Attachment 02 PWS-n-Evaluation Factors for CSC-20103.pdf
PDF 2 MB Posted
- Attached to
- CSC-20103 Preventative Maintenance Circuit Breaker, Switchboard, Switchgear, Motor Control PM, Bldg. 23
- Solicitation number
- SP4702-20-R-0022
- Issued by
-
Defense Logistics Agency
About this file
This document outlines a federal solicitation for preventative maintenance services for circuit breakers, switchboards, switchgear, and motor control equipment located in Building 23. Key details include:
-
The solicitation involves annual preventative maintenance and repair services for equipment in Building 23 at the Defense Supply Center Columbus facility over a one year base period plus two option years.
-
Level 1 services include known regularly scheduled maintenance including annual, two-year, and three-year services. Level 2 covers repairs for unexpected equipment breakdowns billed separately up to $2,000 per repair.
-
Offerors must attend an organized site visit on August 18, 2020 and submit all questions by August 25, 2020. Coordination is required with building security and operations managers for planned maintenance.
-
The contractor must demonstrate experience with similar electrical maintenance projects over $100,000 and completed within the last three years for evaluation of past performance and technical experience. Key staff must meet defined qualifications.
-
The contractor must submit a technical project plan outlining their management approach and capabilities to complete all work by the required response date of August 12, 2020.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Defense Supply Center Columbus - Columbus, Ohio
Project Summary Sheet B23 Circuit Breaker, Switchboards, Switchgear & Motor Control PM
Multi-year Service Contract (Base year + 2 Option years) with Level 1 (Required Performance Work Statement) and
Level 2 (Unexpected Breakdown Repair) Project No. CSC -20103
Prepared by DM-FCIE – Harold Hawkins
Description of Objective Pages This is an ongoing Service Contract to provide preventive maintenance for the Circuit Breakers in building 23. The Successful Bidder of this contract shall deliver to the Government the services on circuit breakers, Switchboard, Switchgear, & Motor Control in building 23 on a yearly bases. This is an annual Service project.
Scope of Work Pages DM-FCIE 00 00 01 CSC-20103 Performance Work Statement for Service Contract - - 21
Specification for this Contract Pages DM-FCIE 00 00 03.4 L & M Evaluation Factors Section - - - - - - - - - - - - - - - - 7 DM-FCIE 00 00 03.6 DISA General Requirements - - - - - - - - - - - - - - 13 DM-FCIE 01 20 00.00 20 Price and Payment Procedures - - - - - - - - - - - - 5 DM-FCIE 01 33 00 Submittal Procedures - - - - - - - - - - - - - - - - - - - - - - - 20 DM-FCIE 01 33 00 Submittal Procedures – Attachment 1 (Excel Template) - - - - - - - - 1 DM-FCIE 01 35 26 Governmental Safety Requirements - - - - - - - - - - - - 33 DM-FCIE 01 35 31 Safety Security and Fire Provisions (30 Sept 2014) - - - - - - - 18 DM-FCIE 01 45 00.10 20 Quality Control for Minor Construction - - - - - - - - - - - - - -12 DM-FCIE 01 78 00 Closeout Submittals - - - - - - - - - - - - - - - - - - - - - - - - - - 13
Product and Material Descriptions for this Contract Pages (Publications to be obtained from manufacturer)(latest revision)
Magnum Low Voltage Power Circuit Breakers User Manual - - - - - - - - - - - - - - - 70 Digitrip Models 1150, 1150i, 1150+, & 1150i+ - - - - - - - - - - - - - - - - - - - - - - 80 Instructions for Magnum DS Metal Enclosed Low-Voltage Assemblies (IB01901001E) - - - 36 Pow-R-Line Switchboards (Instruction Manual IM01500001E) - - - - - - - - - - - - - - 24 Series 2100 Motor Control Center Installation and Maintenance (MN043002EN) - - - - - - 32 NEMA AB-4 (Inspection & Preventative Maintenance of Molded-Case Circuit Breakers) - - 00
Drawing for this Contract Pages 0 None - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Reference Drawing of Available Information Pages
CSC-20103 B23 Circuit Breaker, Switchboard, Switchgear, & Motor Control PM
DM-FCIE 00 00 01 CSC-20103 Performance Work Statement for Service Contract Page 1 of 34
DM-FCIE 00 00 01
Performance Work Statement for Service Contract
B23 Circuit Breaker, Switchboard, Switchgear, & Motor Control PM Multi-year Service Contract (Base year + 2 Option years) with Level 1 (Required Performance Work Statement) and
Level 2 (Unexpected Breakdown Repair)
Project No. CSC -20103 (Revised January 25, 2019)
1.0 References
The Following References are used in this contract:
• Eaton instructional Booklet IB2C12060H12 12/2015
• IAW Eaton Instructional Leaflet IL70C1036H0600 Eff 10/2009
1.1 Nomenclature in Contract
The Following Abbreviations will be used in this contract:
• “ASI” may be an abbreviation for “Authorized Service Interruption”
• “B23” may be an abbreviation for “Building 23”
• “COR” may be an abbreviation for “Contract Officer Representative”
• “DISA” may be an abbreviation for “Defense Information System Agency”
• “DRMO” may be an abbreviation for “Defense Reutilization and Marketing Office”
• “EPO” may be an abbreviation for “Emergency Power Off”
• “O&M” may be an abbreviation for “Operations & Maintenance”
• “PDU” may be an abbreviation for “Power Distribution Unit”
• “PdM” may be an abbreviation for “Predictive Maintenance”
• “PF” may be an abbreviation for “Power Factor”
• “RCM” may be an abbreviation for “Reliability-Centered Maintenance”
• “RDC” may be an abbreviation for “Remote Distribution Cabinet”
• “SEC” may be an abbreviation for “Systems, Equipment, and Components”
• “TIM” may be an abbreviation for “Tiered Infrastructure Maintenance”
• “TO” may be an abbreviation for “Task Order”
• “TRs” may be an abbreviation for “Technical Requirements”
• “VAR” may be an abbreviation for “Visitor Access Request”
• “VESDA” Very Early Smoke Detection for Aspirating
DM-FCIE 00 00 01 CSC-20103 Performance Work Statement for Service Contract Page 2 of 34
1.2 Circuit Breaker Nomenclature for Eaton Digitrip-Trip-Units The Following Circuit Breaker Abbreviations will be used in this contract:
• “AF” Amp Frame (Design ampere capacity of the physical frame)
• “AT” Amp Trip (Designed maximum ampere capacity of the circuit breaker)
• “LD” Long Delay (amperage level to trip on Long Delay)
• “LDT” Long Delay Time (time duration of over load before tripping on Long Delay)
• “LD slope” Long Delay Slope (Trip curve slope starting at point LD & LDT)(𝐼𝐼²𝑡𝑡 or 𝐼𝐼⁴𝑡𝑡 slope)
• “LD action” Long Delay Action (Trip)
• “SDPU” Short Delay Pick Up (amp level to trip Short Delay)(starts at intersection with LD slope)
• “SDT” Short Delay Time (time duration of over load before tripping on Short Delay)
• “SD slope” Short Delay Slope (Trip curve slope starting at SDPU & SDT)(𝐼𝐼²𝑡𝑡, 𝐼𝐼⁴𝑡𝑡, flat slope)
• “SD action” Short Delay Action (Trip)
• “Inst” Instantaneous Trip (amp level to trip before 0.04 seconds)(SD slope ends 0.04 sec.)
