Att 2_NTX VA Health Care Systems Construction Safety Accident Prevention Plan.doc

DOC document 40 KB Posted

Attached to
J063--NTX Fire Alarm/Sprinkler Systems PM Services
Solicitation number
36C25725Q0116
Issued by

About this file

This is an Accident Prevention Plan (APP) template document for construction work at North Texas VA Health Care Systems. The document outlines the required contents and components that contractors must include in their safety plans before beginning work.

The APP must be developed by qualified personnel and signed by both a competent person and management representative. Key required elements include: project background information, safety policy statement, administrative responsibilities, accident prevention personnel, subcontractor control measures, safety training plans, inspection procedures, accident reporting protocols, emergency response plans, and specific safety requirements for hazards like fall protection, confined spaces, hot work, and fire protection. The plan requires hazard analysis for each phase of work, detailing sequence of steps, potential hazards, and control measures. Notable requirements include mandatory safety orientations for subcontractor leads every 3rd Thursday, immediate reporting of serious accidents to the Contracting Officer, and detailed fire protection measures including compliance with NFPA standards and procedures for working with impaired fire protection systems.

View the file

Other files

File Type Posted
Dallas VAMC-Other Inspections_.pdf PDF
Dallas-Sprinkler Systems_.pdf PDF
Garland-Inspections_.pdf PDF
Grand Prairie- Inspections_.pdf PDF
SF30 36C25725Q0116 0003.docx DOCX document
36C25725Q0116 0003_1.docx DOCX document
Bonham-Inspections_.pdf PDF
SF30 36C25725Q0116 0002.docx DOCX document
36C25725Q0116 0002_1.docx DOCX document
Technical Questions_36C25725Q0116.docx DOCX document
Updated Price Schedule - 36C25725Q0116.docx DOCX document
36C25725Q0116 0001_1.docx DOCX document
SF30 36C25725Q0116 0001.docx DOCX document
Att 1_NARA Records Management Language for Contracts.docx DOCX document
S02 RFQ 36C25725Q0116.docx DOCX document
36C25725Q0116_2.docx DOCX document
Service Contract Act WD 2015-5273_Fannin.pdf PDF
Service Contract Act WD 2015-5227_Dallas.pdf PDF
Att 3_Site Plan Grand Prairie_Redacted.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North Texas VA Health Care Systems

Construction Safety Accident Prevention Plan Prior to commencing work contractors must submit for approval Accident Prevention Plan. The prime contractor will write this plan for the specific work and hazards of the contract and implementing in detail the requirements for safety and occupational health. This plan shall be reviewed and found acceptable by Government personnel prior to initiation of work at the job site. The plan shall be developed by qualified personnel and shall be signed by a competent person AND a representative of management.

The prime contractor shall integrate all subcontractor work activities into the Safety and health Program, make the program available to all contractor and subcontractor employees and ensure all subcontractors integrate the provisions of the plan into their work activities.

The prime contractor shall integrate in their safety plan a requirement that all subcontractor lead personnel attend a onetime facility construction safety orientation;

Date: every 3rd Thursday

Time: 9:00 am

Location: 4500 Lancaster, Dallas, Texas 75216 (Engineering Building 9) NOTE: Please provide an anticipated attendance list prior to attendance

The safety plan shall include:

· Title, signature and phone number of the plan preparer

· Title, signature and phone number of the plan approver

· Background information on the project:

· Contractor, contract number, project name, description of work to be performed and location of work to be performed, contractor accident experience such as OSHA 200 forms, corporate safety trend analysis, and a listing of phases of work and hazardous activities requiring hazard analysis.

