ARFQ DEP25-73 OSR Asset Mining-S-5030-95- Plans.pdf
PDF 6 MB Posted
- Attached to
- OSR Asset Mining, LLC - S-5030-95
- Solicitation number
- ARFQ-0313-DEP2500000073-3
- Issued by
- Berkeley County, West Virginia
About this file
The file is a detailed set of engineering and environmental restoration plans for the West Virginia Department of Environmental Protection (WVDEP), Division of Land Restoration, Office of Special Reclamation, for a Water Quality Improvement Project by Asset Mining, LLC in Boone County, West Virginia. The project involves cleaning out and rehabilitating two ponds (Pond No. 1 and Pond No. 1A), constructing limestone beds, creating a sludge cell, installing sludge removal lines, building access roads, and implementing sediment and erosion control measures. The project is permitted under Permit S-5030-95 and is scheduled for completion in April 2025.
The project includes specific quantities such as 1,500 linear feet of silt fence, 3.71 acres of Type I revegetation, 100 linear feet of hay bale dike, 20 linear feet of 18-inch corrugated HDPE pipe, and 744 linear feet of sludge removal line S-1. The work involves site preparation, channel construction, road base and final construction, and installation of various infrastructure components. The project is funded through the Reclamation Coal Tax paid by West Virginia coal mine companies, with the total project cost not specified in the documents. The plans detail precise engineering specifications for each component, including limestone bed construction, pipe installation, access road design, and erosion control measures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHERMAN DISTRICT
OFFICE OF SPECIAL RECLAMATION
DIVISION OF LAND RESTORATION
west virginia department of environmental protection
HANCOCK
BROOKE
OHIO
MARSHALL
PRESTON
MORGAN
MONONGALIA
WETZEL
MINERAL
BERKELEY
MARION
TYLER
HAMPSHIRE
JEFFERSONPLEASANTS
HARRISON
TAYLOR
DODDRIDGE
WOOD
RITCHIE
GRANT
BARBOUR TUCKER
HARDY
WIRT
LEWIS
RANDOLPH
UPSHUR
GILMER
JACKSON CALHOUN
MASON
PENDLETON
ROANE
BRAXTON
POCAHONTAS
WEBSTER
PUTNAM
CLAY
KANAWHA
CABELL
WAYNE
LINCOLN
GREENBRIER
FAYETTE
BOONE
LOGAN
RALEIGH
MINGO
SUMMERS
WYOMING
MONROE
MERCER
McDOWELL
BOONE COUNTY, WEST VIRGINIA
PROJECT
AREA
ASSET MINING, LLC
PERMIT S-5030-95
WATER QUALITY IMPROVEMENT PROJECT
HAROLD D. WARD, CABINET SECRETARY
NICHOLAS
PROJECT
AREA
PROJECT
AREA
APRIL 2025
DESCRIPTION
TITLE SHEET
SHEET NO.
DRAWING INDEX
STATE OF
NOS I
EF
RP O W
TSE
S
E NLA
REENI NGRV I
AI
G I
17052
REG I STERED
CH
R
I S
TOPHER B . FARR
I SH
SUMMARY OF QUANTITIES 3
OVERVIEW 4
GENERAL AND STRUCTURAL NOTES 2
POND NO. 1 PLAN VIEW, PROFILE AND SECTIONS 5
POND NO. 1A PLAN VIEW, PROFILE AND SECTIONS SHEET 1 OF 2 6
POND NO. 1A PLAN VIEW, PROFILE AND SECTIONS SHEET 2 OF 2 7
SLUDGE CELL PLAN VIEW 8
SLUDGE CELL SECTIONS SHEET 1 OF 2 9
SLUDGE CELL SECTIONS SHEET 2 OF 2 10
PIPING PLAN 11
SLUDGE REMOVAL LINE PROFILES AND DETAIL 12
SEDIMENT AND EROSION CONTROL 13
PROJECT SIGN 14
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text
AutoCAD SHX Text
BM
AutoCAD SHX Text
AutoCAD SHX Text
BR
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
JEEP
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
JEEP
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
JEEP
AutoCAD SHX Text
JEEP
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
JEEP
AutoCAD SHX Text
JEEP
AutoCAD SHX Text Hollow
AutoCAD SHX Text Frozen
AutoCAD SHX Text Well
AutoCAD SHX Text Gas
AutoCAD SHX Text Strip
AutoCAD SHX Text Mine
AutoCAD SHX Text Well
AutoCAD SHX Text Gas
AutoCAD SHX Text Wells
AutoCAD SHX Text Gas
AutoCAD SHX Text Well
AutoCAD SHX Text Gas
AutoCAD SHX Text Wells
AutoCAD SHX Text Gas
AutoCAD SHX Text Well
AutoCAD SHX Text Gas
AutoCAD SHX Text Well
AutoCAD SHX Text Gas
AutoCAD SHX Text Strip
AutoCAD SHX Text Mine
AutoCAD SHX Text Strip
AutoCAD SHX Text Mine
AutoCAD SHX Text Strip
AutoCAD SHX Text Mines
AutoCAD SHX Text Strip
AutoCAD SHX Text Prenter
AutoCAD SHX Text Mountain
AutoCAD SHX Text Cold
AutoCAD SHX Text Fork
AutoCAD SHX Text Big
AutoCAD SHX Text Jarrells
AutoCAD SHX Text Fork
AutoCAD SHX Text Lavinia
AutoCAD SHX Text Mines
AutoCAD SHX Text Strip
AutoCAD SHX Text M I N E S
AutoCAD SHX Text S T R I P
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X1571
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CHESEPEAKE
AutoCAD SHX Text Fork
AutoCAD SHX Text Mines
AutoCAD SHX Text Ford
AutoCAD SHX Text Mine
AutoCAD SHX Text
JEEP
AutoCAD SHX Text Prenter
AutoCAD SHX Text Gas Well
AutoCAD SHX Text Fork
AutoCAD SHX Text Lavinia
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
WEST VIRGINIA COUNTY HIGHWAY MAP
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
WILLIAMS MOUNTAIN / SYLVESTER USGS 7.5' QUADRANGLE
AutoCAD SHX Text
BOONE COUNTY
AutoCAD SHX Text
SCALE: 1"=1 MILE
AutoCAD SHX Text
SCALE: 1"=2000'
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text CHRISTOPHER B. FARRISH, PE WEST VIRGINIA PROFESSIONAL ENGINEER REGISTRATION NUMBER 17052
AutoCAD SHX Text
DATE
SEDIMENT AND EROSION CONTROL
THE FIRST ORDER OF WORK FOR THE CONTRACTOR IS TO INSTALL SEDIMENT
CONTROL STRUCTURES TO ESTABLISH EROSION CONTROL AT THE EARLIEST POSSIBLE
DATE. INITIAL CLEARING AND GRUBBING IS TO ONLY BE WHAT IS NECESSARY IN
ORDER TO ACCOMPLISH THESE OPERATIONS.
WVDEP SHALL CONDUCT PERIODIC INSPECTION OF SEDIMENT AND EROSION CONTROL
MEASURES TO INSURE PROPER OPERATION AND COMPLIANCE.
IN THE EVENT THAT THE TEMPORARY EROSION AND POLLUTION CONTROL MEASURES
ARE ORDERED BY THE PROJECT CONTACT DUE TO THE CONTRACTOR'S NEGLIGENCE,
CARELESSNESS, OR FAILURE TO INSTALL PERMANENT CONTROLS AS PART OF THE
WORK AS SCHEDULED, SUCH WORK SHALL BE PERFORMED BY THE CONTRACTOR AT
THE CONTRACTOR'S EXPENSE.
