ADDENDUM 2 ARFQ DEP25-73.pdf

PDF 2 MB Posted

Attached to
OSR Asset Mining, LLC - S-5030-95
Solicitation number
ARFQ-0313-DEP2500000073-3
Issued by
Berkeley County, West Virginia

About this file

This document is Addendum #2 for Agency Solicitation Number ARFQ DEP2500000073, issued by the West Virginia Department of Environmental Protection's Division of Land Restoration and Office of Special Reclamation. The addendum extends the bid closing date from 6/26/25 to 7/2/25 and includes vendor questions and responses, as well as some drawing revisions. The solicitation appears to be for a project involving pond and sludge cell construction, access road upgrades, and related infrastructure work at a mining site in Boone County, West Virginia.

The estimated project cost is $344,113, and the addendum provides clarifications on various project details, including access road construction, sludge removal lines, road maintenance, pond dewatering, and material handling. Key points include using 6-inch HDPE SDR 11 pipes, upgrading existing access roads with specific layering requirements, and converting Pond No. 2 into a sludge cell. The contractor will be responsible for establishing survey control, installing sediment silt fencing, and following state wage requirements. Remaining road maintenance funds will be deducted in the final change order if not fully utilized.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGENCY SOLICITATION NUMBER – ARFQ DEP2500000073

Addendum Number: _2___

The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

[x] Modify bid opening date and time

[x] Modify specification of product or service being sought

[x] Attachment of vendor questions and responses

[] Attachment of pre-bid sign-in sheet

[] Correction of error

[] Other

Description of Modification to Solicitation:

This Addendum issued to publish and distribute the attached documentation to the vendor community.

1. To extend bid close from 6/26/25 to 7/2/25.

2. Questions & answers

3. Revisions

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

Addendum #3 – Vendor Questions Response

ARFQ DEP2500000073

OSR Asset Mining, LLC - S-5030-95

Q1. It is the plan to install all Access Roads as “New” and using the details shown in the drawings? I know some access roads were existing, but needed repaired or cleared to make them usable again

A1. The plan is to upgrade the two existing access roads as proposed in the plans. The typical details included in the plans show the layers of materials including separation fabric that will be included in the construction of the new road surface.

Q2. Is there a spec on the Sludge Lines #1 and #2 in regard to size/diameter or brand?

A2. On the Piping Plan it says 6 Inch HDPE SDR 11 pipe. No particular brand is specified.

Q3. Regarding “Road Maintenance”… on past projects that we bid, this line item was assigned a total dollar amount to be used…. Is there a dollar amount this time or is it up to the contractor to set that amount that will be needed?

A3. The Road Maintenance line item will be a lump sum bid item. It will be used for any necessary repairs which may need to be made to the existing access road to the site should it begin to deteriorate in a particular area. Any area in question would need to be reviewed and approved by the DEP representative on site.

Q4. If the Contractor “sets” the Road Maintenance amount and it is not needed 100%, will that money that is remaining go to the contractor or is it given as credit back to the owner?

A4. If the full amount is not required, the remaining amount will be deducted in the final change order.

Q5. Is there an Engineer’s Estimate for this project?

A5. The estimated project cost is $344,113.

Q6. Are there any restrictions on how fast Pond No. 2 can be drained?

A6. Pond No. 2 shall be dewatered in a controlled manner which will prevent sediment from being discharged.

Q7. Can Pond No. 2 be breached to dewater it for construction purposes?

A7. The water level shall be lowered initially by pumping. After the initial pumping phase the DEP representative on site will approve the level which breaching may occur in order to prevent ponding of water during construction. If Pond No. 2 is breached for construction purposes, the material removed must be placed back and compacted in

OSR Asset Mining, LLC - S-5030-95 accordance with the Technical Specification 6-5 Unclassified Excavation. The cost to do so will be incidental to the lump sum bid price submitted and will be at no additional cost to DEP.

Q8. Where will the material come from to construct the sludge cell?

A8. The material to construct the sludge cell will be excavated at the site as shown in detail on Sheets 8, 9 and 10.

Q9. Are there existing survey control points?

A9. There are no existing survey control points established. It is the responsibility of the contractor to establish survey control for this project.

Q10. Can the baffles being removed be buried on site?

A10. No, they must be disposed of in the garbage.

Q11. How far down is the material to be removed in Pond 1A?

A11. Down the top surface of the old liner.

Q12. Will the contractor be responsible for water treatment during construction?

A12. The DEP will be responsible for treating water quality parameters included in the NPDES permit. However, the contractor will be responsible for installing and maintaining sediment silt fence.

