Attachment 0004-Price Model.xlsx

XLSX spreadsheet 117 KB Posted

Attached to
Tactical Security System Production and Integration Contract
Solicitation number
W909MY-21-R-0006
Issued by

About this file

This document is a final solicitation for a Tactical Security System production and integration contract. The solicitation is seeking proposals for the acquisition of Security Surveillance System equipment formerly known as the Tactical Security System, as well as technical and logistics support services. Proposals are due by February 5, 2021. The solicitation is issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. Any questions regarding the solicitation must be directed to the specified Contracting Officers by January 20, 2021, and responses will be provided prior to the closing date.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Effort

Only yellow highlighted boxes can be filled inYear 1Year 2Year 3Year 4Year 5
CLIN TypeCLINPWSMaterial DescriptionQuantity DescriptionQuantity TypeWeight

Beard, Perry R. CTR USA USAASC: Weight Defined on Definitions tab

Lot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
FFP00016.1.1SSS EquipmentFixed Quantities ordered with range pricingEach8.018.018.018.014.0
Qty 1-52.0$0.004.5$0.004.5$0.004.5$0.003.5$0.0025%
Qty 6-104.0$0.009.0$0.009.0$0.009.0$0.007.0$0.0050%
Qty 11-202.0$0.004.5$0.004.5$0.004.5$0.003.5$0.0025%
Quantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
FFP00026.1.9Minor Repair - Field Level Repair (Man Hours)Each8.448.448.448.448.44
Maintenance Category 10.7$0.000.7$0.000.7$0.000.7$0.000.7$0.008%
Maintenance Category 21.3$0.001.3$0.001.3$0.001.3$0.001.3$0.0015%
FFP00036.1.9Minor Repair - Depot Level Repair (Man Hours)Each113.64113.64113.64113.64113.64
Maintenance Category 19.1$0.009.1$0.009.1$0.009.1$0.009.1$0.008%
Maintenance Category 217.0$0.0017.0$0.0017.0$0.0017.0$0.0017.0$0.0015%
FFP00046.1.9Moderate Repair - Depot Level Repair (Man Hours)Each1,287.961,287.961,287.961,287.961,287.96
Maintenance Category 3360.63$0.00360.63$0.00360.63$0.00360.63$0.00360.63$0.0028%
Maintenance Category 4412.15$0.00412.15$0.00412.15$0.00412.15$0.00412.15$0.0032%
Maintenance Category 5463.67$0.00463.67$0.00463.67$0.00463.67$0.00463.67$0.0036%
Maintenance Category 6515.18$0.00515.18$0.00515.18$0.00515.18$0.00515.18$0.0040%
Quantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
FFP00056.1.5Spares
EOIR Pan/Tilt/Zoom Medium Range (Aeron)Each1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
EOIR Pan/Tilt/Zoom Long Range (Aeron)Each1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Electro-Optical Pan/Tilt/Zoom (Bosch)Each1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Electro-Optical Pan/Tilt/Zoom Dome (Axis PTZ Dome)Each1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Electro-Optical Camera Fixed (Axis Bullet)Each1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Electro-Optical Camera Fixed Dome (Axis Fixed Dome)Includes Omnidirectional MicrophoneEach1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0050%
Solid State Sector RADAR (Echodyne)Each1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0050%
Linear Sensor System Laser Interrogator (Sintela)Each1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Elevating Mast (Blue Sky)Each1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Tripod (MOOG)Each1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Point-to-Multipoint Access Point RadioEach1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Point-to-Multipoint Subscriber RadioEach1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0050%
Power System
Power Management BoxEach1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Battery BoxEach1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Solar ArrayEach1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
GeneratorEach1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Directional Acoustic AssemblyIncludes Integrated EO Camera Fixed wPTU and Directional MicrophoneEach1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Fixed Control Station (FCS)
FCS Processing Unit (Micro disc)Each1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
FCS Router (Cisco)Each1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
FCS UPS (Synqor)Each1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Portable Control Station (PCS)Includes AC Power Supply and DC Power SupplyEach1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
T-HubEach1.01.01.01.01.0
Qty 1-50.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0025%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 11-200.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0025%
Cables (Combined)Includes all data and power cables for one kitEach1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Transit CasesIncludes all cases requires for one kit (not including Tricons)Each1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Ancillary Equipment (see definition tab)Each1.01.01.01.01.0
Qty 1-50.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0025%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 11-200.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0025%
0006CDRL #CDRL DescriptionQuantity DescriptionQuantity TypeQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended Price
FFPA001Contractor’s Progress, Status and Management ReportMonthly reportLot/Each12.0$0.0012.0$0.0012.0$0.0012.0$0.0012.0$0.00
FFPA002Briefing MaterialPriced per briefing material event.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA003Report, Record of Meetings/MinutesPriced per eventLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA004Quality Assurance Program Plan1 in Year 1Lot/Each1.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
FFPA005Failure Analysis and Corrective Action ReportPriced per report at TO/DO level, CPFFLot/EachTO/DO LevelTO/DO LevelTO/DO LevelTO/DO LevelTO/DO Level
FFPA006Acceptance Test PlanPriced per planLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA007Acceptance Test ReportPriced concurrent with each SSS unitLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA008Interface Control Document (ICD)priced for 1 in Year 1 and per ECPLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA009Supplier’s Configuration Management PlanPriced concurrent with each SSS or component delivery.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA010Configuration Audit Plan1 in Year 1 and updates as requestedLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA011Baseline Description Document (BDD)Priced concurrent with each SSS or component delivery.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA012Technical Data Package (TDP)Priced per package at TO/DO level, CPFFLot/EachTO/DO LevelTO/DO LevelTO/DO LevelTO/DO LevelTO/DO Level
FFPA013Logistics Product Data (LPD)Priced per product at TO/DO level, CPFFLot/EachTO/DO LevelTO/DO LevelTO/DO LevelTO/DO LevelTO/DO Level