WASTE AND BORROW SITES
WHEN REQUIRED, WASTE AND BORROW SITES SHALL BE DEPICTED ON THE PROJECT
PLANS. DURING THE CONTRACT, IF ADDITIONAL WASTE AND BORROW SITES ARE
REQUIRED, THE CONTRACTOR SHALL CONTACT THE PROJECT CONTACT.
NO WASTE OR BORROW SITES SHALL BE PERMITTED WITHIN ANY FLOODPLAIN,
WETLANDS, OR HIGHLY SENSITIVE CULTURAL RESOURCES.
EXISTING PIPE REMOVAL
ANY EXISTING PIPES THAT ARE REMOVED DURING CONSTRUCTION SHALL BECOME
THE PROPERTY OF THE WVDEP, UNLESS OTHERWISE NOTED. THE COST OF THE
REMOVAL OF EXISTING PIPES SHALL BE INCLUDED IN THE COMMODITY LINE ITEM "SITE
PREPARATION" AND SHALL INCLUDE REMOVAL, DISPOSAL, AND BACKFILL WITH
SUITABLE MATERIAL.
CONSTRUCTION ENTRANCE AND ROADS
CONSTRUCTION ENTRANCE(S) SHALL BE INSTALLED AT THE LOCATION(S) SHOWN ON
THE PROJECT PLANS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE ROADS IN A CLEAN
AND DUST FREE CONDITION.
AGGREGATE BASE COURSE SHALL BE APPLIED IMMEDIATELY FOLLOWING ROUGH
GRADING PER PROJECT PLAN DETAILS.
ELECTRICAL
THE CONTRACTOR SHALL FOLLOW ALL LATEST LOCAL, STATE, AND FEDERAL
ELECTRICAL CODES, INCLUDING THE NATIONAL ELECTRICAL CODE (NEC).
ALL ELECTRICAL WORK PERFORMED SHALL BE EITHER COMPLETED BY OR UNDER THE
DIRECT SUPERVISION OF A MASTER ELECTRICIAN.
THE GENERAL CONTRACTOR OR AN ELECTRICAL SUBCONTRACTOR SHALL BE
LICENSED IN THE STATE OF WEST VIRGINIA TO PERFORM ELECTRICAL WORK. THE
COMPANY PERFORMING THE ELECTRICAL WORK SHALL HAVE A MINIMUM OF FIVE (5)
YEARS OF EXPERIENCE IN THE INSTALLATION OF ELECTRICAL SYSTEMS FOR WATER
TREATMENT FACILITIES. THE COMPANY MAY EMPLOY WEST VIRGINIA LICENSED
JOURNEYMAN ELECTRICIANS WORKING UNDER THE SUPERVISION OF THE MASTER
ELECTRICIAN. HOWEVER, NO MORE THAN ONE APPRENTICE PER JOURNEYMAN SHALL
BE PERMITTED.
UTILITIES
THE LOCATIONS OF ALL KNOWN UTILITIES ARE SHOWN ON THE PROJECT PLANS AND
FIELD INFORMATION. THE CONTRACTOR IS RESPONSIBLE TO ASCERTAIN THE STATUS
AND LOCATION OF EACH UTILITY WHEN PERFORMING WORK WHICH MAY AFFECT THE
FACILITIES, INCLUDING CALLING WV 811, PROBING, EXCAVATION, OR ANY OTHER
PRECAUTION REQUIRED TO CONFIRM LOCATION. THE CONTRACTOR WILL BE
RESPONSIBLE FOR ANY DAMAGE OR DISRUPTION TO UTILITY LINES WHICH ARE KNOWN
ACTIVE AND ARE TO REMAIN IN OPERATION.
DRAINAGE
THE CONTRACTOR SHALL MAINTAIN WORKING STORM DRAINAGE SYSTEMS THROUGH THE WORK
AREAS AT ALL TIMES DURING CONSTRUCTION. THE WORKING SYSTEM MAY CONSIST OF THE
EXISTING STORM DRAINAGE SYSTEM, THE PROPOSED STORM DRAINAGE SYSTEM OR COMBINATION
THEREOF.
BENCH MARKS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR HOLDING BENCH MARK LOCATIONS THROUGHOUT
THE LIFE OF THE CONTRACT. IN THE EVENT THAT A BENCH MARK IS DISTURBED, THE
CONTRACTOR, AS DIRECTED BY THE PROJECT CONTACT, WILL RELOCATE OR RE-ESTABLISH THE
BENCH MARK. NO ADDITIONAL PAYMENT OR COMPENSATION WILL BE MADE FOR THIS WORK.
VERIFICATION OF DIMENSIONS
THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL PLAN AND ELEVATION DIMENSIONS
PRIOR TO ORDERING MATERIALS FOR THE CONSTRUCTION OF THE VARIOUS COMMODITY LINE
ITEMS IN THIS CONTRACT.
NOTICE TO CONTRACTORS
REPRESENTATIVES OF THE FOLLOWING STATE AND FEDERAL AGENCIES MAY BE IN THE AREA ON
OCCASION TO OBSERVE, INSPECT AND MONITOR THE CONSTRUCTION ACTIVITIES:
WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION, (WVDEP)
WEST VIRGINIA DIVISION OF NATURAL RESOURCES, (WVDNR)
WEST VIRGINIA STATE HISTORIC PRESERVATION OFFICE, (WVSHPO)
UNITED STATES FISH AND WILDLIFE SERVICES, (USFWS)
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, (USEPA)
UNITED STATES ARMY CORPS OF ENGINEERS, (USACE)
UNITED STATES NATURAL RESOURCES CONSERVATION SERVICE,(USNRCS)
ADVISORY COUNCIL OF HISTORIC PRESERVATION, (ACHP)
UNITED STATES DEPARTMENT OF AGRICULTURE, FOREST SERVICE, (USDA, FS)
OFFICE OF SURFACE MINING (OSM)
SHOP DRAWINGS
SHOP DRAWINGS SHALL BE SENT TO THE ATTENTION OF THE PROJECT CONTACT.
GEOTECHNICAL REPORT
WHEN SITE CONDITIONS REQUIRE A GEOTECHNICAL REPORT, REFER TO TECHNICAL SPECIFICATION
SECTION 14-1 GEOTECHNICAL REPORT. ANY INQUIRIES SHALL BE DIRECTED TO THE PROJECT
CONTACT.
ELEVATIONS
ALL ELEVATIONS SHOWN REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988. (NAD88)
COORDINATES
THE PROJECT PLAN DATUMS ARE BASED UPON THE SOUTH ZONE OF THE WEST VIRGINIA STATE
PLANE SYSTEM. THE HORIZONTAL DATUM IS BASED ON THE NORTH\ AMERICAN DATUM OF 1927
(NAD 27). GRID FACTORS ARE NOT REQUIRED WHEN MAKING FIELD MEASUREMENTS.
CROSS-SECTION VIEWS
ALL CROSS SECTIONS ARE TO BE VIEWED IN THE DIRECTION OF THE ARROW.
VIEWING DIRECTION
FOUNDATIONS
1. THE CONTRACTOR SHALL REVIEW THE SUBSURFACE INVESTIGATION
REPORT, IF AVAILABLE, BEFORE THE START OF CONSTRUCTION.
2. THE CONTRACTOR SHALL NOT PLACE ANY FOUNDATION UNTIL THE
SUBGRADE HAS BEEN ACCEPTED BY THE PROJECT CONTACT.
