This document package includes construction specifications for renovating a cardiology cath lab at a Department of Veterans Affairs medical center. Key specifications include rough carpentry, cementitious sheathing, fluid-applied air barriers, flashing and sheet metal, roof and deck insulation, and thermal insulation. The project involves repairing and altering existing roof insulation. Required products and materials include wood blocking, exterior wall sheathing, fluid-applied vapor-retarding air barrier membrane, through-wall flashings, base flashings, counterflashings, gravel stops, gutters, downspouts, and reglets. Installation and testing standards are provided.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VASD 4N CARDIO CATH LAB 2 10-17
DEPARTMENT OF VETERAN’S AFFAIRS IFC DOCUMENTS | 5/10/21
06 10 00 - 1
1835 | DAVY ARCHITECTURE | 664-CSI-116
SECTION 06 10 00
ROUGH CARPENTRY
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies wood blocking, framing, sheathing, furring, nailers, sub-flooring, rough hardware, and light wood construction.
1.2 RELATED WORK:
A. Gypsum sheathing: Section 09 29 00, GYPSUM BOARD.
B. Cement board sheathing: Section 06 16 63, CEMENTITIOUS SHEATHING.
1.3 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
1. For composite wood products, submit documentation indicating that product contains no added urea formaldehyde.
B. Shop Drawings showing framing connection details, fasteners, connections and dimensions.
C. Manufacturer’s Literature and Data:
1. Submit data for lumber, panels, hardware and adhesives.
2. Submit data for wood-preservative treatment from chemical treatment manufacturer and certification from treating plants that treated materials comply with requirements. Indicate type of preservative used and net amount of preservative retained.
3. Submit data for fire retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Include physical properties of treated materials based on testing by a qualified independent testing agency.
4. For products receiving a waterborne treatment, submit statement that moisture content of treated materials was reduced to levels specified before shipment to project site.
D. Manufacturer’s certificate for unmarked lumber.
1.4 PRODUCT DELIVERY, STORAGE AND HANDLING:
A. Protect lumber and other products from dampness both during and after delivery at site.
B. Pile lumber in stacks in such manner as to provide air circulation around surfaces of each piece.
C. Stack plywood and other board products so as to prevent warping.
06 10 00 - 2
D. Locate stacks on well drained areas, supported at least 152 mm
(6 inches) above grade and cover with well-ventilated sheds having firmly constructed over hanging roof with sufficient end wall to protect lumber from driving rain.
1.5 QUALITY ASSURANCE:
A. Installer: A firm with a minimum of three (3) years’ experience in the type of work required by this section.
1.6 GRADING AND MARKINGS:
A. Any unmarked lumber or plywood panel for its grade and species will not be allowed on VA Construction sites for lumber and material not normally grade marked, provide manufacturer’s certificates (approved by an American Lumber Standards approved agency) attesting that lumber and material meet the specified the specified requirements.
1.7 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in the text by basic designation only.
B. American Society of Mechanical Engineers (ASME):
B18.2.1-12(R2013).......Square and Hex Bolts and Screws
B18.2.2-10..............Square and Hex Nuts
B18.6.1-81(R2008).......Wood Screws
C. American Plywood Association (APA):
E30-11..................Engineered Wood Construction Guide
D. ASTM International (ASTM):
A653/A653M-13...........Steel Sheet Zinc-Coated (Galvanized) or Zinc-
Iron Alloy Coated (Galvannealed) by the Hot Dip
Process
C954-11.................Steel Drill Screws for the Application of
Gypsum Board or Metal Plaster Bases to Steel
Studs from 0.033 inch (2.24 mm) to 0.112-inch
(2.84 mm) in thickness
C1002-14................Steel Self-Piercing Tapping Screws for the
Application of Gypsum Panel Products or Metal
Plaster Bases to Wood Studs or Metal Studs
D198-14.................Test Methods of Static Tests of Lumber in
Structural Sizes
06 10 00 - 3
D2344/D2344M-13.........Test Method for Short-Beam Strength of Polymer
Matrix Composite Materials and Their Laminates
F844-07a(R2013).........Washers, Steel, Plan (Flat) Unhardened for
General Use
F1667-13................Nails, Spikes, and Staples
E. American Wood Protection Association (AWPA):
AWPA Book of Standards
F. Commercial Item Description (CID):
A-A-55615...............Shield, Expansion (Wood Screw and Lag Bolt Self
Threading Anchors)
G. Forest Stewardship Council (FSC):
FSC-STD-01-001(Ver. 4-0)FSC Principles and Criteria for Forest
Stewardship
H. Military Specification (Mil. Spec.):
MIL-L-19140E............Lumber and Plywood, Fire-Retardant Treated
I. Environmental Protection Agency (EPA):
40 CFR 59(2014).........National Volatile Organic Compound Emission
Standards for Consumer and Commercial Products
J. U.S. Department of Commerce Product Standard (PS)
PS 1-95.................Construction and Industrial Plywood
PS 20-10................American Softwood Lumber Standard
K
PART 2 - PRODUCTS
2.1 LUMBER:
A. Unless otherwise specified, each piece of lumber must bear grade mark, stamp, or other identifying marks indicating grades of material, and rules or standards under which produced.
1. Identifying marks are to be in accordance with rule or standard under which material is produced, including requirements for qualifications and authority of the inspection organization, usage of authorized identification, and information included in the identification.
