Attachment 0006-Docs Requiring Signed NDA.pdf
PDF 97 KB Posted
- Solicitation number
- W909MY-21-R-0006
About this file
This document contains an attachment and related federal contract opportunity solicitation. The attachment lists technical data, specifications, and reference documents requiring a signed non-disclosure agreement that will be provided for the Tactical Security System Production and Integration Contract solicitation. This solicitation from the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground is for the acquisition of Security Surveillance System equipment and technical and logistic support services. Any questions regarding this solicitation must be directed to the specified Contracting Officers by January 20, 2021, and all questions will be answered prior to the closing date of February 5, 2021 for responses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 0001-PWS FINAL_4Feb21.pdf | ||
| Attachment 0004-Price Model 21FEB03.xlsx | XLSX spreadsheet | |
| Attachment 0007-RFP- Questions-Answers 2-4-2021-Final.xlsx | XLSX spreadsheet | |
| W909MY21R0006-0001-Final.pdf | ||
| Exhibits 2-4-2021.pdf | ||
| Attachment 0002 QASP 2-2-2021.pdf | ||
| Attachment 0004-Price Model.xlsx | XLSX spreadsheet | |
| Exhibits.pdf | ||
| Attachment 0002 QASP.pdf | ||
| Attachment 0001-PWS FINAL.pdf | ||
| Attachment 0003-DD254 Signed.pdf | ||
| PWS Appendix 3 - Acronyms.pdf | ||
| Attachment 0005-Past Performance Questionnaire.pdf | ||
| W909MY21R0006.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0006‐Documents Requiring Signed NDA
List of documents that will be provided with a signed NDA. There are three (3) groups of documents, the Technical Data Package (TDP), Performance Specifications, and References.
TDP:
‐Drawings ‐CAD Files ‐Bill of Materials ‐Maintenance Allocation Chart ‐Technical Manual ‐Training Materials
Performance Specifications:
‐System Performance Specification (P‐Spec) ‐Subsystem Specifications (18 Files) ‐Requirement Traceability Matrices (19 Files) ‐Work Breakdown Structure (WBS) ‐System Design Description (SDD) ‐Interface Design Description (IDD)
Reference Documents:
‐Capability Development Document (CDD) ‐Concept of Operations (CONOPS) ‐Operational Mode Summary/Mission Profile (OMS/MP) ‐Item Unique Identification (IUID) Implementation Plan ‐PM FPS Configuration Management Plan ‐PM FPS Risk Management Plan
File details come from the government source that posted it. Updated .