BLOCK CONSTRUCTION
1. MASONRY WORK SHALL CONFORM TO THE LATEST EDITION OF THE
"NATIONAL CONCRETE MASONRY ASSOCIATION."
2. HOLLOW LOAD-BEARING CONCRETE MASONRY UNITS SHALL MEET THE
REQUIREMENTS OF ASTM C90 AND HAVE A TWO (2) HOUR FIRE RATING.
3. MORTAR SHALL BE TYPE S IN ACCORDANCE WITH ASTM C-270 AND HAVE A
MINIMUM COMPRESSIVE STRENGTH OF ONE THOUSAND EIGHT HUNDERED
(1,800) PSI AT TWENTY-EIGHT (28) DAYS, GROUT SHALL HAVE A MINIMUM
COMPRESSIVE STRENGTH OF TWO THOUSAND FIVE HUNDRED (2,500) PSI AT
TWENTY-EIGHT (28) DAYS.
4. REINFORCING STEEL SHALL BE ASTM, A615, A616, OR A617 YIELD GRADE 60.
MINMUM STRENGTH SIXTY THOUSAND (60,000) PSI.
5. REINFORCING STEEL SHALL BE LAPPED AS SPECIFIED ON THIS SHEET. (REF
REINFORCING STEEL, SUB 3)
6. BLOCK MANUFACTURER SHALL PROVIDE A CONTROL JOINT DETAIL TO BE
REVIEWED AND APPROVED BY THE PROJECT CONTACT DURING
CONSTRUCTION.
STRUCTURAL STEEL
1. ALL STEEL SHALL CONFORM TO THE AISC "SPECIFICATIONS FOR THE
DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR
BUILDINGS", LATEST EDITION.
2. WELDED CONNECTIONS SHALL CONFORM TO THE LATEST EDITION OF
AMERICAN WELDING SOCIETY, AWS D1.1.
3. ALL EXTERIOR STRUCTURAL STEEL SHALL BE PAINTED IN ACCORDANCE
WITH TECHNICAL SPECIFICATION SECTION 13-15 PAINTING METAL
STRUCTURES.
CAST-IN-PLACE CONCRETE
1. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT
TWETNY-EIGHT (28) DAYS OF FOUR THOUSAND (4,000) PSI UNLESS OTHERWISE
NOTED.
2. ALL CONCRETE WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH
"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" ACI 350-01.
3. ALL EMBEDDED ITEMS ARE NOT SHOWN ON THE PROJECT PLANS. THE
CONTRACTOR SHALL REVIEW THE PROJECT PLANS OF THE VARIOUS TRADES
AND COORDINATE PLACEMENT OF EMBEDDED ITEMS.
4. CONSTRUCTION JOINTS ARE SHOWN ON THE PROJECT PLANS. ANY CHANGES
OR ADDITIONS SHALL BE SUBMITTED TO THE PROJECT CONTACT BEFORE
CONCRETE PLACEMENT. USE TWO (2) INCH X FOUR (4) INCH KEY FOR LESS
THAN EIGHTEEN (18) INCH WALL OR SLAB THICKNESS AND TWO (2) INCH X SIX
(6) INCH KEY FOR THICKNESS OF EIGHTEEN (18) INCHES AND GREATER.
5. PROVIDE FORM COVER WITH A MINIMUM OF TWO (2) INCH OF CONCRETE FROM
THE OUTSIDE SURFACE. TIES FOR WALLS SUBJECT TO HYDROSTATIC
PRESSURE SHALL HAVE WATERSTOPS.
6. PROVIDE ROUGH BROOM FINISH FOR EXTERIOR SLABS AND STEEL TROWEL
FINISH FOR INTERIOR SLABS UNLESS NOTED OTHERWISE.
REINFORCING STEEL
1. ASTM, A615, A616, OR A617, GRADE 60, MINIMUM YIELD STRENGTH SIXTY
THOUSAND (60,000) PSI.
2. REINFORCING DETAILS SHALL CONFORM TO ACI "DETAILING MANUAL - 1994"
OR AS SHOWN ON THE PROJECT PLANS.
3. MINIMUM BAR LAPS
TOP OTHER
#9 BAR 90 INCHES 65 INCHES
#8 BAR 71 INCHES 51 INCHES
#7 BAR 54 INCHES 39 INCHES
#6 BAR 43 INCHES 31 INCHES
#5 BAR 36 INCHES 26 INCHES
#4 BAR 28 INCHES 20 INCHES
4. MINIMUM CLEARANCE
a. CAST AGAINST EARTH - 3"
b. #6 BARS AND LARGER - 2"
c. #5 BARS AND SMALLER - 2"
STRUCTURAL LINTELS
UNLESS SHOWN OTHERWISE, PROVIDE THE FOLLOWING LINTEL ANGLES:
MASONRY OPENING ANGLE & SIZE BEARING
4'-0" TO LESS (2) 3 12 X 3 12 X 5
16 6"
4'-1" TO 6'-0" (2) 4 X 3 12 X 5
16 LLV 6"
6'-1" TO 7'-0" (2) 5 X 3 12 X 38 LLV 6"
7'-1" TO 3'-0" (2) 6 X 3 12 X 38 LLV 6"
8'-1" TO 9'-0" (2) 7 X 4 X 38 LLV 6"
1. ALL LINTELS SHALL BE GALVANIZED.
2. ALL LINTELS SHALL HAVE TWELVE (12) INCHES OF SOLID MASONRY BELOW
BEARING END.
GENERAL NOTES STRUCTURAL NOTES
CHANNEL LININGS
LINING FOR CHANNELS NOT SHOWN ON ALL CROSS SECTIONS. SEE PLAN VIEWS FOR
EXTENTS OF LININGS.
REVISIONS
DATE: ( ):BY: GENERAL AND STRUCTURAL NOTES
TOTAL
SHT. NO.
SCALE: NTS DATE: APRIL 2025
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
Division of Land Restoration
Office of Special Reclamation
West Virginia Department of Environmental ProtectionSTANDARD
DETAILS
OFFICE OF SPECIAL RECLAMATION
601 57th STREET SE
CHARLESTON WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
TECHNICAL SPECIFICATION(S) SUMMARY OF QUANTITIES QUANTITY UNITS
1-1 MOBILIZATION & DEMOBILIZATION 1 LS
3-1 4-1
CONSTRUCTION LAYOUT 1 LS
5-1
QUALITY CONTROL 1 LS
6-2
SITE PREPARATION 1 LS
5-5
SEDIMENT CONTROL SILT FENCE 1500 LF
6-1
UTILITIES (NON BID ITEM) N/A N/A
NOTE:
THE QUANTITIES SHOWN ON THE SUMMARY OF QUANTITIES REPRESENT THE AMOUNTS AS
DIRECTLY MEASURED IN THE PLANS. WHEN BIDDING IN WVOASIS THE COMMODITY LINES MAY BE
DIFFERENT AMOUNTS FROM THE PLANS TO ACCOMMODATE ANY UNFORESEEN CHANGES IN THE
FIELD. THEREFORE, ALWAYS BID ON THE QUANTITIES LISTED IN WVOASIS.