Q13. Are Davis Bacon wages required?

A13. No

Q14. May pond cleaning material be placed upon the hill (on previously mined area), covered and seeded?

A14. The plan is for Pond No. 2 to be converted into the sludge cell. Any material removed may be placed at the head of Pond No. 2 in the vicinity of the proposed turnaround area shown on the plans. Once the sludge cell has been constructed, any pond cleaning material from Pond No. 1 and 1A will be placed in the constructed cell.

Q15. What are the wage requirements?

A15. The contractor must pay wage rates based upon current state wage requirements.

OSR Asset Mining, LLC - S-5030-95

Drawing Revisions

Sheet 7 – Changed the title on spillway detail from Pond No. 1 Spillway Detail to Pond No. 1A Spillway Detail.

Sheet 11 – Added proposed Gate / Knife Valve locations.

Sheet 12 Added Typical Gate / Knife Valve Detail.

0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00

ACCESS ROAD PROFILE

20 0 20 40

POND NO. 1A

18 INCH CORRUGATED HDPE PIPE

ROADSIDE CONVEYANCE DITCH

(SEE TYPCIAL DETAIL)

NOTE:

APPROXIMATE CULVERT LOCATION MAY

BE FIELD ADJUSTED AT THE DIRECTION

OF THE DEP FIELD REPRESENTATIVE.

3.40% 0.90%

24.19% 5.74%

1160 1160

POND NO. 1A SPILLWAY DETAIL

NOT TO SCALE

DEPTH LINING

(FT)

TOP WIDTH

(FT)

D T

20.0

BOTTOM

WIDTH

(FT)

B

10.0 D50 = 12 INCHES

LIMESTONE RIPRAP

LINER

THICKNESS

(INCHES)

18.02.5

DESIGN

SLOPE VARIES SLOPE VARIES

SLOPE VARIES SLOPE VARIES

ROAD WIDTH

(12 FT. MINIMUM)

TIE INTO EXISTING CHANNEL

FL

O

W

A A'

DESIGN

BOTTOM

WIDTH

(B)

SLOPE = 9 H:1VSLOPE = 9 H:1V

TIE INTO EXISTING CHANNEL

SLO

PE VARIES SL

O

PE

V

AR

IE

S

D50 12 INCH LIMESTONE

RIPRAP

D50 12 INCH LIMESTONE

RIPRAP

SL

O

PE

V

AR

IE

S SLO

PE VARIES

CHANNEL DEPTH LINING

(FT)

TOP WIDTH

(FT)

NUMBER D T

2.0 46.0 18.0

BOTTOM

WIDTH

(FT)

B

10.0DRIVE THRU D50 = 12 INCHESCROSSING NO. 1

SECTION A-A'

ACCESS

ROAD

ACCESS

ROAD

ROAD WIDTH

(12 FT. MINIMUM)

2.00 %

DEPTH "D"

TOP WIDTH "T"

18 INCHES MIN.

BOTTOM WIDTH "B"

DRIVE THRU CROSSING NO. 1

NOT TO SCALE

SLOPE = 9H:1V OR

ON GENTLE SLOPE

TO ALLOW PASSENGER

VEHICLE PASSAGE

SLOPE = 9H:1V OR

ON GENTLE SLOPE

TO ALLOW PASSENGER

VEHICLE PASSAGE

LIMESTONE RIPRAP

LINER

THICKNESS

(INCHES)

FLOW PATH

THROUGH

LIMESTONE

WOVEN GEOTEXTILE

FABRIC FOR SEPARATION

D50 = 2 INCH

LIMESTONE

FLOW

WOVEN GEOTEXTILE

FABRIC FOR

SEPARATION

2' LAP ALONG BED EDGE "TYPICAL

FOR ALL LIMESTONE BED BAFFLES"

NOTES:

1) LIMESTONE SHALL EXTEND ABOVE THE OUTLET FLOWLINE 2 FEET THE ENTIRE LENGTH AND WIDTH OF

LIMESTONE BEDS TO ENSURE ALL FLOW PASSES THROUGH LIMESTONE BED.

2) ALL LIMESTONE SHALL BE CLEAN.

3) WOVEN GEOTEXTILE FABRIC FOR SEPARATION MEETING REQUIREMENTS OF AASHTO M288 SECTION 7 CLASS 2 WILL BE UTILIZED TO FORCE WATER FLOW DOWN AND THROUGH THE BOTTOM 2 FEET AND TOP PORTIONS OF THE

LIMESTONE BED.

