RECOVERY: MEXICAN CANYON TRESTLE PHASE ll PLATFORM CONSTRUCTION
Solicitation number
AG-9702-S-10-0347
Issued by

About this file

Attachment 3 Specs and Drawings Listings

View the file

Other files

File Type Posted
Schedule of Items061510.docx DOCX document
SF30-005-06-15.rtf RTF text file
amend04Vista Construction Questions Num 2.docx DOCX document
SF30-004-06-01-2010_SEC.rtf RTF text file
amend04DTLS_SHEETS L-5.pdf PDF
amend04Schedule of Items.docx DOCX document
SF30-003-06-01-2010_SEC.rtf RTF text file
Schedule of Items.docx DOCX document
Traffic Control Plan Special Provision Sect 702-A 2004.pdf PDF
Drawings Addendum 060310.pdf PDF
Vista Construction Questions Num 1.docx DOCX document
SF30-002-06-01-2010_SEC.rtf RTF text file
CONSTRUCTION_RFP.doc DOC document
REVISEDSchedule of Items 052110.pdf PDF
SF30_SEC.rtf RTF text file
7 - MCT Drawings.pdf PDF
5 - MCT Vista Interpretive Plan.pdf PDF
3 - MCT Vista Specs Vol I.pdf PDF
Bid Bond_Standard_Form_24.pdf PDF
CONSTRUCTION_RFP.doc DOC document
2 - MCT Vista FP03 Supplement.pdf PDF
4 - MCT Vista Specs Vol II Roadway.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mexican Canyon Vista

Construction

Specification and Drawing Listing

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL

HIGHWAY PROJECTS (FP‐03 U.S. Customary Units)

These specifications are included by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. The 700‐ page book entitled `` Standard Specifications for Construction of Roads and Bridges On Federal Highway Projects,'' (Publication No. FHWA‐FLH‐03‐002) is available from:

U.S. Government Bookstore Norwest Bank Building 201 W. 8th Street Pueblo, CO 81003 719‐544‐3142

ALL MATERIALS AND WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE

CODES AS REFERENCED IN THE CONTRACT AND AS REQUIRED BY LOCAL, STATE AND

FEDERAL LAW AND REGULATION INCLUDING THE FOLLOWING:

State and Local Codes (Uniform Building Code, National Electric Code, etc…) American Concrete Institute (ACI) American Society for Testing Materials (ASTM) American Association of State Highway and Transportation Officials (AASHTO) Architectural Woodwork Institute Manual of Uniform Traffic Control Devices (MUTCD) Americans with Disabilities Act (ADA) National Electric Safety Code (NESC) National Electric Code (NEC)

THE FOLLOWING FP‐03 SPECIFICATIONS ARE DIRECTLY APPLICABLE:

SECTION TITLE

101 Terms, Format, and Definitions 103 Scope of Work 104 Control of Work 105 Control of Material 106 Acceptance of Work 107 Legal Relations and Responsibility to the Public 109 Measurement and Payment 151 Mobilization 152 Construction Survey and Staking 154 Contractor Sampling and Testing 155 Schedules for Construction Contracts 157 Soil Erosion Control

170 Develop Water Supply and Watering

SPECIAL PROJECT SPECIFICATIONS LISTINGS

As listed in the FP‐03 Table of Contents

THE FOLLOWING ADDITIONAL SPECIFICATIONS ARE INCLUDED IN FULL TEXT

Division 01 – General Conditions

010100 – Summary of Work

010250 – Definition of Bid Items

011500 – Historical Site Protection

011700 – Accident Prevention

013300 – Submittal Procedures

014000 – Quality Requirements

014300 – Contractor Quality Control

014580 – Testing Laboratory Services

015000 – Temporary Facilities and Controls

017000 – Execution Requirements

017700 – Closeout Procedures

Division 03 – Concrete

033000 – Cast‐In‐Place Concrete/Flatwork

Division 04 – Masonry

044300 – Dry Stack Wall

Division 05 – Metals

051200 – Structural Steel

057300 – Decorative Metal Railings

Division 06 ‐ Woods, Plastics and Composites

061063 – Exterior Rough Carpentry

Division 12 – Furnishing

129300 – Site Furnishings

Division 31 – Earthwork

311000 – Site Clearing

312300 – Earthwork

316326 – Drilled Caissons

Division 32 ‐ Exterior Improvements

329200 – Grasses

329300 – Plants

VOLUME II ROADWAY SPECIFICATIONS ‐ REVISION TO 2007 SPECIFICATIONS FOR HIGHWAY

AND BRIDGE CONSTRUCTION ‐NEW MEXICO DEPARTMENT OF TRANSPORTATION

Revision of Section 101 ‐ Abbreviations, Symbols, and Definitions

Revision of Section 102 ‐ Bidding Requirements and Conditions

Revision of Section 103 ‐ Award and Execution of Contract

Revision of Section 104 ‐ Scope of Work

Revision of Section 105 ‐ Control of Work

Revision of Section 106 ‐ Control of Materials

Revision of Section 107 ‐ Legal Relations, Environmental Requirements and

Responsibility to the Public

VOLUME II ROADWAY SPECIFICATIONS APPENDIX:

