Att_2_-_Cost_Worksheet.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
RFO 25-1024
Solicitation number
0000038907
Issued by
California

About this file

This is a Cost Worksheet for RFO 25-1024, Investigation Management System Improvements, issued by the State of California. The project requires information technology consulting services across four distinct roles: Project Manager, Business Solutions Analyst, UX/Interaction Designer, and Senior Software Engineer. The contract structure includes a two-year base period followed by two optional one-year extension periods (Years 3 and 4). Year One through Year Three require 4,560 total labor hours distributed across the four positions, while Year Four reduces the total to 2,880 hours. The worksheet is structured as a blank template for respondents to complete, with all pricing currently showing as zero pending vendor submission.

Respondents must complete only the yellow input cells, which require submission of hourly labor rates for each position category and confirmation of estimated labor hours per year. All services are classified as Information Technology Consulting Services under the TDDC MSA Classification system, and vendors are instructed to reference the TDDC MSA List Rate for rate guidance. The total contract value will be calculated based on the hourly rates submitted multiplied by the estimated labor hours for each year, with separate cost totals provided for the base contract years, the base plus first option year, and the full contract period including all option years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Worksheet

RFO 25-1024 Investigation Management System Improvements
Attachment 2 - Cost Worksheet
Respondent:Blank
Instructions: Refer to the Cost Worksheet Key, Sheet Tab 1 for completion instructions. Respondent must complete the Yellow Input Cells only.
YEAR ONE (1)
Line Item # (LIN)Service DescriptionTDDC MSA ClassificationTDDC MSA List RateOffered Hourly Labor RateYear 1 Estimated Number of Labor HoursYear 1 Total
1-1(Year 1) - Information Technology Consulting ServicesProject Manager$ - 0$ - 0640$ - 0
1-2(Year 1) - Information Technology Consulting ServicesBusiness Solutions Analyst$ - 0$ - 01,000$ - 0
1-3(Year 1) - Information Technology Consulting ServicesUX/Interaction Designer$ - 0$ - 01,000$ - 0
1-4(Year 1) - Information Technology Consulting ServicesSenior Software Engineer$ - 0$ - 01,920$ - 0
TOTAL COST:$ - 0
YEAR TWO (2)
2-1(Year 2) - Information Technology Consulting ServicesProject Manager$ - 0$ - 0640$ - 0
2-2(Year 2) - Information Technology Consulting ServicesBusiness Solutions Analyst$ - 0$ - 01,000$ - 0
2-3(Year 2) - Information Technology Consulting ServicesUX/Interaction Designer$ - 0$ - 01,000$ - 0
2-4(Year 2) - Information Technology Consulting ServicesSenior Software Engineer$ - 0$ - 01,920$ - 0
TOTAL COST:$ - 0
GRAND TOTAL COST (BASE CONTRACT YEARS):TOTAL CONTRACT COST$ - 0
OPTION YEAR THREE (3)
3-1(Year 3) - Information Technology Consulting ServicesProject Manager$ - 0$ - 0640$ - 0
3-2(Year 3) - Information Technology Consulting ServicesBusiness Solutions Analyst$ - 0$ - 01,000$ - 0
3-3(Year 3) - Information Technology Consulting ServicesUX/Interaction Designer$ - 0$ - 01,000$ - 0
3-4(Year 3) - Information Technology Consulting ServicesSenior Software Engineer$ - 0$ - 01,920$ - 0
TOTAL COST:$ - 0
GRAND TOTAL COST (BASE CONTRACT YEARS + FIRST OPTION YEAR):TOTAL CONTRACT COST$ - 0
OPTION YEAR FOUR (4)
4-1(Year 4) - Information Technology Consulting ServicesProject Manager$ - 0$ - 0640$ - 0
4-2(Year 4) - Information Technology Consulting ServicesBusiness Solutions Analyst$ - 0$ - 0640$ - 0
4-3(Year 4) - Information Technology Consulting ServicesUX/Interaction Designer$ - 0$ - 0640$ - 0
4-4(Year 4) - Information Technology Consulting ServicesSenior Software Engineer$ - 0$ - 0960$ - 0
TOTAL COST:$ - 0
GRAND TOTAL COST (BASE CONTRACT YEARS + FIRST AND SECOND OPTION YEARS):TOTAL CONTRACT COST$ - 0

Page &P

File details come from the government source that posted it. Updated .