4) THE WOVEN GEOTEXTILE FABRIC FOR SEPARATION WILL BE PLACED AT THE APPROXIMATE LOCATION SHOWN FOR EACH LIMESTONE BED. THE FABRIC WILL EXTEND FROM THE TOP OF THE LIMESTONE BED TO A DEPTH OF

2' OFF THE BOTTOM OF POND.

5) LIMESTONE BED SHALL HAVE SIDE SLOPES OF 2:1.

LIMESTONE

SLOPED 2:1

OPEN WATER

OUTLETINLET

OPEN WATER

LIMESTONE

SLOPED 2:1

60'

POND NO. 1A

SECTION A-A

A

A

1 FOOT CAP OF D50 = 6 INCH

LIMESTONE RIP RAP

1 FOOT OF D50 = 6 INCH

LIMESTONE RIP RAP ON FACE

LIMESTONE BED DETAIL

88' MINIMUM

WOVEN GEOTEXTILE SEPARATION FABRIC

ACCESS ROAD

TYPICAL CROSS SECTION

1/2 INCH PER FOOT

3 INCH LAYER OF 1 1/2 INCH

CRUSHER RUN LIMESTONE

1.50 FT.

EXISTING FILL / ORIGINAL GROUND

NOT TO SCALE

MIN. TRENCH

38 INCHES

HAUNCH 9 INCHES

TO SPRINGLINE

BEDDING 4 INCHES

COMPACTED TO MIN. 90% STANDARD PROCTOR

INITIAL BACKFILL 15 INCHES

6 INCHES ABOVE PIPE CROWN

TYPICAL HDPE PIPE CROSS SECTION

1 1/2 INCH CRUSHER RUN LIMESTONE

EARTHEN FILL/ORIGINAL GROUND18 INCHES

PIPE DIAMETER

NOT TO SCALE

WOVEN GEOTEXTILE SEPARATION FABRIC

ACCESS ROAD

TYPICAL CROSS SECTION WITH PIPE

1/2 INCH PER FOOT

6 INCHES OF

2 1/2 INCH LIMESTONE

3 INCH LAYER OF 1 1/2 INCH

CRUSHER RUN LIMESTONE

12 FT.

1/4

3.0 FT.

EXISTING FILL / ORIGINAL GROUND

NOT TO SCALE

3%.

PROPOSED 18 INCH CORRUGATED HDPE PIPE

NOTE: REFER TO PLAN SHEETS FOR ROADWAY

AND DITCH ALIGNMENT

BERM

12 FT.

BERM

6 INCHES OF

2 1/2 INCH LIMESTONE

REVISIONS

DATE: ( ):BY:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

POND NO. 1A

PLAN VIEW, PROFILE AND SECTIONS

SHEET 2 OF 2

TOTAL

SHT. NO.

OFFICE OF SPECIAL RECLAMATION

SCALE: AS SHOWN DATE: APRIL 2025

601 57th STREET SE

CHARLESTON, WV 25304

OFFICE: 1-304-926-0499

FAX: 1-304-926-0458

ASSET MINING, LLC

PERMIT S-5030-95

BOONE COUNTY, WEST VIRGINIA

CBF

CBF

NLP

CBF

Division of Land Restoration Office of Special Reclamation

West Virginia Department of Environmental Protection

AutoCAD SHX Text B

AutoCAD SHX Text D

AutoCAD SHX Text 1.5

AutoCAD SHX Text

AutoCAD SHX Text 1.5

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text

LINER THICKNESS

1300 13

DRIVE THRU

CROSSING NO. 1

POND NO. 1

LIMESTONE BED

POND NO. 1

PROPOSED

LIMESTONE BED

PROPOSED

SLUDGE CELL

PROPOSED

CHANNEL NO. 1

SLUDGE CELL

ACCESS ROAD

POND NO. 1A

ACCESS ROAD

DRIVE THRU

CROSSING NO. 2

LIMITS OF DISTURBANCE

POND NO. 1A

CAM AND GROVE WITH

LOCKABLE CAP

CAM AND GROVE WITH

LOCKABLE CAP

CAM AND GROVE WITH

LOCKABLE CAP

CAM AND GROVE WITH

LOCKABLE CAP

CAM AND GROVE WITH

LOCKABLE CAP

SLUDGE REMOVAL LINE S-1

6 INCH HDPE SDR 11 PIPE

SLUDGE REMOVAL LINE S-2

6 INCH HDPE SDR 11 PIPE

SLUDGE REMOVAL LINE S-1

6 INCH HDPE SDR 11 PIPE

PROPOSED GATE / KNIFE VALVE

REVISIONS

DATE: ( ):BY:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY: PIPING PLAN

TOTAL

SHT. NO.