6-2
TYPE I REVEGETATION 3.71 AC
SEDIMENT CONTROL HAY BALE DIKE 100 LF
6-5, 7-1, 8-4 CLEAN OUT POND NO. 1 AND CONSTRUCT LIMESTONE BED 1 LS
REHABILITATE POND NO. 1 A SPILLWAY AND CONSTRUCT DRIVE THRU CROSSING
NO. 1
CLEAN OUT POND NO. 1A AND CONSTRUCT LIMESTONE BED 1 LS
SLUDGE CELL CONSTRUCTION 1 LS
CHANNEL NO. 1 396 LF
POND NO. 1A ACCESS ROAD BASE 386 LF
POND NO. 1A ACCESS ROAD FINAL 386 LF
SLUDGE CELL ACCESS ROAD BASE 291 LF
SLUDGE CELL ACCESS ROAD FINAL 291 LF
DRIVE THRU CROSSING NO. 2 1 LS
6-5, 7-1 LS
6-5, 7-1, 8-4 6-5 5-3, 6-5, 7-1, 8-4 5-3, 6-5, 7-1 5-3, 6-5, 7-1, 8-4 5-3, 6-5, 7-1 6-5, 7-1 6-5, 7-1
18 INCH CORRUGATED HDPE PIPE 20 LF10-16
SLUDGE REMOVAL LINE S-1 744 LF6-5, 7-1, 10-15, 10-17, 10-38
SLUDGE REMOVAL LINE S-2 318 LF6-5, 7-1, 10-15, 10-17, 10-38
18 INCH CORRUGATED HDPE PIPE10-16
ROAD MAINTENANCE 1 LS5-2
INCIDENTAL STONE 500 TN7-3
SUMMARY OF QUANTITIES
TOTAL
SHT. NO.
SCALE: NTS DATE: APRIL 2025
Division of Land Restoration
Office of Special Reclamation
West Virginia Department of Environmental Protection
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
601 57th STREET SE
CHARLESTON, WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
OFFICE OF SPECIAL RECLAMATION
FAX: 1-304-926-0458
DRIVE THRU
CROSSING NO. 1
PROPOSED
LIMESTONE BED
POND NO. 1
PROPOSED
LIMESTONE BED
POND NO. 1A
PROPOSED
SLUDGE CELL
PROPOSED
CHANNEL NO. 1
SLUDGE CELL
ACCESS ROAD
POND NO. 1A
ACCESS ROAD
DRIVE THRU
CROSSING NO. 2
PROPOSED LIMITS
OF DISTURBANCE
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY: OVERVIEW
TOTAL
SHT. NO.
SCALE: 1" = 200' DATE: APRIL 2025
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
OFFICE OF SPECIAL RECLAMATION
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text Hollow
AutoCAD SHX Text Frozen
AutoCAD SHX Text Strip
AutoCAD SHX Text Mine
AutoCAD SHX Text Well
AutoCAD SHX Text Gas
AutoCAD SHX Text Well
AutoCAD SHX Text Gas
AutoCAD SHX Text Lavinia
AutoCAD SHX Text Mines
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLAN VIEW
30 0 30 60
PROPOSED LIMESTONE BED
A
A
B
B
C
C
DRIVE THRU
CROSSING NO. 1
LIMITS OF DISTURBANCE
10801080
11001100
11201120
1060 1060
10801080
11001100
11201120
1060 1060
0 604020204060
SECTION B-B
20 0 20 40
POND NO. 1
0 604020204060
SECTION C-C
20 0 20 40
POND NO. 1
EXISTING GROUND
EXISTING GROUND
SLUDGE BUILD UP
SLUDGE BUILD UP
PROPOSED LIMESTONE BED
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00
1120 1120
SECTION A-A
20 0 20 40
POND NO. 1
PROPOSED LIMESTONE BED
SLUDGE BUILD UP
TO BE REMOVED DURING CONSTRUCTION
EXISTING GROUND
FLOW PATH
THROUGH
LIMESTONE
WOVEN GEOTEXTILE
FABRIC FOR SEPARATION
D50 = 2 INCH
LIMESTONE
FLOW
WOVEN GEOTEXTILE
FABRIC FOR
SEPARATION
2' LAP ALONG BED EDGE "TYPICAL
FOR ALL LIMESTONE BED BAFFLES"
NOTES:
1) LIMESTONE SHALL EXTEND ABOVE THE OUTLET FLOWLINE 2 FEET THE ENTIRE LENGTH AND WIDTH OF
LIMESTONE BEDS TO ENSURE ALL FLOW PASSES THROUGH LIMESTONE BED.
2) ALL LIMESTONE SHALL BE CLEAN.
3) WOVEN GEOTEXTILE FABRIC FOR SEPARATION MEETING REQUIREMENTS OF AASHTO M288 SECTION 7 CLASS 2 WILL BE UTILIZED TO FORCE WATER FLOW DOWN AND THROUGH THE BOTTOM 2 FEET AND TOP PORTIONS OF THE
LIMESTONE BED.
4) THE WOVEN GEOTEXTILE FABRIC FOR SEPARATION WILL BE PLACED AT THE APPROXIMATE LOCATION SHOWN FOR EACH LIMESTONE BED. THE FABRIC WILL EXTEND FROM THE TOP OF THE LIMESTONE BED TO A DEPTH OF
2' OFF THE BOTTOM OF POND.
5) LIMESTONE BED SHALL HAVE SIDE SLOPES OF 2:1.
LIMESTONE
SLOPED 2:1
OPEN WATER
OUTLETINLET
OPEN WATER
LIMESTONE
SLOPED 2:1
50'
POND NO. 1
SECTION A-A
A
A
1 FOOT CAP OF D50 = 6 INCH
LIMESTONE RIP RAP
1 FOOT OF D50 = 6 INCH
LIMESTONE RIP RAP ON FACE
LIMESTONE BED DETAIL
93' MINIMUM
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
POND NO. 1
PLAN VIEW, PROFILE AND SECTIONS
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: AS SHOWN DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
PLAN VIEW
30 0 30 60
00A
A
B
B
C
C
0+00
0+
1+
1+
2+
2+
3+
3+
3+
PROPOSED LIMESTONE BED
(SEE TYPICAL DETAIL)
POND 1A ACCESS ROAD
POND 1A SPILLWAY
(SEE TYPICAL DETAIL)
DRIVE THRU
CROSSING NO. 1
LIMITS OF DISTURBANCE
18 INCH CORRUGATED
HDPE PIPE WITH ROCK APRON
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60
SECTION B-B
20 0 20 40
POND NO. 1A
0+00 0+20 0+40 0+60 0+80 1+00 1+20
SECTION C-C
20 0 20 40
POND NO. 1A
EXISTING GROUND
EXISTING GROUND
POND 1A
ACCESS ROAD
ROADSIDE
CONVEYANCE DITCH
1:1
SLUDGE BUILD UP TO BE
REMOVED DURING CONSTRUCTION
SLUDGE BUILD UP TO BE
REMOVED DURING CONSTRUCTION
PROPOSED LIMESTONE BED
(SEE TYPICAL DETAIL)
POND 1A
ACCESS ROAD
ROADSIDE
CONVEYANCE DITCH
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00
SECTION A-A
20 0 20 40
POND NO. 1A
1160 1160
EXISTING GROUND
PROPOSED LIMESTONE BED
(SEE TYPICAL DETAIL)
SLUDGE BUILD UP TO BE
REMOVED DURING CONSTRUCTION
APPROXIMATE WATER EL. 1120
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
POND NO. 1A
PLAN VIEW, PROFILE AND SECTIONS
SHEET 1 OF 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: AS SHOWN DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00
ACCESS ROAD PROFILE
20 0 20 40
POND NO. 1A
18 INCH CORRUGATED HDPE PIPE
ROADSIDE CONVEYANCE DITCH
(SEE TYPCIAL DETAIL)
NOTE:
APPROXIMATE CULVERT LOCATION MAY
BE FIELD ADJUSTED AT THE DIRECTION
OF THE DEP FIELD REPRESENTATIVE.