• “GF” Ground Fault Amps (amperage level to trip on Ground Fault)
• “GFT” Ground Fault Time (duration of Ground Fault to trip)
• “GF slope” Ground Fault Slope (Trip curve slope)(Flat)
• “GF action” Ground Fault Action (Alarm or Trip)(Alarm)
• “COT” Memory Data “Cause of Trip” (LD, SD, Inst, GF)
• “Trips” Memory Data “Number of Trips” (Total trip occurrence on this circuit breaker)
• “AvgI” Memory Data “Average Current through breaker” (by Phase)
• “HLPU” Memory Data “Maximum Current through breaker” (by Phase)
• “PWD TH” Memory Data “Maximum Power through breaker” (by Phase)
1.3 Nomenclature of Types of Systems using Circuit Breaker
The Following Abbreviations will be used in this contract:
• BDS Battery Disconnect Switch (UPS System)
• BRKR Breaker
• CTC Contactor
• ECP Control Panel (Essential)
• EDP Distribution Panel (Essential)
• UDP Distribution Panel (Critical)
• EDISC Disconnect (Essential)
• UDISC Disconnect (Critical)
• GENSWGR Generator Switchgear
• HTIE Hot Tie
• MVS Medium Voltage Switch
• EMCC Motor Control Center (Essential)
• PDU Power Distribution Units
• EPOS Emergency Power Off System
• SBM Switch Bypass Module (UPS system)
• ESWBD Switchboard (Essential)
• USWBD Switchboard (Critical)
• ESWGR Switchgear (Essential)
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 3 of 34
2.0 Description of Objective
This is a Service Contract to provide scheduled annual service and breakdown repairs for the circuit breakers, Switchboards, Switchgear, & Motor Control Centers under DLA responsibility in buildings
23. (DISA Operations Center). This Service Contract provides annual service and will be awarded as a base year with two (2) option years.
There are two Levels to this Service Contract, Level 1 and Level 2.
Level 1 includes the known regularly scheduled services.
Level 2 includes repair of unexpected breakdown in equipment.
2.1 Level 1 Services
The Successful Bidder of this contract shall deliver to the Government the services (specific task requirements) in the PWS Performance Work Statement for circuit breakers, Switchboards, Switchgear, & Motor Control Centers under DLA responsibility in buildings 23. The Level 1 portion of these services contract include the known and regularly scheduled services including; Annual maintenance, Two (2) year maintenance, Three (3) year maintenance, and maintenance requirements when breaker is drawout.
2.2 Level 2 Services
This Service Contract will also provide for repair of unexpected breakdown of circuit breakers, Switchboards, Switchgear, & Motor Control Centers assigned to DLA in building 23. These unexpected breakdown repairs will be invoiced against an “Unexpected Breakdown Repair”. At the COR’s request, the Contractor shall review the circuit breakers assigned to DLA in building 23, determine which equipment needs repair, determine what repair parts are required, and give the COR a repair estimate to fix the equipment. The COR will review the estimate and may approve the repair.
If the estimate is over $2,000 then the CO may approve and request a contract modification.
2.3 Firm Fixed Price Portion of Contract
The Bidder shall include in their contract bid proposal all the known and regularly scheduled services including; all Level 1 services, annual Preventive Maintenance of equipment, annual status reports, Level 2 inspection of equipment (executed upon the COR request), Level 2 listing of repair parts, and Level 2 preparing of repair estimates,. All cost associated with discovery, investigation, identifying repair parts needed, proposal development & execution by on-sight personnel for a Level 2 Service are not payable under the “Unexpected Breakdown Repair” and should be included in the firm fixed price portion of the contract bid proposal.
2.4 Level 2 Cost Charges
Level 2 Services invoiced against the “Unexpected Breakdown Repair” shall include costs for Level 2 ordering of repair parts, Level 2 management of Level 2 repair service (Supervision, Quality Control & Safety Supervision), Level 2 direct repair labor, subcontractors, equipment, and Level 2 repair parts.
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 4 of 34
2.5 Level 2 Procedures
When the COR request an examination of the equipment the Contractor shall respond with a preliminary inspection of equipment by 7:00 PM on the next business work day. The contractor shall determine which equipment is non-functional, what repair parts are required, and submit to the COR an estimate for repairing the equipment. With the COR’s approval the contractor shall schedule the work, order and obtain the repair parts, and preform the repair of the equipment. Upon satisfactory completion the contractor may then invoice the repair work against the “Unexpected Breakdown Repair”.
2.6 Level 2 Services Invoiced against “Unexpected Breakdown Repair” A task order will be issued annually to cover Level 2 Services cost that are less than $2,000 in value per repair. Chargeable expenses include Level 2 cost for ordering repair parts, Level 2 management of Level 2 repair service (Supervision, Quality Control & Safety Supervision), direct repair labor, subcontractors, equipment, and repair parts. A running log of Level 2 Services must be maintained by both the contractor and the COR to track expenditures. The log shall be submitted to the contract administrator monthly for verification.
2.7 DISA
Please note that projects involving DISA have a different General Requirements than most contracts.
Please take special review of DSCC-FCIE 00 00 03.6 DISA General Requirements.
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 5 of 34
3.0 List of circuit breakers under DLA responsibility in buildings 23 The following is a list of presently known circuit breakers under DLA responsibility in buildings 23.
