This document is Addendum #2 for Agency Solicitation Number ARFQ DEP2500000073, issued by the West Virginia Department of Environmental Protection's Division of Land Restoration and Office of Special Reclamation. The addendum extends the bid closing date from 6/26/25 to 7/2/25 and includes vendor questions and responses, as well as some drawing revisions. The solicitation appears to be for a project involving pond and sludge cell construction, access road upgrades, and related infrastructure work at a mining site in Boone County, West Virginia.
The estimated project cost is $344,113, and the addendum provides clarifications on various project details, including access road construction, sludge removal lines, road maintenance, pond dewatering, and material handling. Key points include using 6-inch HDPE SDR 11 pipes, upgrading existing access roads with specific layering requirements, and converting Pond No. 2 into a sludge cell. The contractor will be responsible for establishing survey control, installing sediment silt fencing, and following state wage requirements. Remaining road maintenance funds will be deducted in the final change order if not fully utilized.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ DEP2500000073
Addendum Number: _2___
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[x] Modify bid opening date and time
[x] Modify specification of product or service being sought
[x] Attachment of vendor questions and responses
[] Attachment of pre-bid sign-in sheet
[] Correction of error
[] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
1. To extend bid close from 6/26/25 to 7/2/25.
2. Questions & answers
3. Revisions
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Addendum #3 – Vendor Questions Response
ARFQ DEP2500000073
OSR Asset Mining, LLC - S-5030-95
Q1. It is the plan to install all Access Roads as “New” and using the details shown in the drawings? I know some access roads were existing, but needed repaired or cleared to make them usable again
A1. The plan is to upgrade the two existing access roads as proposed in the plans. The typical details included in the plans show the layers of materials including separation fabric that will be included in the construction of the new road surface.
Q2. Is there a spec on the Sludge Lines #1 and #2 in regard to size/diameter or brand?
A2. On the Piping Plan it says 6 Inch HDPE SDR 11 pipe. No particular brand is specified.
Q3. Regarding “Road Maintenance”… on past projects that we bid, this line item was assigned a total dollar amount to be used…. Is there a dollar amount this time or is it up to the contractor to set that amount that will be needed?
A3. The Road Maintenance line item will be a lump sum bid item. It will be used for any necessary repairs which may need to be made to the existing access road to the site should it begin to deteriorate in a particular area. Any area in question would need to be reviewed and approved by the DEP representative on site.
Q4. If the Contractor “sets” the Road Maintenance amount and it is not needed 100%, will that money that is remaining go to the contractor or is it given as credit back to the owner?
A4. If the full amount is not required, the remaining amount will be deducted in the final change order.
Q5. Is there an Engineer’s Estimate for this project?
A5. The estimated project cost is $344,113.
Q6. Are there any restrictions on how fast Pond No. 2 can be drained?
A6. Pond No. 2 shall be dewatered in a controlled manner which will prevent sediment from being discharged.
Q7. Can Pond No. 2 be breached to dewater it for construction purposes?
A7. The water level shall be lowered initially by pumping. After the initial pumping phase the DEP representative on site will approve the level which breaching may occur in order to prevent ponding of water during construction. If Pond No. 2 is breached for construction purposes, the material removed must be placed back and compacted in
OSR Asset Mining, LLC - S-5030-95 accordance with the Technical Specification 6-5 Unclassified Excavation. The cost to do so will be incidental to the lump sum bid price submitted and will be at no additional cost to DEP.
Q8. Where will the material come from to construct the sludge cell?
A8. The material to construct the sludge cell will be excavated at the site as shown in detail on Sheets 8, 9 and 10.
Q9. Are there existing survey control points?
A9. There are no existing survey control points established. It is the responsibility of the contractor to establish survey control for this project.
Q10. Can the baffles being removed be buried on site?
A10. No, they must be disposed of in the garbage.
Q11. How far down is the material to be removed in Pond 1A?
A11. Down the top surface of the old liner.
Q12. Will the contractor be responsible for water treatment during construction?