2. Inspection agency for lumber approved by the Board of Review, American Lumber Standards Committee, to grade species used.
B. Lumber Other Than Structural:
06 10 00 - 4
1. Unless otherwise specified, species graded under the grading rules of an inspection agency approved by Board of Review, American Lumber
Standards Committee.
2. Furring, blocking, nailers and similar items 101 mm (4 inches) and narrower Standard Grade; and, members 152 mm (6 inches) and wider, Number 2 Grade.
C. Sizes:
1. Conforming to PS 20.
2. Size references are nominal sizes, unless otherwise specified, actual sizes within manufacturing tolerances allowed by standard under which produced.
D. Moisture Content:
1. Maximum moisture content of wood products is to be as follows at the time of delivery to site.
a. Boards and lumber 50 mm (2 inches) and less in thickness: 19 percent or less.
b. Lumber over 50 mm (2 inches) thick: 25 percent or less.
E. Fire Retardant Treatment:
1. Comply with Mil Spec. MIL-L-19140.
2. Treatment and performance inspection, by an independent and qualified testing agency that establishes performance ratings.
F. Preservative Treatment:
1. Do not treat Heart Redwood and Western Red Cedar.
2. Treat wood members and plywood exposed to weather or in contact with plaster, masonry or concrete, including framing of open roofed structures; sills, sole plates, furring, and sleepers that are less than 610 mm (24 inches) from ground; nailers, edge strips, blocking, crickets, curbs, cant, vent strips and other members provided in connection with roofing and flashing materials.
3. Treat other members specified as preservative treated (PT).
4. Preservative treat by the pressure method complying with AWPA Book use category system standards U1 and T1, except any process involving the use of Chromated Copper Arsenate (CCA) or other agents classified as carcinogenic for pressure treating wood is not permitted.
06 10 00 - 5
2.2 PLYWOOD:
A. Comply with PS 1.
B. Bear the mark of a recognized association or independent inspection agency that maintains continuing control over quality of plywood which identifies compliance by veneer grade, group number, span rating where applicable, and glue type.
2.3 ROUGH HARDWARE AND ADHESIVES:
A. Anchor Bolts:
1. ASME B18.2.1 and ASME B18.2.2 galvanized, 13 mm (1/2 inch) unless shown otherwise.
2. Extend at least 203 mm (8 inches) into masonry or concrete with ends bent 50 mm (2 inches).
B. Miscellaneous Bolts: Expansion Bolts: C1D A-A-55615; lag bolt, long enough to extend at least 65 mm (2-1/2 inches) into masonry or concrete. Provide 13 mm (1/2 inch) bolt unless shown otherwise.
C. Washers
1. ASTM F844.
2. Provide zinc or cadmium coated steel or cast iron for washers exposed to weather.
D. Screws:
1. Wood to Wood: ASME B18.6.1 or ASTM C1002.
2. Wood to Steel: ASTM C954, or ASTM C1002.
E. Nails:
1. Size and type best suited for purpose unless noted otherwise.
Provide aluminum-alloy nails, plated nails, or zinc-coated nails, for nailing wood work exposed to weather and on roof blocking.
2. ASTM F1667:
a. Common: Type I, Style 10.
b. Concrete: Type I, Style 11.
c. Barbed: Type I, Style 26.
d. Underlayment: Type I, Style 25.
e. Masonry: Type I, Style 27.
f. Provide special nails designed for use with ties, strap anchors, framing connectors, joists hangers, and similar items. Nails not less than 32 mm (1-1/4 inches) long, 8d and deformed or annular ring shank.
06 10 00 - 6
PART 3 - EXECUTION
3.1 INSTALLATION OF FRAMING AND MISCELLANEOUS WOOD MEMBERS:
A. Conform to applicable requirements of the following:
1. APA for installation of plywood or structural use panels.
B. Fasteners:
1. Nails.
a. Nail in accordance with the Recommended Nailing Schedule as specified in AFPA WCD1 where detailed nailing requirements are not specified in nailing schedule. Select nail size and nail spacing sufficient to develop adequate strength for the connection without splitting the members.
b. Use special nails with framing connectors.
c. For sheathing and subflooring, select length of nails sufficient to extend 25 mm (1 inch) into supports.
d. Use 8d or larger nails for nailing through 25 mm (1 inch) thick lumber and for toe nailing 50 mm (2 inch) thick lumber.
e. Use 16d or larger nails for nailing through 50 mm (2 inch) thick lumber.
f. Select the size and number of nails in accordance with the
Nailing Schedule except for special nails with framing anchors.
g. Nailing Schedule; Using Common Nails:
1) Joist bearing on sill or girder, toe nail three (3) 8d nails or framing anchor.
2) Bridging to joist, toe nail each end two (2) 8d nails.
3) Ledger strip to beam or girder three (3) 16d nails under each joint.
4) Subflooring or Sheathing:
a) 152 mm (6 inch) wide or less to each joist face nail two (2) 8d nails.
b) Subflooring, more than 152 mm (6 inches) wide, to each stud or joint, face nail three (3) 8d nails.
c) Plywood or structural use panel to each stud or joist face nail 8d, at supported edges 152 mm (6 inches) on center and at intermediate supports 254 mm (10 inches) on center. When gluing plywood to joint framing increase nail spacing to
06 10 00 - 7
305 mm (12 inches) at supported edges and 508 mm
(20 inches) o.c. at intermediate supports.