3.1 Circuit Breakers in Building 23 (older) (maintained by DLA) These breakers currently need secondary testing (2018)
Line I.D. Switchboard Location Mfg Model # Serial #
1 EDP-A1 EDP-A 1D EATON MDSX3P3WEA 4135091968-001
2 SPARE EDP-A 1G EATON MDSX163WEA 4135091967-001
3 UPS-A1 EDP-A 2B EATON MDSX163WEA 4135091966-002
4 UPS-A2 EDP-A 2C EATON MDSX163WEA 4135091966-003
5 No HOT TIE 2D
6 UPS-A3 EDP-A 2G EATON MDSX163WEA 4135091966-006
7 UTILITY MAIN A EDP-A 3B EATON MDSX503WEA S003874-001
8 CDP-A [UPS
BYPASS] EDP-A 3D EATON MDSX403WEA 4135091969-001
9 GEN TIE A EDP-A 4B EATON MDSX503WEA 4135091971-004
10 No SSBM-A 4D
11 EDP-B1 EDP-B 9D EATON MDSX3P3WEA 4135091968-002
12 SPARE EDP-B 9G EATON MDSX163WEA 4135091967-002
13 UPS-B1 EDP-B 8C EATON MDSX163WEA 4135091966-001
14 UPS-B2 EDP-B 8B EATON MDSX163WEA 4135091966-004
15 No HOT TIE 6D
16 UPS-B3 EDP-B 8G EATON MDSX163WEA 4135091966-005
17 UTILITY MAIN B EDP-B 7B EATON MDSX503WEA 4135091971-002
18 CDP-B [UPS
BYPASS] EDP-B 7D EATON MDSX403WEA 4135091969-002
19 GEN TIE B EDP-B 6B EATON MDSX503WEA 4135091971-005
20 No SSBM-B 8D
21 EDP TIE EDP-A/B 5B EATON MDSX503WEA 4135091971-003
22 LOAD BANK E-GEN 2C EATON MDSX503WEA 4135091965-001
23 GEN 1 E-GEN 3B EATON MDSX163WEA 413509164-004
24 GEN 2 E-GEN 3C EATON MDSX163WEA 413509164-002
25 GEN 3 E-GEN 3D EATON MDSX163WEA 413509164-003
26 GEN 4 E-GEN 4D EATON MDSX163WEA 413509164-005
27 GEN 5 E-GEN 4C EATON MDSX163WEA 413509164-001
28 EDP-A1 MAIN EDP-A1 Main EATON MDSC323WEA DBN009723-002 29 EDP-B1 MAIN EDP-B1 Main EATON MDSC323WEA DBN009723-001
30 UPS BYPASS MBP CDP-A SEC 1 EATON MDSC4N3WEA DBN009721-003
31 MAIN MIS CDP-A SEC 4 EATON MDSC4N3WEA DBN009721-004
32 MAIN MBP CDP-B SEC 1 EATON MDSC4N3WEA DBN009721-002
33 MAIN MIS CDP-B SEC 4 EATON MDSC4N3WEA DBN009721-001
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 6 of 34
3.1 (continued) Circuit Breakers in Building 23 (older) (maintained by DLA) These breakers currently need secondary testing (2018)
Line I.D. Switchboard Location Mfg Model # Serial #
34 5000 FRAME SPARE BLDG 10 N/A EATON
35 4000 FRAME SPARE BLDG 10 N/A EATON
36 4000 FRAME SPARE BLDG 10 N/A EATON
37 4000 FRAME SPARE BLDG 10 N/A EATON
38 4000 FRAME SPARE BLDG 10 N/A EATON
39 3200 FRAME SPARE BLDG 10 N/A EATON
40 Load Bank Terminal Disc Utility Yard
Load Bank
Terminal
EATON SBSC4N3HEA 4137649273-001
41 GENERATOR #1
BREAKER Utility Yard GEN 1 SQUARE
D RL1600 0640905
1230003
42 GENERATOR #2
BREAKER Utility Yard GEN 2 SQUARE
D RL1600 0640905
1230004
43 GENERATOR #3
BREAKER Utility Yard GEN 3 SQUARE
D RL1600 0640943
6350005
44 GENERATOR #4
BREAKER Utility Yard GEN 4 SQUARE
D RL1600 0640889
1530005
45 GENERATOR #5
BREAKER Utility Yard GEN 5 SQUARE
D RL1600 0640889
1530001
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 7 of 34
3.2 New Circuit Breakers in Building 23 (maintained by DLA)
These breakers currently need secondary testing (2018)
Line I.D. Switchboard Location Mfg Model # Serial # 1 Generator C breaker utility yard Gen C Schneider NW 40 H 85364112001 2 Generator D breaker utility yard Gen D Schneider NW 40 H 85369573202 3 GCM - C Bus Gen Main ESWGR_1-C-1 1B Eaton MDS6323WEA 4135973225-003 4 CMAIN - C Bus Main ESWGR_1-C-1 2B Eaton MDS6323WEA 4135068439-001 5 3200A Spare ESWGR_1-C-1 3C Eaton MDS6323WEA 4135068439-003 6 1200A Spare [52D3] ESWGR_1-C-1 4B Eaton MDS6123WEA 4135193528-004 7 1200A Spare [52D4] ESWGR_1-C-1 4C Eaton MDS6123WEA 4135193528-005 8 CTIE - C Bus Tie ESWGR_1-C-1 5B Eaton MDS6323WEA 4135973225-006 9 U1M - Utility Source 1 Main ESWGR_1-C-1 1D Eaton MDS6323WEA 4135973225-011
10 ESWBD_1-C-1 [52D2] ESWGR_1-C-1 2D Eaton MDS6323WEA 4135973225-009 11 EDP_1-C-16 [52D5] ESWGR_1-C-1 4D Eaton MDS6123WEA 4135193528-003 12 DITE - D Bus Tie ESWGR_1-D-1 6B Eaton MDS6323WEA 4135973225-005 13 EDP_1-D-16 [52D6] ESWGR_1-D-1 7B Eaton MDS6123WEA 4135193528-006 14 1200A Spare [52D7] ESWGR_1-D-1 7C Eaton MDS6123WEA 4135193528-002 15 1200A Spare [52D8] ESWGR_1-D-1 8B Eaton MDS6123WEA 4135193528-001 16 ESWBD_1-D-1 [52D9] ESWGR_1-D-1 8C Eaton MDS6323WEA 4135973225-007 17 DMAIN - D Bus Main ESWGR_1-D-1 9B Eaton MDS6323WEA 4135973225-008 18 GDM - D Bus Gen Main ESWGR_1-D-1 10B Eaton MDS6323WEA 4135973225-010
19 U2M - Utility Source 2 Main ESWGR_1-D-1 10D Eaton MDS6323WEA 4135973225-001
20 GMC - Gen C Main EGENSWGR_1-2 1D Eaton MDS6323WEA 4135973225-004 21 GMD - Gen D Main EGENSWGR_1-2 2D Eaton MDS6323WEA 4135068439-006 22 3200A Spare EGENSWGR_1-2 3D Eaton MDS6323WEA 4135068439-005 23 LB - Loadbank EGENSWGR_1-2 1B Eaton MDS6323WEA 4135973225-002 24 GFC - Gen Swgr Feed C EGENSWGR_1-2 2B Eaton MDS6323WEA 4135068439-004 25 GFD - Gen Swgr Feed D EGENSWGR_1-2 4B Eaton MDS6323WEA 4135068439-002
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 8 of 34
3.3 Molded Case Circuit Breakers in Building 23 (maintained by DLA) These breakers currently need secondary testing (2018)
UPS -A SYSTEM
Line Breaker Location Rating Mfg. Frame Model Trip Unit
