Attach_9._Inspection_Checklist_for_AST_Dike.pdf

PDF 47 KB Posted

Attached to
Preventive Maintenance_Repair Services of Heating System
Solicitation number
W91QVN20R0202
Issued by

About this file

This document contains an inspection checklist for aboveground storage tanks (ASTs) and dikes, as well as information about a related federal contract opportunity for preventive maintenance and repair services of heating systems. The inspection checklist provides a worksheet to document the condition of ASTs and dikes, noting any leaks, debris, corrosion damage, painting needs, signage, and other details. Contractors must report any leaks without delay and maintain cleanliness.

The related federal contract opportunity is a solicitation from the Department of the Army to provide preventive maintenance and repair/replacement services for heating systems. Offerors should review the attached request for proposal and submit a priced proposal, repair/replacement part list, and installation/removal pricing via the beta.SAM website.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment-10, Inspection Checklist, 1 of 1

Worksheet for AST and Dike Tank No:

Work Description Yes No Remark /Take Action

1. Inspeciton & Clean-up

a. Does the tank have any visible leaks or sign of leak?

b. Is the dike drain free of debris drained?

c. Does the dike have a drain valve?

d. Is the dike drain valve closed?

e. Is the tank grounded?

f. Are there "No Smoking" signs on the tank?

g. Does the tank have visible corrosion damaged?

h. Does the container dike have visible damaged?

i. Does the tank required re-painting?

j. Contractor should maintain cleanliness in the dike

k. Contractor must close the drain valve after work.

- Diagram

2. Please, describe below any abnormalities found under inspection and required corrections.

3. If there is any leaking in tank and dike, contractor have to report to COR wihtout delay.

Date :

Inspector/Signature :

Worksheet