FFPA014Data Accession ListPriced per product at TO/DO level, CPFFLot/EachTO/DO LevelTO/DO LevelTO/DO LevelTO/DO LevelTO/DO Level
FFPA015Bill of Materials (BOM) For Logistics and Supply Chain Risk ManagementPriced upon first SSS delivery and as requestedLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA016Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation PlanPriced upon first SSS delivery and as requestedLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA017Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan1 in Year 1Lot/Each1.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
FFPA018Obsolescence Alert NoticePriced per noticeLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA019Failure Reporting, Analysis and Corrective Action Takenpriced per quarterLot/Each4.0$0.004.0$0.004.0$0.004.0$0.004.0$0.00
FFPA020Product Support AnalysisPriced per analysisLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA021Reliability and Maintenance Predictions ReportNSPLot/EachNSPNSPNSPNSPNSP
FFPA022Reliability-Centered Maintenance (RCM) Analysis ReportNSPLot/EachNSPNSPNSPNSPNSP
FFPA023Engineering Data for Provisioning (EDFP)1 in year 1Lot/Each1.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
FFPA024Depot Maintenance Study1 in Year 1Lot/Each1.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
FFPA025Safety Assessment ReportPriced concurrent with delivery of first SSS unitLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
CPFFA026Training Support Package and Training MaterialsDO/TO Level, CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level
CPFFA027System Technical ManualsDO/TO Level, CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level
CPFFA028Program Protection Implementation (PPIP)DO/TO Level, CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level
FFPA029Government Property Inventory Report (GFE/P)/ Contractor Acquired Property (CAP) Inventory ReportPriced per SSS unitLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA030Item Unique Identification (IUID) Marking Plan4 per yearLot/Each4.0$0.004.0$0.004.0$0.004.0$0.004.0$0.00
FFPA031Proposed Spare Parts ListPriced concurrent with delivery of first SSS unitLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA032Contractor Field Service Reports1 per weekLot/Each52.0$0.0052.0$0.0052.0$0.0052.0$0.0052.0$0.00
FFPA033Maintenance Support Plan1 in Year 1Lot/Each1.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
CPFFA034Site Survey Report1 in Year 1, DO/TO level CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level
CPFFA035Site Work Package1 in Year 1, DO/TO level CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level
FFPA036DoD Risk Management Framework Package DeliverablesPriced as requiredLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
FFPA037Contactor’s Risk Management Plan1 in Year 1Lot/Each1.0$0.000.0$0.000.0$0.000.0$0.000.0$0.00
FFPA038Contractor’s Risk Management Status ReportMonthlyLot/Each12.0$0.0012.0$0.0012.0$0.0012.0$0.0012.0$0.00
FFPA039Engineering Change ProposalsPriced per ECP DO/TOLot/EachDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level
FFPA040Notice of Revision (NOR)Priced per NOR, DO/TO LevelLot/EachDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level
FFPA041Request for Variance (RFV)Priced per RFV, DO/TO LevelLot/EachDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level
FFPA042Operations Security Reportpriced for trainingLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
PWS #PWS DescriptionQuantity DescriptionQuantity TypeQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceCDRLType
5.1Program ManagementA001FFP
FFP00075.1.1Key PersonnelFFP per year, key staffLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00FFP
FFP00085.1.2Program MeetingsNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
FFP00095.1.3Contract Kickoff MeetingOne Post Award Meeting NLT 10 Days after order.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A002, A003FFP
FFP00105.1.4Technical Interchange Meetings (TIM)Minimum of 1 and maximum of 6 per year.Lot/Each6.0$0.006.0$0.006.0$0.006.0$0.006.0$0.00A002, A003FFP
FFP00115.2Quality AssurancePriced for QA Plan and Monthly Reports which are Included in Contractors monthly report.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA001, A004FFP
FFP00125.2.1Test SupportNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP-
CPFF00135.2.2Integration/Regression Test SupportPriced to support integration and regression testing from changes directed by the Government (see PWS). NSP, CPFFNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA005CPFF
FFP00145.2.3Government Acceptance Test SupportPriced to plan, develop, implement, and maintain a product acceptance system that demonstrates compliance with the technical and contractual requirements identified in this PWS.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A006FFP
FFP00155.2.4First Article TestPriced for the first unit produced and shall cover, at a minimum, the P-Spec requirements marked for the FAT in Appendix 3 - Acceptance Test Requirements MatrixLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A006, A007
FFP00165.3Engineering SupportWill be specified in the individual TO/Dos.DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelCPFF
FFP00175.3.1Interface Control Document (ICD)Priced per ECPLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A008FFP
FFP00185.4Other Services-
FFP00185.4.1Configuration ManagementPriced to maintain a CM Process of which the Government reserves the right to review and approve (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A009, A010FFP
FFP00195.4.2Production ProceduresPriced to maintain detailed production assembly procedures and documentation to include assembly instructions in a baseline description. (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A011FFP
CPFF00205.4.3Product DataPriced to update and maintain Product Data (see PWS), CPFF.DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA012, A013, A014CPFF
FFP00215.4.4Diminishing Manufacturing Sources and Material Shortages (DMSMS)Priced per minimizing materiel readiness risks and managing obsolescence during the POP (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A015, A016, A017, A018FFP
FFP00225.4.5Failure Reporting, Analysis and Corrective Action System (FRACAS)Priced to collect and analyze failure data to determine the cause of equipment failures (see PWS) plus implantation of FRACAS.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A019FFP
FFP00235.4.6Product Support Analysis (PSA)Priced per Product Support Analysis plus Life Cycle Sustainment Plan.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A020FFP
