Appendix B1 - Bid Alternates RCC Fire Protection System Repl.pdf
PDF 233 KB Posted
- Solicitation number
- IFB1 CBAA 2027000027 1
- Issued by
- El Paso County, Colorado
About this file
This is a Bid Alternates form for the State of Colorado Office of the State Architect's State Buildings Program, prepared for the Colorado Department of Corrections' Fire Protection System Replacement project at Rifle Correctional Center (Project 2026-031M25). The form provides a standardized template for bidders to submit pricing for additive and deductive alternates to the base bid. Additive Alternate 1 (A.A.1) includes a Graphic Workstation in Master Control, referenced in Specification Section 284621 - 2.11.B. The form contains ten line items each for additive alternates and deductive alternates, though only the first additive alternate is populated in this document. Bidders are instructed that additive and deductive alternates are mutually exclusive—only one category may be used per project, and all alternates must be thoroughly described in the associated contract documents.
The form requires bidders to enter pricing for each alternate and submit the completed document with company name, signature, and date. Per the Instructions to Bidders (SBP-6.12, Item 8), additional details regarding alternate specifications and use are incorporated by reference. The base bid will be modified by the amounts entered for accepted alternates. This document serves as the official mechanism for capturing alternative pricing options and allows the State of Colorado to evaluate project costs under different scope scenarios for the fire protection system replacement at the correctional facility.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
| BID ALTERNATES |
| INSTRUCTIONS: |
| ADDITIVE ALTERNATES |
| DEDUCTIVE ALTERNATES |
| THE BIDDER |
| TextInput.127: Colorado Department of Corrections |
| TextInput.173: 2026-031M25 / Fire Protection System Replacement, Rifle Correctional Center |
| TextInput: |
| AA1: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: Graphic Workstation in Master Control |
| AA1S: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: 284621 - 2.11.B |
| AA1P: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| DA1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1S: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1P: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
Company Name:
File details come from the government source that posted it. Updated .