A12. The DEP will be responsible for treating water quality parameters included in the NPDES permit. However, the contractor will be responsible for installing and maintaining sediment silt fence.
Q13. Are Davis Bacon wages required?
A13. No
Q14. May pond cleaning material be placed upon the hill (on previously mined area), covered and seeded?
A14. The plan is for Pond No. 2 to be converted into the sludge cell. Any material removed may be placed at the head of Pond No. 2 in the vicinity of the proposed turnaround area shown on the plans. Once the sludge cell has been constructed, any pond cleaning material from Pond No. 1 and 1A will be placed in the constructed cell.
Q15. What are the wage requirements?
A15. The contractor must pay wage rates based upon current state wage requirements.
OSR Asset Mining, LLC - S-5030-95
Drawing Revisions
Sheet 7 – Changed the title on spillway detail from Pond No. 1 Spillway Detail to Pond No. 1A Spillway Detail.
Sheet 11 – Added proposed Gate / Knife Valve locations.
Sheet 12 Added Typical Gate / Knife Valve Detail.
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00
ACCESS ROAD PROFILE
20 0 20 40
POND NO. 1A
18 INCH CORRUGATED HDPE PIPE
ROADSIDE CONVEYANCE DITCH
(SEE TYPCIAL DETAIL)
NOTE:
APPROXIMATE CULVERT LOCATION MAY
BE FIELD ADJUSTED AT THE DIRECTION
OF THE DEP FIELD REPRESENTATIVE.
3.40% 0.90%
24.19% 5.74%
1160 1160
POND NO. 1A SPILLWAY DETAIL
NOT TO SCALE
DEPTH LINING
(FT)
TOP WIDTH
(FT)
D T
20.0
BOTTOM
WIDTH
(FT)
B
10.0 D50 = 12 INCHES
LIMESTONE RIPRAP
LINER
THICKNESS
(INCHES)
18.02.5
DESIGN
SLOPE VARIES SLOPE VARIES
SLOPE VARIES SLOPE VARIES
ROAD WIDTH
(12 FT. MINIMUM)
TIE INTO EXISTING CHANNEL
FL
O
W
A A'
DESIGN
BOTTOM
WIDTH
(B)
SLOPE = 9 H:1VSLOPE = 9 H:1V
TIE INTO EXISTING CHANNEL
SLO
PE VARIES SL
O
PE
V
AR
IE
S
D50 12 INCH LIMESTONE
RIPRAP
D50 12 INCH LIMESTONE
RIPRAP
SL
O
PE
V
AR
IE
S SLO
PE VARIES
CHANNEL DEPTH LINING
(FT)
TOP WIDTH
(FT)
NUMBER D T
2.0 46.0 18.0
BOTTOM
WIDTH
(FT)
B
10.0DRIVE THRU D50 = 12 INCHESCROSSING NO. 1
SECTION A-A'
ACCESS
ROAD
ACCESS
ROAD
ROAD WIDTH
(12 FT. MINIMUM)
2.00 %
DEPTH "D"
TOP WIDTH "T"
18 INCHES MIN.
BOTTOM WIDTH "B"
DRIVE THRU CROSSING NO. 1
NOT TO SCALE
SLOPE = 9H:1V OR
ON GENTLE SLOPE
TO ALLOW PASSENGER
VEHICLE PASSAGE
SLOPE = 9H:1V OR
ON GENTLE SLOPE
TO ALLOW PASSENGER
VEHICLE PASSAGE
LIMESTONE RIPRAP
LINER
THICKNESS
(INCHES)
FLOW PATH
THROUGH
LIMESTONE
WOVEN GEOTEXTILE
FABRIC FOR SEPARATION
D50 = 2 INCH
LIMESTONE
FLOW
WOVEN GEOTEXTILE
FABRIC FOR
SEPARATION
2' LAP ALONG BED EDGE "TYPICAL
FOR ALL LIMESTONE BED BAFFLES"
NOTES:
1) LIMESTONE SHALL EXTEND ABOVE THE OUTLET FLOWLINE 2 FEET THE ENTIRE LENGTH AND WIDTH OF
LIMESTONE BEDS TO ENSURE ALL FLOW PASSES THROUGH LIMESTONE BED.