5) Sole plate to joist or blocking, through sub floor face nail 20d nails, 406 mm (16 inches) on center.
6) Top plate to stud, end nail two (2) 16d nails.
7) Stud to sole plate, toe nail or framing anchor. Four (4) 8d nails.
8) Doubled studs, face nail 16d at 610 mm (24 inches) on center.
9) Built-up corner studs 16d at 610 mm (24 inches) (24 inches) on center.
10) Doubled top plates, face nails 16d at 406 mm (16 inches) on center.
11) Top plates, laps, and intersections, face nail two
(2) 16d.
12) Continuous header, two pieces 16d at 406 mm (16 inches) on center along each edge.
13) Ceiling joists to plate, toenail three (3) 8d or framing anchor.
14) Continuous header to stud, four (4) 16d.
15) Ceiling joists, laps over partitions, face nail three
(3) 16d or framing anchor.
16) Ceiling joists, to parallel rafters, face nail three
(3) 16d.
17) Rafter to plate, toe nail three (3) 8d or framing anchor. Brace 25 mm (1 inch) thick board to each stud and plate, face nail three (3) 8d.
18) Built-up girders and beams 20d at 812 mm (32 inches) on center along each edge.
2. Bolts:
a. Embed in concrete and solid masonry or provide expansion bolts.
Special bolts or screws designed for anchor to solid masonry or concrete in drilled holes may be used.
b. Provide toggle bolts to hollow masonry or sheet metal.
c. Provide bolts to steel over 2.84 mm (0.112 inch, 11 gage) in thickness. Secure wood nailers to vertical structural steel
06 10 00 - 8 members with bolts, placed one at ends of nailer and 610 mm
(24 inch) intervals between end bolts. Provide clips to beam flanges.
3. Drill Screws to steel less than 2.84 mm (0.112 inch) thick.
a. ASTM C1002 for steel less than 0.84 mm (0.033 inch) thick.
b. ASTM C954 for steel over 0.84 mm (0.033 inch) thick.
4. Power actuated drive pins are not permitted.5. Do not anchor to wood plugs or nailing blocks in masonry or concrete. Provide metal plugs, inserts or similar fastening.
6. Screws to Join Wood:
a. Where shown or option to nails.
b. ASTM C1002, sized to provide not less than 25 mm (1 inch) penetration into anchorage member.
c. Spaced same as nails.
C. Blocking Nailers, and Furring:
1. Install furring, blocking, nailers, and grounds where shown.
2. Provide longest lengths practicable.
3. Provide fire retardant treated wood blocking where shown at openings and where shown or specified.
- - - E N D - - -
VASD 4N CARDIO CATH LAB 2 02-16
06 16 63 - 1
SECTION 06 16 63
CEMENTITIOUS SHEATHING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cement board sheathing at exterior framed wall construction.
1.2 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this Section.
B. American National Standards Institute (ANSI):
1. A118.9-10 - Cementitious Backer Units.
C. ASTM International (ASTM):
1. C954-15 - Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from 0.033 in.
(0.84 mm) to 0.112 in. (2.84 mm) in Thickness
2. C1002-14 - Steel Self-Piercing Tapping Screws for Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or
Steel Studs.
3. C1325-14 - Non-Asbestos Fiber-Mat Reinforced Cementitious Backer Units.
1.3 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
3. Warranty.
C. Samples:
1. Cement Board: 200 mm by 200 mm (8 inches by 8 inches), minimum size.
2. Fasteners: One of each type used.
1.4 DELIVERY AND STORAGE
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.5 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage during handling and construction operations.
1.6 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
06 16 63 - 2
B. Manufacturer's Warranty: Warrant sheathing against material and manufacturing defects.
1. Warranty Period: 10 years.
PART 2 - PRODUCTS
2.1 PRODUCTS - GENERAL
A. Provide each product from one manufacturer.
B. Sustainable Construction Requirements:
1. Sheathing Recycled Content: Select products with recycled content to achieve overall Project recycled content requirement.
2.2 SHEATHING
A. Cement Boards: Meeting ANSI A118.9 and ASTM C1325.
1. Thickness: 16 mm (5/8 inch).
2. Width: 1219 mm (48 inches), minimum.
2.3 ACCESSORIES
A. Steel Drill Screws: Corrosion-resistant, self-drilling.
1. ASTM C1002, Type S for fastening to framing less than 0.8 mm (33 mils) thick.
2. ASTM C954 for fastening to framing 0.8 mm (33 mils) thick and greater.
B. Joint Reinforcement: Alkali resistant tape as recommended by sheathing manufacturer.
C. Bonding Material: As recommended by sheathing manufacturer.
D. Air Barrier: As specified inSection 07 27 27, FLUID-APPLIED MEMBRANE
AIR BARRIER, VAPOR RETARDING.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Verify framing is plumb and level and in plane.
D. Correct substrate deficiencies.
3.2 SHEATHING INSTALLATION
A. Install products according to manufacturer's instructions.
1. Secure units to framing members with screws spaced maximum 200 mm (8 inches) o.c. and not closer than 13 mm (1/2 inch) from edge of unit.
2. Install screw heads without penetrating cement board surface.
3. Install sheathing with 6 mm (1/4 inch) gap where sheathing abuts masonry or similar materials to prevent wicking of moisture.
4. Install sheathing with 10 mm (3/8 inch) gap where non-load-bearing construction abuts structural elements or building expansion joints.