3.40% 0.90%
24.19% 5.74%
1160 1160
POND NO. 1 SPILLWAY DETAIL
NOT TO SCALE
DEPTH LINING
(FT)
TOP WIDTH
(FT)
D T
20.0
BOTTOM
WIDTH
(FT)
B
10.0 D50 = 12 INCHES
LIMESTONE RIPRAP
LINER
THICKNESS
(INCHES)
18.02.5
DESIGN
SLOPE VARIES SLOPE VARIES
SLOPE VARIES SLOPE VARIES
ROAD WIDTH
(12 FT. MINIMUM)
TIE INTO EXISTING CHANNEL
FL
O
W
A A'
DESIGN
BOTTOM
WIDTH
(B)
SLOPE = 9 H:1VSLOPE = 9 H:1V
TIE INTO EXISTING CHANNEL
SLO
PE VARIES SL
O
PE
V
AR
IE
S
D50 12 INCH LIMESTONE
RIPRAP
D50 12 INCH LIMESTONE
RIPRAP
SL
O
PE
V
AR
IE
S SLO
PE VARIES
CHANNEL DEPTH LINING
(FT)
TOP WIDTH
(FT)
NUMBER D T
2.0 46.0 18.0
BOTTOM
WIDTH
(FT)
B
10.0DRIVE THRU D50 = 12 INCHESCROSSING NO. 1
SECTION A-A'
ACCESS
ROAD
ACCESS
ROAD
ROAD WIDTH
(12 FT. MINIMUM)
2.00 %
DEPTH "D"
TOP WIDTH "T"
18 INCHES MIN.
BOTTOM WIDTH "B"
DRIVE THRU CROSSING NO. 1
NOT TO SCALE
SLOPE = 9H:1V OR
ON GENTLE SLOPE
TO ALLOW PASSENGER
VEHICLE PASSAGE
SLOPE = 9H:1V OR
ON GENTLE SLOPE
TO ALLOW PASSENGER
VEHICLE PASSAGE
LIMESTONE RIPRAP
LINER
THICKNESS
(INCHES)
FLOW PATH
THROUGH
LIMESTONE
WOVEN GEOTEXTILE
FABRIC FOR SEPARATION
D50 = 2 INCH
LIMESTONE
FLOW
WOVEN GEOTEXTILE
FABRIC FOR
SEPARATION
2' LAP ALONG BED EDGE "TYPICAL
FOR ALL LIMESTONE BED BAFFLES"
NOTES:
1) LIMESTONE SHALL EXTEND ABOVE THE OUTLET FLOWLINE 2 FEET THE ENTIRE LENGTH AND WIDTH OF
LIMESTONE BEDS TO ENSURE ALL FLOW PASSES THROUGH LIMESTONE BED.
2) ALL LIMESTONE SHALL BE CLEAN.
3) WOVEN GEOTEXTILE FABRIC FOR SEPARATION MEETING REQUIREMENTS OF AASHTO M288 SECTION 7 CLASS 2 WILL BE UTILIZED TO FORCE WATER FLOW DOWN AND THROUGH THE BOTTOM 2 FEET AND TOP PORTIONS OF THE
LIMESTONE BED.
4) THE WOVEN GEOTEXTILE FABRIC FOR SEPARATION WILL BE PLACED AT THE APPROXIMATE LOCATION SHOWN FOR EACH LIMESTONE BED. THE FABRIC WILL EXTEND FROM THE TOP OF THE LIMESTONE BED TO A DEPTH OF
2' OFF THE BOTTOM OF POND.
5) LIMESTONE BED SHALL HAVE SIDE SLOPES OF 2:1.
LIMESTONE
SLOPED 2:1
OPEN WATER
OUTLETINLET
OPEN WATER
LIMESTONE
SLOPED 2:1
60'
POND NO. 1A
SECTION A-A
A
A
1 FOOT CAP OF D50 = 6 INCH
LIMESTONE RIP RAP
1 FOOT OF D50 = 6 INCH
LIMESTONE RIP RAP ON FACE
LIMESTONE BED DETAIL
88' MINIMUM
WOVEN GEOTEXTILE SEPARATION FABRIC
ACCESS ROAD
TYPICAL CROSS SECTION
1/2 INCH PER FOOT
3 INCH LAYER OF 1 1/2 INCH
CRUSHER RUN LIMESTONE
1.50 FT.
EXISTING FILL / ORIGINAL GROUND
NOT TO SCALE
MIN. TRENCH
38 INCHES
HAUNCH 9 INCHES
TO SPRINGLINE
BEDDING 4 INCHES
COMPACTED TO MIN. 90% STANDARD PROCTOR
INITIAL BACKFILL 15 INCHES
6 INCHES ABOVE PIPE CROWN
TYPICAL HDPE PIPE CROSS SECTION
1 1/2 INCH CRUSHER RUN LIMESTONE
EARTHEN FILL/ORIGINAL GROUND18 INCHES
PIPE DIAMETER
NOT TO SCALE
WOVEN GEOTEXTILE SEPARATION FABRIC
ACCESS ROAD
TYPICAL CROSS SECTION WITH PIPE
1/2 INCH PER FOOT
6 INCHES OF
2 1/2 INCH LIMESTONE
3 INCH LAYER OF 1 1/2 INCH
CRUSHER RUN LIMESTONE
12 FT.
1/4
3.0 FT.
EXISTING FILL / ORIGINAL GROUND
NOT TO SCALE
3%.
PROPOSED 18 INCH CORRUGATED HDPE PIPE
NOTE: REFER TO PLAN SHEETS FOR ROADWAY
AND DITCH ALIGNMENT
BERM
12 FT.
BERM
6 INCHES OF
2 1/2 INCH LIMESTONE
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
POND NO. 1A
PLAN VIEW, PROFILE AND SECTIONS
SHEET 2 OF 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: AS SHOWN DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text T
LINER THICKNESS
SLUDGE CELL
ACCESS ROAD
CHANNEL NO. 1
TURNAROUND AREA
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
3+93
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
3+67
SLUDGE CELL
TIE CHANNEL NO. 1 INTO
EXISTING CHANNEL
TIE CHANNEL NO. 1 INTO
EXISTING CHANNEL
A
A
B
B
C
C
D
D
E
E
F
F
DRIVE THRU
CROSSING NO. 2
LIMITS OF DISTURBANCE
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SLUDGE CELL
PLAN VIEW
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1" = 20' DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80
PROFILE
20 0 20 40
SLUDGE CELL ACCESS ROAD
SLUDGE CELL
ACCESS ROAD
DRIVE THRU
CROSSING NO. 2
12.69%
17.90% 4.95% 5.76%
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00
PROFILE
20 0 20 40
CHANNEL NO. 1
CHANNEL NO. 1
TOP OF ROCK SURFACE
43.25%
11.45%
DRIVE THRU
CROSSING NO. 2
1.40% 1.40%
11.22% 4.36%
1.08%
0+00 0+20 0+40 0+60 0+80
SECTION A-A
20 0 20 40
SLUDGE CELL ACCESS ROAD
SLUDGE CELL
ACCESS ROAD
EXISTING GROUND
0+00 0+20 0+40 0+60 0+80
1.0 0:1
EXISTING GROUND
SLUDGE CELL
ACCESS ROAD
SECTION B-B
20 0 20 40
SLUDGE CELL ACCESS ROAD
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60
SECTION C-C
20 0 20 40
SLUDGE CELL ACCESS ROAD
1.5:1
1.5:1
EXISTING GROUND
SLUDGE CELL
ACCESS ROAD
SLUDGE CELL
CHANNEL NO. 1
ROADSIDE
CONVEYANCE DITCH
ROADSIDE
CONVEYANCE DITCH
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROSPOSED SLUDGE CELL SECTIONS
SHEET 1 OF 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1" = 20' DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80
SECTION D-D
20 0 20 40
SLUDGE CELL ACCESS ROAD
1.5:1
1.50:1
1.50:1 CHANNEL NO. 1
EXISTING GROUND
SLUDGE CELL
ACCESS ROAD
SLUDGE CELL
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80
SECTION E-E
20 0 20 40
SLUDGE CELL ACCESS ROAD
1.5:1
1.5:1
1.5:1
EXISTING GROUND
CHANNEL NO. 1
SLUDGE CELL
ACCESS ROAD
SLUDGE CELL
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80
SECTION F-F
20 0 20 40
SLUDGE CELL ACCESS ROAD
EXISTING GROUND
CHANNEL NO. 1
TURNAROUND AREA
EL. 1132
CHANNEL NO. 1 DETAIL
NOT TO SCALE
DEPTH LINING
(FT)
TOP WIDTH
(FT)
D T
13.0
BOTTOM
WIDTH
(FT)
B
4 D50 = 12 INCHES
LIMESTONE RIPRAP
LINER
THICKNESS
(INCHES)
18.03.0
DESIGN
3'
1.5'