2) ALL LIMESTONE SHALL BE CLEAN.
3) WOVEN GEOTEXTILE FABRIC FOR SEPARATION MEETING REQUIREMENTS OF AASHTO M288 SECTION 7 CLASS 2 WILL BE UTILIZED TO FORCE WATER FLOW DOWN AND THROUGH THE BOTTOM 2 FEET AND TOP PORTIONS OF THE
LIMESTONE BED.
4) THE WOVEN GEOTEXTILE FABRIC FOR SEPARATION WILL BE PLACED AT THE APPROXIMATE LOCATION SHOWN FOR EACH LIMESTONE BED. THE FABRIC WILL EXTEND FROM THE TOP OF THE LIMESTONE BED TO A DEPTH OF
2' OFF THE BOTTOM OF POND.
5) LIMESTONE BED SHALL HAVE SIDE SLOPES OF 2:1.
LIMESTONE
SLOPED 2:1
OPEN WATER
OUTLETINLET
OPEN WATER
LIMESTONE
SLOPED 2:1
60'
POND NO. 1A
SECTION A-A
A
A
1 FOOT CAP OF D50 = 6 INCH
LIMESTONE RIP RAP
1 FOOT OF D50 = 6 INCH
LIMESTONE RIP RAP ON FACE
LIMESTONE BED DETAIL
88' MINIMUM
WOVEN GEOTEXTILE SEPARATION FABRIC
ACCESS ROAD
TYPICAL CROSS SECTION
1/2 INCH PER FOOT
3 INCH LAYER OF 1 1/2 INCH
CRUSHER RUN LIMESTONE
1.50 FT.
EXISTING FILL / ORIGINAL GROUND
NOT TO SCALE
MIN. TRENCH
38 INCHES
HAUNCH 9 INCHES
TO SPRINGLINE
BEDDING 4 INCHES
COMPACTED TO MIN. 90% STANDARD PROCTOR
INITIAL BACKFILL 15 INCHES
6 INCHES ABOVE PIPE CROWN
TYPICAL HDPE PIPE CROSS SECTION
1 1/2 INCH CRUSHER RUN LIMESTONE
EARTHEN FILL/ORIGINAL GROUND18 INCHES
PIPE DIAMETER
NOT TO SCALE
WOVEN GEOTEXTILE SEPARATION FABRIC
ACCESS ROAD
TYPICAL CROSS SECTION WITH PIPE
1/2 INCH PER FOOT
6 INCHES OF
2 1/2 INCH LIMESTONE
3 INCH LAYER OF 1 1/2 INCH
CRUSHER RUN LIMESTONE
12 FT.
1/4
3.0 FT.
EXISTING FILL / ORIGINAL GROUND
NOT TO SCALE
3%.