FFP00245.4.7Customer Wait TimeNegotiated at TO level. Contractor shall work with the Government to establish acceptable customer wait times (CWT) to support each phase of the contract.DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelFFP
FFP00255.4.8Reliability, Availability and Maintainability (RAM) Program.Negotiated at the TO/DO level to include Reliability and Maintainability Predictions Report and Reliability-Centered Maintenance (RCM) Analysis Report.DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA021, A022FFP
FFP00265.4.9ProvisioningPriced for submission of Provisioning Parts Data.Lot/Each12.0$0.0012.0$0.0012.0$0.0012.0$0.0012.0$0.00A023FFP
FFP00275.4.10Reach-back SupportNegotiated at the individual TO/DO.DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelFFP
FFP00285.4.11Asset VisibilityPriced to utilize the COLTS program management suite for providing asset visibility.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00FFP
FFP00295.4.12Depot Maintenance Study/Organic Depot Assessment Data1 in Year 1DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA024FFP
FFP00305.4.13Human System Integration (HSI)Safety Assessment Report as changes to SSS are made.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A025FFP
CPFF00315.4.14TrainingPriced per training event (see PWS) not including Training Support Package and Training Materials, CPFF.DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA026CPFF
CPFF00325.4.15Technical Manual UpdatesPriced per item (see PWS), CPFF.DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA027CPFF
FFP00335.4.16Program Protection PlanningPriced for multiple tasks (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A028FFP
FFP00345.4.17Travel15 trips (See PWSLot/Each15.0$ 2,485.38$37,280.7115.0$ 2,485.38$37,280.7115.0$ 2,485.38$37,280.7115.0$ 2,485.38$37,280.7115.0$ 2,485.38$37,280.71A001Cost
FFP00356.0Production Materials and EquipmentNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP-
FFP00356.1Government Property / EquipmentPriced for Government Property Inventory Reports and Acquired Property Inventory Reports (see PWS).DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA029FFP
FFP00366.1.1SSS EquipmentNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
FFP00376.1.2Bar-Coding, Serialization, and LabelingPriced as a component of SSS spares.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA030FFP
FFP00386.1.3Packing, Handling, Storage, Transportation, and MarkingPriced as a component of SSS spares.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
FFP00396.1.4Warranty ItemsPriced as a component of SSS spares.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
FFP00406.1.5SSS SparesNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA007, A031FFP
FFP00416.1.6Environmental, Safety, and Occupational HealthPriced to implement and maintain an ESOH evaluation Program (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A026FFP
CPFF00426.1.7Field Service SupportDO/TO Level, CPFFDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA032CPFF
FFP00436.1.8Readiness SustainmentPriced for Sustainment required to support the effort (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A033FFP
FFP00446.1.9Repair, Inspection, Evaluation Of Non-Warranty ItemsNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA019
CPFF00456.1.10InstallationSegregated at TO level, CPFF, priced per yearDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelCPFF
FFP00466.1.11Site SurveyPriced to prepare a Site Survey Report and Site Work Package.DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA034, A035CPFF
FFP00476.2CybersecurityPriced to support the Assessment and Authorization process and enforce the security controls required to safeguard the data and software.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A036FFP
FFP00486.3Risk ManagementPriced for Contactor’s Risk Management Plan and Contractor’s Risk Management Status Report.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA037, A038FFP
FFP00496.4Engineering Change Proposal (ECP)DO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO Level-
FFP00506.4.1Class I Major ECPsPriced per ECP and NORDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA039, A040-
FFP00516.4.2Class I Minor ECPsPriced per ECP and NORDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA039, A040-
FFP00526.4.3Class II Administrative ECPsPriced per ECP and NORDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA039, A040-
FFP00536.4.4Request for Variance (RFV)Priced per RFVDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelDO/TO LevelA041-
FFP00547.0Security RequirementsNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00558.0Special Security RequirementsNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA042
FFP00568.1.1Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus)NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00578.1.2AT Awareness Training For Outside Conus (OCONUS)NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00588.1.3Access And General Protection/Security Policy And ProceduresNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00598.1.4Contractors/Subcontractors Requiring Common Access Card (CAC)NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00608.1.5Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or InstallationNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00618.1.6IWATCH TrainingNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00628.1.7Army Training Certification Tracking System (ATCTS)NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00638.1.8Operations Security Source Standard Operating Procedure PlanNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA042
FFP00648.1.9OPSEC TrainingNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00658.1.10Information Assurance (IA)/It TrainingNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00668.1.111A/ IT CertificationNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00678.1.12Threat Awareness Reporting Program (TARP) TrainingNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00688.1.13CONUS Replacement Center (CRC) TrainingNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00698.1.14Contractor Personnel Supporting U.S. Armed Forces Deployed OCONUSNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00708.1.15International Trafficking In Arms Regulations Compliance ProgramNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP00719.0Contractor Manpower ReportingNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP007210.0Government's Rights To Technical Data And Computer SoftwareNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP007311.0General InformationNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP007411.1.1Inspection And AcceptanceNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
FFP007511.1.2Quality AssuranceNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP

TOTAL COST $37,280.71 TOTAL COST $37,280.71 TOTAL COST $37,280.71 TOTAL COST $37,280.71 TOTAL COST $37,280.71

PWS 0727

CDRLPWS Ref.TitleType
A0015.1Program ManagementFFP
5.1.1Key PersonnelFFP
5.1.2Program MeetingsFFP
A002, A0035.1.3Contract Kickoff MeetingFFP
A002, A0035.1.4Technical Interchange Meetings (TIM)FFP
A001, A0045.2Quality AssuranceFFP
5.2.1Test Support-
A0055.2.2Integration/Regression Test SupportCPFF
A0065.2.3Government Acceptance Test SupportFFP
A006, A0075.2.4First Article Test
5.3Engineering SupportCPFF
A0085.3.1Interface Control Document (ICD)FFP
5.4Other Services-
A009, A0105.4.1Configuration ManagementFFP
A0115.4.2Production ProceduresFFP
A012, A013, A0145.4.3Product DataCPFF
A015, A016, A017, A0185.4.4Diminishing Manufacturing Sources and Material Shortages (DMSMS)FFP
A0195.4.5Failure Reporting, Analysis and Corrective Action System (FRACAS)FFP
A0205.4.6Product Support Analysis (PSA)FFP
5.4.7Customer Wait TimeFFP
A021, A0225.4.8Reliability, Availability and Maintainability (RAM) Program.FFP
A0235.4.9ProvisioningFFP
5.4.10Reach-back SupportFFP
5.4.11Asset VisibilityFFP
A0245.4.12Depot Maintenance Study/Organic Depot Assessment DataFFP
A0255.4.13Human System Integration (HSI)FFP
A0265.4.14TrainingCPFF
A0275.4.15Technical Manual UpdatesCPFF
A0285.4.16Program Protection PlanningFFP
A0015.4.17TravelCost
6.0Production Materials and Equipment-
A0296.1Government Property / EquipmentFFPmandatory
6.1.1TSS EquipmentFFP
A0306.1.2Bar-Coding, Serialization, and LabelingFFP
6.1.3Packing, Handling, Storage, Transportation, and MarkingFFP
6.1.4Warranty ItemsFFP
A007, A0316.1.5TSS SparesFFP
A0266.1.6Environmental, Safety, and Occupational HealthFFP
A0326.1.7Field Service SupportCPFF
A0336.1.8Readiness SustainmentFFP
A0196.1.9REPAIR, INSPECTION, EVALUATION OF NON-WARRANTY ITEMS
6.1.10InstallationCPFF
A034, A0356.1.11Site SurveyCPFF
A0366.2CybersecurityFFP
A037, A0386.3Risk ManagementFFP
6.4Engineering Change Proposal (ECP)-included in other sections including Engineering Support
A039, A0406.4.1Class I Major ECPs-
A039, A0406.4.2Class I Minor ECPs-
A039, A0406.4.3Class II Administrative ECPs-
A0416.4.4Request for Variance (RFV)-
7.0Security Requirements
A0428.0Special Security Requirements
8.1.1Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus)
8.1.2AT Awareness Training For Outside Conus (Oconus)
8.1.3Access And General Protection/Security Policy And Procedures
8.1.4Contractors/Subcontractors Requiring Common Access Card (CAC)
8.1.5Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or Installation
8.1.6Iwatch Training
8.1.7Army Training Certification Tracking System (ATCTS)
A0428.1.8Operations Security Source Standard Operating Procedure Plan
8.1.9OPSEC Training
8.1.10Information Assurance (Ia)/It Training
8.1.111A/ IT Certification
8.1.12Threat Awareness Reporting Program (TARP) Training
8.1.13Conus Replacement Center (CRC) Training
8.1.14Contractor Personnel Supporting U.S. Armed Forces Deployed Oconus
8.1.15International Trafficking In Arms Regulations Compliance Program
9.0Contractor Manpower Reporting
10.0Government’S Rights To Technical Data And Computer Software
11.0General Information
11.1.1Inspection And Acceptance
11.1.2Quality Assurance