Soils Report

Soils Report Addendum No. 1

Soils Report Addendum No. 2

Interpretive Plan – Option 1

Interpretive Plan – Option 2/Bid Option #7

LIST OF CONTRACT DRAWINGS

SHEET SUB SHEET TITLE OF SHEET

1 T‐1 TITLE SHEET

2 L‐1 OVERALL SITE AND TRAILS PLAN

3 L‐1.1 OVERALL BID OPTIONS SITE AND TRAILS PLAN

4 L‐2 SITE ENLARGEMENT PLAN

5 L‐2.1 OVERALL SITE AND TRAILS PLAN

6 L‐2.2 OVERALL SITE AND TRAILS PLAN

7 L‐2.3 OVERALL SITE AND TRAILS PLAN

8 L‐3 VIEW PLATFORM/INFORMATIONAL KIOSK ENLARGEMENT

PLAN

9 L‐3.1 VIEW PLATFORM/BENT EXHIBIT ENLARGEMENT PLAN‐BID

OPTION #7

10 L‐4 OVERLOOK PLANTING PLAN

11 L‐5 VIEWING DECK AND BRIDGE DETAILS

12 L‐6 INTERPRETIVE EXHIBIT DETAILS

13 L‐7 SITE ELEMENTS AND TRAIL DETAILS

14 L‐8 LOG LOADER INTERPRETATION & INFORMATIONAL KIOSK

15 L‐8.1 BENT EXHIBIT DETAILS‐BID OPTION #7

16 L‐9 S ITE SIGN AND AND TRAILS INTERPRETIVE DETAILS

17 L‐10 PLANTING DETAILS AND SITE FURNISHINGS

18 S1.0 STRUCTURAL GENERAL NOTES

19 S1.1 STRUCTURAL STANDARD DETAILS

20 S2.0 STRUCTURAL FRAMING & FOUNDATION PLAN

21 S2.1 STRUCTURAL FRAMING SECTION

22 S3.0 STRUCTURAL SECTIONS

23 S3.1 STRUCTURAL SECTIONS & DETAILS

24 S3.2 STRUCTURAL SECTIONS & DETAILS

25 S3.3 RETAINING WALL PROFILES

26 S3.4 RETAINING WALL PROFILES

27 S3.5 RETAINING WALL PROFILES

28 S3.6 RETAINING WALL SECTIONS & DETAILS

29 TAB ROADWAY TABULATIONS

30 HCP‐1 HORIZONTAL CONTROL PLAN

31 HCP‐2 HORIZONTAL CONTROL PLAN

32 HCP‐3 HORIZONTAL CONTROL PLAN

33 GDP‐1 GRADING & DRAINAGE PLAN

34 GDP‐2 GRADING & DRAINAGE PLAN

35 GDP‐3 GRADING & DRAINAGE PLAN

36 PP‐1 PIPE PROFILE

37 TYP‐1 TYPICAL SECTIONS

38 TYP‐2 TYPICAL SECTIONS

39 TYP‐3 TYPICAL SECTIONS

40 PNP‐1 ROADWAY PLAN & PROFILE

41 PNP‐2 ROADWAY PLAN & PROFILE

42 PNP‐3 ROADWAY PLAN & PROFILE

43 XSEC‐1 ROADWAY CROSS SECTIONS

44 XSEC‐2 ROADWAY CROSS SECTIONS

45 XSEC‐3 ROADWAY CROSS SECTIONS

46 XSEC‐4 ROADWAY CROSS SECTIONS

47 XSEC‐5 ROADWAY CROSS SECTIONS

48 XSEC‐6 ROADWAY CROSS SECTIONS

49 XSEC‐7 ROADWAY CROSS SECTIONS

50 XSEC‐8 ROADWAY CROSS SECTIONS

51 XSEC‐9 ROADWAY CROSS SECTIONS

52 XSEC‐10 ROADWAY CROSS SECTIONS

53 XSEC‐11 ROADWAY CROSS SECTIONS

54 XSEC‐12 ROADWAY CROSS SECTIONS

55 ECP‐1 EROSION CONTROL PLAN

56 ECP‐2 EROSION CONTROL PLAN

57 ECP‐3 EROSION CONTROL PLAN

58 ECN‐1 EROSION CONTROL NOTES

59 ERD‐1 EROSION CONTROL DETAILS

60 ERD‐2 EROSION CONTROL DETAILS