1 Panel CDP-A1 Main 800 EATON HMDL HMDL3800F RMS310LS 2 Panel CDP-A2 Main 800 EATON HMDL HMDL3800F RMS310LS 3 Panel CDP-A3 Main 800 EATON HMDL HMDL3800F RMS310LS 4 Panel CDP-A4 Main 800 EATON HMDL HMDL3800F RMS310LS 5 Panel CDP-A5 Main 800 EATON HMDL HMDL3800F RMS310LS 6 Panel CDP-A6 Main 800 EATON HMDL HMDL3800F RMS310LS 7 Panel CDP-A7 Main 800 EATON HMDL HMDL3800F RMS310LS 8 Panel CDP-A8 Main 800 EATON 9 Panel UDP_1-A-09 Main 1200 EATON NGH NGH312032E
10 Panel UDP-1-A-10 600 EATON LD 11 Panel CDP-A1 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 12 Panel CDP-A2 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 13 Panel CDP-A3 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 14 Panel CDP-A4 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 15 Panel CDP-A5 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 16 Panel CDP-A6 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 17 Panel CDP-A7 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 18 Panel CDP-A8 @ SWBD EATON 19 Panel UDP_1-A-09 @ SWBD 1200 EATON NDC NDC312T107W OPTIM 1050 20 Spare @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050
21 PNL UDP-1-A-10 @ PNL UDP_1-A-
09 600 EATON L630E LGE3630NN LT360032
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 9 of 34
3.3 Molded Case Circuit Breakers in Building 23 (maintained by DLA) These breakers currently need secondary testing (2018)
UPS -B SYSTEM
Line Breaker Location Rating Mfg. Frame Model Trip Unit
22 Panel CDP-B1 Main 800 EATON HMDL HMDL3800F RMS310LS 23 Panel CDP-B2 Main 800 EATON HMDL HMDL3800F RMS310LS 24 Panel CDP-B3 Main 800 EATON HMDL HMDL3800F RMS310LS 25 Panel CDP-B4 Main 800 EATON HMDL HMDL3800F RMS310LS 26 Panel CDP-B5 Main 800 EATON HMDL HMDL3800F RMS310LS 27 Panel CDP-B6 Main 800 EATON HMDL HMDL3800F RMS310LS 28 Panel CDP-B7 Main 800 EATON HMDL HMDL3800F RMS310LS 29 Panel CDP-B8 Main 800 EATON
30 Panel UDP_1-B-09 Main 1200 EATON NGH NGH312032E 31 Panel UDP-1-B-10 600 EATON LD 32 Panel CDP-B1 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 33 Panel CDP-B2 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 34 Panel CDP-B3 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 35 Panel CDP-B4 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 36 Panel CDP-B5 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 37 Panel CDP-B6 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 38 Panel CDP-B7 @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050 39 Panel CDP-B8 @ SWBD EATON
40 Panel UDP_1-B-09 @ SWBD 1200 EATON NDC NDC312T107W OPTIM 1050 41 Spare @ SWBD 800 EATON NDC NDC3800T107W OPTIM 1050
42 PNL UDP-1-B-10 @ PNL UDP_1-B-
09 600 EATON L630E LGE3630NN LT360032
CHILLER PLANT BREAKERS
Line Breaker Location Rating Mfg. Frame Model Trip Unit
43 Chiller 1 @ SWBD B1 1200 EATON NDC NDC312T107W OPTIM 1050 44 Chiller 2 @ SWBD B1 1200 EATON NDC NDC312T107W OPTIM 1050 45 Chiller 3 @ SWBD A1 1200 EATON NDC NDC312T107W OPTIM 1050 46 Chiller 4 @ SWBD A1 1200 EATON NDC NDC312T107W OPTIM 1050 47 Chiller 5 @ SWBD A1 1200 EATON NDC NDC312T32WA17T05 OPTIM 1050
48 MCC-AB1 @ SWBD A1 1200 EATON NDC NDC312T107W OPTIM 1050
49 MCC-AB1 @ SWBD B1 1200 EATON NDC NDC312T107W OPTIM 1050
50 MCC-AB2 @ SWBD A1 1200 EATON NDC NDC312T107W OPTIM 1050
51 MCC-AB2 @ SWBD B1 1200 EATON NDC NDC312T107W OPTIM 1050
52 MCC-AB1 MAIN A @ MCC-AB1 1200 EATON CNDC CNDC312T32W RMS310LS
53 MCC-AB1 MAIN B @ MCC-AB1 1200 EATON CNDC CNDC312T32W RMS310LS
54 MCC-AB2 MAIN A @ MCC-AB2 1200 EATON CNDC CNDC312T32W RMS310LS
55 MCC-AB2 MAIN B @ MCC-AB2 1200 EATON CNDC CNDC312T32W RMS310LS
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 10 of 34
3.3 Molded Case Circuit Breakers in Building 23 (maintained by DLA) These breakers currently need secondary testing (2018)
CRAH PANELS
Line Breaker Location Rating Mfg. Frame Model Trip Unit
56 EDP_1-CD-01 MAIN A 800 EATON HMDL HMDL3800F MT3800T
57 EDP_1-CD-01 MAIN B 800 EATON HMDL HMDL3800F MT3800T
58 EDP_1-CD-01 MAIN @
SWBD A1 800 EATON NDC NDC3800T107W OPTIM 1050
59 EDP_1-CD-01 MAIN @
SWBD B1 1200 EATON NDC NDC312T107W OPTIM 1050
60 Panel EDP-AB1 Main A 225 EATON HFD HFD3225 JT3225T 61 Panel EDP-AB2 Main A 800 EATON CHMDL CHMDL3800F RMS310 62 Panel EDP-AB3 Main A 800 EATON CHMDL CHMDL3800F RMS310 63 Panel EDP-AB4 Main A 800 EATON CHMDL CHMDL3800F RMS310 64 Panel EDP-AB5 Main A 800 EATON HJD CHMDL3800F RMS310 65 Panel EDP-AB1 Main B 225 EATON HJD HJD3225 JT3225T 66 Panel EDP-AB2 Main B 800 EATON CHMDL CHMDL3800F RMS310 67 Panel EDP-AB3 Main B 800 EATON CHMDL CHMDL3800F RMS310 68 Panel EDP-AB4 Main B 800 EATON CHMDL CHMDL3800F RMS310 69 Panel EDP-AB5 Main B 800 EATON HJD CHMDL3800F RMS310
70 EDP-AB1 @SWBD A1 225 EATON NDC FDC3225
71 EDP-AB2 @SWBD A1 800 EATON NDC NDC3800T107W OPTIM 1050
72 EDP-AB3 @SWBD A1 800 EATON NDC NDC3800T107W OPTIM 1050
73 EDP-AB4 @SWBD A1 800 EATON NDC NDC3800T107W OPTIM 1050
74 EDP-AB5 @SWBD A1 800 EATON NDC NDC3800T107W OPTIM 1050
75 EDP-AB1 @SWBD B1 225 EATON NDC FDC3225
76 EDP-AB2 @SWBD B1 800 EATON NDC NDC3800T107W OPTIM 1050
77 EDP-AB3 @SWBD B1 800 EATON NDC NDC3800T107W OPTIM 1050
78 EDP-AB4 @SWBD B1 800 EATON NDC NDC3800T107W OPTIM 1050
79 EDP-AB5 @SWBD B1 800 EATON NDC NDC3800T107W OPTIM 1050
MISC.