1 1
TYPICAL
6 INCH LAYER OF
ROADSIDE CONVEYANCE DITCH
3 INCH LIMESTONE
WOVEN GEOTEXTILE SEPARATION FABRIC
ACCESS ROAD
TYPICAL CROSS SECTION
1/2 INCH PER FOOT
3 INCH LAYER OF 1 1/2 INCH
CRUSHER RUN LIMESTONE
1.50 FT.
EXISTING FILL / ORIGINAL GROUND
NOT TO SCALE
NOTE: REFER TO PLAN SHEETS FOR ROADWAY
AND DITCH ALIGNMENT
12 FT.
BERM
6 INCHES OF
2 1/2 INCH LIMESTONE
SLOPE VARIES SLOPE VARIES
SLOPE VARIES SLOPE VARIES
ROAD WIDTH
(12 FT. MINIMUM)
TIE INTO EXISTING CHANNEL
FL
O
W
A A'
DESIGN
BOTTOM
WIDTH
(B)
SLOPE = 8.5 H:1VSLOPE = 6 H:1V
TIE INTO EXISTING CHANNEL
SLO
PE VARIES SL
O
PE
V
AR
IE
S
D50 12 INCH LIMESTONE
RIPRAP
D50 12 INCH LIMESTONE
RIPRAP
SL
O
PE
V
AR
IE
S SLO
PE VARIES
CHANNEL DEPTH LINING
(FT)
TOP WIDTH
(FT)
FREEBOARD
(FT)
NUMBER D T F
2.5 40.0 18.0
BOTTOM
WIDTH
(FT)
B
4.0DRIVE THRU D50 = 12 INCHESCROSSING NO. 2
SECTION A-A'
ACCESS
ROAD
ACCESS
ROAD
ROAD WIDTH
(12 FT. MINIMUM)
1.00 %
DEPTH "D"
TOP WIDTH "T"
18 INCHES MIN.
BOTTOM WIDTH "B"
0.50
DRIVE THRU CROSSING NO. 2
NOT TO SCALE
SLOPE = 6H:1V OR
ON GENTLE SLOPE
TO ALLOW PASSENGER
VEHICLE PASSAGE
SLOPE = 8.5H:1V OR
ON GENTLE SLOPE
TO ALLOW PASSENGER
VEHICLE PASSAGE
LIMESTONE RIPRAP
LINER
THICKNESS
(INCHES)
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROSPOSED SLUDGE CELL SECTIONS
SHEET 2 OF 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: AS SHOWN DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text T
LINER THICKNESS
1300 13
DRIVE THRU
CROSSING NO. 1
POND NO. 1
LIMESTONE BED
POND NO. 1
PROPOSED
LIMESTONE BED
PROPOSED
SLUDGE CELL
PROPOSED
CHANNEL NO. 1
SLUDGE CELL
ACCESS ROAD
POND NO. 1A
ACCESS ROAD
DRIVE THRU
CROSSING NO. 2
LIMITS OF DISTURBANCE
POND NO. 1A
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
SLUDGE REMOVAL LINE S-1
6 INCH HDPE SDR 11 PIPE
SLUDGE REMOVAL LINE S-2
6 INCH HDPE SDR 11 PIPE
SLUDGE REMOVAL LINE S-1
6 INCH HDPE SDR 11 PIPE
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY: PIPING PLAN
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1" = 50' DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50
1200 1200
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50
PROFILE
50 0 50 100
SLUDGE REMOVAL LINE S-1
PROFILE
50 0 50 100
SLUDGE REMOVAL LINE S-2
1200 1200
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
PROPOSED GRADEEXISTING GROUND
SLUDGE REMOVAL LINE S-1
6 INCH HDPE SDR 11 PIPE
CAM AND GROVE WITH
LOCKABLE CAP CAM AND GROVE WITH
LOCKABLE CAP
SLUDGE REMOVAL LINE S-2
6 INCH HDPE SDR 11 PIPE EXISTING GROUND
BOTTOM OF 6 INCH HDPE PIPE TRENCH TO BE
A MINIMUM OF 36 INCHES FROM GROUND SURFACE
NOTE:
BOTTOM OF 6 INCH HDPE PIPE TRENCH TO BE
A MINIMUM OF 36 INCHES FROM GROUND SURFACE
NOTE:
MIN. TRENCH
36 INCHES
BEDDING 4 INCHES
COMPACTED TO MIN. 90% STANDARD PROCTOR
INITIAL BACKFILL 6 INCHES
ABOVE PIPE CROWN
TYPICAL HDPE PIPE CROSS SECTION
1 1/2 INCH CRUSHER RUN LIMESTONE
EARTHEN FILL/ORIGINAL GROUND6 INCHES
PIPE DIAMETER
NOT TO SCALE
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY: SLUDGE REMOVAL LINE PROFILES AND DETAIL
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: AS SHOWN DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
AutoCAD SHX Text
6" HDPE PIPE
AutoCAD SHX Text
6" HDPE PIPE
AutoCAD SHX Text
6" X 2" HDPE REDUCER
AutoCAD SHX Text
2" STAINLESS STEEL BALL VALVE
AutoCAD SHX Text
CAM & GROVE WITH LOCKABLE CAP DICKSON BRAND OR EQUAL
AutoCAD SHX Text
6" STAINLESS STEEL - NPT MALE THREAD
AutoCAD SHX Text
2" STAINLESS STEEL - NPT MALE THREAD
AutoCAD SHX Text
6" HDPE WYE
AutoCAD SHX Text
6" HDPE PIPE
AutoCAD SHX Text
6" HDPE PIPE
AutoCAD SHX Text
CAM & GROVE WITH LOCKABLE CAP DICKSON BRAND OR EQUAL
AutoCAD SHX Text
6" STAINLESS STEEL - NPT MALE THREAD
AutoCAD SHX Text
6" HDPE WYE
AutoCAD SHX Text
CAM & GROVE WITH LOCKABLE CAP DETAIL
N.T.S.
OUTLET CROSS-SECTIONUP-SLOPE FACE
R3-ROCK
AASHTO #57
6" MIN.
1 MIN.
1 MIN.
FILTER FABRIC OR
STRAW BALES
WOOD POSTS
1 MIN.
HEIGHT OF ROCK FILTER = 5/6
HEIGHT OF FILTER FABRIC FENCE
OR STRAW BALES
3' MIN.
