00 | 08 | Manufacturer’s Instructions | Posted Instructions | 1.6.1 | G | ||||||||||||||
| 65 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.6 | G | ||||||||||||||
| 66 | 01 78 00 | 11 | Closeout Submittals | As-Built Drawings | 2.1 | G | ||||||||||||||
| 67 | 01 78 00 | 11 | Closeout Submittals | As-Built Record of Equipment and Materials | 2.1 | G | ||||||||||||||
| 68 | 01 78 00 | 11 | Closeout Submittals | Final Approved Shop Drawings | 2.1 | G | ||||||||||||||
| 69 | 01 78 00 | 11 | Closeout Submittals | Interim DD Form 1354 | 3.8 | G | ||||||||||||||
| 70 | 01 78 00 | 11 | Closeout Submittals | Checklist For DD Form 1354 | 3.8 | G | ||||||||||||||
| 71 | 01 78 23 | 10 | Operation and Maintenance Data | O&M Database | 1.3 | G | ||||||||||||||
| 72 | 01 78 23 | 10 | Operation and Maintenance Data | Training Plan | 3.1.1 | |||||||||||||||
| 73 | 01 78 23 | 10 | Operation and Maintenance Data | Training Outline | 3.1.3 | |||||||||||||||
| 74 | 01 78 23 | 10 | Operation and Maintenance Data | Training Content | 3.1.2 | |||||||||||||||
| 75 | 01 78 23 | 11 | Closeout Submittals | Training Video Recording | 3.1.4 | |||||||||||||||
| 76 | 01 78 23 | 11 | Closeout Submittals | Validation of Training Completion | 3.1.6 | |||||||||||||||
| 77 | 02 41 00 | 01 | Preconstruction Submittals | Demolition/Deconstruction Plan | 1.2.2 | G | ||||||||||||||
| 78 | 02 41 00 | 01 | Preconstruction Submittals | Existing Conditions | 1.11 | |||||||||||||||
| 79 | 02 41 00 | 07 | Certificates | Notification | 1.7 | G | ||||||||||||||
| 80 | 02 41 00 | 11 | Closeout Submittals | Receipts | 3.3.4 | G | ||||||||||||||
| 81 | 03 33 00 | 05 | Design Data | Concrete Mix Design | 1.6.1.1 | G | ||||||||||||||
| 82 | 03 33 00 | 06 | Test Reports | Concrete Mix Design | 1.6.1.1 | G | ||||||||||||||
| 83 | 03 33 00 | 06 | Test Reports | Compressive Strength Tests | 3.13.2.3 | G | ||||||||||||||
| 84 | 03 33 00 | 06 | Test Reports | Slump Tests | 3.13.2.1 | G | ||||||||||||||
| 85 | 05 12 00 | 02 | Shop Drawings | Fabrication Drawings Including Details of Connections | ||||||||||||||||
| 86 | 07 60 00 | 02 | Shop Drawings | Exposed Sheet Metal Coverings | 2.21 | G | ||||||||||||||
| 87 | 07 60 00 | 02 | Shop Drawings | Gutters | 3.1.17 | |||||||||||||||
| 88 | 07 60 00 | 02 | Shop Drawings | Downspouts | 3.1.18 | |||||||||||||||
| 89 | 07 60 00 | 02 | Shop Drawings | Expansion Joints | 3.1.26 | G | ||||||||||||||
| 90 | 07 60 00 | 02 | Shop Drawings | Gravel Stops and fascia | 3.1.15 | |||||||||||||||
| 91 | 07 60 00 | 02 | Shop Drawings | Splash Pans | 3.1.22 | |||||||||||||||
| 92 | 07 60 00 | 02 | Shop Drawings | Flashing for Roof Drains | 3.1.19 | G | ||||||||||||||
| 93 | 07 60 00 | 02 | Shop Drawings | Base Flashing | 3.1.11 | |||||||||||||||
| 94 | 07 60 00 | 02 | Shop Drawings | Counterflashing | 3.1.12 | |||||||||||||||
| 95 | 07 60 00 | 02 | Shop Drawings | Flashing at Roof Penetrations and Equipment Supports | 3.1.27 | |||||||||||||||
| 96 | 07 60 00 | 02 | Shop Drawings | Reglets | 3.1.13 | |||||||||||||||
| 97 | 07 60 00 | 02 | Shop Drawings | Scuppers | 3.1.20 | G | ||||||||||||||
| 98 | 07 60 00 | 02 | Shop Drawings | Copings | 3.1.30 | G | ||||||||||||||
| 99 | 07 60 00 | 02 | Shop Drawings | Drip Edges | 3.1.16 | |||||||||||||||
| 100 | 07 60 00 | 02 | Shop Drawings | Conductor Heads | 2.2.17 | |||||||||||||||
| 101 | 07 60 00 | 02 | Shop Drawings | Open Valley Flashing | ||||||||||||||||
| 102 | 07 60 00 | 02 | Shop Drawings | Eave Flashing | 2.21 | |||||||||||||||
| 103 | 07 60 00 | 02 | Shop Drawings | Recycled Content | 2.1 | |||||||||||||||
| 104 | 07 60 00 | 03 | Product Data | Cool Roof Data | 2.2.12 | G | ||||||||||||||
| 105 | 07 60 00 | 04 | Samples | Finish Samples | 1.4.2 | G | ||||||||||||||
| 106 | 07 60 00 | 08 | Manufacturer’s Instructions | Instructions for Installation | ||||||||||||||||
| 107 | 07 60 00 | 08 | Manufacturer’s Instructions | Quality Control Plan | G | |||||||||||||||
| 108 | 07 60 00 | 10 | Operation and Maintenance Data | Cleaning and Maintenance | ||||||||||||||||
| 109 | 32 16 19 | 03 | Product Data | Concrete | 2.1 | G |