Schedule of Items.docx
DOCX document 37 KB Posted
- Solicitation number
- AG-9702-S-10-0347
About this file
Bid Schedule dated 06/04/2010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule of Items061510.docx | DOCX document | |
| SF30-005-06-15.rtf | RTF text file | |
| amend04Vista Construction Questions Num 2.docx | DOCX document | |
| SF30-004-06-01-2010_SEC.rtf | RTF text file | |
| amend04DTLS_SHEETS L-5.pdf | ||
| amend04Schedule of Items.docx | DOCX document | |
| SF30-003-06-01-2010_SEC.rtf | RTF text file | |
| Traffic Control Plan Special Provision Sect 702-A 2004.pdf | ||
| Drawings Addendum 060310.pdf | ||
| Vista Construction Questions Num 1.docx | DOCX document | |
| SF30-002-06-01-2010_SEC.rtf | RTF text file | |
| CONSTRUCTION_RFP.doc | DOC document | |
| REVISEDSchedule of Items 052110.pdf | ||
| SF30_SEC.rtf | RTF text file | |
| 7 - MCT Drawings.pdf | ||
| 1 - MCT Vista Specification and Drawing Listing.pdf | ||
| 5 - MCT Vista Interpretive Plan.pdf | ||
| 3 - MCT Vista Specs Vol I.pdf | ||
| Bid Bond_Standard_Form_24.pdf | ||
| CONSTRUCTION_RFP.doc | DOC document | |
| 2 - MCT Vista FP03 Supplement.pdf | ||
| 4 - MCT Vista Specs Vol II Roadway.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SCHEDULE OF ITEMS DATED 06/04/2010
SECTION B – SERVICES AND PRICES
Mexican Canyon Trestle Vista Sacramento Ranger District Lincoln National Forest Otero County, NM
B- 1 - SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Project
15101
Mobilization – FP-03
Lump Sum
1.00
Highway Re-alignment & Parking Lot
Site Preparation
201000
Clearing and grubbing
Lump Sum
1.00
203000
Unclassified excavation
Cubic Yard
645*
203200
Borrow
Cubic Yard
2,595*
203301
Rock excavation
Cubic Yard
25*
Pavement
207000
Subgrade preparation
Square Yard
6,719.83*
303000
Base course
Ton
1,527.48*
304800
Base course testing by the contractor
Lump Sum
1.00
404000
Open graded friction course
Ton
251.46*
407000
Bituminous material for tack coat
Ton
5.00*
408100
Prime coat
Ton
5.00*
422500
Plant mix bitum. pvmt. (PMBP) sampling and testing by contractor
Lump Sum
1.00
423240
PMBP SP-III
Ton
2,613.77*
606532
Concrete wall barrier (42”)
Foot
320*
Erosion Control
603200
Silt fence
Foot
1,390.00*
603280
SWPPP management
Lump Sum
1.00
603325
Drop inlet protection (Type I)
Each
2.00
632100
Steep slope seeding
Acre
0.25*
Construction Traffic Control & Staking
618000
Traffic control management
Lump Sum
1.00
702800
Traffic control plan
Lump Sum
1.00
702801
Traffic control during construction
Lump Sum
1.00
702810
Traffic control devices for construction (Include 2 variable message boards in addition to NM DOT requirements)
Lump Sum
1.00
704099
Temporary striping
Foot
6,200.00*
801000
Construction staking by the contractor
Lump Sum
1.00
Signing & Striping
701000
Panel signs
Square Foot
50.00
701031
Remove and reset traffic sign
Each
11.00
701100
Steel post and base post for aluminum panel signs
Foot
30.00
703100
Road delineator type guide
Each
128.00
704204
Retroreflect. Plastic PVMT stripe 4"
Foot
9,305.00*
704208
Retroreflect. Plastic PVMT stripe 8"
Foot
550.00*
704783
Retro PTN’K PVMT mark handicapped sym
Each
1.00
Vertical Offset Parking Lot - Earthwork + Retaining Wall
Unclassified excavation
Cubic Yard
1,555.00*
203200
Borrow
Cubic Yard
949.00*
511800
Cantilever retaining wall
Foot
515.00*
Highway-Parking Separation
514032
Concrete barrier railings 32"
Foot
515.00*
606110
Metal barrier end Trtmnt (quadguard)
Each
4.00
