amend04Vista Construction Questions Num 2.docx

DOCX document 14 KB Posted

Attached to
RECOVERY: MEXICAN CANYON TRESTLE PHASE ll PLATFORM CONSTRUCTION
Solicitation number
AG-9702-S-10-0347
Issued by

About this file

Questions and answers

View the file

Other files

File Type Posted
Schedule of Items061510.docx DOCX document
SF30-005-06-15.rtf RTF text file
SF30-004-06-01-2010_SEC.rtf RTF text file
amend04DTLS_SHEETS L-5.pdf PDF
amend04Schedule of Items.docx DOCX document
SF30-003-06-01-2010_SEC.rtf RTF text file
Schedule of Items.docx DOCX document
Traffic Control Plan Special Provision Sect 702-A 2004.pdf PDF
Drawings Addendum 060310.pdf PDF
Vista Construction Questions Num 1.docx DOCX document
SF30-002-06-01-2010_SEC.rtf RTF text file
CONSTRUCTION_RFP.doc DOC document
REVISEDSchedule of Items 052110.pdf PDF
SF30_SEC.rtf RTF text file
7 - MCT Drawings.pdf PDF
1 - MCT Vista Specification and Drawing Listing.pdf PDF
5 - MCT Vista Interpretive Plan.pdf PDF
3 - MCT Vista Specs Vol I.pdf PDF
Bid Bond_Standard_Form_24.pdf PDF
CONSTRUCTION_RFP.doc DOC document
2 - MCT Vista FP03 Supplement.pdf PDF
4 - MCT Vista Specs Vol II Roadway.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mexican Canyon Trestle Clarifications and Answers to Questions

Drawings

· Corrected references on sheets L-5

Schedule

· Added site entrance signs: one for east bound traffic and one for west bound traffic.

· Added “Type 1-A” to the drop inlet item.

Questions

1. Rail details do not specify wall thickness of steel tubes. What is required?

ANSWER: The steel posts are HSS3x3x3/16

2. Sheet L5 Sections A-A & plan 4 call for 1" steel grating. Sheet L5 Section 7 calls for aluminum grating. Sheet S2.0 framing plan calls for 3/4" steel grating. Which is correct?

ANSWER: Use 3/4" steel grating

3. There is a note @ Detail 1, Sheet L-5 just below the section cut calling for 3 x 1/4" plate steel. What is this referring to?

ANSWER: See revised Sheet L-5; the callout was deleted.

4. Handrail notes @ detail 1 & 3 Sheet L-5 call for 1x1 1/4" tube top rail. @ plan 4 calls for 4x1 1/2" Tube. 4x1 1/2" is more readily available. Is this acceptable?

ANSWER: Structurally 4"x 1 1/2" is acceptable for top rail

5. How will the stream crossing be paid for?

ANSWER: The stream crossing is considered incidental to trail construction.

6. Will you allow the use of SPIV in lieu of the SPIII called out in the bid items?

ANSWER: Use SP III in your proposal; we may consider SP IV after award.

7. Can you provide more details or a standard reference for the drop inlet? The detail shown on sheet 39 (sub sheet PP) doesn’t detail the grate, rebar, etc. Can you please provide?

ANSWER: Use NMDOT Type 1-A drop inlet.