06 16 63 - 3
5. Horizontal Installation: Abut ends of boards over centers of studs.
Stagger end joints minimum one stud spacing for adjacent boards.
Fasten boards at perimeter and within field of board to each stud.
6. Vertical Installation: Install board vertical edges centered over studs. Abut ends and edges of each board with those of adjacent boards. Fasten boards at perimeter and with fin field of board to each stud.
7. Apply bonding material to imbed tape and completely fill board joints, and gaps between each panel.
3.3 PROTECTION
A. Remove loose or spalling joint finish. Patch areas missing joint finish.
B. Replace broken or damaged boards.
C. Protect boards from moisture using temporary coverings until finishes are applied.
- - E N D - -
This page intentionally left blank.
VASD 4N CARDIO CATH LAB 2 11-16
07 08 00 - 1
SECTION 07 08 00
FACILITY EXTERIOR CLOSURE COMMISSIONING
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 07 and Division 08.
B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A
Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.
1.2 RELATED WORK
A. Section 01 00 00 GENERAL REQUIREMENTS.
B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.3 SUMMARY
A. This Section includes requirements for commissioning the Facility exterior closure, related subsystems and related equipment. This
Section supplements the general requirements specified in Section 01 91
00 General Commissioning Requirements.
B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding commissioning processes and procedures, as well as roles and responsibilities for all Commissioning Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 07 and
Division 08 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and
Maintenance personnel in accordance with the requirements of Section 01
91 00 and of Division 07 and 08, is required in cooperation with the VA and the Commissioning Agent.
07 08 00 - 2
B. The Facility exterior closure systems commissioning will include the systems listed in Section 01 91 00 General Commissioning Requirements:
1.6 SUBMITTALS
A. The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the
Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP
DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL
COMMISSIONING REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of the building envelope systems will require inspection of individual elements of the envelope construction throughout the construction period. The Contractor shall coordinate with the
Commissioning Agent in accordance with Section 01 91 00 and the
Commissioning plan to schedule envelope inspections as required to support the Commissioning Process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The Commissioning
Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists.
Completed checklists shall be submitted to the VA and to the
Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the
Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning
Agent will select a broader sample of checklists for review. If the
07 08 00 - 3
Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING
REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 07 or
Division 08 shall be scheduled and documented in accordance with
Section 01 00 00 GENERAL REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected Contractor tests at the sole discretion of the
Commissioning Agent. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING:
A. The Commissioning Process includes Systems Functional Performance
Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems
Functional Performance Test procedures for review and approval by the
Resident Engineer. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL
COMMISSIONING REQUIREMENTS, for additional details.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the Resident Engineer and Commissioning Agent.
Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00. The instruction shall be
07 08 00 - 4 scheduled in coordination with the VA Resident Engineer after submission and approval of formal training plans. Refer to Section 01
91 00 GENERAL COMMISSIONING REQUIREMENTS and Division 07 and 08
Sections for additional Contractor training requirements.
----- END -----
VASD 4N CARDIO CATH LAB 2 05-15
07 14 21 - 1
SECTION 07 14 21
LATEX MASTIC DECK COVERING
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies latex mastic covering for waterproofing deck surfacing.
1.2 RELATED WORK:
A. Color of deck covering: Section 09 06 00, SCHEDULE FOR FINISHES.
1.3 QUALITY ASSURANCE:
A. Manufacturer’s Qualifications: Latex mastic deck covering manufacturer to have a minimum of five (5) years’ experience in manufacturing latex mastic deck covering products specified herein. Obtain products from single manufacturer or from sources recommended by manufacturer for use with latex mastic deck covering and incorporated in manufacturer’s warranty. Submit manufacturer’s qualifications.
B. Installers Qualifications: Work is to be performed by installer having three (3) years’ experience for work relating to this section and approved in writing by latex mastic deck covering manufacturer. Submit installer qualifications.
1.4 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B. ASTM International (ASTM):
D412-06a(R2013).........Vulcanized Rubber and Thermoplastic Elastomers-
Tension
D570-98(R2010)e1........Water Absorption of Plastics
D903-98(R2010)..........Peel or Stripping Strength of Adhesive Bonds
D2240-05(R2010).........Rubber Property-Durometer Hardness
1.5 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Samples: 152 mm (6 inch) square, each color.
C. Manufacturer's Literature and Data:
1. Latex mastic deck covering.
2. Installation instructions.
3. Primer.
07 14 21 - 2
D. Certificates:
1. Compliance of material with specification requirements.
2. Manufacturer’s qualifications as specified.
3. Installer’s qualifications as specified.
E. Manufacturer warranty.
1.6 DELIVERY:
A. Deliver materials to job site in original sealed containers identified with manufacturer's name and brand.
1.7 WARRANTY:
A. Construction Warranty: Comply with FAR clause 52.246-21 “Warranty of
Construction”.
B. Manufacturer Warranty: Manufacturer shall warranty their latex mastic deck covering for a minimum of five (5) years starting from the date of installation and final acceptance by the Government. Submit manufacturer warranty.
PART 2 - PRODUCTS
2.1 LATEX MASTIC DECK COVERING:
A. Product to be a trowel applied elastomeric material meeting all performance requirements specified and designed primarily for waterproofing deck surfacing.
2.2 PRIMER:
A. As recommended by the Latex Mastic Covering manufacturer.
2.3 PERFORMANCE REQUIREMENTS:
A. Tensile Strength: ASTM D412: Not less than 7240 KPa (1050 psi).
B. Water Transmission: ASTM D570: None when subjected to a water pressure of 345 KPa (50 psi) for a period of one (1) hour.