AASHTO #57
% SLOPE
L
1'
3"
FLOW
RUN
R
IS
E
9"
3" MIN.
SECTION A-A' SECTION C-C'
NOTE:
1. SPACING OF PREFABRICATED DITCH CHECKS
SHALL BE THE SAME AS STONE DITCH CHECKS.
2. AASHTO #1 (2-4 INCH) SHALL BE USED, AND MAY
BE REINFORCED WITH 3 TO 6 INCH RIPRAP.
3. THE MINIMUM DITCH DEPTH IS 1.0'.DITCH MAY BE
TRAPEZOIDAL OR V-DITCH.
A
A'
C
C'
LL= (160/S), WITH A 100' MAX
WHERE,
L= SPACING IN FEET
S= % SLOPE= (RISE/RUN) X 100
9"
3" MIN.
ROCK CHECK DAM
NTS
3"
2"-5"
12"
6"
2.4.
5.
3B.
1.
3A.
CRITICAL POINTS
A. OVERLAPS AND SEAMS
B. PROJECTED WATER LINE
C. CHANNEL BOTTOM/SIDE
SLOPE VERTICES
* HORIZONTAL STAPLE SPACING SHOULD BE ALTERED
IF NECESSARY TO ALLOW STAPLES TO SECURE THE
CRITICAL POINTS ALONG THE CHANNEL SURFACE.
A
A
B C
B C
** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE
OR STAKE LENGTHS GREATER THAN 6" MAY BE
12"
6"
6"
6"
4"-6"
4"
(15 cm)
NOTE:
NECESSARY TO PROPERLY ANCHOR THE BLANKETS.
4"
2"-5"1.
6.
7.
2.
5.
4.8.
3.
6"
" M
IN
4" MIN
FLOW
EMBED FILTER FABRIC
MIN. 6" INTO GROUND
FILTER FABRIC
FILTER FABRIC
THE FENCE POSTS AND EXTEND
IT INTO THE DITCH.
EXTENSION OF FABRIC INTO TRENCH
FENCE POST
THE EXCAVATED SOIL.
48" MIN. FENCE
OF FILTER ABOVE
GROUND SURFACE
30" MIN. HEIGHT
FLOW
FLOW
10' MAX. C/O2. ATTACH THE FILTER FABRIC TO
A 4" X 4" TRENCH UPSLOPE
ALONG THE LINE OF POSTS.
1. SET POSTS AND EXCAVATE 3. BACKFILL AND COMPACT
POST
48" HIGH (MIN.) FENCE POSTS
NOTE:
SILT FENCE SHALL BE INSTALLED IN THE LOCATIONS SHOWN ON THE PROJECT PLANS AND IN
ACCORDANCE WITH THE DRAWING DETAILS SHOWN:
1. A TRENCH SHALL BE PLOWED OR OTHERWISE EXCAVATED TO THE REQUIRED DEPTH
WITH LITTLE, IF ANY, DISTURBANCE TO THE DOWN SLOPE SIDE OF THE TRENCH. THE
BOTTOM OF THE TRENCH AND THE FENCE TOP SHALL BE PLACED ON A LEVEL GRADE.
WHEN IT IS NECESSARY TO CROSS SMALL DEPRESSIONS, THE TRENCH BOTTOM AND
FENCE TOP MAY DEVIATE SLIGHTLY FROM THE LEVEL GRADE. GRADES IN SUCH
SECTIONS WILL NOT EXCEED 1%, NOR WILL THE DEVIATION EXTEND
FOR MORE THEN TWENTY-FIVE (25) FEET.
2. SUPPORT STAKES WILL BE DRIVEN TO THE REQUIRED DEPTH BELOW THE EXISTING
GROUND SURFACE AT THE SPECIFIED INTERVALS.
3. STRETCH AND FASTEN FABRIC TO THE UP-SLOPE SIDE OF THE SUPPORT STAKES.
4. WHERE THE ENDS OF THE FABRIC COME TOGETHER, THEY BE BE OVERLAPPED,
FOLDED, AND STAPLED TO PREVENT SEDIMENT BYPASS.
5. THE TOE ANCHOR WILL BE BACKFILLED AND COMPACTED TO A DENSITY EQUAL TO THE
SURROUNDING SOILS.
6. FILTER FABRIC IS TO BE FASTENED SECURELY TO POSTS WITH WIRE TIES OR STAPLES.
7. WHEN TWO SECTIONS OF FILTER FABRIC ADJOIN EACH OTHER, THEY SHALL BE
OVERLAPPED BY SIX INCHES AND FOLDED.
8. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND INSPECTED FOR DAMAGE
AFTER RAINS.
9. POSTS SHALL BE CONSTRUCTED OF TWO (2) INCH X TWO (2) INCH HARDWOOD, FOUR
(4) FEET LONG.
10. APPROVED PREFABRICATED UNITS INCLUDE "GEOFAB", "ENVIROFENCE", OR APPROVED
EQUAL.
11. REFER TO TECHNICAL SPECIFICATION SECTION 6-2 SEDIMENT CONTROL FOR MORE
DETAILS.
1. PREPARE SOIL BEFORE INSTALLATION BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. WHEN USING
EROSION MATTING.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH THAT WITH APPROXIMATELY TWELVE (12) INCHES OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING TWELVE (12) INCH PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY
TWELVE (12) INCHES ACROSS THE WIDTH OF THE BLANKET.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO THE SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH
EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A FOUR (4) INCH TO SIX (6) INCH OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED FOUR (4) INCHES APART AND FOUR (4) INCH ON CENTER TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE
(12) INCHES APART IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY TWO (2) TO FIVE (5) INCHES (DEPENDING ON BLANKET TYPE) AND STAPLED.
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT THIRTY (30) TO FORTY (40) FOOT INTERVALS. USE A
DOUBLE ROW OF STAPLES STAGGERED FOUR (4) INCHES APART AND FOUR (4) INCH ON CENTER THE ENTIRE WIDTH OF THE CHANNEL.
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN
A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
1. PREPARE SOIL BEFORE INSTALLATION BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. WHEN USING
EROSION MATTING.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH THAT WITH APPROXIMATELY TWELVE (12) INCHES OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING TWELVE (12) INCH PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY
TWELVE (12) INCHES ACROSS THE WIDTH OF THE BLANKET.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO THE SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH
EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY TWO (2) INCH TO FIVE (5) INCH OVERLAP DEPENDING ON
BLANKET TYPE.
5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE THREE (3) INCH OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY TWELVE (12) INCHES APART ACROSS THE ENTIRE BLANKET WIDTH.
6. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGHTS GREATER THAN SIX (6) INCHES MAY BE NECESSARY TO PROPERLY
SECURE THE BLANKETS.
1' 1'
EROSION MATTING
NTS
ROCK FILTER OUTLETS
NTS
SILT FENCE DETAIL
NTS
CONSTRUCTION DETAIL
INSTALLATION DETAIL
SLOPE INSTALLATION
CHANNEL INSTALLATION
STORAGE TANKCOMPACTED
SOIL COMPACTED
SOIL
10 MIL PLASTIC LINER
EARTHEN BASIN
4 SIDES
LOOSE SAND TO PROTECT
PLASTIC LINER FROM PUNCTURE
BURY "ENDS" OR WEIGHT
TO SECURE LINER (TYP.)