OFFICE OF SPECIAL RECLAMATION

SCALE: 1" = 50' DATE: APRIL 2025

601 57th STREET SE

CHARLESTON, WV 25304

OFFICE: 1-304-926-0499

FAX: 1-304-926-0458

ASSET MINING, LLC

PERMIT S-5030-95

BOONE COUNTY, WEST VIRGINIA

CBF

CBF

NLP

CBF

Division of Land Restoration Office of Special Reclamation

West Virginia Department of Environmental Protection

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50

1200 1200

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50

PROFILE

50 0 50 100

SLUDGE REMOVAL LINE S-1

PROFILE

50 0 50 100

SLUDGE REMOVAL LINE S-2

1200 1200

CAM AND GROVE WITH

LOCKABLE CAP

CAM AND GROVE WITH

LOCKABLE CAP

CAM AND GROVE WITH

LOCKABLE CAP

PROPOSED GRADEEXISTING GROUND

SLUDGE REMOVAL LINE S-1

6 INCH HDPE SDR 11 PIPE

CAM AND GROVE WITH

LOCKABLE CAP CAM AND GROVE WITH

LOCKABLE CAP

SLUDGE REMOVAL LINE S-2

6 INCH HDPE SDR 11 PIPE EXISTING GROUND

BOTTOM OF 6 INCH HDPE PIPE TRENCH TO BE

A MINIMUM OF 36 INCHES FROM GROUND SURFACE

NOTE:

BOTTOM OF 6 INCH HDPE PIPE TRENCH TO BE

A MINIMUM OF 36 INCHES FROM GROUND SURFACE

NOTE:

6"

MIN. TRENCH

36 INCHES

BEDDING 4 INCHES

COMPACTED TO MIN. 90% STANDARD PROCTOR

INITIAL BACKFILL 6 INCHES

ABOVE PIPE CROWN

TYPICAL HDPE PIPE CROSS SECTION

1 1/2 INCH CRUSHER RUN LIMESTONE

EARTHEN FILL/ORIGINAL GROUND6 INCHES

PIPE DIAMETER

NOT TO SCALE

REVISIONS

DATE: ( ):BY:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY: SLUDGE REMOVAL LINE PROFILES AND DETAIL

TOTAL

SHT. NO.

OFFICE OF SPECIAL RECLAMATION

SCALE: AS SHOWN DATE: APRIL 2025

601 57th STREET SE

CHARLESTON, WV 25304

OFFICE: 1-304-926-0499

FAX: 1-304-926-0458

ASSET MINING, LLC

PERMIT S-5030-95

BOONE COUNTY, WEST VIRGINIA

CBF

CBF

NLP

CBF

Division of Land Restoration Office of Special Reclamation

West Virginia Department of Environmental Protection

AutoCAD SHX Text

6" HDPE PIPE

AutoCAD SHX Text

6" HDPE PIPE

AutoCAD SHX Text

6" X 2" HDPE REDUCER

AutoCAD SHX Text

2" STAINLESS STEEL BALL VALVE

AutoCAD SHX Text

CAM & GROVE WITH LOCKABLE CAP DICKSON BRAND OR EQUAL

AutoCAD SHX Text

6" STAINLESS STEEL - NPT MALE THREAD

AutoCAD SHX Text

2" STAINLESS STEEL - NPT MALE THREAD

AutoCAD SHX Text

6" HDPE WYE

AutoCAD SHX Text

6" HDPE PIPE

AutoCAD SHX Text

6" HDPE PIPE

AutoCAD SHX Text

CAM & GROVE WITH LOCKABLE CAP DICKSON BRAND OR EQUAL

AutoCAD SHX Text

6" STAINLESS STEEL - NPT MALE THREAD

AutoCAD SHX Text

6" HDPE WYE

AutoCAD SHX Text

CAM & GROVE WITH LOCKABLE CAP DETAIL

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

TYPICAL GATE / KNIFE VALVE

AutoCAD SHX Text N.T.S.

Applicable Addendum Category:
Description of Modification to Solicitation:
Terms and Conditions:
Asset Mining ARFQ 25-73 Revisions.pdf
Sheets and Views
SHEET 2
Insert from: "11 - S-5030-95_PIPING PLAN-SHEET.pdf"
Sheets and Views
SHEET
Insert from: "12 - S-5030-95_SLUDGE LINE PROFILES AND DETAILS (2).pdf"
Sheets and Views
SHEET (2)