C. Hardness: ASTM D2240: 60-70 Shore “A”.
D. Adhesive Strength: ASTM D903: Not less than 1035 kPa (150 psi).
E. Weight: 1.8 kg per sq. m (0.45 lbs. per sq. ft.).
F. Elongation: ASTM D412: 500 percent (of original benchmark distance).
G. The topcoat to be of the specified color in Section 09 06 00, SCHEDULE
FOR FINISHES.
PART 3 - EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS:
A. Apply deck covering coating as per the manufacturer’s written instructions.
3.2 INSTALLATION:
07 14 21 - 3
A. Prepare surface by removing dirt or other foreign matter including any concrete curing agents.
B. Apply primer by roller.
C. Apply basecoat and pigmented topcoat as per manufacturer’s instructions. Turn up the material against walls to form an integral waterproof membrane.
D. Provide finish of two coats for a total minimum thickness not less than
2 mm (1/16 inch).
- - - E N D - - -
This page intentionally left blank.
07 21 13 - 1
SECTION 07 21 13
THERMAL INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Thermal insulation.
a. Batt or blanket insulation at exterior framed and furred walls.
2. Acoustical insulation.
a. Semi-rigid insulation at interior framed partitions.
b. Batt and blanket insulation at interior framed partitions.
1.2 RELATED REQUIREMENTS
A. Adhesives VOC Limits: Section 01 81 13, SUSTAINABLE CONSTRUCTION
REQUIREMENTS.
B. Safing Insulation: Section 07 84 00, FIRESTOPPING.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. C553-13 - Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications.
2. C612-14 - Mineral Fiber Block and Board Thermal Insulation.
3. C954-15 - Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Base to Steel Studs From 0.033 (0.84
mm) inch to 0.112 inch (2.84 mm) in thickness.
4. C1002-14 - Steel Self-Piercing Tapping Screws for Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or
Steel Studs.
5. D312/D312M-15 - Asphalt Used in Roofing.
6. E84-15a - Surface Burning Characteristics of Building Materials.
7. F1667-15 - Driven Fasteners: Nails, Spikes, and Staples.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show insulation type, thickness, and R-value for each location.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Adhesive indicating manufacturer recommendation for each application.
D. Sustainable Construction Submittals:
07 21 13 - 2
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
2. Low Pollutant-Emitting Materials:
a. Show volatile organic compound types and quantities.
1.5 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.6 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage during handling and construction operations.
1.7 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 INSULATION - GENERAL
A. Insulation Thickness:
1. Provide thickness required by R-value shown on drawings.
2. Provide thickness indicated when R-value is not shown on drawings.
B. Insulation Types:
1. Provide one insulation type for each application.
C. Sustainable Construction Requirements:
1. Insulation Recycled Content:
a. Glass fiber reinforced: 6 percent recovered material.
b. Phenolic rigid foam: 5 percent recovered material.
c. Rock wool material: 75 percent recovered material.
2. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:
a. Non-Flooring Adhesives and Sealants.
2.2 THERMAL INSULATION
A. Exterior Framing or Furring Insulation:
1. Mineral Fiber: ASTM C665, Type II, Class C, Category I where concealed by thermal barrier.
2. Mineral Fiber: ASTM C665, Type III, Class A at other locations.
B. Inside Face of Exterior Wall Insulation:
1. Mineral Fiber Board: ASTM C612, Type IB or II.
07 21 13 - 3
2. Perlite Board: ASTM C728.
3. Cellular Glass Block: ASTM C552, Type I.
C. Floor Assemblies Above Unconditioned Spaces:
1. Mineral Fiber Board: ASTM C612, Type IB or Type II.
2. Perlite Board: ASTM C728.
3. Cellular Glass Block: ASTM C552, Type I.
2.3 ACOUSTICAL INSULATION
A. Semi Rigid, Batts and Blankets:
1. Widths and lengths to fit tight against framing.
2. Mineral Fiber boards: ASTM C553, Type II, flexible, or Type III, FSK faced.
a. Density: nominal 4.5 pound.
3. Mineral Fiber Batt or Blankets: ASTM C665 FSK faced.
4. Maximum Surface Burning Characteristics: ASTM E84.
a. Flame Spread Rating: 25.
b. Smoke Developed Rating: 450.
B. Sound Deadening Board:
1. Mineral Fiber Board: ASTM C612, Type IB.
a. Thickness: 13 mm (1/2 inch).
2. Perlite Board: ASTM C728.
a. Thickness: 13 mm (1/2 inch).
2.4 ACCESSORIES
A. Fasteners:
1. Staples or Nails: ASTM F1667, zinc-coated, size and type to suit application.
2. Screws: ASTM C954 or ASTM C1002, size and length to suit application with washer minimum 50 mm (2 inches) diameter.
3. Impaling Pins: Steel pins with head minimum 50 mm (2 inches) diameter.
a. Length: As required to extend beyond insulation and retain cap washer when washer is placed on pin.
b. Adhesive: Type recommended by manufacturer to suit application.
