Schedule_B_AG82ATS170014-SOI_Fill-In.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- CCRD Clear Lake & Clear Creek Campground Construction/Re-Construction Federal contract opportunity
- Solicitation number
- AG-82AT-S-17-0014
About this file
Schedule B, AG-82AT-S-17-0014, SOI Fillable
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR NAME
| CONTRACTOR NAME HERE |
| SECTION B – SCHEDULE OF ITEMS (AG-82AT-S-17-0014) |
| CCRD Clear Lake & Clear Creek Campground Construction/Re-Construction |
| South Clear Creek CG Construction | |||||
| ITEM | |||||
| No. | ITEM | ||||
| CODE | DESCRIPTION | METHOD OF MEASUREMENT | QUANTITY | UNIT OF MEASURE | UNIT |
PRICE
Clear Lake CG ADA Reconstruction
TOTAL PRICE
| 1 | 01505(01)B | Mobilization | L.S. | 1 | Lump Sum | ||
| 2 | 00250(01)B | Construction Surveying | L.S. | 1 | Lump Sum | ||
| 3 | 01442(01)B | Quality Control | L.S. | 1 | Lump Sum | ||
| 4 | 01561(01)B | Soil Erosion & Pollution Control | L.S. | 1 | Lump Sum | ||
| 5 | 02130(01)B | Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs, Logs, And Stumps | D.Q. | 1.2 | Acre | ||
| 6 | 02221(01)B | Excavation, Placement Method 4 | D.Q. | 313 | Cubic Yard | ||
| 7 | 02221(02)B | Borrow Excavation, Placement Method 4 (Embankment) | D.Q. | 414 | Cubic Yard | ||
| 8 | 02221(03)B | Placing GFM Barrier Rock | A.Q. | 32 | Each | ||
| 9 | 02231(01)B | Crushed Aggregate, Grading CDOT Class 6 (3/4" Minus), Placement Method D- Road and Spurs | A.Q. | 376 | Ton | ||
| 10 | 02231(02)B | Crusher Fines, Placement Method 2- Layer Placement - Facility & Tent Pads | A.Q. | 216 | Ton | ||
| 11 | 02462(01)B | Furnish and Install Accessible Raised Fire Ring | A.Q. | 8 | Each | ||
| 12 | 02465(01)B | Install GFM Metal Bear Proof Box on Pedestals with Concrete Pad | A.Q. | 8 | Each | ||
| 13 | 02472(01)B | Picnic Table (Single Pad) | A.Q. | 8 | Each | ||
| 14 | 02514(01)B | Hot Bituminous Plant Mix | A.Q. | 18 | Ton | ||
| 15 | 02519(01)B | Aggregate Trails, 3'-0" Wide, Granite Crusher Fines 586 linear feet trail | A.Q. | 59 | Ton | ||
| 16 | 02521(01)B | 18-Inch Corregated Plastic Pipe with End Sections, Method C | A.Q. | 90 | Linear Feet | ||
| 17 | 02831(01)B | Wheelstops (Precast Concrete) | A.Q. | 13 | Each | ||
| 18 | 02833(01)B | Single Lane Closure Gate | A.Q. | 1 | Each | ||
| 19 | 02833(02)B | 30-Feet Double Lane Closure Gate | A.Q. | 1 | Each | ||
| 20 | 02846(01)B | Furnish and Install Regulatory Sign (Aluminum) | A.Q. | 8 | Each | ||
| 21 | 02846(02)B | Install Recreational Sign (Government Furnished Material) | A.Q. | 3 | Each | ||
| 22 | 02933(01)B | Seeding, Dry Method | A.Q. | 0.3 | Acre | ||
| 23 | 03305(01)B | Portland Cement Concrete, 4-Inch Thickness | A.Q. | 3 | Cubic Yard | ||
| 24 | 06131(01)B | Timber Borders - Length in Place | A.Q. | 1280 | Linear Feet | ||
| 25 | 10411(01)B | Site Unit Markers | A.Q. | 8 | Each | ||
| 26 | 10414(01)B | Site Identification Sign, Timber Frame | A.Q. | 1 | Each | ||
| 27 | 10415(01)B | Double Panel Interpretive Kiosk | A.Q. | 1 | Each | ||
| 28 | 10415(03)B | Construct Fee Station and Install (GFM) Fee Tube | A.Q. | 1 | Each | ||
| 29 | 10415(04)B | Concrete Dumpster Pad 6'x7' & 20' Road Section | A.Q. | 1 | Each | ||
| 30 | 10474(01)B | Facility Pad (Single) | A.Q. | 8 | Each | ||
| 31 | 10474(03)B | Tent Pad | A.Q. | 8 | Each | ||
| 32 | 13601(01)B | Two Unit Prefabricated Concrete Toilet with Stone Wainscotting | A.Q. | 1 | Each | ||
| SUBTOTAL | $0.00 | ||||||
| MOBILIZATION | $0.00 | ||||||
| PROJECT TOTAL | $0.00 |
| South Clear Creek CG Construction | |||||
| ITEM | |||||