Schedule

New ProcurementFY21FY22FY23FY24FY25FY26FY27FY28TOTAL
System Quantity Production8888436
System Quantity Production - IBD1010101040
Total81818181400076
IGSSR-C Fixed Control Station22
IGCE Total Cost$14,699,794$35,001,756$34,818,656$37,986,337$34,825,920$11,165,104$11,431,267$11,709,147$191,637,980
Repair % from TSS POE = 16.35%$2,403,416$5,722,787$5,692,850$6,210,766$5,694,038$1,825,494$1,869,012$1,914,445
TSS System BOMCurrent POE
Materials DescriptionQTY per KitPrice ($K)Total Cost ($K)Total Cost ($)
Mid Range PTZ EO/LWIR2$ 40.00$ 80.00$ 80,000.00
Mid Range PTZ EO/MWIR2$ 70.00$ 140.00$ 140,000.00
Perimeter Intrusion Sensor6$ 30.00$ 180.00$ 180,000.00
Pan Tilt Zoom Camera (PTZ)10$ 3.25$ 32.50$ 32,500.00
Linear Sensing System (LSS)1$ 200.00$ 200.00$ 200,000.00
Tri Pod8$ 1.70$ 13.60$ 13,600.00
Radio11$ 4.40$ 48.40$ 48,400.00
Power System7$ 35.00$ 245.00$ 245,000.00
Audio2$ 5.00$ 10.00$ 10,000.00
Control/Command Station1$ 67.00$ 67.00$ 67,000.00
Data & Power Distribution (DPD)8$ 16.80$ 134.40$ 134,400.00
Fixed Imaging10$ 1.25$ 12.50$ 12,500.00
$ 1,163.40$ 1,163,400.00
IGSSR-C Fixed Control Station
Current BOM (No Cross Domain Kit)Current POE
Materials DescriptionQTY per KitPrice ($K)Total Cost ($K)Total Cost ($)
Node
Node Server / Switch OTC2$ 211.96$ 423.92$ 423,920.00
Node UPS OTC2$ 38.37$ 76.74$ 76,740.00
Node EBM OTC2$ 9.43$ 18.86$ 18,860.00
$ 519.52$ 519,520.00
Client Workstation (Populated Storage Case)2$ 42.56$ 85.12$ 85,120.00
Sensor Connectivity Kit OTC2$ 25.47$ 50.94$ 50,940.00
Time Provider1$ 29.29$ 29.29$ 29,290.00
Kit SW License1$ 240.53$ 240.53$ 240,529.00
Per System Cost$ 925.40$ 925,399.00

Option Effort

Year 6Year 7Year 8
CLIN TypeCLINPWSMaterial DescriptionQuantity DescriptionQuantity TypeWeight

