Attachment 10 Revised Bid Schedule

View the file

Other files

File Type Posted
Schedule of Items061510.docx DOCX document
SF30-005-06-15.rtf RTF text file
amend04Vista Construction Questions Num 2.docx DOCX document
SF30-004-06-01-2010_SEC.rtf RTF text file
amend04DTLS_SHEETS L-5.pdf PDF
amend04Schedule of Items.docx DOCX document
SF30-003-06-01-2010_SEC.rtf RTF text file
Schedule of Items.docx DOCX document
Traffic Control Plan Special Provision Sect 702-A 2004.pdf PDF
Drawings Addendum 060310.pdf PDF
Vista Construction Questions Num 1.docx DOCX document
SF30-002-06-01-2010_SEC.rtf RTF text file
CONSTRUCTION_RFP.doc DOC document
SF30_SEC.rtf RTF text file
7 - MCT Drawings.pdf PDF
1 - MCT Vista Specification and Drawing Listing.pdf PDF
5 - MCT Vista Interpretive Plan.pdf PDF
3 - MCT Vista Specs Vol I.pdf PDF
Bid Bond_Standard_Form_24.pdf PDF
CONSTRUCTION_RFP.doc DOC document
2 - MCT Vista FP03 Supplement.pdf PDF
4 - MCT Vista Specs Vol II Roadway.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

Mexican Canyon Trestle Vista Sacramento Ranger District

Lincoln National Forest

Otero County, NM

B‐ 1 ‐ SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

Project

15101

Mobilization – FP‐03 Lump Sum 1.00

Highway Re‐alignment & Parking Lot

Site Preparation

201000

Clearing and grubbing Lump Sum 1.00

203000

Unclassified excavation Cubic Yard 645*

203200

Borrow Cubic Yard 2,595*

203301

Rock excavation Cubic Yard 25*

Pavement

207000

Subgrade preparation Square Yard 6,719.83*

303000

Base course Ton 1,527.48*

304800

Base course testing by the contractor Lump Sum 1.00

404000

Open graded friction course Ton 251.46*

407000

Bituminous material for tack coat Ton 5.00*

408100

Prime coat Ton 5.00*

422500

Plant mix bitum. pvmt. (PMBP) sampling and testing by contractor

Lump Sum 1.00

423240

PMBP SP‐III Ton 2,613.77*

606532

Concrete wall barrier (42”) Foot 320*

Erosion Control

603200

Silt fence Foot 1,390.00*

603280

SWPPP management Lump Sum 1.00

603325

Drop inlet protection (Type I) Each 2.00

632100

Steep slope seeding Acre 0.25*

Construction Traffic Control & Staking

618000

Traffic control management Lump Sum 1.00

622200

Field office Each 1.00

702800

Traffic control plan Lump Sum 1.00

702801

Traffic control during construction Lump Sum 1.00

702810

Traffic control devices for construction (Included 2 variable message boards in addition to NM DOT requirements)

704099

Temporary striping Foot 6,200.00*

801000

Construction staking by the contractor Lump Sum 1.00

Signing & Striping

701000

Panel signs Square Foot 50.00

701031

Remove and reset traffic sign Each 11.00

701100

Steel post and base post for aluminum panel signs Foot 30.00

703100

Road delineator type guide Each 128.00

704204

Retroreflect. Plastic PVMT stripe 4" Foot 9,305.00*

704208

Retroreflect. Plastic PVMT stripe 8" Foot 550.00*

704783

Retro PTN’K PVMT mark handicapped sym Each 1.00

Vertical Offset Parking Lot ‐ Earthwork + Retaining Wall

Unclassified excavation Cubic Yard 1,555.00*

203200

Borrow Cubic Yard 949.00*

511800

Cantilever retaining wall Foot 515.00*

Highway‐Parking Separation

514032

Concrete barrier railings 32" Foot 515.00*

606110

Metal barrier end Trtmnt (quadguard) Each 1.00

Miscellaneous Site Work

601000

Removal of structures and obstructions (includes guard rail)