| No. | ITEM | ||||
| CODE | DESCRIPTION | METHOD OF MEASUREMENT | QUANTITY | UNIT OF MEASURE | UNIT |
PRICE
Clear Lake CG ADA Reconstruction
TOTAL PRICE
| 1 | 01505(01)A | Mobilization | L.S. | 1 | Lump Sum | ||
| 2 | 00250(01)A | Construction Surveying | L.S. | 1 | Lump Sum | ||
| 3 | 01442(01)A | Quality Control | L.S. | 1 | Lump Sum | ||
| 4 | 01561(01)A | Soil Erosion & Pollution Control | L.S. | 1 | Lump Sum | ||
| 5 | 02020(01)A | Obliteration of Abandoned Site and Demolition of Storage & Toilet Buildings | L.S. | 1 | Lump Sum | ||
| 6 | 02130(01)A | Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs, Logs , and Stumps | D.Q. | 0.15 | Acre | ||
| 7 | 02221(01)A | Excavation, Placement Method 4, Tolerance Class D | D.Q. | 115 | Cubic Yard | ||
| 8 | 02221(02)A | Borrow Excavation, Placement Method 4 (Embankment) | D.Q. | 15 | Cubic Yard | ||
| 9 | 02221(03)A | Barrier Rock, Haul & Place GFM from So. Clear Creek CG | A.Q. | 20 | Each | ||
| 10 | 02231(01)A | Crushed Aggregate, Grading CDOT Class 6, Placement Method D (6"x12'x1000') (Entire Road Length ~1000') | A.Q. | 528.1 | Ton | ||
| 11 | 02231(02)A | Crusher Fines, Placement Method 2- Layer Placement & 2 pass of vibratory compaction or no more displacement - for Facility & Tent Pads | A.Q. | 307.7 | Ton | ||
| 12 | 02232(01)A | Filter Fabric GeoTextile Type II - Seperation | A.Q. | 200 | Linear Feet | ||
| 13 | 02462(01)A | Furnish and Install Accessible Raised Fire Ring | A.Q. | 11 | Each | ||
| 14 | 02465(01)A | Install GFM Metal Bear Proof Box on Pedestals with Concrete Pad | A.Q. | 9 | Each | ||
| 15 | 02465(02)A | Install GFM Metal Bear Proof Box (Double Unit) on Pedestals with Large Concrete Pad | A.Q. | 2 | Each | ||
| 16 | 02472(01)A | Picnic Table (Single Pad) | A.Q. | 9 | Each | ||
| 17 | 02472(02)A | Picnic Table (Double Pad) | A.Q. | 2 | Each | ||
| 18 | 02514(01)A | Hot Bituminous Plant Mix | A.Q. | 22 | Tons | ||
| 19 | 02519(01)A | Aggregate Trails, 3'-0" Wide, Granite Crusher Fines | A.Q. | 37 | Tons | ||
| 20 | 125 + 240 linear ft trail | ||||||
| 21 | 02520(01)A | Timber Steps @ Site #10 | A.Q. | 6 | Each | ||
| 22 | 02521(01)A | 18-Inch Corregated Plastic Pipe with End Sections, Method C | A.Q. | 40 | Linear Feet | ||
| 23 | 02831(01)A | Wheelstops (Precast Concrete) | A.Q. | 13 | Each | ||
| 24 | 02833(02)A | 30-Feet Double Lane Closure Gate | A.Q. | 1 | Each | ||
| 25 | 02846(01)A | Furnish and Install Regulatory Sign (Aluminum) | A.Q. | 2 | Each | ||
| 26 | 02846(02)A | Install Recreational Sign (Government Furnished Material) | A.Q. | 7 | Each | ||
| 27 | 02933(01)A | Seeding, Dry Method (with Mulch) | L.S. | 0.25 | Acre | ||
| 28 | 03305(01)A | Portland Cement Concrete Sidewalk, 4-Inch Thickness | A.Q. | 2 | Cubic Yard | ||
| 29 | 06131(01)A | Timber Borders Length in Place | A.Q. | 1496 | Linear Feet | ||
| 30 | 10411(01)A | Site Unit Markers | A.Q. | 11 | Each | ||
| 31 | 10415(02)A | Triple Panel Interpretive Kiosk | A.Q. | 1 | Each | ||
| 32 | 10415(03)A | Construct Fee Station and Install (GFM) Fee Tube | A.Q. | 1 | Each | ||
| 33 | 10415(04)A | Aggregate Dumpster Pad 6'X7' | A.Q. | 1 | Each | ||
| 34 | 10474(01)A | Facility Pad (Single) | A.Q. | 9 | Each | ||
| 35 | 10474(02)A | Facility Pad (Double) | A.Q. | 2 | Each | ||
| 36 | 10474(03)A | Tent Pad | A.Q. | 13 | Each | ||
| 37 | 10474(04)A | Replace Hand Pump with ADA Hand Pump | A.Q. | 1 | Each | ||
| SUBTOTAL | $0.00 | ||||||
| MOBILIZATION | $0.00 | ||||||
| PROJECT TOTAL | $0.00 | ||||||
| GRAND TOTAL | $0.00 |
File details come from the government source that posted it. Updated .