Appendix B1 - Bid Alternates RCC Fire Protection System Repl.pdf

PDF 233 KB Posted

Attached to
CTF RCC Fire Protection System Repl IFB1 TBD CMS210772
Solicitation number
IFB1 CBAA 2027000027 2
Issued by
Garfield County, Colorado

About this file

This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for a Fire Protection System Replacement project at Rifle Correctional Center under the Colorado Department of Corrections (Project No. 2026-031M25). The form provides the framework for bidders to submit pricing for additive and deductive alternates to the base bid. Additive Alternate 1 (A.A.1) involves a Graphic Workstation in Master Control, referenced to specification section 284621 - 2.11.B. The form contains ten lines each for additive alternates (A.A.1 through A.A.10) and deductive alternates (D.A.1 through D.A.10), with corresponding specification section references and pricing fields. Bidders must understand that additive and deductive alternates are mutually exclusive—only one type may be used in a single bid response.

The form requires bidders to enter pricing for each alternate and sign and date the document by their company representative. Per the instructions, bidders should refer to Item #8 in the Instructions to Bidders (SBP-6.12) and the contract documents for thorough descriptions of all alternates. The specific pricing amounts for each alternate line item are to be filled in by the bidding contractor, with the base bid to be modified accordingly if any alternates are accepted.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBP-6.131

Rev 7/2025 R1

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

BID ALTERNATES

Institution or Agency:

Project No./Project Name:

INSTRUCTIONS:

1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.

2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.

3. Refer to the contract documents for thorough description(s) of the alternates.

4. If alternates are accepted, the base bid will be modified by the amount entered below.

ADDITIVE ALTERNATES

Alt. # Description of Additive Alternate Spec. Section Pricing

A.A.1 $

A.A.2 $

A.A.3 $

A.A.4 $

A.A.5 $

A.A.6 $

A.A.7 $

A.A.8 $

A.A.9 $

A.A.10 $ lanexxTX Line lanexxTX Line

SBP-6.131

Rev 7/2025 R1

DEDUCTIVE ALTERNATES

Alt. # Description of Deductive Alternate Spec. Section Pricing

D.A.1

D.A.2 $

D.A.3 $

D.A.4 $

D.A.5 $

D.A.6 $

D.A.7 $

D.A.8 $

D.A.9 $

D.A.10 $

THE BIDDER

BY_________________________________________________________________

Company Name

BY__________________________________________________________________

Signature Date

BID ALTERNATES
INSTRUCTIONS:
ADDITIVE ALTERNATES
DEDUCTIVE ALTERNATES
THE BIDDER
TextInput.127: Colorado Department of Corrections
TextInput.173: 2026-031M25 / Fire Protection System Replacement, Rifle Correctional Center
TextInput:
AA1:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1: Graphic Workstation in Master Control
AA1S:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1: 284621 - 2.11.B
AA1P:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1:
DA1:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1S:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1P:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:

Company Name:

File details come from the government source that posted it. Updated .