Statement of safety & health policy

· Administrative responsibilities for implementing the plan

· Identification and accountability of personnel responsible for accident prevention

· Means for controlling work activities of subcontractors and suppliers

· Responsibilities of subcontractors

· Plans for safety orientation of new employees / sub contractors

· Plans for continued safety training

· Provisions for safety inspections to include

· Work site/material and equipment inspection

· Means for recording inspection results

· Timetable for correction of deficiencies

· Procedures for follow-up inspections to ensure correction

· Responsibilities for investigation and reporting accidents/exposure

· All accidents incident to the project will be investigated & reported within 24 hours

· Accidents that result in a fatality, three or more persons admitted to a hospital or significant property damage will be reported immediately to the Contracting Officer. Contractors are responsible for notifying OSHA.

· First aid treatments shall be reported and recorded daily.

· Responsibilities for maintaining accident data, reports and logs

· Emergency response capabilities for disasters

· Emergency Plans will include emergency phone numbers and shall be tested periodically. Plans shall include escape procedures, employee accounting following an emergency evacuation, rescue and medical duties, means of reporting emergencies and persons to be contacted.

· Plans for maintaining job cleanup and safe access

· Public safety requirements (fencing/signs)

· Prevention of alcohol/drug abuse on the job

NOTE: Items that are commonly omitted in safety plans:

· Plans for hazard communication program must include:

1. A list of hazardous chemicals known to be present

2. Methods used to inform employees of the hazards

3. Containers must be present and labeled

4. MSDS for each hazardous chemical on site

Plans must identify monthly supervisor safety meeting and weekly worker safety meetings. Meetings shall be documented including the date, attendance, subjects, and the name of individuals who conducted the meeting.

· Fire protection plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work; prepare a plan detailing project-specific fire safety measures. As part of the Fire Safety Plan the contractor shall include the following applicable standards NFPA 101, NFPA 1, NFPA 241. These standards describe requirements when the Fire protection Systems are impaired. Any open piping/conduit and/or penetrations extending through walls or floors from the construction area into a non-construction compartment will need to be capped off and fire stopped. All hot work will require a permit a facility Safety Officer will inspect the area before such work is performed.

NOTE: When fire protection systems are disrupted, contractors shall ensure procedures are incorporated to maintain equivalent levels of fire protection and provide formal notification to the facility. Procedures shall be approved by facility CSO (construction safety officer) or project COR (contracting officer representative) prior to implementation.

Safety requirements for the hazards identified on the job site such as listed but not limited to the following:

· Fall protection

· Alternate measures for impaired fire protection systems (sprinkler, fire alarm, etc)

· Asbestos exposure

· Confined space entry

· Lock out/tag out

· Excavations

· Electrical safety

· Machinery and mechanized equipment

· Hand and power tools

· Contingency plan for severe weather

· Hot work (welding, torch cutting, brazing etc)

· Flammable storage NOTE: Plan must indicate that no hot work shall be performed without required burn permit issued by safety)

Hazard Analysis

Prior to beginning EACH PHASE OF WORK, an activity hazard analysis shall be prepared by the contractor performing that work. Work shall not proceed until the hazard analysis has been accepted by facility Construction Safety Coordinator.

The analysis will:

· Define the activity being performed

· Identify the sequence of work to be accomplished

· Identify the specific hazards that are anticipated

· Identify the control measures that shall be implemented to reduce each hazard to an acceptable level

Hazard analysis shall identify the principal steps to be accomplished in sequence to accomplish the operations. Equipment used in the operation shall be listed on the hazard analysis form. Inspection requirements for the equipment and machinery shall be listed on the hazard analysis form. Each step shall be analyzed to identify its potential hazards and a recommended control shall be identified to reduce the hazard to an acceptable level.

Hazard Analysis Work Phase:

Activity

Analyzed by/Date

Reviewed by/Date

Principal

Potential

Recommended

Steps

Hazards

Controls

Identify the

Identify the potential hazards

List specific control measures sequence of work activities

Equipment

Inspection

Training / certification requirements to be used

Requirements

List equipment/machinery

List inspection

List trained /certified operators .

used in conducting the work requirement for activities equipment/machinery listed

File details come from the government source that posted it. Updated .