B. Insulation Adhesive:
1. Nonflammable type recommended by insulation manufacturer to suit application.
C. Tape:
1. Pressure sensitive adhesive on one face.
07 21 13 - 4
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
B. Install insulation with vapor barrier facing the heated side, unless indicated otherwise.
C. Install insulation with joints close and flush, in regular courses, and with end joints staggered.
D. Install batt and blanket insulation with joints tight. Fill framing voids completely. Seal facing cuts, tears, and unlapped joints with tape.
E. Fit insulation tight against adjoining construction and penetrations, unless indicated otherwise.
3.3 THERMAL INSULATION
A. Exterior Framing or Furring Insulation:
1. General:
a. Open voids are not acceptable.
b. Pack insulation around door frames and windows, in building expansion joints, door soffits, and other voids.
c. Pack behind outlets, around pipes, ducts, and services encased in walls.
d. Hold insulation in place with pressure sensitive tape.
e. Lap facing flanges together over framing for continuous surface. Seal penetrations through insulation and facings.
2. Metal Studs:
a. Fasten insulation between metal studs, framing, and furring with pressure sensitive tape continuous along flanged edges.
3. Ceilings and Soffits:
a. Metal Framing:
1) Fasten insulation between metal framing with pressure sensitive tape continuous along flanged edges.
2) At metal framing and ceilings suspension systems, install insulation above suspended ceilings and metal framing at right angles to main runners and framing.
3) Tape insulation tightly together without gaps. Cover metal framing members with insulation.
b. Ceiling Transitions:
07 21 13 - 5
1) In areas where suspended ceilings transition to structural ceiling, install blanket or batt insulation.
2) Extend insulation from suspended ceiling to underside of structure above.
3) Secure blanket and batt with continuous cleats to structure above.
B. Inside Face of Exterior Wall Insulation:
1. Location: On interior face of solid masonry and concrete walls, beams, beam soffits, underside of floors, and to face of studs to support interior wall finish where indicated.
2. Bond insulation to solid vertical surfaces with adhesive. Fill joints with adhesive cement.
3. Fasten board insulation to face of studs with screws, nails or staples. Space fastenings maximum 300 mm (12 inches) on center.
Stagger fasteners at board joints. Install fasteners at each corner.
3.4 ACOUSTICAL INSULATION
A. General:
1. Install insulation without voids.
2. Pack insulation around door frames and windows, in building expansion joints, door soffits, and other voids.
3. Pack behind outlets, around pipes, ducts, and services encased in walls.
4. Hold insulation in place with pressure sensitive tape.
5. Lap facer flanges together over framing for continuous surface. Seal all penetrations through the insulation and facers.
6. Do not compress insulation below required thickness except where embedded items prevent required thickness.
B. Semi Rigid, Batts and Blankets:
1. When insulation is not full thickness of cavity, adhere insulation to one side of cavity, maintaining continuity of insulation and covering penetrations or embedments.
a. Wood Framing:
1) Fasten blanket insulation between wood framing and joists with nails or staples through flanged edges of insulation.
2) Space fastenings maximum 150 mm (6 inches) on center.
b. Metal Framing:
1) Fasten insulation between metal framing with pressure sensitive tape continuous along flanged edges.
2) At metal framing or ceilings suspension systems, install blanket insulation above suspended ceilings or metal framing at right angles to the main runners or framing.
3) Tape insulation tightly together so no gaps occur and metal framing members are covered by insulation.
C. Sound Deadening Board:
07 21 13 - 6
1. Secure with screws to metal and wood framing. Secure sufficiently in place until subsequent cover is installed. Seal all cracks with caulking.
3.5 CLEANING
A. Remove excess adhesive before adhesive sets.
3.6 PROTECTION
A. Protect insulation from construction operations.
B. Repair damage.
07 22 00 - 1
SECTION 07 22 00
ROOF AND DECK INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
B. Repairs and alteration work to existing roof insulation.
1.2 RELATED REQUIREMENTS
A. Non-Flooring Adhesives and Sealants VOC Limits: Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
B. Wood Cants, Blocking, and Edge Strips: Section 06 10 00, ROUGH
CARPENTRY.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American Society of Heating, Refrigeration and Air Conditioning
(ASHRAE):
1. Standard 90.1-13 - Energy Standard for Buildings Except Low-Rise Residential Buildings.
C. ASTM International (ASTM):
1. C208-12 - Cellulosic Fiber Insulating Board.
2. C552-15 - Cellular Glass Thermal Insulation.
3. C726-05 - Mineral Fiber Roof Insulation Board.
4. C728-15 - Perlite Thermal Insulation Board.
5. C1177/C1177M-13 - Glass Mat Gypsum Substrate for Use as Sheathing.
6. C1278/C1278M-07a(2015) - Fiber-Reinforced Gypsum Panel.
7. C1289-15 - Faced Rigid Cellular Polyisocyanurate Thermal Insulation
Board.
8. C1396/C1396M-14a - Gypsum Board.
9. D41/D41M-11 - Asphalt Primer Used in Roofing, Dampproofing, and
Waterproofing.
10. D312-06 - Asphalt Used in Roofing.
11. D1970/D1970M-15 - Self-Adhering Polymer Modified Bituminous Sheet
Materials Used as Steep Roofing Underlayment for Ice Dam
Protection.
12. D2178/D2178M-15 - Asphalt Glass Felt Used in Roofing and
Waterproofing.