Beard, Perry R. CTR USA USAASC: Weight Defined on Definitions tab

Lot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
FFP6.1.1SSS EquipmentFixed Quantities ordered with range pricingEach8.018.018.0
Qty 1-52.0$0.004.5$0.004.5$0.0025%
Qty 6-104.0$0.009.0$0.009.0$0.0050%
Qty 11-202.0$0.004.5$0.004.5$0.0025%
Quantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
FFP6.1.9Minor Repair - Field Level Repair (Man Hours)Each8.448.448.44
Maintenance Category 10.7$0.000.7$0.000.7$0.008%
Maintenance Category 21.3$0.001.3$0.001.3$0.0015%
FFP6.1.9Minor Repair - Depot Level Repair (Man Hours)Each113.64113.64113.64
Maintenance Category 19.1$0.009.1$0.009.1$0.008%
Maintenance Category 217.0$0.0017.0$0.0017.0$0.0015%
FFP6.1.9Moderate Repair - Depot Level Repair (Man Hours)Each1,287.961,287.961,287.96
Maintenance Category 3360.63$0.00360.63$0.00360.63$0.0028%
Maintenance Category 4412.15$0.00412.15$0.00412.15$0.0032%
Maintenance Category 5463.67$0.00463.67$0.00463.67$0.0036%
Maintenance Category 6515.18$0.00515.18$0.00515.18$0.0040%
Quantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
FFP6.1.5Spares
EOIR Pan/Tilt/Zoom Medium Range (Aeron)Each1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
EOIR Pan/Tilt/Zoom Long Range (Aeron)Each1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Electro-Optical Pan/Tilt/Zoom (Bosch)Each1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Electro-Optical Pan/Tilt/Zoom Dome (Axis PTZ Dome)Each1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Electro-Optical Camera Fixed (Axis Bullet)Each1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Electro-Optical Camera Fixed Dome (Axis Fixed Dome)Includes Omnidirectional MicrophoneEach1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.0050%
Solid State Sector RADAR (Echodyne)Each1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.0050%
Linear Sensor System Laser Interrogator (Sintela)Each1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Elevating Mast (Blue Sky)Each1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Tripod (MOOG)Each1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Point-to-Multipoint Access Point RadioEach1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Point-to-Multipoint Subscriber RadioEach1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.0050%
Power System
Power Management BoxEach1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Battery BoxEach1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Solar ArrayEach1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
GeneratorEach1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Directional Acoustic AssemblyIncludes Integrated EO Camera Fixed wPTU and Directional MicrophoneEach1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Fixed Control Station (FCS)
FCS Processing Unit (Micro disc)Each1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
FCS Router (Cisco)Each1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
FCS UPS (Synqor)Each1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Portable Control Station (PCS)Includes AC Power Supply and DC Power SupplyEach1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
T-HubEach1.01.01.0
Qty 1-50.3$0.000.3$0.000.3$0.0025%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Qty 11-200.3$0.000.3$0.000.3$0.0025%
Cables (Combined)Includes all data and power cables for one kitEach1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Transit CasesIncludes all cases requires for one kit (not including Tricons)Each1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Ancillary Equipment (see definition tab)Each1.01.01.0
Qty 1-50.3$0.000.3$0.000.3$0.0025%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Qty 11-200.3$0.000.3$0.000.3$0.0025%
CDRL #CDRL DescriptionQuantity DescriptionQuantity TypeQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended Price
FFPA001Contractor’s Progress, Status and Management ReportMonthly reportLot/Each12.0$0.0012.0$0.0012.0$0.00
FFPA002Briefing MaterialPriced per briefing material event.Lot/Each1.0$0.001.0$0.001.0$0.00
FFPA003Report, Record of Meetings/MinutesPriced per eventLot/Each1.0$0.001.0$0.001.0$0.00
FFPA004Quality Assurance Program Plan1 in Year 1Lot/Each0.0$0.000.0$0.000.0$0.00
FFPA005Failure Analysis and Corrective Action ReportPriced per report, DO/TO level CPFFLot/EachTO/DO LevelTO/DO LevelTO/DO Level
FFPA006Acceptance Test PlanPriced per planLot/Each1.0$0.001.0$0.001.0$0.00
FFPA007Acceptance Test ReportPriced concurrent with each SSS unitLot/Each1.0$0.001.0$0.001.0$0.00
FFPA008Interface Control Document (ICD)priced for 1 in Year 1 and per ECPLot/Each1.0$0.001.0$0.001.0$0.00
FFPA009Supplier’s Configuration Management PlanPriced concurrent with each SSS or component delivery.Lot/Each1.0$0.001.0$0.001.0$0.00
FFPA010Configuration Audit Plan1 in Year 1 and updates as requestedLot/Each1.0$0.001.0$0.001.0$0.00
FFPA011Baseline Description Document (BDD)Priced concurrent with each SSS or component delivery.Lot/Each1.0$0.001.0$0.001.0$0.00
FFPA012Technical Data Package (TDP)Priced per package, DO/TO Level, CPFFLot/EachTO/DO LevelTO/DO LevelTO/DO Level
FFPA013Logistics Product Data (LPD)Priced per product, DO/TO Level, CPFFLot/EachTO/DO LevelTO/DO LevelTO/DO Level
FFPA014Data Accession ListPriced per product, DO/TO Level, CPFFLot/EachTO/DO LevelTO/DO LevelTO/DO Level
FFPA015Bill of Materials (BOM) For Logistics and Supply Chain Risk ManagementPriced upon first SSS delivery and as requestedLot/Each1.0$0.001.0$0.001.0$0.00
FFPA016Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation PlanPriced upon first SSS delivery and as requestedLot/Each1.0$0.001.0$0.001.0$0.00
