This is an Appendix document containing estimated unit price quantities for the Sand and Spring Run Subsidence Repair project (F-001-260-004) in Maryland. The project encompasses stream restoration and environmental remediation work across multiple zones including in-stream structures, lower and upper stream banks, and forested floodplain areas. The scope of work includes site preparation, mobilization/demobilization, construction layout staking, installation of erosion control measures (compost filter sock, stabilized construction entrance, stream diversions), channel excavation and embankment placement totaling approximately 620 cubic yards, reconstruction of boulder structures (J-hooks and vanes), stream channel riffles backfilling (255 linear feet), grouted riprap channel backfill (60 cubic yards), and toe wood repair and extension with live brush layering (395 linear feet combined). The project also includes significant planting and revegetation components with 2,560 two-inch plugs, 138 one-gallon trees and shrubs, seeding using native meadow mix and habitat mix (totaling 47 pounds), biodegradable erosion control matting (1,900 square yards), temporary seeding (316 pounds), and straw mulching (189 bales). Material deliveries include AASHTO-specified stone aggregates and riprap in various classifications.

The document serves as a reference pricing schedule that outlines estimated quantities for bid preparation purposes. No specific pricing, contract terms, award dates, or renewal options are detailed in this quantity estimate appendix. The quantities are organized by work category and unit type (lump sum, linear feet, cubic yards, each, pounds, square yards, tons, and bales) to facilitate contractor estimation and bid submission. This reference document establishes the scope and scale of materials and labor required for the subsidence repair and stream restoration project without establishing final pricing terms or contract award conditions.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. Item Unit Quantity 1 Site Preparation (Clearing and Grubbing) (All materials, equipment, and labor) LS 1 2 Mobilization/Demobilization (All materials, equipment, and labor) LS 1 3 Construction Layout Staking (All materials, equipment, and labor) LS 1 4 18-Inch Compost Filter Sock LF 920 5 Stream Diversion Pump-Around (as needed) EA 2 6 Stabilized Construction Entrance EA 1 7 Temporary Stream Crossing EA 1

8 Channel Deposition Excavation CY 295 9 Channel Embankment Placement CY 325

10 Reconstruction of Boulder J-Hook (All materials, equipment, and labor) EA 1 11 Reconstruction of Boulder Vane (All materials, equipment, and labor) EA 1 12 Backfilling of Stream Channel Riffles (All materials, equipment, and labor) LF 255 13 Grouted RipRap Channel Backfill (All materials, equipment, and labor) CY 60 14 Repair of Toe Wood with Live Brush Layering (All materials, equipment, and labor) LF 125 15 Extension of Toe Wood with Live Brush Layering (All materials, equipment, and labor) LF 270

16 2-in plugs (see Planting Plan for spacing and type) EA 2,560 17 ERNMX-122 FACW Meadow Mix LBS 2

18 Trees & shrubs - 1 gallon container (see Planting Plan for spacing and type) EA 72 19 ERNMX-122 FACW Meadow Mix LBS 3

21 Trees & shrubs - 1 gallon container (see Planting Plan for spacing and type) EA 66 22 ERNMX-122 FACW Meadow Mix LBS 17

23 ERNMX-173 Eastern Native Habitat & CREP Mix LBS 25

24 Biodegradable Erosion Control Matting (700 Gram Coir Fiber) SY 1,900 25 Temporary Seeding LBS 316 26 Straw Mulching BALES 189

12A AASHTO #1 Stone (Delivered and installed) Ton 1 12B AASHTO #67 Stone (Delivered and installed) Ton 1 12C AASHTO R-3 RipRap (Delivered and installed) Ton 1 12D AASHTO R-4 RipRap Stone (Delivered and installed) Ton 1

AASHTO

Planting Zone - Property Boundary and Grading Extents

E&S - Stream and Floodplain

SAND SPRING RUN SUBSIDENCE REPAIR (F-001-260-004) ESTIMATED QUANTITIES

Grading

In Stream Structures

Planting Zone - Lower Stream Bank (Lower One-Third Channel Width)

Planting Zone - Upper Stream Bank (Upper One-Third Channel Width)

Planting Zone - Forested Floodplain