13. D2822/D2822M-11 - Asphalt Roof Cement, Asbestos Containing.
14. D4586/D4586M-07(2012)e1 - Asphalt Roof Cement, Asbestos-Free.
15. E84-15a - Surface Burning Characteristics of Building Materials.
16. F1667-15 - Driven Fasteners: Nails, Spikes, and Staples.
D. National Roofing Contractors Association (NRCA):
1. Manual-15 - The NRCA Roofing Manual: Membrane Roof Systems.
E. U.S. Department of Agriculture (USDA):
1. USDA BioPreferred Program Catalog.
F. UL LLC (UL):
1. Listed - Online Certifications Directory.
07 22 00 - 2
G. U.S. Department of Commerce National Institute of Standards and
Technology (NIST):
1. DOC PS 1-09 - Structural Plywood.
2. DOC PS 2-04 - Performance Standard for Wood-Based Structural-Use
Panels.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and installation details.
a. Nailers, cants, and terminations.
b. Layout of insulation showing slopes, tapers, penetrations, and edge conditions.
C. Manufacturer's Literature and Data:
1. Description of each product.
D. Samples:
1. Roof insulation, each type.
2. Fasteners, each type.
E. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
2. Biobased Content:
a. Show type and quantity for each product.
3. Low Pollutant-Emitting Materials:
a. Show volatile organic compound types and quantities.
b. Certify each composite wood product contain no added urea formaldehyde.
F. Qualifications: Substantiate qualifications meet specifications.
1. Installer.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Same installer as Division 07 roofing section installer.
1.6 DELIVERY
A. Comply with recommendations of NRCA Manual.
B. Deliver products in manufacturer's original sealed packaging.
C. Mark packaging, legibly. Indicate manufacturer's name or brand, type, and manufacture date.
D. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Comply with recommendations of NRCA Manual.
B. Store products indoors in dry, weathertight facility.
07 22 00 - 3
C. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS
A. Environment:
1. Install products when existing and forecasted weather permit installation according to manufacturer's instructions.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant substrate board, vapor retarder, insulation, and cover board against material and manufacturing defects as part of Division 07 roofing system warranty.
PART 2 - PRODUCTS
2.1 SYSTEM PERFORMANCE
A. Insulation Thermal Performance:
1. Overall Average R-Value: RSI-57 (R-33), minimum.
2. Any Location R-Value: RSI-17 (R-10), minimum.
B. Fire and Wind Uplift Resistance: Provide roof insulation complying with requirements specified in Division 07 roofing section.
C. Insulation on Metal Decking: UL labeled indicating compliance with one of the following:
1. UL Listed.
2. Insulation Surface Burning Characteristics: When tested according to
ASTM E84.
a. Flame Spread Rating: 75 maximum.
b. Smoke Developed Rating: 150 maximum.
2.2 PRODUCTS - GENERAL
A. Provide each product from one manufacturer.
B. Sustainable Construction Requirements:
1. Insulation Recycled Content:
a. Mineral Fiber: 75 percent total recycled content, minimum.
b. Fiberglass: 20 percent total recycled content, minimum.
c. Cellulose: 75 percent post-consumer recycled content, minimum.
d. Perlite Composite Board: 23 percent post-consumer recycled content, minimum.
e. Rigid Foam: 9 percent total recycled content, minimum.
f. Glass Fiber Reinforced Rigid Foam: 6 percent total recycled content, minimum.
2. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:
a. Non-flooring adhesives and sealants.
b. Composite wood and agrifiber.
07 22 00 - 4
3. Bio-Based Materials: Where applicable, provide products designated by USDA and meeting or exceeding USDA recommendations for bio-based content, and products meeting Rapidly Renewable
Materials and certified sustainable wood content definitions;
refer to www.biopreferred.gov.
2.3 ADHESIVES
A. Primer: ASTM D41/D41M.
B. Bead-Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended bead-applied, low-rise, one- or multicomponent urethane adhesive formulated to adhere roof insulation to substrate or to another insulation layer.
C. Full-Spread Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended spray-applied, low-rise, two-component urethane adhesive formulated to adhere roof insulation to substrate or to another insulation layer.
2.4 ACCESSORIES
A. Fasteners: Corrosion-resistant carbon steel fasteners and galvalume-coated steel or plastic round plates for fastening substrate board and insulation to roof deck.
B. Nails: ASTM F1667; type to suit application.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Comply with requirements of Division 07 roofing section.
3.2 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
3.3 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
B. Comply with requirements of UL for insulated steel roof deck.
C. Attach substrate board and other products to meet requirements of
Division 07 roofing section.
3.4 SUBSTRATE BOARD INSTALLATION
A. Fasten substrate board to top flanges of steel decking to resist uplift pressures according requirements for specified roofing system.
1. Locate the long dimension edge joints solidly bearing on top of decking ribs.
3.5 VAPOR RETARDER INSTALLATION
A. Vapor Retarder Installation, General:
1. Install continuous vapor retarder on roof decks where indicated.
07 22 00 - 5
2. At vertical surfaces, turn up vapor retarder to top of insulation or base flashing.
3. Seal penetrations through vapor retarder with roof cement to prevent moisture entry from below.
B. Cast in Place Concrete Decks, Except Insulating Concrete:
1. Prime deck as specified.
2. Apply two plies of asphalt saturated felt mopped down to deck.
C. Precast Concrete Unit Decks Without Concrete Topping:
1. Prime deck as specified.
2. Apply two plies of asphalt saturated felt.
3. Mop to deck, keeping bitumen 100 mm (4 inches) away from joints of precast units. Bridge joints with felt. Mop between plies as specified.