(H) MIN 2'
6'4'
2" SS - NPT
MALE THREAD
2" BANJO BALL VALVE OR
APPROVED EQUIVALENT
SEAL TO LINER BY MEANS
OF MECHANICAL FITTINGS
OR WELDING
SPILL CONTAINMENT DETAIL
NTS
NOTES:
1. SELECTED HEIGHT (H) OF EARTHEN BERM IS TO BE A TWO (2) FOOT MINIMUM OR 110% OF THE CAPACITY OF THE TANK(S) TOTAL VOLUME WITHIN THE BERM. A SIX (6) INCH FREEBOARD MUST BE INCLUDED.
2. A TWO (2) INCH WATER REMOVAL DRAIN SHALL BE LOCATED AT THE LOWEST POINT IN THE BOTTOM OF THE CONTAINMENT VOLUME. IT SHALL CONNECT TO A NORMALLY CLOSED VALVE OUTSIDE THE DIKE.
THE VALVE SHALL BE MANUALLY OPERATED AND PROTECTED FROM UNAUTHORIZED OPERATION.
RAINWATER CONTAINED WITHIN THIS DIKE SHALL BE EXAMINED PRIOR TO RELEASE TO ENSURE THAT HARMFUL QUANTITIES OF FUELS AND LUBRICANTS ARE NOT DISCHARGED. ALTERNATE METHODS OF
WATER REMOVAL WILL BE CONSIDERED FOR APPROVAL.
3. TANKS WITH SECONDARY CONTAINMENT MAY BE USED AS AN ALTERNATIVE.
SECTION A-A'
A
A'
8'
6'
2'
3"
MIN
Flow
SEDIMENT SUMP DETAIL
NTS
STRAW OR HAY BALE DIKE DETAILS
NTS
NOTES:
1. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES.
2. ALL BALES SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF FOUR (4) INCHES OR BALES COVERED WITH A FILTER MAT, WITH EARTH TAMPED
ON THE UPSTREAM SIDE TO PREVENT PIPING.
3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY STAKES DRIVEN THROUGH THE BALES. THE FIRST STAKE IN EACH BALE SHALL BE
DRIVEN TOWARD PREVIOUSLY LAID BALE TO FORCE BALES TOGETHER.
4. BALES SHALL BE REMOVED AS DIRECTED BY THE ENGINEER.
ANCHORING DETAIL END VIEW
FLOW
EMBEDDED AS SITE
CONDITIONS DICTATE TO
PREVENT FLOW UNDER
BALES.
SOIL COMPACTED TO
PREVENT PIPING
ANGLE FIRST STAKE TOWARD
PREVIOUSLY LAID BALE
BOUND BALES
PLACED ON CONTOUR
2" X 2" STAKES MINIMUM OF 1 FT. INTO GROUND
REVISIONS
DATE: ( ):BY: SEDIMENT AND EROSION CONTROL
TOTAL
SHT. NO.
SCALE: NTS
Division of Land Restoration
Office of Special Reclamation
West Virginia Department of Environmental ProtectionSTANDARD
DETAILS
DATE: APRIL 2025
OFFICE OF SPECIAL RECLAMATION
601 57th STREET SE
CHARLESTON WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
4"
4'-0"
4'-0"
4'-0"
9"
1'-3"
1'-3"
5"
GROUND LINE
(3) 4"X4" POSTS
# 57 AGGREGATE
(TYPICAL)
(3) 2"X4" CROSS
BRACE
CARRIAGE BOLT
CENTER LINE
CARRIAGE BOLT
CENTER LINE
NOTES:
1. REFER TO TECHNICAL SPECIFICATIONS SECTION
1-0 MOBILIZATION AND DEMOBILIZATION.
2. SIGN BOARD TO BE 3/4" BY 4' X 8' MARINE
PLYWOOD OR ALUMINUM CLAD.
3. MOUNT SIGN TO POSTS USING 3/8" X 7"
GALVANIZED CARRIAGE BOLTS.
4. POSTS ARE TO BE PRESSURE TREATED 4" X 4" X
12'.
5. LOCATION TO BE DETERMINED BY WVDEP.
6. ALL LETTERING TO BE EITHER GREEN OR BLACK.
STATE OF WEST VIRGINIA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Division of Land Restoration Office of Special Reclamation
Project Name Permit X-XXXX-XX
HAROLD D. WARD
Cabinet Secretary
Contractor: Project Start Date: XX/XX/XX
Project Cost: $XXX,XXX.00 Funding provided by the Special Reclamation Coal Tax paid by WV Coal Mine Companies
DLR
6" 3'-0" 3'-0" 6"
1' -0
5 8"
77 8"
33 4"
33 4"
2" 1'-51
4" 6'-51 4"
11 8" 3"
21 4"
33 4"
33 4"
21 4"11 2"
21 4"
6"
21 4"11 2"
6'-17 8"
1' -6
21 4"
PROJECT SIGN
SCALE: NTS
7"
33 4" 1" 3 4" 1"
71 8"
1" 3 4" 1"
8"
1' -4
7 8"
1" 3 4" 1"
47 8" 21 4"11 2"21 4"
47 8"
33 4"
11 2"
11 2"
1"
8'
REVISIONS
DATE: ( ):BY: PROJECT SIGN
TOTAL
SHT. NO.
SCALE: NTS DATE: APRIL 2025
Division of Land Restoration
Office of Special Reclamation
West Virginia Department of Environmental ProtectionSTANDARD
DETAILS
OFFICE OF SPECIAL RECLAMATION
601 57th STREET SE
CHARLESTON WEST VIRGINIA 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
| Sheets and Views |
| CoverSheet-01 |
| Insert from: "2 - S-5030-95_General Notes-GENERAL NOTES.pdf" |
| Sheets and Views |
| GENERAL NOTES |
| Insert from: "3 - S-5030-95_Summary of Quantities-SUMMARY OF QUANTITIES.pdf" |
| Sheets and Views |
| SUMMARY OF QUANTITIES |
| Insert from: "4 - S-5030-95_OVERVIEW-Overview.pdf" |
| Sheets and Views |
| Overview |
| Insert from: "5 - S-5030-95_POND 1-SHEET.pdf" |
| Sheets and Views |
| SHEET |
| Insert from: "6 - S-5030-95_POND 1A-SHEET 1.pdf" |
| Sheets and Views |
| SHEET 1 |
| Insert from: "7 - S-5030-95_POND 1A-SHEET 2.pdf" |
| Sheets and Views |
| SHEET 2 |
| Insert from: "8 - POND 2 PLAN VIEW-PLAN VIEW.pdf" |
| Sheets and Views |
| PLAN VIEW |
| Insert from: "9 - SLUDGE CELL SECTIONS SHEET 1.pdf" |
| Sheets and Views |
| SECTIONS SHEET 1 |
| Insert from: "10 - SLUDGE CELL SECTIONS SHEET 2.pdf" |
| Sheets and Views |
| SECTIONS SHEET 2 |
| Insert from: "11 - S-5030-95_PIPING PLAN-SHEET.pdf" |
| Sheets and Views |
| SHEET |
| Insert from: "12 - S-5030-95_SLUDGE LINE PROFILES AND DETAILS (2).pdf" |
| Sheets and Views |
| SHEET (2) |
| Insert from: "13 - S-5030-95_SEDIMENT AND EROSION CONTROL-EROSION AND SEDIMENT CONTROL.pdf" |
| Sheets and Views |
| EROSION AND SEDIMENT CONTROL |
| Insert from: "14 - S-5030-95_PROJECT SIGN-TITLE PAGE.pdf" |
| Sheets and Views |
| TITLE PAGE |
| 2025-05-07T09:07:01-0400 | |
| Christopher Farrish |
File details come from the government source that posted it. Updated .