PROPOSED 18 INCH CORRUGATED HDPE PIPE
NOTE: REFER TO PLAN SHEETS FOR ROADWAY
AND DITCH ALIGNMENT
BERM
12 FT.
BERM
6 INCHES OF
2 1/2 INCH LIMESTONE
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
POND NO. 1A
PLAN VIEW, PROFILE AND SECTIONS
SHEET 2 OF 2
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: AS SHOWN DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text 1.5
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
LINER THICKNESS
1300 13
DRIVE THRU
CROSSING NO. 1
POND NO. 1
LIMESTONE BED
POND NO. 1
PROPOSED
LIMESTONE BED
PROPOSED
SLUDGE CELL
PROPOSED
CHANNEL NO. 1
SLUDGE CELL
ACCESS ROAD
POND NO. 1A
ACCESS ROAD
DRIVE THRU
CROSSING NO. 2
LIMITS OF DISTURBANCE
POND NO. 1A
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
SLUDGE REMOVAL LINE S-1
6 INCH HDPE SDR 11 PIPE
SLUDGE REMOVAL LINE S-2
6 INCH HDPE SDR 11 PIPE
SLUDGE REMOVAL LINE S-1
6 INCH HDPE SDR 11 PIPE
PROPOSED GATE / KNIFE VALVE
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY: PIPING PLAN
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1" = 50' DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50
1200 1200
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50
PROFILE
50 0 50 100
SLUDGE REMOVAL LINE S-1
PROFILE
50 0 50 100
SLUDGE REMOVAL LINE S-2
1200 1200
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
CAM AND GROVE WITH
LOCKABLE CAP
PROPOSED GRADEEXISTING GROUND
SLUDGE REMOVAL LINE S-1
6 INCH HDPE SDR 11 PIPE
CAM AND GROVE WITH
LOCKABLE CAP CAM AND GROVE WITH
LOCKABLE CAP
SLUDGE REMOVAL LINE S-2
6 INCH HDPE SDR 11 PIPE EXISTING GROUND
BOTTOM OF 6 INCH HDPE PIPE TRENCH TO BE
A MINIMUM OF 36 INCHES FROM GROUND SURFACE
NOTE:
BOTTOM OF 6 INCH HDPE PIPE TRENCH TO BE
A MINIMUM OF 36 INCHES FROM GROUND SURFACE
NOTE:
6"
MIN. TRENCH
36 INCHES
BEDDING 4 INCHES
COMPACTED TO MIN. 90% STANDARD PROCTOR
INITIAL BACKFILL 6 INCHES
ABOVE PIPE CROWN
TYPICAL HDPE PIPE CROSS SECTION
1 1/2 INCH CRUSHER RUN LIMESTONE
EARTHEN FILL/ORIGINAL GROUND6 INCHES
PIPE DIAMETER
NOT TO SCALE
REVISIONS
DATE: ( ):BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY: SLUDGE REMOVAL LINE PROFILES AND DETAIL
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: AS SHOWN DATE: APRIL 2025
601 57th STREET SE
CHARLESTON, WV 25304
OFFICE: 1-304-926-0499
FAX: 1-304-926-0458
ASSET MINING, LLC
PERMIT S-5030-95
BOONE COUNTY, WEST VIRGINIA
CBF
CBF
NLP
CBF
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
AutoCAD SHX Text
6" HDPE PIPE
AutoCAD SHX Text
6" HDPE PIPE
AutoCAD SHX Text
6" X 2" HDPE REDUCER
AutoCAD SHX Text
2" STAINLESS STEEL BALL VALVE
AutoCAD SHX Text
CAM & GROVE WITH LOCKABLE CAP DICKSON BRAND OR EQUAL
AutoCAD SHX Text
6" STAINLESS STEEL - NPT MALE THREAD
AutoCAD SHX Text
2" STAINLESS STEEL - NPT MALE THREAD
AutoCAD SHX Text
6" HDPE WYE
AutoCAD SHX Text
6" HDPE PIPE
AutoCAD SHX Text
6" HDPE PIPE
AutoCAD SHX Text
CAM & GROVE WITH LOCKABLE CAP DICKSON BRAND OR EQUAL
AutoCAD SHX Text
6" STAINLESS STEEL - NPT MALE THREAD
AutoCAD SHX Text
6" HDPE WYE
AutoCAD SHX Text
CAM & GROVE WITH LOCKABLE CAP DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
TYPICAL GATE / KNIFE VALVE
AutoCAD SHX Text N.T.S.
| Applicable Addendum Category: |
| Description of Modification to Solicitation: |
| Terms and Conditions: |
| Asset Mining ARFQ 25-73 Revisions.pdf |
| Sheets and Views |
| SHEET 2 |
| Insert from: "11 - S-5030-95_PIPING PLAN-SHEET.pdf" |
| Sheets and Views |
| SHEET |
| Insert from: "12 - S-5030-95_SLUDGE LINE PROFILES AND DETAILS (2).pdf" |
| Sheets and Views |
| SHEET (2) |
File details come from the government source that posted it. Updated .