3.6 INSULATION INSTALLATION
A. Insulation Installation, General:
1. Base Sheet: Where required by roofing system, install one lapped base sheet specified in Division 07 roofing section by mechanically fastening to roofing substrate before installation of insulation.
2. Cant Strips: Install preformed insulation cant strips specified in Section 06 10 00 ROUGH CARPENTRY at junctures of roofing system with vertical construction.
3. Use same insulation as existing for roof repair and alterations unless specified otherwise.
B. Insulation Thickness:
1. Thickness of roof insulation shown on drawings is nominal. Provide thickness required to comply with specified thermal performance.
2. Insulation on Metal Decks: Provide insulation in minimum thickness recommended by insulation manufacturer to span deck flutes.
Support edges of insulation on metal deck ribs.
3. When actual insulation thickness differs from drawings, coordinate alignment and location of roof drains, flashing, gravel stops, fascias and similar items.
4. Where tapered insulation is used, maintain insulation thickness at high points and roof edges shown on drawings.
a. Low Point Thickness: Minimum 38 mm (1-1/2 inches).
5. Use minimum two layers of insulation when required thickness is 68 mm (2.7 inch) or greater.
C. Lay insulating units with close joints, in regular courses and with end joints staggered.
1. Stagger joints between layers minimum 150 mm (6 inches).
D. Lay units with long dimension perpendicular to the rolled
(longitudinal) direction of the roofing felt.
E. Seal cut edges at penetrations and at edges against blocking with bitumen or roof cement.
F. Cut to fit tightly against blocking or penetrations.
07 22 00 - 6
G. Cover all insulation installed on the same day; comply with temporary protection requirements of Division 07 roofing section.
H. Installation Method:
1. Adhered Insulation:
a. Prime substrate as required.
b. Set each layer of insulation firmly in solid mopping of hot asphalt.
c. Set each layer of insulation firmly in ribbons of bead-applied insulation adhesive.
d. Set each layer of insulation firmly in uniform application of full-spread insulation adhesive.
2. Mechanically Fastened Insulation:
a. Fasten insulation according to requirements in Division 07 roofing section.
b. Fasten insulation to resist uplift pressures specified in
Division 07 roofing section.
3. Mechanically Fastened and Adhered Insulation:
a. Fasten first layer of insulation according to "Mechanically
Fastened Insulation" requirements.
b. Fasten each subsequent layer of insulation according to
"Adhered Insulation" requirements.
3.7 COVER BOARD INSTALLATION
A. Install cover boards over insulation with long joints in continuous straight lines with staggered end joints.
B. Offset cover board joints from insulation joints 150 mm (6 inches), minimum.
C. Secure cover boards according to"Mechanically Fastened
Insulation" requirements.
07 27 27 - 1
SECTION 07 27 27
FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR RETARDING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Fluid-applied vapor-retarding air barrier at exterior above grade wall assemblies.
2. Connection to adjacent air barrier components providing a durable, continuous, full building air barrier.
1.2 RELATED REQUIREMENTS
A. General Quality Assurance and Quality Control Requirements: Section 01
45 29 TESTING LABORATORY SERVICES.
B. General Sustainable Construction Requirements: Section 01 81 13
SUSTAINABLE CONSTRUCTION REQUIREMENTS.
C. Commissioning of Building Envelope Components: Section 01 91 00 GENERAL
COMMISSIONING REQUIREMENTS.
D. Masonry Unit Air Barrier Substrates: Section 04 20 00 UNIT MASONRY.
E. Flashing Components of Factory Finished Roofing and Wall Systems Air
Barriers Requiring Air Barrier Transitions: Division 07 roofing and wall system sections.
F. Metal Flashing Requiring Air Barrier Transitions: Section 07 60 00
FLASHING AND SHEET METAL.
G. Joint Sealants: Section 07 92 00 JOINT SEALANTS.
H. Exterior Wall Openings Requiring Air Barrier Transitions: Division 08 sections for aluminum-framed entrances and storefronts.
I. Wall Sheathings Air Barrier Substrates: Section 09 29 00 GYPSUM BOARD.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. Air Barrier Association of America (ABAA):
1. Quality Assurance Program.
C. ASTM International (ASTM):
1. C920-14a - Elastomeric Joint Sealants.
2. C1193-13 - Use of Joint Sealants.
3. D412-06a(2013) - Vulcanized Rubber and Thermoplastic
Elastomers-Tension.
4. E84-15a - Surface Burning Characteristics of Building Materials.
5. E96/E96M-15 - Water Vapor Transmission of Materials.
6. E162-15a - Surface Flammability of Materials Using a Radiant Heat
Energy Source.
7. E783-02(2010) - Field Measurement of Air Leakage Through Installed Exterior Windows and Doors.
8. E1186-03(2009) - Air Leakage Site Detection in Building Envelopes and Air Barrier Systems.
9. E2178-13 - Air Permeance of Building Materials.
07 27 27 - 2
10. E2357-11 - Determining Air Leakage of Air Barrier Assemblies.
D. U.S. Environmental Protection Agency (EPA):
1. 40 CFR 59, Subpart D National Volatile Organic Compound Emission Standards for Consumer and Commercial Products.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1. Indicate size, configuration, and fabrication and installation details.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
C. Sustainable Construction Submittals:
1. Low Pollutant-Emitting Materials:
a. Show volatile organic compound types and quantities.
D. Test reports:
1. Submit field…