Line Breaker Location Rating Mfg. Frame Model Trip Unit
80 EDP_1-C-16 MAIN 1200 EATON NGH NGH312033E
81 EDP_1-D-16 MAIN 1200 EATON NGH NGH312033E
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 11 of 34
3.4 Switchboards, Switchgear, & Motor Control Centers in B23 (maintained by DLA)
Line # Designation GO#
1 EDP-A
2 EDP-B
3 EDP-A1
4 EDP-B1
5 CDP-A
6 CDP-B
7 MCC-A1
8 MCC-B1
9 ESWGR-C
10 ESWGR-D
11 GENSWGR_1-AB-01 [AB Bus Generator Switchgear] 12 GENSWGR_1-CD-01 [CD Bus Generator Switchgear] 13 Load Bank Terminal
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 12 of 34
4.0 Data Center
4.1 Coordination with COR:
This project must be coordinated with building 23 security and building 23 operation manager.
The contractor shall request in writing through the COR the approval of their time table for planned service in building 23. The contractor shall request 45 days in advance an ASI (Authorized Service Interruption) from the building 23 operation manager for planned maintenance that would interrupt service. An approved ASI (Authorized Service Interruption) form (for each item of equipment and time period) (to include a primary date & time and a alternate date & time for performance) must be obtained prior to taking that item of equipment out of service. The ASI shall be submitted (45 days in advance) to the building 23 operation manager for planned maintenance that would interrupt service.
4.2 Contractor Access:
Each contractor requiring access to Building 23 must have an approved Visitor Access Request (VAR) prior to the start of work. The VAL is used to identify contractor personnel working on the contract at the site. Instructions for obtaining a Visit Authorization Request (VAR) are covered in document DM-FCIE 00 00 03.6 DISA General Requirements, Section G.2.16. The request should be sent to: DISA Visits INBOX: DISA Columbus OH EIS Mailbox Cols Visits (disa.columbus.eis.mbx.cols-visits@mail.mil).
4.3 Circuit Breaker Trip Control Power
The Digitrip 1150 trip units may be applied to either 50 or 60 Hz systems.
The Digitrip DT1150 family of trip units incorporates two microprocessors in their design. One processor is devoted totally to the task of current protection functions. This processor provides true rms current sensing for the proper coordination with the thermal characteristics of conductors and equipment. The Digitrip analyzes the secondary current signals from the circuit breaker current sensors and, when preset current levels and time delay settings are exceeded, sends an initiating trip signal to the Trip Actuator of the circuit breaker. The current sensors provide operating power to the trip unit. As current begins to flow through the circuit breaker, the sensors generate a secondary current that powers the trip unit.
The second microprocessor provides the voltage protection display, communications, metering, harmonic calculations, alarming, and auxiliary relay functions. These additional features require that auxiliary power be provided to the circuit breaker.
4.4 Trip Unit Testing (secondary injection & primary injection) A functional local test of a major portion of the trip unit’s electronic circuitry and the circuit breaker’s mechanical tripping action can be verified through the trip unit’s test receptacle.
This is accomplished using a Digitrip (DS Type) test kit that provides a secondary injection test that simulates the current sensors. A small hand-held Magnum functional test kit can also be used to check circuitry and mechanical tripping functions.
A Secondary Injection Trip Unit Test is a test that injects trip conditions by simulating the current levels but not using the current sensors. A Primary Injection Trip Unit Test is a test that injects trip conditions by using the current sensors.
mailto:disa.columbus.eis.mbx.cols-visits@mail.mil
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 13 of 34
4.5 Magnum Circuit Breaker’s Health (Trips, LDT, GFT, oP)
Health (applicable only to Digitrip 1150+ Rev. E or higher) The HEaLTH menu on the Digitrip 1150 front panel will provide information on the Magnum circuit breaker’s health as well as a history of the circuit breaker and circuit it is protecting. This data is useful for planning maintenance and inspection schedules.
The type of data includes the total number of all Instantaneous and Short Delay trips seen by the circuit breaker.
A second counter shows the number of overloads (LDT) and ground faults (GFT) encountered while in service. The oP count provides data on the number of close operations experienced by the circuit breaker. The internal test function will not increment the InST/SD or the LDT/GFT counters, however, there will be count values in these registers from the factory primary injection testing. Each of these three values can be zeroed by depressing the Reset pushbutton.
These counters will roll over at a value of 255. The operation counter will roll over at 65,000.
The last time the circuit breaker was operated (open or closed or tripped) is viewable with time and date displayed. Also included is the maximum temperature in degrees centigrade as seen by the Digitrip microprocessor CHip.
The capture of the data requires external trip unit power. This data, once captured, is stored in nonvolatile memory.
These features are available to Powernet communications using Digitrip firmware Rev . F or higher. Notee: Rev . F firmware permits maximum temperature to be reset.
4.6 Power Redundancy Design
Preventing a power interruption is very important. Incoming service power is provided from two different sources (labeled “Sub-A” & “Sub-B”). Each input feeder is split into two main branches.
The first main branch circuit is called “Critical Circuits” because they power the IT equipment.
The second main branch circuit is called “Essential Circuits” because they power lights, air conditioning, etc. As the power is disseminated it will travel through either “Critical Distribution Panel” circuit breakers or “Essential Distribution Panel” circuit breakers. For example the PDU’s for the IT equipment are on the “Critical Distribution Panel” circuit breakers.
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 14 of 34
5.0 Contract Deliverables and General Scope
This is a Multi-year Service Contract to provide scheduled annual service and breakdown repairs for circuit breakers, Switchboards, Switchgear, & Motor Control Centers under DLA responsibility in building 23 (listed in section 3) and will be awarded as a base year with two (2) option years. At the beginning of the base year contract (or optional year contract) and for the remainder of the year (or optional year contract), the Successful Bidder of this contract shall deliver to the Government the following services:
5.1 Testing Schedule
The testing schedule is setup on a three (3) year rotational schedule. The schedule shall be a follows:
5.1.1 (0) Initial Installation (Present Condition) Circuit Breakers
• Replace Batteries (section 5.2)
• Verify Control Circuit Auxiliary Power (section 5.3)
• Verify “INCOM PowerNet communications network (section 5.4)
• Functional Testing (minus trip unit) (section 5.7)
• Primary Contact Inspection (section 5.9)
• Primary Disconnect Inspection (section 5.10)
• Secondary Connection Inspection (section 5.11)
• Internal Mechanism Inspection (section 5.12)
• Interlocks Inspection (section 5.13)
• Trip Unit Testing (Primary Injection) (section 5.15)
5.1.2 (1) First Year Service Circuit Breakers
• Record Historical Data on Circuit Breakers (section 5.2) (annually)
• Replace Batteries (section 5.3) (annually)
• Verify Control Circuit Auxiliary Power (section 5.4) (annually)
• Verify “INCOM PowerNet communications network (section 5.5) (annually)
• Clean Circuit Breaker (section 5.6) (annually)
• Functional Testing (minus trip unit) (section 5.7) (annually)
• Arc Chute Inspection (section 5.8) (annually)
• Primary Contact Inspection (section 5.9) (annually)
• Primary Disconnect Inspection (section 5.10) (annually)
• Secondary Connection Inspection (section 5.11) (annually)
Switchboard Preventive Maintenance
• Switchboard Preventive Maintenance (section 5.17) (annually)
Switchgear Preventive Maintenance
• Switchgear Preventive Maintenance (section 5.18) (annually)
Motor Control Center Preventive Maintenance
• Motor Control Preventive Maintenance (section 5.19) (annually)
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 15 of 34
5.1.3 (2) Second Year Service Circuit Breakers
• Record Historical Data on Circuit Breakers (section 5.2) (annually)
• Replace Batteries (section 5.3) (annually)
• Verify Control Circuit Auxiliary Power (section 5.4) (annually)
• Verify “INCOM PowerNet communications network (section 5.5) (annually)
• Clean Circuit Breaker (section 5.6) (annually)
• Functional Testing (minus trip unit) (section 5.7) (annually)
• Arc Chute Inspection (section 5.8) (annually)
• Primary Contact Inspection (section 5.9) (annually)
• Primary Disconnect Inspection (section 5.10) (annually)
• Secondary Connection Inspection (section 5.11) (annually)
• Internal Mechanism Inspection (section 5.12) (2-3 years)
• Interlocks Inspection (section 5.13) (2-3 years)
• Trip Unit Testing (Secondary Injection) (section 5.14) (2-3 years)
Switchboard Preventive Maintenance
• Switchboard Preventive Maintenance (section 5.17) (annually)
Switchgear Preventive Maintenance
• Switchgear Preventive Maintenance (section 5.18) (annually)
Motor Control Center Preventive Maintenance
• Motor Control Preventive Maintenance (section 5.19) (annually)
5.1.4 (3) Third Year Service Circuit Breakers
• Record Historical Data on Circuit Breakers (section 5.2) (annually)
• Replace Batteries (section 5.3) (annually)
• Verify Control Circuit Auxiliary Power (section 5.4) (annually)
• Verify “INCOM PowerNet communications network (section 5.5) (annually)
• Clean Circuit Breaker (section 5.6) (annually)
• Functional Testing (minus trip unit) (section 5.7) (annually)
• Arc Chute Inspection (section 5.8) (annually)
• Primary Contact Inspection (section 5.9) (annually)
• Primary Disconnect Inspection (section 5.10) (annually)
• Secondary Connection Inspection (section 5.11) (annually)
Switchboard Preventive Maintenance
• Switchboard Preventive Maintenance (section 5.17) (annually)
Switchgear Preventive Maintenance
• Switchgear Preventive Maintenance (section 5.18) (annually)
Motor Control Center Preventive Maintenance
• Motor Control Preventive Maintenance (section 5.19) (annually)
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 16 of 34
5.2 to 5.16 Circuit Breaker PM (Circuit Breaker Preventive Maintenance)
5.2 Record Historical Data on Circuit Breakers (annually) (Circuit Breaker Preventive Maintenance) Each circuit breaker records data on the circuit breaker events. This data can be reviewed from the control station computer (or by connecting a program module directly into each circuit breaker).
Recording data from each circuit breaker annually will present a pattern of the operation. The contractor shall record the following data (values) from each circuit breaker:
DO NOT PUSH the RESET BUTTON (This will delete data)
1. Number of all Instantaneous and Short Delay trips (InST/SD).
2. Number of overload and ground fault trips (LDT/GF).
3. Operation Count Total (Open, Close, or Trip).
4. Time & Date of Last Operation (Open, Close, or Trip)
5. Maximum Current (Maximum current seen since last trip or reset)
5.3 Replace Batteries in Circuit Breakers (annually) (Circuit Breaker Preventive Maintenance) The circuit breakers have batteries that maintain memory when all power is lost.
These batteries are important when recording events and data during a trip opening. The batteries should be replaced annually.
5.4 Verify Control Circuit Auxiliary Power to Circuit Breakers (annually) (Circuit Breaker PM) Each circuit breaker has a control circuit auxiliary power feed (24 volts DC). This circuit provides the power to open and close the circuit breaker. Review/test circuit breakers as follows:
• Check fuses at the circuit breaker are operational (not blown).
• Verify the 24 volt control circuit line connection
• Measure the control circuit voltage (24 volts DC).
5.5 Verify “INCOM PowerNet Communications Network“ to Circuit Breakers (annually) The circuit breakers are connected to a Control System Console (computer) by way of a “INCOM” communication line. The Control System Console has the ability to program each circuit breaker and review the data recorded on each circuit breaker. To verify that the “INCOM” connection is functional, access the Control System Console (computer) and verify the following:
• Correct Addressing for each circuit breaker
• Complete coverage (Nothing Missing) View each circuit breaker (listed in section 3)
5.6 Cleaning (annually) (Circuit Breaker Preventive Maintenance) Use industrial quality vacuum cleaner and/or lint-free dust cloth to remove loose dirt & dust.
DO NOT USE HIGH PRESSURE AIR OR WIRE BRUSH
5.7 Functional Testing (minus trip unit) (annually) (Circuit Breaker Preventive Maintenance)
Before doing any work on drawout type circuit breakers, confirm that the breaker is levered out to the TEST or DISCONNECT position.
To perform electrical operation testing the breaker must be levered out to the TEST position.
5.7.1 Manual Operation Functional Testing (Circuit Breaker Preventive Maintenance) Charge the breaker mechanism springs either using the charging handle or the motor operator.
Press the ON pushbutton to close the breaker manually and verify closing by noting the state of the indicating flag.
Charge the breaker mechanism springs either using the charging handle or the motor operator handle or the motor operator. If using the motor operator, disconnect power to it to prevent automatic recharging.
Press the OFF pushbutton to manually open the breaker Press the ON pushbutton to manually close the breaker Press the ON pushbutton to manually close the breaker. Is the breaker open?
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 17 of 34
5.7.2 Electrical Operation Functional Test (Circuit Breaker Preventive Maintenance) Note: Breaker accessory voltages can vary within the same breaker.
Be sure to review the accessory voltage rating before energizing as damage may occur.
This test procedure is based on the assumption that the breaker is equipped with optional shunt trip (ST), undervoltage release (UVR) and/or spring release (SR) accessories. If one accessory is missing, substitute the manual button or manual charge handle to replace the accessory’s function.
If equipped with a motor operator, the voltage is listed on the breaker nameplate.
Charge the breaker mechanism springs using the motor operator, then if equipped with a UVR, energize the UVR with the rated voltage.
Close the breaker by applying rated voltage to the spring release accessory and verify closing by noting the state of the indicating flag.
Charge the breaker mechanism springs using the motor operator. If using the motor operator, after charging, remove power to the motor operator to prevent automatic recharging.
Open the breaker by applying rated voltage to the shunt trip accessory.
Note: If UVR is not installed, proceed to step 5.14 (Trip Unit Testing [secondary injection]) With UVR energized, close the breaker using the spring release accessory. The breaker should now be closed.
Open the breaker by removing power from the UVR. The breaker should now be open.
Repeat this entire described test procedure three times.
5.7.3 Trip Unit Functional Test (Circuit Breaker Preventive Maintenance) Perform IAW with specific trip unit manual instructions.
Pre-inspection conditions for the following procedures:
Device Position of Poles Mechanism Device Position in Cassette
Fixed OPEN Closed Charged DISCHARGED - - - - - - - - - - - - - - - - - - - -
Drawout OPEN Closed Charged DISCHARGED Connected Test Disconnected REMOVED
5.8 Arc Chute Inspection (annually) (Circuit Breaker Preventive Maintenance) Remove arc chute screws and all arc chutes from the arc chamber.
Turn each arc chute upside down and visually inspect the inside.
Be sure to look for erosion and sooty discoloration on the splitter plates and insulating jacket.
If arc chutes show severe signs of erosion or discoloration, replace with a new arc chute.
When the inspections are complete, position each arc chute over its respective set of primary contacts, and secure in place with the screw(s) removed earlier. Be sure to torque arc chute screws to 35 to 45 in-lb.
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 18 of 34
5.9 Primary Contact Inspection (annually) (Circuit Breaker Preventive Maintenance) Note: Using the mating line of the housing halves as a reference guide will assist in this visual inspection
With the arc chutes removed, look directly down into the arc chamber, and visually inspect each primary contact structure for signs of wear and/or damage.
Use the contact wear indicator to inspect each contact. The contact wear indicator is the relative position of the individual contact fingers to a narrow, side-to-side ledge inside the arc chamber.
The ledge is actually part of the arc chamber. When the circuit breaker is closed and the contacts are in good condition, the narrow ledge is covered by the back end of each of the contact fingers. If the back end of any of the contacts are below the ledge, the contact assembly should be replaced.
Once the inspection is complete, be sure to verify the arc chutes are properly replaced as previously described in the Arc Chute Inspection procedure.
5.10 Primary Disconnect Inspection (annually) (Circuit Breaker Preventive Maintenance) For Magnum breakers with vertically mounted primary disconnects:
With breaker removed from cell, verify that vertical adapter nuts and bolts are torqued to 37–43 lb-ft For all Magnum breakers primary disconnects
Remove the primary disconnect.
Inspect primary disconnect contact surfaces for indications of plating wear, corrosion, or arcing and pitting; Replace primary disconnect if there is evidence of any exposed copper.
Inspect finger springs for broken, cracked, or misalignment with fingers.
Remove loose contaminates.
Reinstall and tighten the M6 screw to retain the primary disconnect. Verify that the primary disconnect is free to rotate about the screw, and return to the home position.
Be certain that the retaining screw is in the proper position and does not deform the end plates on the primary disconnects.
5.11 Secondary Connection Inspection (annually) (Circuit Breaker Preventive Maintenance) Breaker:
Remove the breaker cover.
With breaker removed from cell, verify that the breaker secondary disconnect pins are fully seated and locked into position by lightly pulling on each wire individually.
Note: Do not exceed 1 lb of force or damage to pin or housing may occur.
Ensure all pins are straight without bends, corrosion, or show evidence of arcing Damaged pins are to be replaced Refer to renewal parts catalog.
Cassette
REMOVE ALL POWER TO THE CASSETTE SECONDARY PINS.
On the cassette side of the secondary disconnect, ensure all sockets are fully seated and locked into position by lightly pressing on each socket.
Visually inspect each socket for evidence of arcing, corrosion, or foreign objects.
Damaged sockets are to be replaced.
Ensure that socket housings are free to move to allow self-aligning with the breaker side secondary housing.
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 19 of 34
5.12 Internal Mechanism Inspection (2-3 years) (Circuit Breaker Preventive Maintenance) Inspect the breaker for nicked wires, cracks in plastic parts, and loose screws. Screws or bolts should be tightened to levels outlined in Table 22. Loose screws inserted into plastic parts will require thread-locking compound (such as Loctite 242). All nicked wiring should be replaced or repaired in accordance with accepted industry practices. Ensure that the torque values of the operating mechanism and motor mounting hardware are within the recommended values in Table
18. Inspect all sliding or rolling parts for cleanliness and adequate lubrication. Refer to Table 23 and Figure 101—Figure 106
5.13 Interlocks Inspection (2-3 years) (Circuit Breaker Preventive Maintenance) Note: The circuit breaker will be required to be charged, closed, and opened during this inspection procedure.
Remove the breaker cover.
Verify that the breaker is in working order by charging the breaker, close the breaker, recharge the breaker, and open the breaker.
Note: The breaker will need to be charged and opened for this inspection procedure.
Verify that the circuit breaker will not close if any of the following mechanical conditions exist:
If the breaker is equipped with an Undervoltage Release that is NOT energized, and the breaker is charged and opened, depress the ON (close) breaker is charged and opened, depress the ON (close) pushbutton. The breaker should not close.
Note: Remove the Undervoltage Release for the remainder of the interlock testing if installed For drawout breakers, lift the levering-in screw access door. With door open or not fully closed depress the ON (close) button. The breaker should not close.
Rotate the levering-in screw and verify that the door does not close in intermediate positions.
The door should only close in the full disconnect, test, and connect positions.
Return the drawout levering in screw to the disconnected position.
Depress and hold the breakers OFF (open) pushbutton and then depress the ON (close) pushbutton. The breaker should not close. If the breaker is equipped with an internal key lock, engage the lock and remove the key. Depress the ON (close) button. The breaker not close.
Reinsert the key and disengage the key lock. Close the breaker. Attempt to engage the key lock;
the key should not rotate fully and the breaker should remain in the closed position. Open the breaker, but do not recharge.
Depress and hold the ON (close) pushbutton while charging the breaker. The breaker should not close when the breaker is fully charged.
Release and re-press the ON (close) button. The breaker should close. Do not open the breaker until instructed to do so.
There are NO impediments to tripping/opening. The Magnum circuit breaker will always be permitted to open on command of the following:
• OFF (open) pushbutton is depressed
• Shunt trip (electrical)
• External trip interlock (cassette)
• UVR being de-energized (electrical)
• Trip unit signal (overcurrent etc.)
• Rotating the interlock wire form
• For breakers used in multi-way interlocks with other breakers, testing should be performed as described in the appropriate instruction manual.
Note: Drawout breakers must be installed in their cassette. To verify proper operation of multi-way interlocks, the breaker will be required to close and open while installed in the switchgear.
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 20 of 34
5.14 Trip Unit Testing (Secondary Injection) (2-3 years) (Circuit Breaker Preventive Maintenance) Perform IAW Eaton Instructional Leaflet IL70C1036H0600 Eff 10/2009
5.15 Trip Unit Testing (Primary Injection) (Initial Installation only) (Circuit Breaker Preventive Maintenance) Primary Injection Trip Unit Testing is only preformed on new circuit breakers during installation (Per DISA requirements).
5.16 Written Report on Service (annually) (Circuit Breaker Preventive Maintenance) Prepare and distribute (within 15 days of service completion) (copy the COR, FCIE Project Engineer, & building 23 maintenance staff) a report on services completed to include:
● Serial Number of Circuit Breaker
● Model Number of Circuit Breaker
● Location of Circuit Breaker
● Date of Testing Circuit Breaker
● Address on INCOM net of Circuit Breaker
● “Trips” Total trips recorded on Circuit Breaker (Data from section 5.5)
● Number of overload trios on Circuit Breaker (Data from section 5.5)
● Number of Ground Fault trios on Circuit Breaker (Data from section 5.5)
● Maximum Current (Maximum current seen since last trip or reset) (Data from section 5.5)
● Any problems that prevent breakers from returning to full service status
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 21 of 34
5.17 Switchboard Preventive Maintenance (annually)
It is essential to maintain the equipment in satisfactory condition.
To ensure continued quality service, a systematic maintenance schedule is vital. Facility operation and local conditions vary to such an extent that the schedule must be prepared to suit the conditions. The maintenance schedule for individual devices, such as circuit breakers, meters, fusible switches, and so on, should be based upon recommendations contained in the individual instruction leaflet for each device. Inspection and test operations should be coordinated with an overall testing program to result in the least operating inconvenience and system shutdowns.
Prior to performing any maintenance on the switchboard, first de-energize the switchboard at the source. Use lockout/ tagout precautions as prescribed in OSHA, NFPA 70E, and other safety manuals.
The switchboard should be given a thorough maintenance check annually.
Exercise extreme care to prevent the equipment from being connected to the power source while tests are being conducted.
5.17.1 Switchboard Insulation Resistance Testing (Switchboard Preventive Maintenance) Prior to cleaning, perform an initial Megger or DC test of the switchboard insulation, between phases and ground. Inspect for symptoms that may indicate overheating or weakened insulation.
Record test readings. Refer to NEMA publication AB-4, Guidelines for Inspection and Preventative Maintenance of Molded-Case Circuit Breakers Used in Commercial and Industrial Application.
Prior to testing, remove all control power fusing and connections to products, which will be damaged in this test. This includes all components with control wire fusing, transient voltage surge suppression, surge protective devices, metering equipment, and so on.
Do not use AC dielectric testing.
Do not use alternating current (AC) dielectric/megger testing. Damage to components will occur.
To prevent damage to ground fault control circuits, metering circuits, surge protective device (SPD) or other control circuits, when Meggering switchboard, isolate circuits from switchboard system before beginning the Megger Operation, be sure to reconnect those circuits after Megger tests are completed.
Note: Sone ground fault circuits may not be fused; therefore, isolation of those circuits requires isconnecting wiring from busbars.
5.17.2 Switchboard Cleaning (Switchboard Preventive Maintenance) While the switchboard is de-energized, remove dust and debris from busbars, connections, supports, and enclosure surfaces. A vacuum cleaner with a long nozzle will be of assistance.
Wipe clean with a lint-free cloth. Do not use solvents to clean equipment, as damage to surfaces can occur. Should the switchboard be exposed to adverse conditions, such as airborne contaminants, more frequent inspections and cleaning may be required.
Do not use compressed air to clean or blow out debris or dust in switchboards.
Use of compressed air to clean or blow out debris in switchboards may imbed the contaminants within overcurrent devices, metering equipment, and other components.
Damage to insulation and other surface materials can occur. Do not use compressed air in cleaning.
DM-FCIE 00 00 01 Performance Work Statement for Service Contract Page 22 of 34
5.17.3 Switchboard Insulation Resistance Testing After Cleaning (Switchboard PM) After cleaning, perform a second Megger or DC test of the switchboard insulation between phases and ground.
Prior to testing, remove all control power fusing and connections to products, which will be damaged in this test. This includes all components with control wire fusing, transient voltage surge suppression, surge protective devices, metering equipment, and so on.
To prevent damage to ground fault control circuits, surge protective device (SPD), or other control circuits, when meggering switchboard, isolate circuits from switchboard system before beginning the megger operation. Be sure to reconnect those circuits after megger tests are completed.
Note: Some ground fault circuits may not be fused; therefore, isolation of those circuits requires disconnection wiring from busbars.
Do not use AC dielectric testing.
Do not use alternating current (AC) dielectric/megger testing. Damage to components will occur.
A test resulting in readings at or above 1 megaohm is satisfactory. Compare these test readings with prior readings and retain with previous testing for future comparisons. Trends of lowered insulation resistance are signs of potential problems. A Switchboard Inspection Log form should be keep to record readings.
5.17.4 Visual Inspect (Switchboard Preventive Maintenance)
Inspect Bus and Cable Connections.
1. Inspect busbar and cables for visible damage.
2. Visually inspect…