Miscellaneous Site Work
601000
Removal of structures and obstructions (includes guard rail)
Lump Sum
1.00
606400
Remove and reinstall metal barrier
Foot
410.00*
Pedestrian Walkway
608004
Concrete walks - 4" depth, 4000 psi
Square Yard
338.11*
Drainage
570024
24" RCP
Foot
33.00*
570025
24" pipe end section
Each
1.00
602000
Riprap Class A
Cubic Yard
8.00*
604001
Geotextile Class 1
Square Yard
10.00*
609478
Conc Barr Curb & Gut D (6"x18")
Foot
402.00*
623301
Drop inlet
Each
2.00
Highway Landscape
329300
Shredded wood chip mulch - highway
Square Foot
2,700*
Native deciduous shrubs - highway
Each
Native ornamental grasses - highway
Each
Overlook
Observation Deck and Bridge
61063
3X8 rough sawn timber observation deck with footings and structure
Square Foot
800*
51200
Observation bridge (9' x 20') with footing and structure
Square Foot
180*
Pedestrian Walk
57300
Sidewalk railing system (concrete footings included)
Foot
400*
57300
Platform and deck railing system
Foot
115*
Interpretive Signs + Kiosk
N.A.
Interpretive panels mounted to sidewalk railings
Each
Terrain model mounted to sidewalk railing
Each
Overlook identification monument
Each
Sound mechanism device mounted to trestle
Each
Site Furnishings
129300
6' railroad tie bench (backed)
Each
2' square railroad tie bench with back
Each
| Base Bid TOTAL |
| $________ |
Options
Options 1 - Interpretive Structure
Pre-engineered 10' x 14' interpretive & information kiosk
Lump Sum
Interpretive panels mounted to kiosk
Each
Image Panel panels mounted to kiosk
Each
6' railroad tie bench (backless)
Each
| Option 1 - Interpretive Structure TOTAL |
| $________ |
Option 3 - Log Chute Exhibit Area
Install log flume trailside exhibit
Lump Sum
44300
Dry stack rock retaining wall (4' max ht.)
Square Foot
Trail surface (trail mix)
Square Foot
311000
Clearing & grubbing
Square Foot
Unclassified cut and place
Cubic Yard
Fine grading
Square Foot
| Option 3 - Interpretive Structure TOTAL |
| $________ |
Option 4 - Trestle Trail
Trestle trail (native surface)
Square Foot
1,320.00
Square Foot
1,540.00
Install historic rail in trail - rail provided by Gov’t
Foot
300.00
Improve historic railroad bed (clear rubble/rock fill, provide subbase for trail)
Square Foot
2,850
Square Foot
4,120.00
Historic railroad bed trail (trail mix)
Square Foot
2,800.00
Cubic Yard
Square Foot
2,800.00
| Option 4 - Trestle Trail TOTAL |
| $________ |
Option 5 - Lower Mexican Canyon Trail
Lower Mexican Canyon Trail (native surface)
Square Foot
2,520.00
Square Foot
2,860.00
329200
Native seeded areas
Square Foot
4,934.00
Square Foot
2,520.00
Cubic Yard
Square Foot
2,520.00
| Option 5 - Lower Mexican Canyon TOTAL |
| $________ |
Option 6 - Upper Mexican Canyon Trail
Upper Mexican Canyon Trail (native surface)
Square Foot
3,900.00
Square Foot
4,490.00
329200
Native seeded areas
Square Foot
7,562.00
Square Foot
3,900.00
Cubic Yard
Square Foot
3,900.00
| Option 6 - Upper Mexican Canyon Trail TOTAL |
| $________ |
Option #7 - Interpretive Bent Structures & Information Panels
Bent structure #1
Lump Sum
Bent structure #2
Lump Sum
Bent structure #3
Lump Sum
6' railroad tie bench (backless)
Each
6' railroad tie bench (backed)
Each
Interpretive panels mounted to kiosk
Each
| Option 7 - Interpretive Bent Structures & Information Panels TOTAL |
| $________ |
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization FP-03.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
* Denotes items paid as Contract Quantity.