606400

Remove and reinstall metal barrier Foot 410.00*

Pedestrian Walkway

608004

Concrete walks ‐ 4" depth, 4000 psi Square Yard 338.11*

Drainage

570024

24" RCP Foot 33.00*

570025

24" pipe end section Each 1.00

602000

Riprap Class A Cubic Yard 8.00*

604001

Geotextile Class 1 Square Yard 10.00*

609478

Conc Barr Curb & Gut D (6"x18") Foot 402.00*

623301

Drop inlet Each 2.00

Highway Landscape

329300

Shredded wood chip mulch ‐ highway Square Foot 2,700*

Native deciduous shrubs ‐ highway Each 60

Native ornamental grasses ‐ highway Each 41

Overlook

Observation Deck and Bridge

61063

3X8 rough sawn timber observation deck with footings and structure

Square Foot 800*

51200

Observation bridge (9' x 20') with footing and structure Square Foot 180*

Pedestrian Walk

57300

Sidewalk railing system (concrete footings included) Foot 400*

57300

Platform and deck railing system Foot 115*

Interpretive Signs + Kiosk

N.A.

Interpretive panels mounted to sidewalk railings Each 2

Terrain model mounted to sidewalk railing Each 1

Overlook identification monument Each 1

Sound mechanism device mounted to trestle Each 1

Site Furnishings

129300

6' railroad tie bench (backed) Each 1

2' square railroad tie bench with back Each 2

Base Bid TOTAL $________

Options

Options 1 ‐ Interpretive Structure

Pre‐engineered 10' x 14' interpretive & information kiosk and p/v security lighting

Lump Sum 1

Interpretive panels mounted to kiosk Each 4

Image Panel panels mounted to kiosk Each 2

6' railroad tie bench (backless) Each 1

Option 1 ‐ Interpretive Structure TOTAL $________

Option 3 ‐ Log Chute Exhibit Area

Install log flume trailside exhibit Lump Sum 1

44300

Dry stack rock retaining wall (4' max ht.) Square Foot 225

Trail surface (trail mix) Square Foot 500

311000

Clearing & grubbing Square Foot 500

Unclassified cut and place Cubic Yard 7

Fine grading Square Foot 500

Option 3 ‐ Interpretive Structure TOTAL $________

Option 4 ‐ Trestle Trail

Trestle trail (native surface) Square Foot 1,320.00

Dry stack rock retaining wall (4' max ht.) Square Foot 1,540.00

Install historic rail in trail ‐ rail provided by Gov’t Foot 300.00

Improve historic railroad bed (clear rubble/rock fill, provide subbase for trail)

Square Foot 2,850

Clearing & grubbing Square Foot 4,120.00

Historic railroad bed trail (trail mix) Square Foot 2,800.00

Unclassified cut and place Cubic Yard 20

Fine grading Square Foot 2,800.00

Option 4 ‐ Trestle Trail TOTAL $________

Option 5 ‐ Lower Mexican Canyon Trail

Lower Mexican Canyon Trail (native surface) Square Foot 2,520.00

Dry stack rock retaining wall (4' max ht.) Square Foot 2,860.00

329200

Native seeded areas Square Foot 4,934.00

Clearing & grubbing Square Foot 2,520.00

Unclassified cut and place Cubic Yard 37

Fine grading Square Foot 2,520.00

Option 5 ‐ Lower Mexican Canyon TOTAL $________

Option 6 ‐ Upper Mexican Canyon Trail

Upper Mexican Canyon Trail (native surface) Square Foot 3,900.00

Dry stack rock retaining wall (4' max ht.) Square Foot 4,490.00

329200

Native seeded areas Square Foot 7,562.00

Clearing & grubbing Square Foot 3,900.00

Unclassified cut and place Cubic Yard 58

Fine grading Square Foot 3,900.00

Option 6 ‐ Upper Mexican Canyon Trail TOTAL $________

Option #7 ‐ Interpretive Bent Structures & Information Panels

Bent structure #1 Lump Sum 1

Bent structure #2 Lump Sum 1

Bent structure #3 Lump Sum 1

6' railroad tie bench (backless) Each 1

6' railroad tie bench (backed) Each 1

Interpretive panels mounted to kiosk Each 4

Option 7 ‐ Interpretive Bent Structures & Information Panels TOTAL $________

B‐2 ‐ NOTE: Payment for bond premiums in accordance with Clause 52.232‐5, Payments under Fixed‐Price Construction

Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization FP‐03.

Payment will be made on actual work performed as described in FP‐03 109.01 unless otherwise noted.

* Denotes items paid as Contract Quantity.