FFPA017Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan1 in Year 1Lot/Each0.0$0.000.0$0.000.0$0.00
FFPA018Obsolescence Alert NoticePriced per noticeLot/Each1.0$0.001.0$0.001.0$0.00
FFPA019Failure Reporting, Analysis and Corrective Action Takenpriced per quarterLot/Each4.0$0.004.0$0.004.0$0.00
FFPA020Product Support AnalysisPriced per analysisLot/Each1.0$0.001.0$0.001.0$0.00
FFPA021Reliability and Maintenance Predictions ReportNSPLot/EachNSPNSPNSP
FFPA022Reliability-Centered Maintenance (RCM) Analysis ReportNSPLot/EachNSPNSPNSP
FFPA023Engineering Data for Provisioning (EDFP)1 in year 1Lot/Each0.0$0.000.0$0.000.0$0.00
FFPA024Depot Maintenance Study1 in Year 1Lot/Each0.0$0.000.0$0.000.0$0.00
FFPA025Safety Assessment ReportPriced concurrent with delivery of first SSS unitLot/Each1.0$0.001.0$0.001.0$0.00
CPFFA026Training Support Package and Training MaterialsDO/TO Level CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO Level
CPFFA027System Technical ManualsDO/TO Level CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO Level
CPFFA028Program Protection Implementation (PPIP)Specified in individual TOs/DosLot/EachDO/TO LevelDO/TO LevelDO/TO Level
FFPA029Government Property Inventory Report (GFE/P)/ Contractor Acquired Property (CAP) Inventory ReportPriced per SSS unitLot/Each1.0$0.001.0$0.001.0$0.00
FFPA030Item Unique Identification (IUID) Marking Plan4 per yearLot/Each4.0$0.004.0$0.004.0$0.00
FFPA031Proposed Spare Parts ListPriced concurrent with delivery of first SSS unitLot/Each1.0$0.001.0$0.001.0$0.00
FFPA032Contractor Field Service Reports1 per weekLot/Each52.0$0.0052.0$0.0052.0$0.00
FFPA033Maintenance Support Plan1 in Year 1Lot/Each0.0$0.000.0$0.000.0$0.00
CPFFA034Site Survey Report1 in Year 1, CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO Level
CPFFA035Site Work Package1 in Year 1, CPFFLot/EachDO/TO LevelDO/TO LevelDO/TO Level
FFPA036DoD Risk Management Framework Package DeliverablesPriced as requiredLot/Each1.0$0.001.0$0.001.0$0.00
FFPA037Contactor’s Risk Management Plan1 in Year 1Lot/Each0.0$0.000.0$0.000.0$0.00
FFPA038Contractor’s Risk Management Status ReportMonthlyLot/Each12.0$0.0012.0$0.0012.0$0.00
FFPA039Engineering Change ProposalsPriced per ECP NSPLot/EachDO/TO LevelDO/TO LevelDO/TO Level
FFPA040Notice of Revision (NOR)Priced per NOR, NSPLot/EachDO/TO LevelDO/TO LevelDO/TO Level
FFPA041Request for Variance (RFV)Priced per RFV, NSPLot/EachDO/TO LevelDO/TO LevelDO/TO Level
FFPA042Operations Security Reportpriced for trainingLot/Each1.0$0.001.0$0.001.0$0.00
PWS #PWS DescriptionQuantity DescriptionQuantity TypeQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceCDRLType
5.1Program ManagementA001FFP
FFP5.1.1Key PersonnelFFP per year, key staffLot/Each1.0$0.001.0$0.001.0$0.00FFP
FFP5.1.2Program MeetingsNSPNSPNSPNSPNSPNSPNSPFFP
FFP5.1.3Contract Kickoff MeetingOne Post Award Meeting NLT 10 Days after order.Lot/Each1.0$0.001.0$0.001.0$0.00A002, A003FFP
FFP5.1.4Technical Interchange Meetings (TIM)Minimum of 1 and maximum of 6 per year.Lot/Each6.0$0.006.0$0.006.0$0.00A002, A003FFP
FFP5.2Quality AssurancePriced for QA Plan and Monthly Reports which are Included in Contractors monthly report.NSPNSPNSPNSPNSPNSPNSPA001, A004FFP
FFP5.2.1Test SupportNSPNSPNSPNSPNSPNSPNSP-
CPFF5.2.2Integration/Regression Test SupportPriced to support integration and regression testing from changes directed by the Government (see PWS). DO/TO Level, CPFFNSPNSPNSPNSPNSPNSPNSPA005CPFF
FFP5.2.3Government Acceptance Test SupportPriced to plan, develop, implement, and maintain a product acceptance system that demonstrates compliance with the technical and contractual requirements identified in this PWS.Lot/Each1.0$0.001.0$0.001.0$0.00A006FFP
FFP5.2.4First Article TestPriced for the first unit produced and shall cover, at a minimum, the P-Spec requirements marked for the FAT in Appendix 3 - Acceptance Test Requirements MatrixLot/Each1.0$0.001.0$0.001.0$0.00A006, A007
FFP5.3Engineering SupportWill be specified in the individual TO/Dos.DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelCPFF
FFP5.3.1Interface Control Document (ICD)Priced per ECPLot/Each1.0$0.001.0$0.001.0$0.00A008FFP
FFP5.4Other Services-
FFP5.4.1Configuration ManagementPriced to maintain a CM Process of which the Government reserves the right to review and approve (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A009, A010FFP
FFP5.4.2Production ProceduresPriced to maintain detailed production assembly procedures and documentation to include assembly instructions in a baseline description. (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A011FFP
CPFF5.4.3Product DataPriced to update and maintain Product Data (see PWS), CPFF.DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelA012, A013, A014CPFF
FFP5.4.4Diminishing Manufacturing Sources and Material Shortages (DMSMS)Priced per minimizing materiel readiness risks and managing obsolescence during the POP (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A015, A016, A017, A018FFP
FFP5.4.5Failure Reporting, Analysis and Corrective Action System (FRACAS)Priced to collect and analyze failure data to determine the cause of equipment failures (see PWS) plus implantation of FRACAS.Lot/Each1.0$0.001.0$0.001.0$0.00A019FFP
FFP5.4.6Product Support Analysis (PSA)Priced per Product Support Analysis plus Life Cycle Sustainment Plan.Lot/Each1.0$0.001.0$0.001.0$0.00A020FFP
FFP5.4.7Customer Wait TimeNegotiated at TO level. Contractor shall work with the Government to establish acceptable customer wait times (CWT) to support each phase of the contract.DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelFFP
FFP5.4.8Reliability, Availability and Maintainability (RAM) Program.Negotiated at the TO/DO level to include Reliability and Maintainability Predictions Report and Reliability-Centered Maintenance (RCM) Analysis Report.DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelA021, A022FFP
FFP5.4.9ProvisioningPriced for submission of Provisioning Parts Data.Lot/Each12.0$0.0012.0$0.0012.0$0.00A023FFP
FFP5.4.10Reach-back SupportNegotiated at the individual TO/DO.DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelFFP
FFP5.4.11Asset VisibilityPriced to utilize the COLTS program management suite for providing asset visibility.Lot/Each1.0$0.001.0$0.001.0$0.00FFP
FFP5.4.12Depot Maintenance Study/Organic Depot Assessment Data1 in Year 1DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelA024FFP
FFP5.4.13Human System Integration (HSI)Safety Assessment Report as changes to SSS are made.Lot/Each1.0$0.001.0$0.001.0$0.00A025FFP
CPFF5.4.14TrainingPriced per training event (see PWS) not including Training Support Package and Training Materials, CPFF.DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelA026CPFF
CPFF5.4.15Technical Manual UpdatesPriced per item (see PWS), CPFF.DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelA027CPFF
FFP5.4.16Program Protection PlanningPriced for multiple tasks (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A028FFP
FFP5.4.17Travel15 trips (See PWSLot/Each15.0$ 2,485.38$37,280.7115.0$ 2,485.38$37,280.7115.0$ 2,485.38$37,280.71A001Cost
FFP6.0Production Materials and EquipmentNSPNSPNSP-
FFP6.1Government Property / EquipmentPriced for Government Property Inventory Reports and Acquired Property Inventory Reports (see PWS).DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelA029FFP
FFP6.1.1SSS EquipmentNSPNSPNSPNSPNSPNSPNSPFFP
FFP6.1.2Bar-Coding, Serialization, and LabelingPriced as a component of SSS spares.NSPNSPNSPNSPNSPNSPNSPA030FFP
FFP6.1.3Packing, Handling, Storage, Transportation, and MarkingPriced as a component of SSS spares.NSPNSPNSPNSPNSPNSPNSPFFP
FFP6.1.4Warranty ItemsPriced as a component of SSS spares.NSPNSPNSPNSPNSPNSPNSPFFP
FFP6.1.5SSS SparesNSPNSPNSPNSPNSPNSPNSPA007, A031FFP
FFP6.1.6Environmental, Safety, and Occupational HealthPriced to implement and maintain an ESOH evaluation Program (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A026FFP
CPFF6.1.7Field Service SupportDO/TO Level, CPFFDO/TO LevelNSPDO/TO LevelNSPDO/TO LevelA032CPFF
FFP6.1.8Readiness SustainmentPriced for Sustainment required to support the effort (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A033FFP
FFP6.1.9Repair, Inspection, Evaluation Of Non-Warranty ItemsNSPNSPNSPNSPNSPNSPNSPA019
CPFF6.1.10InstallationSegregated at TO level, CPFF, priced per yearDO/TO LevelNSPDO/TO LevelNSPDO/TO LevelCPFF
FFP6.1.11Site SurveyPriced to prepare a Site Survey Report and Site Work Package.DO/TO LevelNSPDO/TO LevelNSPDO/TO LevelA034, A035CPFF
FFP6.2CybersecurityPriced to support the Assessment and Authorization process and enforce the security controls required to safeguard the data and software.Lot/Each1.0$0.001.0$0.001.0$0.00A036FFP
FFP6.3Risk ManagementPriced for Contactor’s Risk Management Plan and Contractor’s Risk Management Status Report.NSPNSPNSPNSPNSPNSPNSPA037, A038FFP
FFP6.4Engineering Change Proposal (ECP)DO/TO LevelDO/TO LevelDO/TO Level-
FFP6.4.1Class I Major ECPsPriced per ECP and NORDO/TO LevelDO/TO LevelDO/TO LevelA039, A040-
FFP6.4.2Class I Minor ECPsPriced per ECP and NORDO/TO LevelDO/TO LevelDO/TO LevelA039, A040-
FFP6.4.3Class II Administrative ECPsPriced per ECP and NORDO/TO LevelDO/TO LevelDO/TO LevelA039, A040-
FFP6.4.4Request for Variance (RFV)Priced per RFVDO/TO LevelDO/TO LevelDO/TO LevelA041-
FFP7.0Security RequirementsNSPNSPNSPNSPNSPNSPNSP
FFP8.0Special Security RequirementsNSPNSPNSPNSPNSPNSPNSPA042
FFP8.1.1Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus)NSPNSPNSPNSPNSPNSPNSP
FFP8.1.2AT Awareness Training For Outside Conus (OCONUS)NSPNSPNSPNSPNSPNSPNSP
FFP8.1.3Access And General Protection/Security Policy And ProceduresNSPNSPNSPNSPNSPNSPNSP
FFP8.1.4Contractors/Subcontractors Requiring Common Access Card (CAC)NSPNSPNSPNSPNSPNSPNSP
FFP8.1.5Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or InstallationNSPNSPNSPNSPNSPNSPNSP
FFP8.1.6IWATCH TrainingNSPNSPNSPNSPNSPNSPNSP
FFP8.1.7Army Training Certification Tracking System (ATCTS)NSPNSPNSPNSPNSPNSPNSP
FFP8.1.8Operations Security Source Standard Operating Procedure PlanNSPNSPNSPNSPNSPNSPNSPA042
FFP8.1.9OPSEC TrainingNSPNSPNSPNSPNSPNSPNSP
FFP8.1.10Information Assurance (IA)/It TrainingNSPNSPNSPNSPNSPNSPNSP
FFP8.1.111A/ IT CertificationNSPNSPNSPNSPNSPNSPNSP
FFP8.1.12Threat Awareness Reporting Program (TARP) TrainingNSPNSPNSPNSPNSPNSPNSP
FFP8.1.13CONUS Replacement Center (CRC) TrainingNSPNSPNSPNSPNSPNSPNSP
FFP8.1.14Contractor Personnel Supporting U.S. Armed Forces Deployed OCONUSNSPNSPNSPNSPNSPNSPNSP
FFP8.1.15International Trafficking In Arms Regulations Compliance ProgramNSPNSPNSPNSPNSPNSPNSP
FFP9.0Contractor Manpower ReportingNSPNSPNSPNSPNSPNSPNSP
FFP10.0Government's Rights To Technical Data And Computer SoftwareNSPNSPNSPNSPNSPNSPNSP
FFP11.0General InformationNSPNSPNSPNSPNSPNSPNSP
FFP11.1.1Inspection And AcceptanceNSPNSPNSPNSPNSPNSPNSP
FFP11.1.2Quality AssuranceNSPNSPNSPNSPNSPNSPNSP

TOTAL COST $37,280.71 TOTAL COST $37,280.71 TOTAL COST $37,280.71

Sample Task SSS Sample Task Orders involving CPFF elements

Sample Task Order 1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .