Attachment 01 of Section M -Sample TEP Calculation for VSD.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
MC-130J Variable Speed Drogue (VSD) Full Rate Production Effort
Solicitation number
FA8509-21-R-0003
Issued by

About this file

This document contains a sample evaluation template and statement of work for a federal contract solicitation seeking a full rate production effort for Variable Speed Drogues to be installed on MC-130J aircraft.

The solicitation will utilize a Delivery Protection Program to award an initial Mission Essential Quantity to a proven source while an unproven source manufactures a required first article for testing and qualification. The resultant IDIQ contract would have a one year base period and four option years for production and delivery of Variable Speed Drogues, initial spares, and support equipment. The Air Force Lifecycle Management Center at Robins Air Force Base intends to award the contract to a vendor with expertise in the MC-130J and its aerial refueling systems, as the required equipment was specifically designed for use on that aircraft and similar parts cannot be obtained commercially. The sample template outlines pricing scenarios for both proven and unproven sources across multiple contract options.

View the file

Other files

File Type Posted
Method of Manufacturing Sheet.pdf PDF
PD439030.pdf PDF
VSD_Drawings.pdf PDF
Exhibit_D_Initial_Spare_Parts_Kit_B.xlsx XLSX spreadsheet
DDForm1653_Transportation Requirements.pdf PDF
SOW_8Apr2021.pdf PDF
FA8509-21-R-0003.pdf PDF
Section_M_Sample_TEP_Calc.xlsx XLSX spreadsheet
Exhibit_B_CDRL_B001.pdf PDF
Exhibit_A_CDRLs_A001_A008.pdf PDF
Exhibit_C_Initial_Spare_Parts_Kit_A.xlsx XLSX spreadsheet
AFMC158_Packaging _Requirements.pdf PDF
Section L - Instructions_Conditions and Notices to Offerors.pdf PDF
Section M - Evaluation Factors for Award.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment 01 of Section M, Sample TEP CalculationsAlternative 2, if proven source is not lowest offeror in Alternative 1:
Alternative 1 Scenario:Proven SourceUnproven SourceProven Source:Unproven Source:
CLINTitlePricingQuantityUnit PricePriceUnit PricePriceCLINTitlePricingQuantityUnit PricePriceUnit PricePrice
Bid A: (Unproven Source) (Alt 1)Bid C: (Unproven Source) (Alt 2)
0001 VSD First ArticleFFP1 EA$110,000.00$110,000.000010 VSD First ArticleFFP1 EA$110,000.00
0002 VSD Production UnitsFFP12 EA$110,000.00$1,320,000.000014DataNSP1 LO
0003 VSD SparesFFP2 EA$103,000.00$206,000.00
0004 VSD Support Equipment KitsFFP5 EA$30,000.00$150,000.00Bid D: (Proven Source) (Alt 2)
First Article –Evaluation Factor (Govt Cost)*$27,000.000011 MEQ -VSD Production UnitsFFP12 EA$100,000.00$1,200,000.00
0014DataNSP0012 MEQ - VSD SparesFFP2 EA$100,000.00$200,000.00
Bid B: (Proven Source) (Alt 1)0013 MEQ - VSD Support Equipment KitsFFP5 EA$20,000.00$100,000.00
0005 VSD Production UnitsFFP12 EA$100,000.00$1,200,000.000014DataNSP1 LO
0006 VSD SparesFFP2 EA$100,000.00$200,000.00
0007 VSD Support Equipment KitsFFP5 EA$20,000.00$100,000.00Proven IDIQ Award:$1,500,000.00Unproven IDIQ Award:$110,000.00
0008 TravelCRNF1 LO
0009 TrainingFFP1 EA$53,000.00$53,000.00NOTE: See Section M for different scenarios regarding options.
0014DataNSP1 LOOption 1
Option 11001VSD Production UnitsFFP42 EA$110,000.00$4,620,000.00$110,000.00$4,620,000.00
1001VSD Production UnitsFFP42 EA$110,000.00$4,620,000.00$110,000.00$4,620,000.001002VSD SparesFFP8 EA$110,000.00$880,000.00$110,000.00$880,000.00
1002VSD SparesFFP8 EA$110,000.00$880,000.00$110,000.00$880,000.001004TrainingFFP1 EA$53,000.00$53,000.00$53,000.00$53,000.00
1003TravelCRNF1 LO1005DataNSP1 LO
1004TrainingFFP1 EA$53,000.00$53,000.00
1005DataNSP1 LOOption 2
2001VSD Production UnitsFFP36 EA$120,000.00$4,320,000.00$120,000.00$4,320,000.00
Option 22002VSD SparesFFP8 EA$120,000.00$960,000.00$120,000.00$960,000.00
2001VSD Production UnitsFFP36 EA$120,000.00$4,320,000.00$120,000.00$4,320,000.002005DataNSP1 LO
2002VSD SparesFFP8 EA$120,000.00$960,000.00$120,000.00$960,000.00
2005DataNSP1 LOOption 3
3001VSD Production UnitsFFP12 EA$130,000.00$1,560,000.00$130,000.00$1,560,000.00
Option 33002VSD SparesNSP6 EA$130,000.00$780,000.00$130,000.00$780,000.00
3001VSD Production UnitsFFP12 EA$130,000.00$1,560,000.00$130,000.00$1,560,000.003005DataNSP1 LO
3002VSD SparesNSP6 EA$130,000.00$780,000.00$130,000.00$780,000.00
3005DataNSP1 LOOption 4
4001VSD Production UnitsFFP2 EA$140,000.00$280,000.00$140,000.00$280,000.00
Option 44002VSD SparesFFP6 EA$140,000.00$840,000.00$140,000.00$840,000.00
4001VSD Production UnitsFFP2 EA$140,000.00$280,000.00$140,000.00$280,000.004005DataNSP1 LO
4002VSD SparesFFP6 EA$140,000.00$840,000.00$140,000.00$840,000.00
4005DataNSP1 LO
PROVEN TEP:$15,793,000.00UNPROVEN TEP:$16,106,000.00
*note: First Article –Evaluation Factor (Govt Cost) is a firm amount in accordance with FAR 9.306(i) Evaluation Cost Factor for First Article

File details come from the government source that posted it. Updated .